Project
   Spans 2½ miles including ship channel
   Replace, increase capacity of 1929, 1966 bridge pair
       Weight-limited (structural deterioration)

       Congested

       High maintenance

       Provide 8 lanes

       Obsolete design criteria
            No shoulder, medians

            Steep grades10 foot lanes
                                                                 Source: http://maps.google.com/
            Insufficient vertical clearance over ship channel


   Improve interchanges on bridge approaches
                                                                                             2
Project




Replace one 2-lane and one 3-lane
bridge with an 8-lane bridge and
improve connections to I-26 and local
roads.




                                                  3
CSS Approach
           Agency partnership
                   State infrastructure bank
                   SCDOT
                   Charleston County
                   South Carolina State Port Authority
                   FHWA
           Proactive partnership with community
                   Compatibility
                   Environmental mitigation
                   Design input
                   Expedited environmental permitting
           Other features
                   Public work sessions
                   Public outreach campaign
                   Collaboration with other agencies, citizens, stakeholders
                   Citizen vote on bridge tower design
Photo source: http://ravenelbridge.net/small/jul_12_bridge_south_blog.jpg       4
CSS Design Features
   Sensitivity to community features
   Aesthetic treatments
       Decorative lighting
       Hand rails
       Light poles
   Citizen approved tower design
   12 foot ped/bike path
   Scenic overlooks                     Source: http://www.gcbl.org/system/files/cooper_river_thumb_0.jpg




   Rock islands at tower bases (prevent damage by ship)
   Decorative lighting (off during turtle season)
   Relocation of some displaced trees
   Parks, open space in old bridge alignment
                                                                                                             5
CSS Design Features (cont.)




Longest cable-stayed bridge in North America. Highest cost public works project in South Carolina history. Source: Google Earth


                                                                                                                                  6
CSS Design Features (cont.)




West (left) and east approaches and
interchanges. Source: Google Earth




                                      7
CSS Design Features (cont.)




West approach during late construction phase. Source: http://www.ravenel.net




                                                                               8
CSS Design Features




 Source: http://www.freyssinetusa.com/images/freyssinet/lightbox/stay_cable_1.jpg




                                                                                    9

Weitere ähnliche Inhalte

Was ist angesagt?

Project 2 north central expy-high 5 interchange 092210
Project 2   north central expy-high 5 interchange 092210Project 2   north central expy-high 5 interchange 092210
Project 2 north central expy-high 5 interchange 092210TTI-UTCM
 
Midtown Plan
Midtown PlanMidtown Plan
Midtown Planalpha480
 
Project 11 culver blvd 092710
Project 11   culver blvd 092710Project 11   culver blvd 092710
Project 11 culver blvd 092710TTI-UTCM
 
Project 4 mopac 1 092210
Project 4   mopac 1 092210Project 4   mopac 1 092210
Project 4 mopac 1 092210TTI-UTCM
 
Capitol Hill Cc 12110
Capitol Hill Cc 12110Capitol Hill Cc 12110
Capitol Hill Cc 12110jseattle
 
Lee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningLee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningFairfax County
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectFabiha Rahman
 
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...Congress for the New Urbanism
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyCity of College Station
 
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)City of College Station
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?William Riggs
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 

Was ist angesagt? (20)

Project 2 north central expy-high 5 interchange 092210
Project 2   north central expy-high 5 interchange 092210Project 2   north central expy-high 5 interchange 092210
Project 2 north central expy-high 5 interchange 092210
 
Midtown Plan
Midtown PlanMidtown Plan
Midtown Plan
 
Ahmedabad srfdcl
Ahmedabad srfdclAhmedabad srfdcl
Ahmedabad srfdcl
 
Project 11 culver blvd 092710
Project 11   culver blvd 092710Project 11   culver blvd 092710
Project 11 culver blvd 092710
 
West Side Master Plan Report
West Side Master Plan ReportWest Side Master Plan Report
West Side Master Plan Report
 
Project 4 mopac 1 092210
Project 4   mopac 1 092210Project 4   mopac 1 092210
Project 4 mopac 1 092210
 
TN RTP Presentation 2009
TN RTP Presentation 2009TN RTP Presentation 2009
TN RTP Presentation 2009
 
Capitol Hill Cc 12110
Capitol Hill Cc 12110Capitol Hill Cc 12110
Capitol Hill Cc 12110
 
Transit Ready Design - Canin CNU17
Transit Ready Design - Canin CNU17Transit Ready Design - Canin CNU17
Transit Ready Design - Canin CNU17
 
