4. Facts & Figures
Pakistan’s energy crisis initiated in the end of 1999
which turned out to be worse since last one decade.
Max Production capacity = 21,143 MW
Max Electricity Production =5,643 MW
Current Electricity Demand =21,000MW
Electric Power shortfall of = 5,500MW
There are approximately 6-12hours
blackouts in cities & 10-16hours in rural
areas during peak.
6. Energy Potential
Solar energy production potential is
2,900,000MW against current production of
20+ MW Only!
Wind energy production potential is
340000MW against current production of
255.4 MW.
Hydro energy production potential is
60,000MW against current production of
6720MW.
Pakistan has one of world’s largest coal
deposits of 185 billion tons and
unfortunately more than 90% resources are
still unexplored.
7. Causes of Electrical Power Crisis
• Mismanagement of energy resources..
• Dependency on expensive means of productivity e.g Oil & Gas.
• Aging of equipment.
• Faulty distribution system.
• Silting Process.
• Economic & Political instability.
• Illiteracy & Poverty.
• Electricity Theft.
• Huge energy losses due to poor and old infrastructure.
• Lack of Periodical Maintenance.
8. Solution to Pakistan’s Increasing
Electricity Crisis
It is a biggest challenge for the nation to fix this increasing energy
crisis.
Following approaches can be adopted to cope up with this crisis.
9. • Increase IPPs
(Independent
power
producers).
• Reactivation
of closed
power
stations.
• Importing
electricity from
neighbouring
countries to
improve the
situation and
rebuilding of
industries.
• Utilization of
available
renewable
energy
resources.
• Development
& Installation
of biogas,
solar, wind &
micro hydro-
based projects
in villages
• Development
& installation
of coal based
powerhouses.
• Construction
of new
proposed
dams.
• Exploration
and
management
of available
resources like
coal, gas & oil.
10. Suggestions
Completion & focus to on-going hydro, solar, wind energy projects.
Educate individuals to save energy.
Transparent bill recovery system.
Continuous maintenance of the existing power stations on yearly basis to improve
their life.
Designating right professionals to right positions with an ability to assess the future
energy demands and their management.
Promoting education so literacy rate could be improved which certainly is root cause
of such issues.