Building for the future through
our past success…
Canatuan – A TVI Success Story
Canatuan Overview
• The Canatuan gold/silver-copper/zinc
mine was the first foreign-invested mine
to reach production after the passage of
the Philippine Mining Act of 1995.
• Located within the Province of
Zamboanga del Norte, on the Philippine
island of Mindanao, in the agricultural
town Siocon.
• 508-hectare property is covered under a
Mineral Production Sharing Agreement
(“MPSA”) valid from October 23, 1996
until October 23, 2021
• TVI entered the area in 1993 through its
100% owned subsidiary, TVI Resource
Development Inc. (TVIRD)*, which
entered into an Exploration Agreement
with Option to Purchase with Benquet
Corp.
Canatuan MPSA
508 hectares
2
Canatuan mining camp
Canatuan Overview
3
Two full-scale projects were
developed during the mining
operations and focused on two
distinct orebodies:
• An upper gold and silver-rich
gossan (oxidized) zone which
was mined between Years 2004
and 2008. A combined
gold/silver dore was the product
of this operation.
• A lower copper and zinc-rich
sulphide zone which was
mined from Years 2008 to 2014
and processed. Conventional
flotation circuits were used to
produce copper and zinc
concentrates.
• By the end of operations, nearly
6 million tonnes of ore were
mined and processed.
Canatuan Overview
4
Activity Timeline
1996 MPSA Issued
1996 Feasibility Studies
1997 1st ECC
2002 DMPF
2003 Issuance CADT
2004 Begin Gossan Operations
2007 Preparation of Final
Reclamation and Closure Plans
(FMRDP)
2008 End Gossan Phase Operations
2008 Begin Sulphide Operations
2009 Approval FMRDP
2014 End Sulphide Operations
2015 Begin Closure Plan
2021 Expiration MPSA
Small Scale Mining at Canatuan (pre-TVI)
5
• Prior to TVIRD’s involvement in 1994, the Canatuan
area saw many years of illegal mining activities
carried out by a population in excess of 10,000 small
scale miners.
• The area suffered from uncontrolled tailings
discharge to the area streams and rivers as well as
rampant deforestation in support of the illegal mining
activities.
• Child labor was predominant and few or no safety
measures were implemented.
• In 2002 and 2003 TVIRD purchased tailings
contaminated with cyanide and mercury from the
small scale mining operators to clean up the area and
to act as feed for the initial gold extraction pilot plant.
• The plant processed approximately 24,000 tonnes of
tailings which were then deposited within an
engineered tailings storage facility.
• In July 2004, TVIRD commissioned a full-scale
processing plant for the Gossan Phase of
operations (gold-silver) with an initial daily
throughput of 125 dry metric tonnes.
• The processing plant used CIL recovery
methods and produced gold and silver doré.
• Processing facilities were incrementally
expanded over 4 years to a maximum daily
production of ~2,500 dry metric tonnes in 2008.
• Initial capital costs were low and mostly funded
by existing cash flows from earlier tailings
processing:
• Prior to 2005: US$16.89 Million
• Sustaining (2005 to 2007): US$12.29 Million
• Project total: US$29.18 Million
Canatuan Gossan Gold-Silver Operations 2004 - 2008
0
500
1,000
1,500
2,000
2,500
3,000
2004
2005
2006
2007
2008
MillThroughput(tonnesperday)
Daily Mill Throughput Capacity
6
Gossan Metal Production (Actual)
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Jul-04
Oct-04
Jan-05
Apr-05
Jul-05
Oct-05
Jan-06
Apr-06
Jul-06
Oct-06
Jan-07
Apr-07
Jul-07
Oct-07
Jan-08
AuEqOz
Calculated Au Calculated Ag Credit
Financial Summary
• AuEq produced: 137,000 ounces
(at average operating cost of
US$26/tonne milled)
• Original reserve estimate: 1.0
million tonnes at 3.12 g/t Au and
119 g/t Ag
• Actual mined amount: 1.9 million
tonnes at 2.1 g/t Au and 70 g/t Ag
• Mine life was extended due to
increased metal prices and lower
cutoff grades
• Gross revenues (2004-2008):
US$86.0 Million
• Net Cash Flow from Operations
(2005-2008): US$29.0 Million
7
$4.1
$16.1
$8.7
$0.08
$2.0
$12.0
$34.5 $31.5
$5.9
$0.0
$10.0
$20.0
$30.0
$40.0
2004 2005 2006 2007 2008
$USMillions
Gross Revenue and Cash Flows for Gossan
Operations 2004 - 2008
Cash Flows from Operations Gross Revenues
Canatuan Gossan Gold-Silver Operations 2004 - 2008
Canatuan Gossan Operations 2004 - 2008
8
Canatuan Sulphide Copper-Zinc Operations 2009 - 2014
9
• In May 2008, TVIRD began construction
of a sulphide plant and associated
infrastructure to process the underlying
sulphide orebody containing copper and
zinc.
• Construction on the sulphide plant was
completed on time and under budget in
November of 2008.
• Initial CAPEX for the project was
US$28.3 million
• Exclusive copper offtake agreement with
MRI Trading AG was signed in October
2008
• Copper ore processing began in
November 2008 and first copper
concentrate shipment was made in March
2009.
10
• In January 2009, TVIRD arranged a
US$30.1 million 5-year Omnibus Loan and
Security Agreement with LIM Asia Multi-
Strategy Fund Inc. and LIM Asia Special
Situations Master Fund Limited to support
mining operations and complete the residual
construction related to the sulphide plant.
• By June 2010, (less than 18 months) TVIRD
had completely repaid the US$30.1 million
Omnibus Loan and Security Agreement
using cash flows from operations and local
financings – well ahead of schedule.
• On April 25, 2011 TVIRD announced the
commencement of zinc production at the
Canatuan mine. The first shipment of zinc
concentrate was completed on August 12
that year.
Canatuan Sulphide Copper-Zinc Operations 2009 - 2014
Financial Summary
• Milling operations ended in
January 2014.
• Originally anticipated
amount to be mined:
119,800 dmt of copper
concentrate and 6,100
dmt of zinc concentrate.
• Actual mined amount:
199,778 dmt of copper
concentrate and 30,548
dmt of zinc concentrate.
• Gross revenues (2009-
2014): US$393.0 Million
