SlideShare ist ein Scribd-Unternehmen logo
1 von 67
CSR Embedded Project Management
       Construction of Suzlon One Earth – A Case Study




Presented By: Ameya Gumaste & Jitesh Donga
                                                         1
About Us




           2
Suzlon One Earth




SEZ                                                       EPC




      ISO 9001:2008 I ISO 14001:2004 I OHSAS 18001:2007




                           e-PM




                                                                3
Our Achievements; Our Expertise

•     Accomplished over 150 successful projects globally
•     A remarkable 1400 acres of Hi-tech Engineering SEZ developments in
      Vadodara, Coimbatore and Mangalore
•     Delivered 5 million sq. ft. of top class work spaces, campuses, R&D
      Centers, Industrial and Warehousing and social infrastructure projects.


    SYNEFRA offers Project Management, Sustainability Management, EPC and
                            Facility Management Services




                                                                                4
The Context




              5
All these Projects made great Social Impact!

                       Coliseum                            Eiffel eTower




          Taj Mahal

                                  St. Peter Basilica




              Opera House                     Suez Canal




                                                                       Burj Khalifa   6
India Today!!

                                    Bandra Worli Sea Link




Pune Mumbai Expressway

                                Delhi Metro




Konkan Railway
                          Bandra Worli Sea Link         Bhakra Nangal Dam              Reliance Refinery

                                                                  Reliance Refinery
                                      Magarpatta City City
                                         Magarpatta




      Bhakra Nangal Dam
                                                                Chatrapati Shivaji International Airport   7
Social Impact of Projects

• Projects have both POSITIVE and NEGATIVE impacts


• Social Issues and their impact associated with a project in a developing
  country like India could be completely different from Developed Nations


• Every project is UNIQUE, so are the Social Impacts associated


• Bottom of the Pyramid is impacted the most




                                                                             8
The Synefra CSR Model




                        9
“Suzlon One Earth”




• Global HQ of Suzlon Energy Ltd and Group Companies
• 820,000 Sft Integrated Development
• LEED Platinum and GRIHA Five Star certified campus
• India’s first campus 100% on renewable energy



                                                       10
SUZLON ONE EARTH, PUNE




                         11
Suzlon One Earth – A Case Study




                                  12
Synefra’s Scope & Responsibility

Visualize                    Synergize                  Harmonise
Conversion of                Between various            Harmony of
a dream to reality in        designers and briefs       concepts without
terms of project profile                                diluting the brief


Align                        Manage                     Add value
Alignment of an idea         Managing the functional   Value adds in terms
and action considering       need with aesthetics      Innovation and
cost, time & quality                                   creativity

    Create a Built-to-suit campus that is a unique & inspiring place to work


                     To conceive, develop and manage
                    one of the world’s greenest campus

                                                                               13
Why “One Earth”?

                   • The name is a dedication to our
                     precious home, Earth
                   • It highlights Earth’s unique
                     existence as an eco system
                   • It reinforces Suzlon’s belief that co-
                     existence and responsible usage of
                     natural resources are the only way
                     to achieve sustainability
                   • Devoted to Suzlon’s efforts across
                     the globe to create a sustainable
                     future

                                                          14
Project Management




                     15
Challenges

• To take off for a large & prestigious requirement from a very
  simply worded, but very sound and extremely challenging
  brief to execute and establish.

• Select and choose methodically a site and the team with a
  clear focus of all stakeholders so that the vision of SEL
  management and Synefra the Project Managers were in total
  alignment.

• To create a space, which was not just an office, but an area
  which will personify the vision of its leader, the mission of
  the company and the core business of the group – Powering a
  greener tomorrow, today.


                                                                  16
Project Strategy & Management

• Direction / Approach
   o Deliberation & decision of what, who, how & when of the project
   o Project programming with respect to needs, stakeholders /
     partners and milestones
   o Set a very focused and precise action plan



• Dedicated Project Management team formed to capture & imbibe
  the company requirement and prepare precise briefs for all designers




                                                                   18
Project approach – Design briefs

• Development of Design brief :
   o   Project Architecture design brief
   o   Project Services design brief
   o   Project Interior Architecture design brief
   o   Project Communication design brief


• Help reduce input time for each stakeholder and help them deliver
  an output much superior than expected

• Reduced the otherwise high level of initial energy which gets
  drained in negotiating through the clutter & change in ideas

• Approval sought from SEL at various stages of data assimilation and
  preparation of brief for each discipline
                                                                      19
Formation of Project Task Force

Based on the requirements of the Design briefs, an appropriate team got
established at various stages of the project as per expertise required:

   o   Strategic Synefra project team – Project owner, project
       manager, finance controller, site management team
   o   Developer – To build base infrastructure with services & landscape
   o   Architect – To conceive the building and develop design as per brief
   o   Construction contractor – For execution & construction of cold shell as
       per the design envelope
   o   Interior design build company – For effective justice to the cold shell
       and a functional yet classic interior architecture
   o   Communication designer – For a total space experience, memory
       points, branding and signage to enhance the architecture
   o   Design coordinator – For complete synergy between all designers and
       harmony of ideas during execution


                                                                                 20
Change Management

• Change Management - As Suzlon became larger, business plans grew
  and requirements changed significantly -
    o   From talking green to demonstrating green
    o   From a place to work to an inspiring place to work
    o   No. of people from 1500 to 2500 and their functional requirements
    o   Introduction of shared services – 24x7 operations
    o   Belief structure replaced by Values
    o   Technology advancement in operations, Information
        Technology, Audio-Visual, etc.
This changed project parameters, scale and design criteria.

• Consistent focus, managing change, adaptation to circumstances and
  the flexibility of approach were the keys to stay on track.


                                                                            21
Evolution of the program




                           22
Design Management




                    23
Design Management

 Design Selection – with criteria as to:
 o   What is it that we want to achieve through the design?

 o   What are the indicators which would help in the enabling objectives
     and how to recognize them?

 o   What is the message that we wish to convey through the design to
     all its stakeholders which would represent the client’s vision.