Lee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningLee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III Widening
 
warm mix casselberry comp
warm mix casselberry compwarm mix casselberry comp
warm mix casselberry comp
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development Project
 
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
 
padma
padmapadma
padma
 
PMBP SALIENTS
PMBP SALIENTSPMBP SALIENTS
PMBP SALIENTS
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park Property
 
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 
Commercial strip4.29.13
Commercial strip4.29.13Commercial strip4.29.13
Commercial strip4.29.13
 

Ähnlich wie Project 5 cooper river bridge 092210

Project 9 south lake shore drive - chicago 092210
Project 9   south lake shore drive - chicago 092210Project 9   south lake shore drive - chicago 092210
Project 9 south lake shore drive - chicago 092210TTI-UTCM
 
Project 6 paris pike 092210
Project 6   paris pike 092210Project 6   paris pike 092210
Project 6 paris pike 092210TTI-UTCM
 
Wilma Dykeman Riverway Road Intersection Re-modernization
Wilma Dykeman Riverway  Road Intersection Re-modernizationWilma Dykeman Riverway  Road Intersection Re-modernization
Wilma Dykeman Riverway Road Intersection Re-modernizationMsplcdYkee69
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearOHM Advisors
 
Lane ave bridge report
Lane ave bridge reportLane ave bridge report
Lane ave bridge reportJohn Mangini
 
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...Lucas de Brito Nascimento
 
Innovative Bicycle Facilities for Roswell, Georgia
Innovative Bicycle Facilities for Roswell, GeorgiaInnovative Bicycle Facilities for Roswell, Georgia
Innovative Bicycle Facilities for Roswell, GeorgiaSharon Roerty
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)Sunny Mahajan
 
Los Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainLos Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainAdina Levin
 
05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards PresentationAISC/NSBA
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadFairfax County
 
2018 Engineering Excellence Diamond Project Panels
2018 Engineering Excellence Diamond Project Panels2018 Engineering Excellence Diamond Project Panels
2018 Engineering Excellence Diamond Project PanelsACEC New York
 
Kosinski, Andy - CV
Kosinski, Andy - CVKosinski, Andy - CV
Kosinski, Andy - CVakosinski
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence AwardsACECSDES
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence AwardsACECSDES
 

Ähnlich wie Project 5 cooper river bridge 092210 (20)

Project 9 south lake shore drive - chicago 092210
Project 9   south lake shore drive - chicago 092210Project 9   south lake shore drive - chicago 092210
Project 9 south lake shore drive - chicago 092210
 
Project 6 paris pike 092210
Project 6   paris pike 092210Project 6   paris pike 092210
Project 6 paris pike 092210
 
Wilma Dykeman Riverway Road Intersection Re-modernization
Wilma Dykeman Riverway  Road Intersection Re-modernizationWilma Dykeman Riverway  Road Intersection Re-modernization
Wilma Dykeman Riverway Road Intersection Re-modernization
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the Year
 
Lane ave bridge report
Lane ave bridge reportLane ave bridge report
Lane ave bridge report
 
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
 
041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete
 
Innovative Bicycle Facilities for Roswell, Georgia
Innovative Bicycle Facilities for Roswell, GeorgiaInnovative Bicycle Facilities for Roswell, Georgia
Innovative Bicycle Facilities for Roswell, Georgia
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
 
GATrailSummitPrez
GATrailSummitPrezGATrailSummitPrez
GATrailSummitPrez
 
Los Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainLos Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to Caltrain
 
05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation
 
Ellis Sess14 102009
Ellis Sess14 102009Ellis Sess14 102009
Ellis Sess14 102009
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
2018 Engineering Excellence Diamond Project Panels
2018 Engineering Excellence Diamond Project Panels2018 Engineering Excellence Diamond Project Panels
2018 Engineering Excellence Diamond Project Panels
 
Kosinski, Andy - CV
Kosinski, Andy - CVKosinski, Andy - CV
Kosinski, Andy - CV
 
BDE80_p10
BDE80_p10BDE80_p10
BDE80_p10
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
 

Mehr von TTI-UTCM

UTCM 09-37-15 Zietsman
UTCM 09-37-15 ZietsmanUTCM 09-37-15 Zietsman
UTCM 09-37-15 ZietsmanTTI-UTCM
 
Css classes 27 28 - term project presentations 100410
Css classes 27 28 - term project presentations 100410Css classes 27 28 - term project presentations 100410
Css classes 27 28 - term project presentations 100410TTI-UTCM
 
Css class 26 using css in practice 113009
Css class 26   using css in practice 113009Css class 26   using css in practice 113009
Css class 26 using css in practice 113009TTI-UTCM
 