• Net Cash Flows from
operations (2009-2013):
US$151.0 Million
Mill Throughput tonnes per 1,439 2,204 2,389 2,645 2,701 3,068
Copper pound equivalent
produced
thousand
Cu lb eq
26,824 25,312 26,437 28,197 20,296
Copper produced thousand 20,726 19,923 16,680 14,955 10,842
Gold produced oz 6,970 6,316 7,248 11,430 11,026
Silver produced oz 532,108 514,299 486,026 504,626 371,967
Zinc produced thousand 8,847 13,619 9,111
Copper concentrate
produced
dty metric
tonnes
50,403 48,300 34,055 37,231 28,055 1,066
Zinc concentrate produced dry metric 7,924 12,713 9,923
Total Cost per Cu lb eq ($US) 1.05 1.84 2.81 2.67 2.88 2.53
Production cash cost per ($US) 0.61 0.99 1.51 1.40 1.81 1.81
Q1 20142009 2010 2011 2012 2013
11
$35.9 $45.7
$32.9 $27.1
$9.4
$64.1
$78.1
$94.8 $90.4
$44.6
$13.2
$0.00
$20.00
$40.00
$60.00
$80.00
$100.00
2009 2010 2011 2012 2013 2014
$USMillions
Cash Flows from Operations Gross Revenues
Gross Revenues & Cash Flows for Sulphide Operations 2009 - 2014
Canatuan Sulphide Copper-Zinc Operations 2009 - 2014
Canatuan Sulphide Operations 2009 - 2014
12
Canatuan Operational/Financial Summary
13
Gossan Phase Operations Years 2004-2008
• Total Project CAPEX: US$ 29.18 million
• Gold Equivalent Produced: 137,000 ounces
• Gross Revenue: US$ 86.0 million
• Cash Flow Generated: US$ 29.0 million
Sulphide Operations Years 2009-2014
• Initial CAPEX: US$ 28.3 million
• Total Project CAPEX: US$ 44.8 million
• Copper Concentrate Produced: 199,778 tonnes
• Zinc Concentrate Produced: 30,548 tonnes
• Gross Revenue: US$ 393.0 million
• Cash Flow Generated: US$ 151.0 million
TVI Industry Awards – “Best in Class”
14
From 2010 to 2013, TVIRD received multiple prestigious awards at the
annual Presidential Mineral Industry Environmental Awards ceremony.
2010 Awards:
• Platinum Achievement Award, Surface Mining Category
• Safest Mines Award, Concentrator Category
• Mining Forest Award, Metallic Category
• Health and Safety Award
2011 Awards:
• Titanium Award for Excellence in Environmental Management
• Safest Mining Operation
• Safest Surface Mining Operation
• Safest Mineral Processing, Concentrator Category
2012 Awards:
• Presidential Mineral Industry Environment Award – Platinum Award
• Safest Surface Mining Operation
• Safest Mineral Processing, Concentrator Category
• Best Mining Forest, Metallic Category – 3rd runner up
2013 Awards:
• Titanium Award – Surface Mining Category
• Safest Mineral Processing, Concentrator Category
• Safest Exploration (for Agata Nickel Project) – Category A
• Best Mining Forest, Metallic Category – 2nd runner up
Commitment to Environmental Protection
15
Environmental Management and Rehabilitation Programs
• 320,000 trees planted during the operations period. Nearly
140,000 cash crops are planned as part of the final
rehabilitation
• No negative climate change impacts based on the PAGASA
Climate Change model.
• Carbon sequestration potential after rehabilitation nearly 10
times greater than pre-mining conditions.
• Monitoring programs by internal and third parties included:
o Terrestrial flora and fauna and aquatic resource habitat
o River and stream water and sediment quality
o Air quality and noise impact
o Forest resources within and around the Project area
o Meteorology, hydrology and watershed impacts
o Geotechnical and operating performance of tailings
storage facilities
• More than US$45 million spent on environmental
management programs and infrastructure during operations
and final rehabilitation.
Commitment to Environmental Protection
16
Mining Waste and Process Tailings Management
• Waste rock disposal areas developed using
engineered slope stability methods and
geotechnical controls. Areas rehabilitated using
cash crops for post mining agricultural benefits.
• Four dams and tailings storage impoundments
constructed for tailings management and
environmental protection
o Designed for the Maximum Credible Earthquake
and Probable Maximum Flood.
o Design and construction management by
international engineering firms specializing in
tailings dam design and construction
management.
Health and Sanitation
• Constructed a health clinic that provides free
24/7 healthcare, ambulance service and
health & wellness programs -- receiving
14,000 consultations and admissions per year.
Responsive Education
• Constructed 10 schools accommodating
nearly 4,000 students as well as providing
teachers, learning tools, equipment and 48
college scholarships.
Infrastructure
• TVI built four bridges in partnership with the
Philippine government and a spillway.
• Also built or improved 85 kilometres (52.8
miles) of roads providing access to education,
livelihood and healthcare.
Commitment to Social Responsibility
17
Sustainable Livelihood
• Focused on sustainability, economics and social well-
being of community including micro-finance, technical
skills, training and apprenticeship programs.
Royalty and Support for Ancestral Domain
• Extended technical and financial assistance for
crafting of Ancestral Domain Sustainable
Development and Protection Plan.
• Net royalties paid totaled approximately US$4.5
million over the 10-year period of the Canatuan
operations.
Development for impact communities
• Initiated projects in areas outside Canatuan:
Built Sta. Maria water system.
• Built 11 kilometres (6.8 miles) of farm-to-market
roads.
• Provided employment during shipment days in Sta.
Maria.
18
Commitment to Social Responsibility
Canatuan Post Mining Agribusiness
19
• In 2013, TVIRD established TVI Agriproducts Inc., to shift
local economy at Canatuan from mining back to
agriculture,
• TVI Agriproducts formed a joint venture an international
company to engage local communities in the production
and sale of cacao beans through a lease/operation
arrangement.
• TVIRD plans to establish an initial 200-hectare cocoa
plantation with projected total of 220,000 cacao trees to