            To align all designers to the Client’s expectations,
              the project vision, objectives and deliverables
                was a phenomenal process and for which
      Synefra Strategic team became a key catalyst and an enabler.

                                                                           24
Project management approach for design

• Started with Interactions with senior management, business
  vertical heads & HR team

   • With Senior management – Values, business vertical structure, business
     needs, significance of facility in global business, future plans

   • With Business Vertical heads – team function, hierarchy and
     nos., archiving requirement, special requirements like
     studios, library, control rooms, etc.

   • With HR team – final nos., defining work areas as per
     team/group/position functions, allocation of space/floor/building to
     respective business units, and common facilities like
     cafeteria, gym, clinic, etc. as per Admin policies

• Along with company requirements, facilities for all kinds of users
  were mapped, established and considered in design which were
  approved and signed off for execution                                       25
Alignment of the Design Process

                    Purpose                                              Result
 • Built to suit model                                  All requirements set forth in the brief
 • Studying the design to match needs                   document were achieved in the Design,
 • Achieve satisfaction first on paper                  including the brief of the Green
 • Ensure design & technical aspects                    Building
 • Efficient costs and effective design


                      Action: Design drawings were screened with respect to:




 Functional         Vaastu        Construction      Local Rules &     Criteria for    Cost & Time
Requirements      Compliances      Technology        Regulations    Green buildings   implications

                      All of the above were closely monitored & cross-checked by :
        1.     Client                 2. Developer                   3. Architects
                                                                                                  26
Mapping Key Users & Functions
               Service Providers                     Casual Visitors
      Security Agencies, Caterers, House   College School Students, Relatives.
       Keeping Agency, Courier Agency,
                                                                    Business Visitors
                                                           Government Officials, MEDA, Business
                                                                      Personalities
                                                                    Vendors, Suppliers and Consultants
       Executive                                                     Part Manufacturers, Transporters,
      Management                                                    Legal Consultants, Training Faculty
    Promoters, CMD,
   Board of Directors,
    CXOs, S4, SGM,
       VP/Heads                                                               Clients & Investors
                                                                                  Existing &
                                                                            Prospective, FIIs, Large
                                                                               Brokerage Firms

                                                                             Interview Candidates
     Senior Executives and
                                                                         Short term visitors appearing
           Executives
                                                                               for job interviews
   S3 - GM, S2 - DGM,AGM
 S1, M6, Sr. Manager, Manager
   M5 – Dy. Manager & Below                                         Training & Induction Candidates
                                                                    Short term visitors appearing for
                                                                              short courses

                                                             Media
                                                           World Press
                                                                                                         27
Systematic organization from part to whole

                                    Strategy Planning
                                                                  Media Room

                              Training Rooms
  New Business
                                                       MBU                         Technology
                                                                                   Group
                  Library                                    Wind Gallery
      Cafeteria                                                                  Gymnasium


                            Welcome Lounge                         IT

Chairman Offce
                                                                               HR / Admin

                                                       Finance     CLC
Corporate                                  Parking
                   Travel Desk                                                     Stores
Communication
                                                                                  Record Room

                              Executive                      Board Room
                                          IBMS / FMS
 Business Halls   Courier Desk
                                                                                                28
The Whole




            29
Driving factors and program scale


   Sustainability                        Inspiring place to work
   Principles of sustainability          A place which will inspire & motivate
   from site selection, design,          Providing healthy and productive
   engineering, construction,            environment for occupants in terms of
   material and operations               indoor air quality and daylight usage


                Land                       443,473 sq ft (10.18 acres)

                Office space               598,256 sq ft
  Highlights    Terminus (basement)        223,270 sq ft
                Open space (landscape)     185,578 sq ft
                Capacity                   2300



                                                                                 30
                                                                                 30
360 degree approach to Sustainability

         1                  2                     3                    4                        5                      6
    Environment           Water                Energy             Eco-Friendly             Healthy &              Innovative
     Sensitive           Sensitive            Conscious            Material &              Productive               Design
    development          Approach             Approach             Resources                 Indoor                Elements
                                                                                          environment

• Minimum Site         • Rain Water                             • Minimum               • Use of low emitting    • Green design
                                           • Energy efficient
  Disturbance            Harvesting                               Construction waste      materials                education
                                             HVAC

• Heat island effect   • Use of low flow                        • Use of regional       • Indoor pollutants      • Creating green
                                           • Energy efficient
                         fixtures                                 materials               control                  energy
                                             lighting
•   Minimum light                                                                                                  resource on site
                       • Use of sensor                          • Use of rapidly        • Natural use of day       and off site
    pollution                              • Usage of
                         based fixtures                           renewable material      light and view of
                                             renewable energy
• Use of native                                                                           outdoor spaces         • Green house
                       • Water efficient                        • Recycle & reuse of                               keeping
  plants                                   • Sensor based
                         Irrigation
                                             lighting and         material              • Increase ventilation
• CFC & HCFC free                            ventilation                                • Minimum pollution      • Zero waste
  material use         • 100 % use of                           • Use of high recycle     during construction      policy
                         sewage water                             content material
                                           • Energy efficient
• Promote Public                             electrical
  transport            • Water efficient
                                             equipment
                         HVAC system

                       • Less water
                         requirement
                         landscape
                                                                                                                             31
Architecture Design :
From abstract to form




                        32
Conceptualization




                    33
Master Plan




              34
              34
Landscape :
From form to functional enhancement




                                      35
Aim: Responsive & responsible landscape




                                          36
Sustainability in landscape practices


 Using recycled water
 Reduced water
 consumption
 Use of native plants
 Creating new Habitats




                                        37
Interior :
Functional enhancement
to operational optimization




                              38
Design Goal

• Translating Suzlon’s values and vision into
  the interior space as experienced in the
  context of architecture and landscape

• Bringing value to the space by integrating
  the functional HR requirements of the
  business units, employee aspirations and
  well being.