Css class 25 project checklist and approval process 113009
Css class 25   project checklist and approval process 113009Css class 25   project checklist and approval process 113009
Css class 25 project checklist and approval process 113009TTI-UTCM
 
Css slide template 111609
Css slide template 111609Css slide template 111609
Css slide template 111609TTI-UTCM
 
Css classes 19 22 - developing compatible supportive design 120309
Css classes 19 22 - developing compatible supportive design 120309Css classes 19 22 - developing compatible supportive design 120309
Css classes 19 22 - developing compatible supportive design 120309TTI-UTCM
 
Css class 18 placemaking 120309
Css class 18   placemaking 120309Css class 18   placemaking 120309
Css class 18 placemaking 120309TTI-UTCM
 
Css class 17 multimodal options 112309
Css class 17   multimodal options 112309Css class 17   multimodal options 112309
Css class 17 multimodal options 112309TTI-UTCM
 
Css classes 14 16 - class project startup & charrette 120309
Css classes 14 16 - class project startup & charrette 120309Css classes 14 16 - class project startup & charrette 120309
Css classes 14 16 - class project startup & charrette 120309TTI-UTCM
 
Css classes 11 13 superceded - stakeholder involvement 111909
Css classes 11 13 superceded - stakeholder involvement 111909Css classes 11 13 superceded - stakeholder involvement 111909
Css classes 11 13 superceded - stakeholder involvement 111909TTI-UTCM
 
Css classes 11 13 - stakeholder involvement 120309
Css classes 11 13 - stakeholder involvement 120309Css classes 11 13 - stakeholder involvement 120309
Css classes 11 13 - stakeholder involvement 120309TTI-UTCM
 
Css class 9 physical context 120309
Css class 9   physical context 120309Css class 9   physical context 120309
Css class 9 physical context 120309TTI-UTCM
 
Css class 10 socio-economic context 120309
Css class 10   socio-economic context 120309Css class 10   socio-economic context 120309
Css class 10 socio-economic context 120309TTI-UTCM
 
Css class 8 multi-disciplinary teaming 120309
Css class 8   multi-disciplinary teaming 120309Css class 8   multi-disciplinary teaming 120309
Css class 8 multi-disciplinary teaming 120309TTI-UTCM
 
Css class 7 creating a css project 100410
Css class 7   creating a css project 100410Css class 7   creating a css project 100410
Css class 7 creating a css project 100410TTI-UTCM
 
Css class 5 css and environmental analysis 111809
Css class 5   css and environmental analysis 111809Css class 5   css and environmental analysis 111809
Css class 5 css and environmental analysis 111809TTI-UTCM
 
Css class 4 css and project development 120309
Css class 4   css and project development 120309Css class 4   css and project development 120309
Css class 4 css and project development 120309TTI-UTCM
 
Css class 3 definition and benefits 120309
Css class 3   definition and benefits 120309Css class 3   definition and benefits 120309
Css class 3 definition and benefits 120309TTI-UTCM
 
Css class 1 intro and overview 120309
Css class 1   intro and overview 120309Css class 1   intro and overview 120309
Css class 1 intro and overview 120309TTI-UTCM
 
Css class 2 my favorite street 120309
Css class 2   my favorite street 120309Css class 2   my favorite street 120309
Css class 2 my favorite street 120309TTI-UTCM
 

Mehr von TTI-UTCM (20)

UTCM 09-37-15 Zietsman
UTCM 09-37-15 ZietsmanUTCM 09-37-15 Zietsman
UTCM 09-37-15 Zietsman
 
Css classes 27 28 - term project presentations 100410
Css classes 27 28 - term project presentations 100410Css classes 27 28 - term project presentations 100410
Css classes 27 28 - term project presentations 100410
 
Css class 26 using css in practice 113009
Css class 26   using css in practice 113009Css class 26   using css in practice 113009
Css class 26 using css in practice 113009
 
Css class 25 project checklist and approval process 113009
Css class 25   project checklist and approval process 113009Css class 25   project checklist and approval process 113009
Css class 25 project checklist and approval process 113009
 
Css slide template 111609
Css slide template 111609Css slide template 111609
Css slide template 111609
 
Css classes 19 22 - developing compatible supportive design 120309
Css classes 19 22 - developing compatible supportive design 120309Css classes 19 22 - developing compatible supportive design 120309
Css classes 19 22 - developing compatible supportive design 120309
 
Css class 18 placemaking 120309
Css class 18   placemaking 120309Css class 18   placemaking 120309
Css class 18 placemaking 120309
 
Css class 17 multimodal options 112309
Css class 17   multimodal options 112309Css class 17   multimodal options 112309
Css class 17 multimodal options 112309
 