be planted.
• If proven successful, the joint venture would scale up the
plantation in the medium term to at least 1,600 hectares
depending on available land.
• Other cash crops included as part of the Agribusiness
enterprise consist of coffee, rubber, rattan, bamboo and
tiger grass.
Results of the Canatuan Experience
 TVI became a ‘partner of choice’ in the
Philippines
 Management earned the reputation for
‘getting things done’ -- on time and under
budget
 Successfully performed under challenging
conditions
 Operated responsibly with industry-leading
social and environmental programs.
 TVI has become the model operator in eyes
of Philippine government and regulators
TVI Management is now focused on repeating its success at
Canatuan in new jurisdictions within the Asia Pacific Region
20
Thank you. For more information, please contact:
Corporate Head Office:
TVI Pacific Inc.
Suite 2000, 736 - 6th Avenue S.W.
Calgary, Alberta T2P 3T7
Tel: (403) 265-4356
Fax: (403) 264-7028
Email: tvi-info@tvipacific.com
Investor Relations/Media Contact:
Shirley Anthony, VP Corporate Communications
Tel: 778-999-2771
E-mail: Shirley.anthony@tvipacific.com
Contact Information
21
Date Event
April 10, 1992 Benguet Corp, for. R. V. Bosque, files MPSA application
January 20, 1994 Benguet Corp. and TVIRD sign an Exploration Agreement with Option to Purchase
1996
50 tonne/day gold extraction pilot plant is commissioned to generate early cash
flow and verify mining and metallurgical criteria for larger-scale operations
1996-1998 Exploration commences under approved MPSA
October 23, 1996
Philippine Government signs MPSA with Bosque and Benguet Corp; 508.3396
hectares
June 8, 1997 Environmental Compliance Certificate issued for TVIRD Canatuan Project
June 16, 1997 Benguet Corp and TVIRD execute Deed of Assignment
Oct 21, 1997
Certificate of Ancestral Domain Claim issued to Subanons covering 6,523.689
hectares, including the Canatuan MPSA
May 14, 1998 DENR approves assignment of MPSA to TVIRD
1999 TVIRD stops exploration activities
October 2001 TVIRD executes MOU with Siocon Subanon Association, Inc.
October 16, 2002 TVIRD submits Partial Declaration of Mining Feasibility to MGB
Canatuan Property History: 1992 - 2002
22
Canatuan Property History: 2002 - 2008
Date Event
October 28, 2002 MGB approves MPSA exploration period extension, Partial Declaration of Mining
Feasibility
2002 - 2004 TVIRD buys and processes tailings from illegal small-scale miners (the
“Environmental Cleanup”)
June 12, 2003 Certificate of Ancestral Domain Title issued to Subanons; 8,213 hectares,
including MPSA
November 18, 2003 TVIRD signs MOA with Subanon Council of Elders and SSAI
July 2004 TVIRD commissions full-scale processing plant and begins Gossan Project at 150
dry metric tonnes per day throughput
September 2005 Gossan Mill Production exceeds 700 dmtpd
January 2005 Canatuan achieves steady state throughput of 1,300 dmtpd
May 13, 2006 TVIRD inaugurates Gossan Tailings Dam, applauded by Canadian Ambassador
and DENR Secretary
February 2007 TVIRD confirms additional polymetallic occurrences near Canatuan
April 2007 Canatuan exceeds 2,000 dmtpd average throughput
April 9 2008 Gossan Project decommissioning starts
23
Canatuan Property History: 2008 - 2010
Date Event
April 7, 2008 TVIRD files updated NI43-101 Technical Report on Sulphide Project
November 11, 2008 TVIRD signs 5-year Offtake agreement with MRI Trading AG for concentrates to
be shipped in lots of approximately 5,000 tonnes.
November 15, 2008 Construction of Sulphide Project is completed
February 9, 2009 Secures US$30.1 million Omnibus Loan and Security Agreement with Lim Asia
Multi-Strategy Fund Inc. and LIM Asia Special Situations Master Fund Limited
March 2009 TVIRD commissions full-scale processing plant and begins Sulphide operations
with initial 5,000 tonne inventory and throughput of 1,500 tonnes per day
March 30, 2009 First shipment of copper concentrate is completed from Sulphide Operations
January 22, 2010 TVIRD reduces debt obligation to $16.2 million (a 46% reduction from the
original loan of $30.1 million)
June 25, 2010 Completes 15th shipment of copper concentrates from Sulphide Operations
June 28, 2010 TVIRD repays $30.1 million Omnibus loan with LIM Asia funds in full
November 23, 2010 TVIRD receives multiple awards from the Philippine government at the annual
Mine Safety and Environmental Conference, including “Platinum Achievement
Award, Surface Mining Category”, “Safest Mines Award, Concentrator Category”,
“Mining Forest Award, Metallic Category” and “Health and Safety Award”
24
Canatuan Property History: 2011 - 2014
Date Event
April 25, 2011 Announces zinc production start up
August 12, 2011 Completes 23rd shipment of copper concentrate and first shipment of zinc
concentrate
November 14, 2011 TVIRD declared “The Best of the Best” in Presidential Mineral Industry
Environmental and Safety Awards, receiving the “Titanium Award for Excellence
in Environmental Management”, “Safest Mining Operation”, “Safest Surface
Mining Operation” and “Safest Mineral Processing, Concentrator Category”
December 21, 2011 Completes second shipment of zinc concentrate
January 4, 2012 TVIRD wins injunction against ordinance that would ban new open pit mining
November 22, 2012 TVIRD wins again at the annual Mine Safety and Environmental Conference,
receiving the “Presidential Mineral Industry Environment Award – Platinum
Award”, “Safest Surface Mining Operation”, “Safest Mineral Processing,
Concentrator Category” and “Best Mining Forest, Metallic Category – 3rd runner
up”
January 20, 2014 Decommissioning of Sulphide Operations and implementation of Project Closure
plan commences
January 21, 2014 Completes 7th and final shipment of zinc concentrates
February 5, 2014 Completes 39th and final shipment of copper concentrates
25