                                                39
Holistic Design Approach

 Space Planning - Interior, Architecture & Landscape “Becoming One”




                                                                      40
Brand Communication :
From operations to a ‘wow’
experience




                             41
Approach


 Goal

                       LANDSCAPE

           INTERIORS
 USER
 JOURNEY



           ARCHITECTURE




                                   42
Nomenclature – Business Units

                                  Sustainability

                       Renewable Key Energy Elements


      Sun                 Water             Wind + Wood       Space or Sky




                           Aqua                    Tree           Sky
       Sun
                       Technology +          Manufacturing   Board members &
Corporate Services   Manufacturing team      Business team     new business
                     Terminus : Terra or Earth Energy                   43

                                                                             43
Nomenclature – Global Learning Academy

                             Learning ICON
                             Cultural symbol for learning


                             It depicts energy and
                             awareness


                             Each intersection depicts a
                             point of creation


                             Each ‘one’ numeral at the top
                             of the icon is an abstract
                             indicative beginning to the
                             process of knowledge
                             gathering
                                                             44
Memory Points

 Customised indoor & outdoor artworks




                                        45
Sustainability Measures




                          46
Sustainability Features at One Earth

• Sustainability has to be an objective from the concept stage and then
  embedded in every design aspect
• Sustainable solution and practices are integrated towards efficiency in:
        o   ENERGY USE
        o   WATER USE
        o   WASTE MANAGEMENT
        o   MATERIALS USE
        o   HEALTHY AIR QUALITY
        o   OPERATING PRACTICES
• Sustainability is the hallmark of this project while the result is an
  inspiring place to work. Achievements then speak for themselves.
                                                                             47
                                                                             47
Design Approach Results


          47%             85%
          Energy          Recycle
          Savings         Waste




            60%           90%
            Water         Occupants use
           Savings          Daylight




                                      48
Global Recognitions

         SYNEFRA WINS THE              SYNEFRA WINS MIPIM
         PRESTIGIOUS ASIA              ASIA GOLD Award 2011
         PACIFIC PROPERTY              Synefra E&C Ltd was
         AWARD 2011                    awarded the MIPIM Asia
         The Asia Pacific Property     2011 GOLD Award in “Best
         Awards 2011 in association    Green Buildings” category for
         with Bloomberg Television     its project Suzlon One Earth
         & Google awarded the          which it conceived, managed
         prestigious award to          and executed.
         Synefra E&C Ltd for Best      MIPIM Asia this year
         Office Development for        received entries of 80
         Suzlon One Earth.             projects from 15 countries.
         The project was further       This year, Synefra E&C Ltd. is
         selected as the official      the only Indian company to
         nominee from Asia Pacific     be announced as a winner
         at the World Property         amongst the 29 winners in
         Award to be held at the end   10 distinct categories in Asia.
         of this year

                                                                     49
Sustainable Approach for Construction

Comprehensive planning for construction created a wide path for the
execution team taking a batten from design team. Key areas of
construction management are mentioned below:
• People Management & the integration of knowledge & technology
   with project planning

• Fundamentals of Project planning were followed emphasizing “Plan,
  Organize, Lead and Monitor”

• Procurement process considering the aspects of QS, sustainable
  options, logistics, properties, impacts, cash flows, ABC analysis & life
  cycle costing.

• Execution with appropriate sequencing, time management, processes
  including ISO norms, EHS norms, quality checklists, execution checklists,
  etc.
                                                                             50
                                                                             50
Sustainable Approach for Construction


• Quality control, checks, assessments & audits on predefined
  timeline throughout the project life cycle for improvement in all
  aspects

• Timely reviews and feedbacks through regular review meetings at
  site along with all key stakeholders

• Appropriate skill up-gradations & capacity building through
  trainings & appropriate inputs to the engineers and supervisors on
  site

• Labour welfare activities in co-ordination with CSR team, NGOs, etc.



                                                                         51
                                                                         51
Environment Management Plan Implementation


• Site barricading to define boundaries & prevent damage to neighborhood.
• Excavation- Top Soil preservation / excess soil disposal / handling / reuse.
• Erosion & sedimentation control during construction- planning for drain
  lines below terminus level.
• Sprinkling water on roads at pre-decided frequencies to prevent pollution
  of the air.
• Spill prevention- Use of trays, etc. as per the need for DG sets / pumps &
  other equipments during handling of oil.
• Waste management during construction- segregation / storage / disposal
  of waste, etc.
• Water use minimization- use of sedimentation tank to reuse the water at
  central batching plant, use of curing compounds / covering the concrete
  surfaces by Hessian cloth / gunny bags as applicable to reduce the need of
  overall water requirement.                                                   52
                                                                              52
Concern for Construction Workers

• It was a culture at One Earth construction site to consider all the
  stakeholders like family members irrespective to their economic class,
  gender and race. All the construction team members were treated with
  equal care and respect. The project team demonstrated a unique example
  of a care which any construction company can practice for their workers.
  Few of the initiatives taken at site are mentioned as under:

       • Crèche & School facility during construction for the construction
         worker’s children with nutritious mid-day meal facility.
       • Regular health checkups– Periodic blood tests for blood groups /
         hemoglobin / malaria etc. of all construction workers and their
         children.
       • Onsite medical facility (Doctor & dispensary across the road)
         available 24x 7.


                                                                             53
                                                                             53
Concern for Construction Workers

• Hygienic Sanitation facility on site with state of the art temporary toilets
  and their regular maintenance and management by a professional agency.
  Other services included daily housekeeping & garbage collection systems,
  provision of appropriate fire fighting facility, safe drinking water
  provisions, sufficient lighting, security etc.

• Improvement in conventional cooking methods- Training & facilitation to
  the workers for making the smokeless chullahs for cooking needs.
  Distribution of the same free of cost.

• Pure drinking water supply & sanitation facility at labour camp.




                                                                            54
                                                                           54
CSR Initiatives




                  55
                  55
CSR Initiatives




                  56
                   56
Key Stakeholders

•   Chief Architect                        : Christopher Charles Benninger Architects
•   Integrated Design coordination         : Tao Design
•   Construction & Engineering             : Vascon Engineers
•   Interior Architecture,                 : Space Matrix in association
    Engineering & Execution                with Tao Architecture
•   Landscape Architect                    : Ravi Varsha Gavandi
•   Communication Design                   : Elephant Design
•   Sustainability Consultants             : Environmental Design Solutions

             Design Consultants                    06

             Technical Consultants                 12

             Direct Suppliers                      46

             Sub-contractors / suppliers           400
                                                                                        57
SUZLON One Earth
Visual Experience




                    58
59
60
Incorporating
local arts & crafts




                      61
62
63
64
65
66
67
Thank You!



