1. INTERNATIONAL BOUNDARY AND WATER COMISSION
COMISIÓN INTERNACIONAL DE LÍMITES Y AGUAS
USIBWC
Projects and Priorities
Jayne Harkins, P.E.
Commissioner
Texas Water Conservation Association
Annual Convention, Fort Worth, Texas
March 4-5, 2020
COMMISSION
UNITED STATES SECTION
2. INTERNATIONAL BOUNDARY AND WATER COMISSION
COMISIÓN INTERNACIONAL DE LÍMITES Y AGUAS
COMMISSION
UNITED STATES SECTION
Presentation Overview
1. Agency Priorities
2. Rio Grande Canalization and Rectification Projects
3. Presidio Field Office
4. Amistad Dam
5. Falcon Dam
6. Lower Rio Grande Flood Control Project
7. Water Management
8. Border Security
9. USIBWC Budget
10. Strategic Plan
3. Priorities
u Border Sanitation
u Treaty Water
Deliveries
u Infrastructure
u Safety and Security of Employees
u Communication and Transparency
10. Rio Grande Canalization Project- Hydraulic Modeling,
Sediment Accumulation and Flow Capacity Analysis
§ Hydraulic model update: Develop 1D/2D HEC-RAS unsteady
state and 1D HEC-RAS steady state model.
§ Evaluate flow capacity and identify levee freeboard
deficiencies. Remove sediment to reestablish levee freeboard
for FEMA levee accreditation.
§ Estimation of sediment removal required to achieve 1943
base project geometry.
§ Feasibility study was awarded to Consultant Wilson-Freese
and Nichols Joint Venture in September 2019.
§ Completed by mid 2021.
21. Amistad Dam
§ Requires
investment of tens
of millions to
hundreds of
millions to
mitigate risk
§ Project to be
jointly funded by
US and Mexico
22. Falcon Dam Geophysical Study
There are about 520 concrete panels in the
spillway.
Many are 25’ wide by 40’ in length.
EROSION WHICH CAN LEAD TO
UPLIFTING
SPALLATION EXPOSING REBAR
27. Water Management
Binational Flood Workshops
Amistad during
Hurricane Alex
(July 2010)
Falcon during
Hurricane Alex
(July 2010)
Chapeño gage below Falcon (July 2010)
31. WQ Primary Concerns
u Bacteria
u Nutrients
u Salinity
u Depressed Dissolved
Oxygen
u Fish kills
u Illegal discharging
u Trash
u Exotic species
u Lack of water
35. USIBWC
Strategic Planning Process
u Risk Assessments
u Preparing New Strategic Plan
►Stakeholder Input
►IBWC Staff Input
u Priorities for the next 5 years
u Performance metrics
u Completed in a few months
36. INTERNATIONAL BOUNDARY AND WATER COMISSION
COMISIÓN INTERNACIONAL DE LÍMITES Y AGUAS
U.S. SECTION
4191 N. Mesa
El Paso, Texas 79902
www.ibwc.gov
HEADQUARTERS
UNITED STATES SECTION