Weitere ähnliche Inhalte

Was ist angesagt?

Tvi corporate presentation january 2016
Tvi corporate presentation january 2016Tvi corporate presentation january 2016
Tvi corporate presentation january 2016TVI_Pacific
 
Tvi pacific corporate presentation 24.06.2021 v2
Tvi pacific corporate presentation   24.06.2021 v2Tvi pacific corporate presentation   24.06.2021 v2
Tvi pacific corporate presentation 24.06.2021 v2TVI_Pacific
 
Tvi corporate presentation november 2015
Tvi corporate presentation november 2015Tvi corporate presentation november 2015
Tvi corporate presentation november 2015TVI_Pacific
 
Tvi pacific-corporate-presentation-20.06.2019-v1
Tvi pacific-corporate-presentation-20.06.2019-v1Tvi pacific-corporate-presentation-20.06.2019-v1
Tvi pacific-corporate-presentation-20.06.2019-v1RobertLing8
 
Tvi pacific corporate presentation 08.10.2021 final
Tvi pacific corporate presentation   08.10.2021 finalTvi pacific corporate presentation   08.10.2021 final
Tvi pacific corporate presentation 08.10.2021 finalTVI_Pacific
 
Tvi corporate presentation august 2016
Tvi corporate presentation august 2016Tvi corporate presentation august 2016
Tvi corporate presentation august 2016TVI_Pacific
 
Tvi corporate presentation june 1 2015
Tvi corporate presentation june 1 2015Tvi corporate presentation june 1 2015
Tvi corporate presentation june 1 2015TVI_Pacific
 
Tvi corporate presentation june 15 2015
Tvi corporate presentation june 15 2015Tvi corporate presentation june 15 2015
Tvi corporate presentation june 15 2015TVI_Pacific
 
Tvi corporate presentation may 2017 v3
Tvi corporate presentation may 2017 v3Tvi corporate presentation may 2017 v3
Tvi corporate presentation may 2017 v3TVI_Pacific
 
TVI investor Presentation May 13 2015
TVI investor Presentation May 13 2015TVI investor Presentation May 13 2015
TVI investor Presentation May 13 2015TVI_Pacific
 
Tvi corporate presentation august 11 2016
Tvi corporate presentation august 11 2016Tvi corporate presentation august 11 2016
Tvi corporate presentation august 11 2016TVI_Pacific
 
Tvi pacific corporate presentation 21.06.2018 final
Tvi pacific corporate presentation   21.06.2018 finalTvi pacific corporate presentation   21.06.2018 final
Tvi pacific corporate presentation 21.06.2018 finalTVI_Pacific
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015TVI_Pacific
 
Tvi corporate presentation october 2015
Tvi corporate presentation october 2015Tvi corporate presentation october 2015
Tvi corporate presentation october 2015TVI_Pacific
 
Tvi investor presentation may 8 2015
Tvi investor presentation may 8 2015Tvi investor presentation may 8 2015
Tvi investor presentation may 8 2015TVI_Pacific
 
Tvi corporate presentation august 2015
Tvi corporate presentation august 2015Tvi corporate presentation august 2015
Tvi corporate presentation august 2015TVI_Pacific
 
Tvi corporate presentation october 2016
Tvi corporate presentation october 2016Tvi corporate presentation october 2016
Tvi corporate presentation october 2016TVI_Pacific
 
TVI Investor Presentation May 2015
TVI Investor Presentation May 2015TVI Investor Presentation May 2015
TVI Investor Presentation May 2015TVI_Pacific
 
TVI Pacific Corporate Presentation 06.12.2021
TVI Pacific Corporate Presentation 06.12.2021TVI Pacific Corporate Presentation 06.12.2021
TVI Pacific Corporate Presentation 06.12.2021TVI_Pacific
 

Was ist angesagt? (20)

Tvi corporate presentation january 2016
Tvi corporate presentation january 2016Tvi corporate presentation january 2016
Tvi corporate presentation january 2016
 
Tvi pacific corporate presentation 24.06.2021 v2
Tvi pacific corporate presentation   24.06.2021 v2Tvi pacific corporate presentation   24.06.2021 v2
Tvi pacific corporate presentation 24.06.2021 v2
 
Tvi corporate presentation november 2015
Tvi corporate presentation november 2015Tvi corporate presentation november 2015
Tvi corporate presentation november 2015
 
Tvi pacific-corporate-presentation-20.06.2019-v1
Tvi pacific-corporate-presentation-20.06.2019-v1Tvi pacific-corporate-presentation-20.06.2019-v1
Tvi pacific-corporate-presentation-20.06.2019-v1
 
Tvi pacific corporate presentation 08.10.2021 final
Tvi pacific corporate presentation   08.10.2021 finalTvi pacific corporate presentation   08.10.2021 final
Tvi pacific corporate presentation 08.10.2021 final
 
Tvi corporate presentation august 2016
Tvi corporate presentation august 2016Tvi corporate presentation august 2016
Tvi corporate presentation august 2016
 
Tvi corporate presentation june 1 2015
Tvi corporate presentation june 1 2015Tvi corporate presentation june 1 2015
Tvi corporate presentation june 1 2015
 
Tvi corporate presentation june 15 2015
Tvi corporate presentation june 15 2015Tvi corporate presentation june 15 2015
Tvi corporate presentation june 15 2015
 
Tvi corporate presentation may 2017 v3
Tvi corporate presentation may 2017 v3Tvi corporate presentation may 2017 v3
Tvi corporate presentation may 2017 v3
 
TVI investor Presentation May 13 2015
TVI investor Presentation May 13 2015TVI investor Presentation May 13 2015
TVI investor Presentation May 13 2015
 
Tvi corporate presentation august 11 2016
Tvi corporate presentation august 11 2016Tvi corporate presentation august 11 2016
Tvi corporate presentation august 11 2016
 
Tvi pacific corporate presentation 21.06.2018 final
Tvi pacific corporate presentation   21.06.2018 finalTvi pacific corporate presentation   21.06.2018 final
Tvi pacific corporate presentation 21.06.2018 final
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015
 
Tvi corporate presentation october 2015
Tvi corporate presentation october 2015Tvi corporate presentation october 2015
Tvi corporate presentation october 2015
 
Tvi investor presentation may 8 2015
Tvi investor presentation may 8 2015Tvi investor presentation may 8 2015
Tvi investor presentation may 8 2015
 
Tvi corporate presentation august 2015
Tvi corporate presentation august 2015Tvi corporate presentation august 2015
Tvi corporate presentation august 2015
 
Tvi corporate presentation october 2016
Tvi corporate presentation october 2016Tvi corporate presentation october 2016
Tvi corporate presentation october 2016
 
TVI Investor Presentation May 2015
TVI Investor Presentation May 2015TVI Investor Presentation May 2015
TVI Investor Presentation May 2015
 