 Synefra Engineering & Construction Ltd.

One Earth - Tree Lounge, Level 2, Hadapsar,
               Pune 411 028
                   INDIA

Tel: +91.20.67022000 | Fax: +91.20.67022100
          Toll Free: 1800-200-1330

Email: info@synefra.com | www.synefra.com

                                              68

Weitere ähnliche Inhalte

Was ist angesagt?

case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.Milan Jain
 
Auroville visitors centre
Auroville visitors centreAuroville visitors centre
Auroville visitors centreAthira Suresh
 
Suzlon One Earth- Green Building
Suzlon One Earth- Green BuildingSuzlon One Earth- Green Building
Suzlon One Earth- Green BuildingGRIHA India
 
LAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIESLAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIESSumaiya Musliim
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGgatti Teja
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case studyRadhikaJadhav8
 
Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Saurav Chaudhary
 
Bharat Bhavan, Bhopal
Bharat Bhavan, BhopalBharat Bhavan, Bhopal
Bharat Bhavan, BhopalDivya Suresh
 
Sohrabji Godrej Green Business Centre
Sohrabji Godrej Green Business CentreSohrabji Godrej Green Business Centre
Sohrabji Godrej Green Business CentreGaurav Jhunjhunwala
 
A case study of intelligent buildings
A case study of intelligent buildingsA case study of intelligent buildings
A case study of intelligent buildingsRajat Nainwal
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention centerKiruthika Selvi K J
 
Teri university case study
Teri university case studyTeri university case study
Teri university case studyDeepika Verma
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadOnal Kothari
 
Torrent research building spa
Torrent research building spaTorrent research building spa
Torrent research building spaShamitha Reddy
 
Case study on Energy Efficient Building PEDA Office Complex at Chandigarh, India
Case study on Energy Efficient Building PEDA Office Complex at Chandigarh, IndiaCase study on Energy Efficient Building PEDA Office Complex at Chandigarh, India
Case study on Energy Efficient Building PEDA Office Complex at Chandigarh, IndiaShabana Kotta
 
Case Study of Triveni Kala Sangam
Case Study of Triveni Kala SangamCase Study of Triveni Kala Sangam
Case Study of Triveni Kala SangamAnubhav Arora
 

Was ist angesagt? (20)

case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.
 
Auroville visitors centre
Auroville visitors centreAuroville visitors centre
Auroville visitors centre
 
Suzlon One Earth- Green Building
Suzlon One Earth- Green BuildingSuzlon One Earth- Green Building
Suzlon One Earth- Green Building
 
LAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIESLAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIES
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
ITC Green Centre Gurgaon
ITC Green Centre GurgaonITC Green Centre Gurgaon
ITC Green Centre Gurgaon
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case study
 
BV doshi design
BV doshi designBV doshi design
BV doshi design
 
Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida
 
Bharat Bhavan, Bhopal
Bharat Bhavan, BhopalBharat Bhavan, Bhopal
Bharat Bhavan, Bhopal
 
Sohrabji Godrej Green Business Centre
Sohrabji Godrej Green Business CentreSohrabji Godrej Green Business Centre
Sohrabji Godrej Green Business Centre
 
A case study of intelligent buildings
A case study of intelligent buildingsA case study of intelligent buildings
A case study of intelligent buildings
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention center
 
Teri university case study
Teri university case studyTeri university case study
Teri university case study
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
 
Torrent research building spa
Torrent research building spaTorrent research building spa
Torrent research building spa
 
Indian Habitat Centre
Indian Habitat CentreIndian Habitat Centre
Indian Habitat Centre
 
Green Presentation
Green PresentationGreen Presentation
Green Presentation
 
Case study on Energy Efficient Building PEDA Office Complex at Chandigarh, India
Case study on Energy Efficient Building PEDA Office Complex at Chandigarh, IndiaCase study on Energy Efficient Building PEDA Office Complex at Chandigarh, India
Case study on Energy Efficient Building PEDA Office Complex at Chandigarh, India
 
Case Study of Triveni Kala Sangam
Case Study of Triveni Kala SangamCase Study of Triveni Kala Sangam
Case Study of Triveni Kala Sangam
 

Andere mochten auch

HISTORY: Greek Architecture (Minoan + Mycenaean)
HISTORY: Greek Architecture (Minoan + Mycenaean)HISTORY: Greek Architecture (Minoan + Mycenaean)
HISTORY: Greek Architecture (Minoan + Mycenaean)ArchiEducPH
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India Satya Rachakonda
 
Griha 5 star rated project
Griha 5 star rated projectGriha 5 star rated project
Griha 5 star rated projectGRIHA India
 
TERI -BANGLORE_Case study
TERI -BANGLORE_Case study TERI -BANGLORE_Case study
TERI -BANGLORE_Case study Ar Naveen Naveen
 
Greek architecture
Greek architectureGreek architecture
Greek architectureysrj
 
Itc green center gurgaon A2sheet
Itc green center gurgaon A2sheetItc green center gurgaon A2sheet
Itc green center gurgaon A2sheetrohit singh
 
IITK case study
IITK case studyIITK case study
IITK case studyYeshu Rao
 
THESIS PRESENTATION ( NICMAR )
THESIS PRESENTATION ( NICMAR )THESIS PRESENTATION ( NICMAR )
THESIS PRESENTATION ( NICMAR )ams_5686
 
Greek Architecture
Greek ArchitectureGreek Architecture
Greek Architecturemfresnillo
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 

Andere mochten auch (20)