Css classes 14 16 - class project startup & charrette 120309
Css classes 14 16 - class project startup & charrette 120309Css classes 14 16 - class project startup & charrette 120309
Css classes 14 16 - class project startup & charrette 120309
 
Css classes 11 13 superceded - stakeholder involvement 111909
Css classes 11 13 superceded - stakeholder involvement 111909Css classes 11 13 superceded - stakeholder involvement 111909
Css classes 11 13 superceded - stakeholder involvement 111909
 
Css classes 11 13 - stakeholder involvement 120309
Css classes 11 13 - stakeholder involvement 120309Css classes 11 13 - stakeholder involvement 120309
Css classes 11 13 - stakeholder involvement 120309
 
Css class 9 physical context 120309
Css class 9   physical context 120309Css class 9   physical context 120309
Css class 9 physical context 120309
 
Css class 10 socio-economic context 120309
Css class 10   socio-economic context 120309Css class 10   socio-economic context 120309
Css class 10 socio-economic context 120309
 
Css class 8 multi-disciplinary teaming 120309
Css class 8   multi-disciplinary teaming 120309Css class 8   multi-disciplinary teaming 120309
Css class 8 multi-disciplinary teaming 120309
 
Css class 7 creating a css project 100410
Css class 7   creating a css project 100410Css class 7   creating a css project 100410
Css class 7 creating a css project 100410
 
Css class 5 css and environmental analysis 111809
Css class 5   css and environmental analysis 111809Css class 5   css and environmental analysis 111809
Css class 5 css and environmental analysis 111809
 
Css class 4 css and project development 120309
Css class 4   css and project development 120309Css class 4   css and project development 120309
Css class 4 css and project development 120309
 
Css class 3 definition and benefits 120309
Css class 3   definition and benefits 120309Css class 3   definition and benefits 120309
Css class 3 definition and benefits 120309
 
Css class 1 intro and overview 120309
Css class 1   intro and overview 120309Css class 1   intro and overview 120309
Css class 1 intro and overview 120309
 
Css class 2 my favorite street 120309
Css class 2   my favorite street 120309Css class 2   my favorite street 120309
Css class 2 my favorite street 120309
 

Kürzlich hochgeladen

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 

Kürzlich hochgeladen (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 

Project 5 cooper river bridge 092210

  • 1. Project 5 Cooper River (Arthur Ravenal Jr.) Bridge Charleston-Mt. Pleasant, South Carolina 1
  • 2. Project  Spans 2½ miles including ship channel  Replace, increase capacity of 1929, 1966 bridge pair  Weight-limited (structural deterioration)  Congested  High maintenance  Provide 8 lanes  Obsolete design criteria  No shoulder, medians  Steep grades10 foot lanes Source: http://maps.google.com/  Insufficient vertical clearance over ship channel  Improve interchanges on bridge approaches 2
  • 3. Project Replace one 2-lane and one 3-lane bridge with an 8-lane bridge and improve connections to I-26 and local roads. 3
  • 4. CSS Approach  Agency partnership  State infrastructure bank  SCDOT  Charleston County  South Carolina State Port Authority  FHWA  Proactive partnership with community  Compatibility  Environmental mitigation  Design input  Expedited environmental permitting  Other features  Public work sessions  Public outreach campaign  Collaboration with other agencies, citizens, stakeholders  Citizen vote on bridge tower design Photo source: http://ravenelbridge.net/small/jul_12_bridge_south_blog.jpg 4
  • 5. CSS Design Features  Sensitivity to community features  Aesthetic treatments  Decorative lighting  Hand rails  Light poles  Citizen approved tower design  12 foot ped/bike path  Scenic overlooks Source: http://www.gcbl.org/system/files/cooper_river_thumb_0.jpg  Rock islands at tower bases (prevent damage by ship)  Decorative lighting (off during turtle season)  Relocation of some displaced trees  Parks, open space in old bridge alignment 5
  • 6. CSS Design Features (cont.) Longest cable-stayed bridge in North America. Highest cost public works project in South Carolina history. Source: Google Earth 6
  • 7. CSS Design Features (cont.) West (left) and east approaches and interchanges. Source: Google Earth 7
  • 8. CSS Design Features (cont.) West approach during late construction phase. Source: http://www.ravenel.net 8
  • 9. CSS Design Features Source: http://www.freyssinetusa.com/images/freyssinet/lightbox/stay_cable_1.jpg 9

Hinweis der Redaktion

  1. New Cooper River Arthur Ravenal, Jr. Bridge with old bridges still standing next to it.