Denver gold-2016-final
Denver gold-2016-finalDenver gold-2016-final
Denver gold-2016-final
 
TVI Pacific Corporate Presentation 06.12.2021
TVI Pacific Corporate Presentation 06.12.2021TVI Pacific Corporate Presentation 06.12.2021
TVI Pacific Corporate Presentation 06.12.2021
 

Andere mochten auch

Corporate Summary - December 2016
Corporate Summary - December 2016Corporate Summary - December 2016
Corporate Summary - December 2016yamanagold2016
 
Corporate Summary - January 2017
Corporate Summary - January 2017Corporate Summary - January 2017
Corporate Summary - January 2017yamanagold2016
 
Tvi corporate presentation december 2016
Tvi corporate presentation december 2016Tvi corporate presentation december 2016
Tvi corporate presentation december 2016TVI_Pacific
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016PretiumR
 
December 2016 - Corporate Presentation
December 2016 - Corporate PresentationDecember 2016 - Corporate Presentation
December 2016 - Corporate Presentationsilverwheaton2016
 
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalPhilippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalNo to mining in Palawan
 
Mossma peoples' mine peoples' business2
Mossma  peoples' mine peoples' business2Mossma  peoples' mine peoples' business2
Mossma peoples' mine peoples' business2Edgar Baling
 
Reducción de arsénico en concentrados de cobre
Reducción de arsénico en concentrados de cobreReducción de arsénico en concentrados de cobre
Reducción de arsénico en concentrados de cobrearonaron
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing processShreenath Bohra
 

Andere mochten auch (11)

Corporate Summary - December 2016
Corporate Summary - December 2016Corporate Summary - December 2016
Corporate Summary - December 2016
 
Corporate Summary - January 2017
Corporate Summary - January 2017Corporate Summary - January 2017
Corporate Summary - January 2017
 
Tvi corporate presentation december 2016
Tvi corporate presentation december 2016Tvi corporate presentation december 2016
Tvi corporate presentation december 2016
 
About Ohio Campus Compact
About Ohio Campus CompactAbout Ohio Campus Compact
About Ohio Campus Compact
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016
 
December 2016 - Corporate Presentation
December 2016 - Corporate PresentationDecember 2016 - Corporate Presentation
December 2016 - Corporate Presentation
 
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalPhilippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
 
Mossma peoples' mine peoples' business2
Mossma  peoples' mine peoples' business2Mossma  peoples' mine peoples' business2
Mossma peoples' mine peoples' business2
 
Reducción de arsénico en concentrados de cobre
Reducción de arsénico en concentrados de cobreReducción de arsénico en concentrados de cobre
Reducción de arsénico en concentrados de cobre
 
1. cement ppt
1. cement ppt1. cement ppt
1. cement ppt
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 

Ähnlich wie Canatuan story presentation november 16 2015

Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story PresentationTVI_Pacific
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015TVI_Pacific
 
Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015TVI_Pacific
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013FirstQuantum
 
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...No to mining in Palawan
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012FirstQuantum
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013FirstQuantum
 
Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Metals
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013FirstQuantum
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationFirstQuantum
 
#MP2013 Presentation by the Minister of Mines and Steel Development
#MP2013 Presentation by the Minister of Mines and Steel Development#MP2013 Presentation by the Minister of Mines and Steel Development
#MP2013 Presentation by the Minister of Mines and Steel DevelopmentFMINigeria
 
30042010 asx-mar-10-quarterly
30042010 asx-mar-10-quarterly30042010 asx-mar-10-quarterly
30042010 asx-mar-10-quarterlyMark Clark
 
23.04.2012, PRESENTATION, Bronze fox copper gold project revealing true poten...
23.04.2012, PRESENTATION, Bronze fox copper gold project revealing true poten...23.04.2012, PRESENTATION, Bronze fox copper gold project revealing true poten...
23.04.2012, PRESENTATION, Bronze fox copper gold project revealing true poten...The Business Council of Mongolia
 
23.04.2012, Bronze fox copper gold project-revealing true potential – from di...
23.04.2012, Bronze fox copper gold project-revealing true potential – from di...23.04.2012, Bronze fox copper gold project-revealing true potential – from di...
23.04.2012, Bronze fox copper gold project-revealing true potential – from di...The Business Council of Mongolia
 
Corporate Presentation July 2013
Corporate Presentation July 2013Corporate Presentation July 2013
Corporate Presentation July 2013Crocodile Gold
 
Tiernan Gold - Corporate Update, January 2023
Tiernan Gold - Corporate Update, January 2023Tiernan Gold - Corporate Update, January 2023
Tiernan Gold - Corporate Update, January 2023TiernanGold
 
Tiernan Gold - Corporate Presentation February 2023
Tiernan Gold - Corporate Presentation February 2023 Tiernan Gold - Corporate Presentation February 2023
Tiernan Gold - Corporate Presentation February 2023 TiernanGold
 
Corporate Presentation - March 2023
Corporate Presentation - March 2023Corporate Presentation - March 2023
Corporate Presentation - March 2023TiernanGold
 

Ähnlich wie Canatuan story presentation november 16 2015 (20)

Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story Presentation
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015
 
Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015
 
IRON SAND
IRON SANDIRON SAND
IRON SAND
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
 
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013
 
Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Presenation September 2016
Lion One Presenation September 2016
 
14.10.2010 Bayan airag gold project, John Wyche
14.10.2010 Bayan airag gold project, John Wyche14.10.2010 Bayan airag gold project, John Wyche
14.10.2010 Bayan airag gold project, John Wyche
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
#MP2013 Presentation by the Minister of Mines and Steel Development
#MP2013 Presentation by the Minister of Mines and Steel Development#MP2013 Presentation by the Minister of Mines and Steel Development
#MP2013 Presentation by the Minister of Mines and Steel Development
 
30042010 asx-mar-10-quarterly
30042010 asx-mar-10-quarterly30042010 asx-mar-10-quarterly
30042010 asx-mar-10-quarterly
 
23.04.2012, PRESENTATION, Bronze fox copper gold project revealing true poten...
23.04.2012, PRESENTATION, Bronze fox copper gold project revealing true poten...23.04.2012, PRESENTATION, Bronze fox copper gold project revealing true poten...
23.04.2012, PRESENTATION, Bronze fox copper gold project revealing true poten...
 