Suzlon ppt
Suzlon pptSuzlon ppt
Suzlon ppt
 
Suzlon
SuzlonSuzlon
Suzlon
 
HISTORY: Greek Architecture (Minoan + Mycenaean)
HISTORY: Greek Architecture (Minoan + Mycenaean)HISTORY: Greek Architecture (Minoan + Mycenaean)
HISTORY: Greek Architecture (Minoan + Mycenaean)
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India
 
Griha 5 star rated project
Griha 5 star rated projectGriha 5 star rated project
Griha 5 star rated project
 
TERI -BANGLORE_Case study
TERI -BANGLORE_Case study TERI -BANGLORE_Case study
TERI -BANGLORE_Case study
 
LEED GA Exam Prep
LEED GA Exam PrepLEED GA Exam Prep
LEED GA Exam Prep
 
Roman Architecture
Roman ArchitectureRoman Architecture
Roman Architecture
 
Greek architecture
Greek architectureGreek architecture
Greek architecture
 
Itc green center gurgaon A2sheet
Itc green center gurgaon A2sheetItc green center gurgaon A2sheet
Itc green center gurgaon A2sheet
 
Teri
Teri Teri
Teri
 
Ancient greek architecture
Ancient greek architectureAncient greek architecture
Ancient greek architecture
 
IITK case study
IITK case studyIITK case study
IITK case study
 
THESIS PRESENTATION ( NICMAR )
THESIS PRESENTATION ( NICMAR )THESIS PRESENTATION ( NICMAR )
THESIS PRESENTATION ( NICMAR )
 
Griha
GrihaGriha
Griha
 
IGBC
IGBCIGBC
IGBC
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
 
Greek Architecture
Greek ArchitectureGreek Architecture
Greek Architecture
 
GREEN BUILDING
GREEN BUILDING GREEN BUILDING
GREEN BUILDING
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 

Ähnlich wie CSR Embedded Project Management for Suzlon One Earth

Introduction to Project Management and Planning.ppt
Introduction to Project Management and Planning.pptIntroduction to Project Management and Planning.ppt
Introduction to Project Management and Planning.pptAyushSrivastava8761
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design WorkshopJerry Yudelson
 
05. Mena Healthcare Capability Rev 2
05. Mena Healthcare Capability Rev  205. Mena Healthcare Capability Rev  2
05. Mena Healthcare Capability Rev 2hamadagkhater
 
Mena Healthcare Capability
Mena Healthcare CapabilityMena Healthcare Capability
Mena Healthcare Capabilityhamadagkhater
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepComputer Aid, Inc
 
Presentation buro cite english
Presentation buro cite english Presentation buro cite english
Presentation buro cite english Buro CITE
 
How to absorb changing requirements in new product development
How to absorb changing requirements in new product developmentHow to absorb changing requirements in new product development
How to absorb changing requirements in new product developmentMark Hart
 
Introduction to project management.pdf
Introduction to project management.pdfIntroduction to project management.pdf
Introduction to project management.pdfBryanSmith305640
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012REDceo.net
 
Halbyn Rich portfolio 2013
Halbyn Rich portfolio 2013Halbyn Rich portfolio 2013
Halbyn Rich portfolio 2013Peoplespace
 

Ähnlich wie CSR Embedded Project Management for Suzlon One Earth (20)

Introduction to Project Management and Planning.ppt
Introduction to Project Management and Planning.pptIntroduction to Project Management and Planning.ppt
Introduction to Project Management and Planning.ppt
 
Arunava Sarkar_CV
Arunava Sarkar_CVArunava Sarkar_CV
Arunava Sarkar_CV
 
PMExpo2017slide Eureka Service - Oracle Prime
PMExpo2017slide Eureka Service - Oracle PrimePMExpo2017slide Eureka Service - Oracle Prime
PMExpo2017slide Eureka Service - Oracle Prime
 
Cloud Foundry Foundation Overview
Cloud Foundry Foundation OverviewCloud Foundry Foundation Overview
Cloud Foundry Foundation Overview
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
 
05. Mena Healthcare Capability Rev 2
05. Mena Healthcare Capability Rev  205. Mena Healthcare Capability Rev  2
05. Mena Healthcare Capability Rev 2
 
Mena Healthcare Capability
Mena Healthcare CapabilityMena Healthcare Capability
Mena Healthcare Capability
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope Creep
 
Presentation buro cite english
Presentation buro cite english Presentation buro cite english
Presentation buro cite english
 
57086 01 introduction
57086 01 introduction57086 01 introduction
57086 01 introduction
 
Ch01
Ch01Ch01
Ch01
 
How to absorb changing requirements in new product development
How to absorb changing requirements in new product developmentHow to absorb changing requirements in new product development
How to absorb changing requirements in new product development
 
Zyeta Introductory
Zyeta IntroductoryZyeta Introductory
Zyeta Introductory
 
Introduction to project management.pdf
Introduction to project management.pdfIntroduction to project management.pdf
Introduction to project management.pdf
 
Pe ch 1
Pe ch   1Pe ch   1
Pe ch 1
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
 
Lekki pearl estate presentation
Lekki pearl estate presentationLekki pearl estate presentation
Lekki pearl estate presentation
 
We@sp 4 (2010)
We@sp 4 (2010)We@sp 4 (2010)
We@sp 4 (2010)
 
Halbyn Rich portfolio 2013
Halbyn Rich portfolio 2013Halbyn Rich portfolio 2013
Halbyn Rich portfolio 2013
 
India capability web
India capability webIndia capability web
India capability web
 

Mehr von TechGigDotCom

Welcome speech_Efficient project management - Girish Kelkar
Welcome speech_Efficient project management - Girish KelkarWelcome speech_Efficient project management - Girish Kelkar
Welcome speech_Efficient project management - Girish KelkarTechGigDotCom
 
Mrityunjay Singh_PMI Key Note
Mrityunjay Singh_PMI Key NoteMrityunjay Singh_PMI Key Note
Mrityunjay Singh_PMI Key NoteTechGigDotCom
 
Nirmalendu Jajodia - Project and change management
Nirmalendu Jajodia  - Project and change managementNirmalendu Jajodia  - Project and change management
Nirmalendu Jajodia - Project and change managementTechGigDotCom
 
