1. This report is prepared by the PMO EBC Diagnostic Team using parameter trending and Cumulative Summation (CUSUM) analysis. For questions, comments,
and suggestions, please contact M Khairul Syahir (x7434) or Mior Muzaffar (x7646).
FOR INTERNAL USE ONLY Page 1 of 1
PMO EBC Data Analysis Report
XXX– 18 July 2015 – 1 August 2015
Reliability Management (PRM2) - PRM2/EBC-DA/2015/OSC/1
This report is a biweekly results summary of analysis performed on equipment parameters data as recorded from the EBC
Handheld program.
EBC ROUNDS COMPLIANCE
EBC rounds compliance for the two-week period covered in this report is
satisfactory. Recommend further improvements of EBC rounds to increase
the accuracy of data analysis.
Good EBC rounds compliance (more than 80% completed) is needed to
ensure good accuracy of data analysis, and that any early indications of
failure can be detected and mitigated.
EQUIPMENT STATUS: CLOSE MONITORING REQUIRED
From our EBC Handheld data analysis, the following equipment are found to be operating outside of the normal operating
envelope, or showing signs of degradation. Close monitoring is recommended.
Tag ID Equipment System Findings
Generator EDG Battery No 1 HiHi (13.1 Volt)
Diesel day tank Firewater System Diesel Day Tank Level LoLo (70%)
Fuel gas scrubber Fuel Gas System Inlet temperature showing increasing trending
EQUIPMENT STATUS: NORMAL
EBC Handheld data analysis does not indicate any cause for concern for the following equipment. Continue with routine EBC
rounds.
Equipment Status Equipment Status Equipment Status
P-5431 Normal P-5156 Normal HX-5402 Normal
P-5432 Normal G-5415 Normal P-5543 Normal
P-5433 Normal P-5471 Normal TK-5540 Normal
P-5434 Normal P-5472 Normal TK-5541 Normal
P-5530 Normal P-5473 Normal C-5450 Normal
P-5531 Normal P-5474 Normal C-5460 Normal
P-5532 Normal P-5475 Normal C-5470 Normal
P-5533 Normal P-5477 Normal D-5457A Normal
V-5430 Normal TK-5470 Normal D-5457B Normal
WS-5437 Normal TK-5478 Normal D-5467A Normal
WS-5439 Normal V-5424 Normal D-5467B Normal
P-5150 Normal V-5425 Normal V-5400 Normal
P-5151 Normal HX-5401 Normal V-5455 Normal
P-5155 Normal P-5542 Normal V-5465 Normal
Note: this analysis involves only the equipment covered under the EBC Handheld program, as agreed with the operations team.
Additional equipment coverage may be added if necessary.
Report Issuance Date: 22 May 2016
Completed,
60%
Missed,
40%