23.04.2012, Bronze fox copper gold project-revealing true potential – from di...
23.04.2012, Bronze fox copper gold project-revealing true potential – from di...23.04.2012, Bronze fox copper gold project-revealing true potential – from di...
23.04.2012, Bronze fox copper gold project-revealing true potential – from di...
 
Corporate Presentation July 2013
Corporate Presentation July 2013Corporate Presentation July 2013
Corporate Presentation July 2013
 
Tiernan Gold - Corporate Update, January 2023
Tiernan Gold - Corporate Update, January 2023Tiernan Gold - Corporate Update, January 2023
Tiernan Gold - Corporate Update, January 2023
 
Tiernan Gold - Corporate Presentation February 2023
Tiernan Gold - Corporate Presentation February 2023 Tiernan Gold - Corporate Presentation February 2023
Tiernan Gold - Corporate Presentation February 2023
 
Corporate Presentation - March 2023
Corporate Presentation - March 2023Corporate Presentation - March 2023
Corporate Presentation - March 2023
 

Kürzlich hochgeladen

如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书Fis s
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...First NO1 World Amil baba in Faisalabad
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024nicola_mining
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 

Kürzlich hochgeladen (20)

如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 

Canatuan story presentation november 16 2015

  • 1. Building for the future through our past success… Canatuan – A TVI Success Story
  • 2. Canatuan Overview • The Canatuan gold/silver-copper/zinc mine was the first foreign-invested mine to reach production after the passage of the Philippine Mining Act of 1995. • Located within the Province of Zamboanga del Norte, on the Philippine island of Mindanao, in the agricultural town Siocon. • 508-hectare property is covered under a Mineral Production Sharing Agreement (“MPSA”) valid from October 23, 1996 until October 23, 2021 • TVI entered the area in 1993 through its 100% owned subsidiary, TVI Resource Development Inc. (TVIRD)*, which entered into an Exploration Agreement with Option to Purchase with Benquet Corp. Canatuan MPSA 508 hectares 2 Canatuan mining camp
  • 3. Canatuan Overview 3 Two full-scale projects were developed during the mining operations and focused on two distinct orebodies: • An upper gold and silver-rich gossan (oxidized) zone which was mined between Years 2004 and 2008. A combined gold/silver dore was the product of this operation. • A lower copper and zinc-rich sulphide zone which was mined from Years 2008 to 2014 and processed. Conventional flotation circuits were used to produce copper and zinc concentrates. • By the end of operations, nearly 6 million tonnes of ore were mined and processed.
  • 4. Canatuan Overview 4 Activity Timeline 1996 MPSA Issued 1996 Feasibility Studies 1997 1st ECC 2002 DMPF 2003 Issuance CADT 2004 Begin Gossan Operations 2007 Preparation of Final Reclamation and Closure Plans (FMRDP) 2008 End Gossan Phase Operations 2008 Begin Sulphide Operations 2009 Approval FMRDP 2014 End Sulphide Operations 2015 Begin Closure Plan 2021 Expiration MPSA
  • 5. Small Scale Mining at Canatuan (pre-TVI) 5 • Prior to TVIRD’s involvement in 1994, the Canatuan area saw many years of illegal mining activities carried out by a population in excess of 10,000 small scale miners. • The area suffered from uncontrolled tailings discharge to the area streams and rivers as well as rampant deforestation in support of the illegal mining activities. • Child labor was predominant and few or no safety measures were implemented. • In 2002 and 2003 TVIRD purchased tailings contaminated with cyanide and mercury from the small scale mining operators to clean up the area and to act as feed for the initial gold extraction pilot plant. • The plant processed approximately 24,000 tonnes of tailings which were then deposited within an engineered tailings storage facility.
  • 6. • In July 2004, TVIRD commissioned a full-scale processing plant for the Gossan Phase of operations (gold-silver) with an initial daily throughput of 125 dry metric tonnes. • The processing plant used CIL recovery methods and produced gold and silver doré. • Processing facilities were incrementally expanded over 4 years to a maximum daily production of ~2,500 dry metric tonnes in 2008. • Initial capital costs were low and mostly funded by existing cash flows from earlier tailings processing: • Prior to 2005: US$16.89 Million • Sustaining (2005 to 2007): US$12.29 Million • Project total: US$29.18 Million Canatuan Gossan Gold-Silver Operations 2004 - 2008 0 500 1,000 1,500 2,000 2,500 3,000 2004 2005 2006 2007 2008 MillThroughput(tonnesperday) Daily Mill Throughput Capacity 6
  • 7. Gossan Metal Production (Actual) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Jul-04 Oct-04 Jan-05 Apr-05 Jul-05 Oct-05 Jan-06 Apr-06 Jul-06 Oct-06 Jan-07 Apr-07 Jul-07 Oct-07 Jan-08 AuEqOz Calculated Au Calculated Ag Credit Financial Summary • AuEq produced: 137,000 ounces (at average operating cost of US$26/tonne milled) • Original reserve estimate: 1.0 million tonnes at 3.12 g/t Au and 119 g/t Ag • Actual mined amount: 1.9 million tonnes at 2.1 g/t Au and 70 g/t Ag • Mine life was extended due to increased metal prices and lower cutoff grades • Gross revenues (2004-2008): US$86.0 Million • Net Cash Flow from Operations (2005-2008): US$29.0 Million 7 $4.1 $16.1 $8.7 $0.08 $2.0 $12.0 $34.5 $31.5 $5.9 $0.0 $10.0 $20.0 $30.0 $40.0 2004 2005 2006 2007 2008 $USMillions Gross Revenue and Cash Flows for Gossan Operations 2004 - 2008 Cash Flows from Operations Gross Revenues Canatuan Gossan Gold-Silver Operations 2004 - 2008
  • 9. Canatuan Sulphide Copper-Zinc Operations 2009 - 2014 9 • In May 2008, TVIRD began construction of a sulphide plant and associated infrastructure to process the underlying sulphide orebody containing copper and zinc. • Construction on the sulphide plant was completed on time and under budget in November of 2008. • Initial CAPEX for the project was US$28.3 million • Exclusive copper offtake agreement with MRI Trading AG was signed in October 2008 • Copper ore processing began in November 2008 and first copper concentrate shipment was made in March 2009.