Project life cycle_management by Subbu
Project life cycle_management by SubbuProject life cycle_management by Subbu
Project life cycle_management by SubbuTechGigDotCom
 
Life time achievement awards gsk pre-corrections
Life time achievement awards   gsk pre-correctionsLife time achievement awards   gsk pre-corrections
Life time achievement awards gsk pre-correctionsTechGigDotCom
 
Life time achievement awards v3 finalversion
Life time achievement awards v3 finalversionLife time achievement awards v3 finalversion
Life time achievement awards v3 finalversionTechGigDotCom
 
Tech gig presentation - pmi
Tech gig presentation - pmiTech gig presentation - pmi
Tech gig presentation - pmiTechGigDotCom
 

Mehr von TechGigDotCom (8)

Welcome speech_Efficient project management - Girish Kelkar
Welcome speech_Efficient project management - Girish KelkarWelcome speech_Efficient project management - Girish Kelkar
Welcome speech_Efficient project management - Girish Kelkar
 
Mrityunjay Singh_PMI Key Note
Mrityunjay Singh_PMI Key NoteMrityunjay Singh_PMI Key Note
Mrityunjay Singh_PMI Key Note
 
Nirmalendu Jajodia - Project and change management
Nirmalendu Jajodia  - Project and change managementNirmalendu Jajodia  - Project and change management
Nirmalendu Jajodia - Project and change management
 
Project life cycle_management by Subbu
Project life cycle_management by SubbuProject life cycle_management by Subbu
Project life cycle_management by Subbu
 
Noriyasu Sugimura
Noriyasu SugimuraNoriyasu Sugimura
Noriyasu Sugimura
 
Life time achievement awards gsk pre-corrections
Life time achievement awards   gsk pre-correctionsLife time achievement awards   gsk pre-corrections
Life time achievement awards gsk pre-corrections
 
Life time achievement awards v3 finalversion
Life time achievement awards v3 finalversionLife time achievement awards v3 finalversion
Life time achievement awards v3 finalversion
 
Tech gig presentation - pmi
Tech gig presentation - pmiTech gig presentation - pmi
Tech gig presentation - pmi
 

Kürzlich hochgeladen

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 

Kürzlich hochgeladen (20)