  • 10. 10 • In January 2009, TVIRD arranged a US$30.1 million 5-year Omnibus Loan and Security Agreement with LIM Asia Multi- Strategy Fund Inc. and LIM Asia Special Situations Master Fund Limited to support mining operations and complete the residual construction related to the sulphide plant. • By June 2010, (less than 18 months) TVIRD had completely repaid the US$30.1 million Omnibus Loan and Security Agreement using cash flows from operations and local financings – well ahead of schedule. • On April 25, 2011 TVIRD announced the commencement of zinc production at the Canatuan mine. The first shipment of zinc concentrate was completed on August 12 that year. Canatuan Sulphide Copper-Zinc Operations 2009 - 2014
  • 11. Financial Summary • Milling operations ended in January 2014. • Originally anticipated amount to be mined: 119,800 dmt of copper concentrate and 6,100 dmt of zinc concentrate. • Actual mined amount: 199,778 dmt of copper concentrate and 30,548 dmt of zinc concentrate. • Gross revenues (2009- 2014): US$393.0 Million • Net Cash Flows from operations (2009-2013): US$151.0 Million Mill Throughput tonnes per 1,439 2,204 2,389 2,645 2,701 3,068 Copper pound equivalent produced thousand Cu lb eq 26,824 25,312 26,437 28,197 20,296 Copper produced thousand 20,726 19,923 16,680 14,955 10,842 Gold produced oz 6,970 6,316 7,248 11,430 11,026 Silver produced oz 532,108 514,299 486,026 504,626 371,967 Zinc produced thousand 8,847 13,619 9,111 Copper concentrate produced dty metric tonnes 50,403 48,300 34,055 37,231 28,055 1,066 Zinc concentrate produced dry metric 7,924 12,713 9,923 Total Cost per Cu lb eq ($US) 1.05 1.84 2.81 2.67 2.88 2.53 Production cash cost per ($US) 0.61 0.99 1.51 1.40 1.81 1.81 Q1 20142009 2010 2011 2012 2013 11 $35.9 $45.7 $32.9 $27.1 $9.4 $64.1 $78.1 $94.8 $90.4 $44.6 $13.2 $0.00 $20.00 $40.00 $60.00 $80.00 $100.00 2009 2010 2011 2012 2013 2014 $USMillions Cash Flows from Operations Gross Revenues Gross Revenues & Cash Flows for Sulphide Operations 2009 - 2014 Canatuan Sulphide Copper-Zinc Operations 2009 - 2014
  • 13. Canatuan Operational/Financial Summary 13 Gossan Phase Operations Years 2004-2008 • Total Project CAPEX: US$ 29.18 million • Gold Equivalent Produced: 137,000 ounces • Gross Revenue: US$ 86.0 million • Cash Flow Generated: US$ 29.0 million Sulphide Operations Years 2009-2014 • Initial CAPEX: US$ 28.3 million • Total Project CAPEX: US$ 44.8 million • Copper Concentrate Produced: 199,778 tonnes • Zinc Concentrate Produced: 30,548 tonnes • Gross Revenue: US$ 393.0 million • Cash Flow Generated: US$ 151.0 million
  • 14. TVI Industry Awards – “Best in Class” 14 From 2010 to 2013, TVIRD received multiple prestigious awards at the annual Presidential Mineral Industry Environmental Awards ceremony. 2010 Awards: • Platinum Achievement Award, Surface Mining Category • Safest Mines Award, Concentrator Category • Mining Forest Award, Metallic Category • Health and Safety Award 2011 Awards: • Titanium Award for Excellence in Environmental Management • Safest Mining Operation • Safest Surface Mining Operation • Safest Mineral Processing, Concentrator Category 2012 Awards: • Presidential Mineral Industry Environment Award – Platinum Award • Safest Surface Mining Operation • Safest Mineral Processing, Concentrator Category • Best Mining Forest, Metallic Category – 3rd runner up 2013 Awards: • Titanium Award – Surface Mining Category • Safest Mineral Processing, Concentrator Category • Safest Exploration (for Agata Nickel Project) – Category A • Best Mining Forest, Metallic Category – 2nd runner up
  • 15. Commitment to Environmental Protection 15 Environmental Management and Rehabilitation Programs • 320,000 trees planted during the operations period. Nearly 140,000 cash crops are planned as part of the final rehabilitation • No negative climate change impacts based on the PAGASA Climate Change model. • Carbon sequestration potential after rehabilitation nearly 10 times greater than pre-mining conditions. • Monitoring programs by internal and third parties included: o Terrestrial flora and fauna and aquatic resource habitat o River and stream water and sediment quality o Air quality and noise impact o Forest resources within and around the Project area o Meteorology, hydrology and watershed impacts o Geotechnical and operating performance of tailings storage facilities • More than US$45 million spent on environmental management programs and infrastructure during operations and final rehabilitation.
  • 16. Commitment to Environmental Protection 16 Mining Waste and Process Tailings Management • Waste rock disposal areas developed using engineered slope stability methods and geotechnical controls. Areas rehabilitated using cash crops for post mining agricultural benefits. • Four dams and tailings storage impoundments constructed for tailings management and environmental protection o Designed for the Maximum Credible Earthquake and Probable Maximum Flood. o Design and construction management by international engineering firms specializing in tailings dam design and construction management.
  • 17. Health and Sanitation • Constructed a health clinic that provides free 24/7 healthcare, ambulance service and health & wellness programs -- receiving 14,000 consultations and admissions per year. Responsive Education • Constructed 10 schools accommodating nearly 4,000 students as well as providing teachers, learning tools, equipment and 48 college scholarships. Infrastructure • TVI built four bridges in partnership with the Philippine government and a spillway. • Also built or improved 85 kilometres (52.8 miles) of roads providing access to education, livelihood and healthcare. Commitment to Social Responsibility 17
  • 18. Sustainable Livelihood • Focused on sustainability, economics and social well- being of community including micro-finance, technical skills, training and apprenticeship programs. Royalty and Support for Ancestral Domain • Extended technical and financial assistance for crafting of Ancestral Domain Sustainable Development and Protection Plan. • Net royalties paid totaled approximately US$4.5 million over the 10-year period of the Canatuan operations. Development for impact communities • Initiated projects in areas outside Canatuan: Built Sta. Maria water system. • Built 11 kilometres (6.8 miles) of farm-to-market roads. • Provided employment during shipment days in Sta. Maria. 18 Commitment to Social Responsibility