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 

CSR Embedded Project Management for Suzlon One Earth

  • 1. CSR Embedded Project Management Construction of Suzlon One Earth – A Case Study Presented By: Ameya Gumaste & Jitesh Donga 1
  • 3. Suzlon One Earth SEZ EPC ISO 9001:2008 I ISO 14001:2004 I OHSAS 18001:2007 e-PM 3
  • 4. Our Achievements; Our Expertise • Accomplished over 150 successful projects globally • A remarkable 1400 acres of Hi-tech Engineering SEZ developments in Vadodara, Coimbatore and Mangalore • Delivered 5 million sq. ft. of top class work spaces, campuses, R&D Centers, Industrial and Warehousing and social infrastructure projects. SYNEFRA offers Project Management, Sustainability Management, EPC and Facility Management Services 4
  • 6. All these Projects made great Social Impact! Coliseum Eiffel eTower Taj Mahal St. Peter Basilica Opera House Suez Canal Burj Khalifa 6
  • 7. India Today!! Bandra Worli Sea Link Pune Mumbai Expressway Delhi Metro Konkan Railway Bandra Worli Sea Link Bhakra Nangal Dam Reliance Refinery Reliance Refinery Magarpatta City City Magarpatta Bhakra Nangal Dam Chatrapati Shivaji International Airport 7
  • 8. Social Impact of Projects • Projects have both POSITIVE and NEGATIVE impacts • Social Issues and their impact associated with a project in a developing country like India could be completely different from Developed Nations • Every project is UNIQUE, so are the Social Impacts associated • Bottom of the Pyramid is impacted the most 8
  • 9. The Synefra CSR Model 9
  • 10. “Suzlon One Earth” • Global HQ of Suzlon Energy Ltd and Group Companies • 820,000 Sft Integrated Development • LEED Platinum and GRIHA Five Star certified campus • India’s first campus 100% on renewable energy 10
  • 11. SUZLON ONE EARTH, PUNE 11
  • 12. Suzlon One Earth – A Case Study 12
  • 13. Synefra’s Scope & Responsibility Visualize Synergize Harmonise Conversion of Between various Harmony of a dream to reality in designers and briefs concepts without terms of project profile diluting the brief Align Manage Add value Alignment of an idea Managing the functional Value adds in terms and action considering need with aesthetics Innovation and cost, time & quality creativity Create a Built-to-suit campus that is a unique & inspiring place to work To conceive, develop and manage one of the world’s greenest campus 13
  • 14. Why “One Earth”? • The name is a dedication to our precious home, Earth • It highlights Earth’s unique existence as an eco system • It reinforces Suzlon’s belief that co- existence and responsible usage of natural resources are the only way to achieve sustainability • Devoted to Suzlon’s efforts across the globe to create a sustainable future 14
  • 16. Challenges • To take off for a large & prestigious requirement from a very simply worded, but very sound and extremely challenging brief to execute and establish. • Select and choose methodically a site and the team with a clear focus of all stakeholders so that the vision of SEL management and Synefra the Project Managers were in total alignment. • To create a space, which was not just an office, but an area which will personify the vision of its leader, the mission of the company and the core business of the group – Powering a greener tomorrow, today. 16
  • 17. Project Strategy & Management • Direction / Approach o Deliberation & decision of what, who, how & when of the project o Project programming with respect to needs, stakeholders / partners and milestones o Set a very focused and precise action plan • Dedicated Project Management team formed to capture & imbibe the company requirement and prepare precise briefs for all designers 18
  • 18. Project approach – Design briefs • Development of Design brief : o Project Architecture design brief o Project Services design brief o Project Interior Architecture design brief o Project Communication design brief • Help reduce input time for each stakeholder and help them deliver an output much superior than expected • Reduced the otherwise high level of initial energy which gets drained in negotiating through the clutter & change in ideas • Approval sought from SEL at various stages of data assimilation and preparation of brief for each discipline 19
  • 19. Formation of Project Task Force Based on the requirements of the Design briefs, an appropriate team got established at various stages of the project as per expertise required: o Strategic Synefra project team – Project owner, project manager, finance controller, site management team o Developer – To build base infrastructure with services & landscape o Architect – To conceive the building and develop design as per brief o Construction contractor – For execution & construction of cold shell as per the design envelope o Interior design build company – For effective justice to the cold shell and a functional yet classic interior architecture o Communication designer – For a total space experience, memory points, branding and signage to enhance the architecture o Design coordinator – For complete synergy between all designers and harmony of ideas during execution 20
  • 20. Change Management • Change Management - As Suzlon became larger, business plans grew and requirements changed significantly - o From talking green to demonstrating green o From a place to work to an inspiring place to work o No. of people from 1500 to 2500 and their functional requirements o Introduction of shared services – 24x7 operations o Belief structure replaced by Values o Technology advancement in operations, Information Technology, Audio-Visual, etc. This changed project parameters, scale and design criteria. • Consistent focus, managing change, adaptation to circumstances and the flexibility of approach were the keys to stay on track. 21
  • 21. Evolution of the program 22
  • 23. Design Management Design Selection – with criteria as to: o What is it that we want to achieve through the design? o What are the indicators which would help in the enabling objectives and how to recognize them? o What is the message that we wish to convey through the design to all its stakeholders which would represent the client’s vision. To align all designers to the Client’s expectations, the project vision, objectives and deliverables was a phenomenal process and for which Synefra Strategic team became a key catalyst and an enabler. 24
  • 24. Project management approach for design • Started with Interactions with senior management, business vertical heads & HR team • With Senior management – Values, business vertical structure, business needs, significance of facility in global business, future plans • With Business Vertical heads – team function, hierarchy and nos., archiving requirement, special requirements like studios, library, control rooms, etc. • With HR team – final nos., defining work areas as per team/group/position functions, allocation of space/floor/building to respective business units, and common facilities like cafeteria, gym, clinic, etc. as per Admin policies • Along with company requirements, facilities for all kinds of users were mapped, established and considered in design which were approved and signed off for execution 25
  • 25. Alignment of the Design Process Purpose Result • Built to suit model All requirements set forth in the brief • Studying the design to match needs document were achieved in the Design, • Achieve satisfaction first on paper including the brief of the Green • Ensure design & technical aspects Building • Efficient costs and effective design Action: Design drawings were screened with respect to: Functional Vaastu Construction Local Rules & Criteria for Cost & Time Requirements Compliances Technology Regulations Green buildings implications All of the above were closely monitored & cross-checked by : 1. Client 2. Developer 3. Architects 26
  • 26. Mapping Key Users & Functions Service Providers Casual Visitors Security Agencies, Caterers, House College School Students, Relatives. Keeping Agency, Courier Agency, Business Visitors Government Officials, MEDA, Business Personalities Vendors, Suppliers and Consultants Executive Part Manufacturers, Transporters, Management Legal Consultants, Training Faculty Promoters, CMD, Board of Directors, CXOs, S4, SGM, VP/Heads Clients & Investors Existing & Prospective, FIIs, Large Brokerage Firms Interview Candidates Senior Executives and Short term visitors appearing Executives for job interviews S3 - GM, S2 - DGM,AGM S1, M6, Sr. Manager, Manager M5 – Dy. Manager & Below Training & Induction Candidates Short term visitors appearing for short courses Media World Press 27
  • 27. Systematic organization from part to whole Strategy Planning Media Room Training Rooms New Business MBU Technology Group Library Wind Gallery Cafeteria Gymnasium Welcome Lounge IT Chairman Offce HR / Admin Finance CLC Corporate Parking Travel Desk Stores Communication Record Room Executive Board Room IBMS / FMS Business Halls Courier Desk 28
  • 28. The Whole 29
  • 29. Driving factors and program scale Sustainability Inspiring place to work Principles of sustainability A place which will inspire & motivate from site selection, design, Providing healthy and productive engineering, construction, environment for occupants in terms of material and operations indoor air quality and daylight usage Land 443,473 sq ft (10.18 acres) Office space 598,256 sq ft Highlights Terminus (basement) 223,270 sq ft Open space (landscape) 185,578 sq ft Capacity 2300 30 30
  • 30. 360 degree approach to Sustainability 1 2 3 4 5 6 Environment Water Energy Eco-Friendly Healthy & Innovative Sensitive Sensitive Conscious Material & Productive Design development Approach Approach Resources Indoor Elements environment • Minimum Site • Rain Water • Minimum • Use of low emitting • Green design • Energy efficient Disturbance Harvesting Construction waste materials education HVAC • Heat island effect • Use of low flow • Use of regional • Indoor pollutants • Creating green • Energy efficient fixtures materials control energy lighting • Minimum light resource on site • Use of sensor • Use of rapidly • Natural use of day and off site pollution • Usage of based fixtures renewable material light and view of renewable energy • Use of native outdoor spaces • Green house • Water efficient • Recycle & reuse of keeping plants • Sensor based Irrigation lighting and material • Increase ventilation • CFC & HCFC free ventilation • Minimum pollution • Zero waste material use • 100 % use of • Use of high recycle during construction policy sewage water content material • Energy efficient • Promote Public electrical transport • Water efficient equipment HVAC system • Less water requirement landscape 31
  • 31. Architecture Design : From abstract to form 32
  • 33. Master Plan 34 34
  • 34. Landscape : From form to functional enhancement 35
  • 35. Aim: Responsive & responsible landscape 36
  • 36. Sustainability in landscape practices Using recycled water Reduced water consumption Use of native plants Creating new Habitats 37
  • 37. Interior : Functional enhancement to operational optimization 38
  • 38. Design Goal • Translating Suzlon’s values and vision into the interior space as experienced in the context of architecture and landscape • Bringing value to the space by integrating the functional HR requirements of the business units, employee aspirations and well being. 39
  • 39. Holistic Design Approach Space Planning - Interior, Architecture & Landscape “Becoming One” 40
  • 40. Brand Communication : From operations to a ‘wow’ experience 41
  • 41. Approach Goal LANDSCAPE INTERIORS USER JOURNEY ARCHITECTURE 42
  • 42. Nomenclature – Business Units Sustainability Renewable Key Energy Elements Sun Water Wind + Wood Space or Sky Aqua Tree Sky Sun Technology + Manufacturing Board members & Corporate Services Manufacturing team Business team new business Terminus : Terra or Earth Energy 43 43
  • 43. Nomenclature – Global Learning Academy Learning ICON Cultural symbol for learning It depicts energy and awareness Each intersection depicts a point of creation Each ‘one’ numeral at the top of the icon is an abstract indicative beginning to the process of knowledge gathering 44
  • 44. Memory Points Customised indoor & outdoor artworks 45
  • 46. Sustainability Features at One Earth • Sustainability has to be an objective from the concept stage and then embedded in every design aspect • Sustainable solution and practices are integrated towards efficiency in: o ENERGY USE o WATER USE o WASTE MANAGEMENT o MATERIALS USE o HEALTHY AIR QUALITY o OPERATING PRACTICES • Sustainability is the hallmark of this project while the result is an inspiring place to work. Achievements then speak for themselves. 47 47
  • 47. Design Approach Results 47% 85% Energy Recycle Savings Waste 60% 90% Water Occupants use Savings Daylight 48
  • 48. Global Recognitions SYNEFRA WINS THE SYNEFRA WINS MIPIM PRESTIGIOUS ASIA ASIA GOLD Award 2011 PACIFIC PROPERTY Synefra E&C Ltd was AWARD 2011 awarded the MIPIM Asia The Asia Pacific Property 2011 GOLD Award in “Best Awards 2011 in association Green Buildings” category for with Bloomberg Television its project Suzlon One Earth & Google awarded the which it conceived, managed prestigious award to and executed. Synefra E&C Ltd for Best MIPIM Asia this year Office Development for received entries of 80 Suzlon One Earth. projects from 15 countries. The project was further This year, Synefra E&C Ltd. is selected as the official the only Indian company to nominee from Asia Pacific be announced as a winner at the World Property amongst the 29 winners in Award to be held at the end 10 distinct categories in Asia. of this year 49
  • 49. Sustainable Approach for Construction Comprehensive planning for construction created a wide path for the execution team taking a batten from design team. Key areas of construction management are mentioned below: • People Management & the integration of knowledge & technology with project planning • Fundamentals of Project planning were followed emphasizing “Plan, Organize, Lead and Monitor” • Procurement process considering the aspects of QS, sustainable options, logistics, properties, impacts, cash flows, ABC analysis & life cycle costing. • Execution with appropriate sequencing, time management, processes including ISO norms, EHS norms, quality checklists, execution checklists, etc. 50 50
  • 50. Sustainable Approach for Construction • Quality control, checks, assessments & audits on predefined timeline throughout the project life cycle for improvement in all aspects • Timely reviews and feedbacks through regular review meetings at site along with all key stakeholders • Appropriate skill up-gradations & capacity building through trainings & appropriate inputs to the engineers and supervisors on site • Labour welfare activities in co-ordination with CSR team, NGOs, etc. 51 51
  • 51. Environment Management Plan Implementation • Site barricading to define boundaries & prevent damage to neighborhood. • Excavation- Top Soil preservation / excess soil disposal / handling / reuse. • Erosion & sedimentation control during construction- planning for drain lines below terminus level. • Sprinkling water on roads at pre-decided frequencies to prevent pollution of the air. • Spill prevention- Use of trays, etc. as per the need for DG sets / pumps & other equipments during handling of oil. • Waste management during construction- segregation / storage / disposal of waste, etc. • Water use minimization- use of sedimentation tank to reuse the water at central batching plant, use of curing compounds / covering the concrete surfaces by Hessian cloth / gunny bags as applicable to reduce the need of overall water requirement. 52 52
  • 52. Concern for Construction Workers • It was a culture at One Earth construction site to consider all the stakeholders like family members irrespective to their economic class, gender and race. All the construction team members were treated with equal care and respect. The project team demonstrated a unique example of a care which any construction company can practice for their workers. Few of the initiatives taken at site are mentioned as under: • Crèche & School facility during construction for the construction worker’s children with nutritious mid-day meal facility. • Regular health checkups– Periodic blood tests for blood groups / hemoglobin / malaria etc. of all construction workers and their children. • Onsite medical facility (Doctor & dispensary across the road) available 24x 7. 53 53
  • 53. Concern for Construction Workers • Hygienic Sanitation facility on site with state of the art temporary toilets and their regular maintenance and management by a professional agency. Other services included daily housekeeping & garbage collection systems, provision of appropriate fire fighting facility, safe drinking water provisions, sufficient lighting, security etc. • Improvement in conventional cooking methods- Training & facilitation to the workers for making the smokeless chullahs for cooking needs. Distribution of the same free of cost. • Pure drinking water supply & sanitation facility at labour camp. 54 54
  • 56. Key Stakeholders • Chief Architect : Christopher Charles Benninger Architects • Integrated Design coordination : Tao Design • Construction & Engineering : Vascon Engineers • Interior Architecture, : Space Matrix in association Engineering & Execution with Tao Architecture • Landscape Architect : Ravi Varsha Gavandi • Communication Design : Elephant Design • Sustainability Consultants : Environmental Design Solutions Design Consultants 06 Technical Consultants 12 Direct Suppliers 46 Sub-contractors / suppliers 400 57
  • 57. SUZLON One Earth Visual Experience 58
  • 58. 59
  • 59. 60
  • 61. 62
  • 62. 63
  • 63. 64
  • 64. 65
  • 65. 66
  • 66. 67
  • 67. Thank You! Synefra Engineering & Construction Ltd. One Earth - Tree Lounge, Level 2, Hadapsar, Pune 411 028 INDIA Tel: +91.20.67022000 | Fax: +91.20.67022100 Toll Free: 1800-200-1330 Email: info@synefra.com | www.synefra.com 68