  • 19. Canatuan Post Mining Agribusiness 19 • In 2013, TVIRD established TVI Agriproducts Inc., to shift local economy at Canatuan from mining back to agriculture, • TVI Agriproducts formed a joint venture an international company to engage local communities in the production and sale of cacao beans through a lease/operation arrangement. • TVIRD plans to establish an initial 200-hectare cocoa plantation with projected total of 220,000 cacao trees to be planted. • If proven successful, the joint venture would scale up the plantation in the medium term to at least 1,600 hectares depending on available land. • Other cash crops included as part of the Agribusiness enterprise consist of coffee, rubber, rattan, bamboo and tiger grass.
  • 20. Results of the Canatuan Experience  TVI became a ‘partner of choice’ in the Philippines  Management earned the reputation for ‘getting things done’ -- on time and under budget  Successfully performed under challenging conditions  Operated responsibly with industry-leading social and environmental programs.  TVI has become the model operator in eyes of Philippine government and regulators TVI Management is now focused on repeating its success at Canatuan in new jurisdictions within the Asia Pacific Region 20
  • 21. Thank you. For more information, please contact: Corporate Head Office: TVI Pacific Inc. Suite 2000, 736 - 6th Avenue S.W. Calgary, Alberta T2P 3T7 Tel: (403) 265-4356 Fax: (403) 264-7028 Email: tvi-info@tvipacific.com Investor Relations/Media Contact: Shirley Anthony, VP Corporate Communications Tel: 778-999-2771 E-mail: Shirley.anthony@tvipacific.com Contact Information 21
  • 22. Date Event April 10, 1992 Benguet Corp, for. R. V. Bosque, files MPSA application January 20, 1994 Benguet Corp. and TVIRD sign an Exploration Agreement with Option to Purchase 1996 50 tonne/day gold extraction pilot plant is commissioned to generate early cash flow and verify mining and metallurgical criteria for larger-scale operations 1996-1998 Exploration commences under approved MPSA October 23, 1996 Philippine Government signs MPSA with Bosque and Benguet Corp; 508.3396 hectares June 8, 1997 Environmental Compliance Certificate issued for TVIRD Canatuan Project June 16, 1997 Benguet Corp and TVIRD execute Deed of Assignment Oct 21, 1997 Certificate of Ancestral Domain Claim issued to Subanons covering 6,523.689 hectares, including the Canatuan MPSA May 14, 1998 DENR approves assignment of MPSA to TVIRD 1999 TVIRD stops exploration activities October 2001 TVIRD executes MOU with Siocon Subanon Association, Inc. October 16, 2002 TVIRD submits Partial Declaration of Mining Feasibility to MGB Canatuan Property History: 1992 - 2002 22
  • 23. Canatuan Property History: 2002 - 2008 Date Event October 28, 2002 MGB approves MPSA exploration period extension, Partial Declaration of Mining Feasibility 2002 - 2004 TVIRD buys and processes tailings from illegal small-scale miners (the “Environmental Cleanup”) June 12, 2003 Certificate of Ancestral Domain Title issued to Subanons; 8,213 hectares, including MPSA November 18, 2003 TVIRD signs MOA with Subanon Council of Elders and SSAI July 2004 TVIRD commissions full-scale processing plant and begins Gossan Project at 150 dry metric tonnes per day throughput September 2005 Gossan Mill Production exceeds 700 dmtpd January 2005 Canatuan achieves steady state throughput of 1,300 dmtpd May 13, 2006 TVIRD inaugurates Gossan Tailings Dam, applauded by Canadian Ambassador and DENR Secretary February 2007 TVIRD confirms additional polymetallic occurrences near Canatuan April 2007 Canatuan exceeds 2,000 dmtpd average throughput April 9 2008 Gossan Project decommissioning starts 23
  • 24. Canatuan Property History: 2008 - 2010 Date Event April 7, 2008 TVIRD files updated NI43-101 Technical Report on Sulphide Project November 11, 2008 TVIRD signs 5-year Offtake agreement with MRI Trading AG for concentrates to be shipped in lots of approximately 5,000 tonnes. November 15, 2008 Construction of Sulphide Project is completed February 9, 2009 Secures US$30.1 million Omnibus Loan and Security Agreement with Lim Asia Multi-Strategy Fund Inc. and LIM Asia Special Situations Master Fund Limited March 2009 TVIRD commissions full-scale processing plant and begins Sulphide operations with initial 5,000 tonne inventory and throughput of 1,500 tonnes per day March 30, 2009 First shipment of copper concentrate is completed from Sulphide Operations January 22, 2010 TVIRD reduces debt obligation to $16.2 million (a 46% reduction from the original loan of $30.1 million) June 25, 2010 Completes 15th shipment of copper concentrates from Sulphide Operations June 28, 2010 TVIRD repays $30.1 million Omnibus loan with LIM Asia funds in full November 23, 2010 TVIRD receives multiple awards from the Philippine government at the annual Mine Safety and Environmental Conference, including “Platinum Achievement Award, Surface Mining Category”, “Safest Mines Award, Concentrator Category”, “Mining Forest Award, Metallic Category” and “Health and Safety Award” 24
  • 25. Canatuan Property History: 2011 - 2014 Date Event April 25, 2011 Announces zinc production start up August 12, 2011 Completes 23rd shipment of copper concentrate and first shipment of zinc concentrate November 14, 2011 TVIRD declared “The Best of the Best” in Presidential Mineral Industry Environmental and Safety Awards, receiving the “Titanium Award for Excellence in Environmental Management”, “Safest Mining Operation”, “Safest Surface Mining Operation” and “Safest Mineral Processing, Concentrator Category” December 21, 2011 Completes second shipment of zinc concentrate January 4, 2012 TVIRD wins injunction against ordinance that would ban new open pit mining November 22, 2012 TVIRD wins again at the annual Mine Safety and Environmental Conference, receiving the “Presidential Mineral Industry Environment Award – Platinum Award”, “Safest Surface Mining Operation”, “Safest Mineral Processing, Concentrator Category” and “Best Mining Forest, Metallic Category – 3rd runner up” January 20, 2014 Decommissioning of Sulphide Operations and implementation of Project Closure plan commences January 21, 2014 Completes 7th and final shipment of zinc concentrates February 5, 2014 Completes 39th and final shipment of copper concentrates 25