This report is prepared by the PMO EBC Diagnostic Team using parameter trending and Cumulative Summation (CUSUM) analysis. For questions, comments,
and suggestions, please contact M Khairul Syahir (x7434) or Mior Muzaffar (x7646).
FOR INTERNAL USE ONLY Page 1 of 1
PMO EBC Data Analysis Report
XXX– 18 July 2015 – 1 August 2015
Reliability Management (PRM2) - PRM2/EBC-DA/2015/OSC/1
This report is a biweekly results summary of analysis performed on equipment parameters data as recorded from the EBC
Handheld program.
EBC ROUNDS COMPLIANCE
EBC rounds compliance for the two-week period covered in this report is
satisfactory. Recommend further improvements of EBC rounds to increase
the accuracy of data analysis.
Good EBC rounds compliance (more than 80% completed) is needed to
ensure good accuracy of data analysis, and that any early indications of
failure can be detected and mitigated.
EQUIPMENT STATUS: CLOSE MONITORING REQUIRED
From our EBC Handheld data analysis, the following equipment are found to be operating outside of the normal operating
envelope, or showing signs of degradation. Close monitoring is recommended.
Tag ID Equipment System Findings
Generator EDG Battery No 1 HiHi (13.1 Volt)
Diesel day tank Firewater System Diesel Day Tank Level LoLo (70%)
Fuel gas scrubber Fuel Gas System Inlet temperature showing increasing trending
EQUIPMENT STATUS: NORMAL
EBC Handheld data analysis does not indicate any cause for concern for the following equipment. Continue with routine EBC
rounds.
Equipment Status Equipment Status Equipment Status
P-5431 Normal P-5156 Normal HX-5402 Normal
P-5432 Normal G-5415 Normal P-5543 Normal
P-5433 Normal P-5471 Normal TK-5540 Normal
P-5434 Normal P-5472 Normal TK-5541 Normal
P-5530 Normal P-5473 Normal C-5450 Normal
P-5531 Normal P-5474 Normal C-5460 Normal
P-5532 Normal P-5475 Normal C-5470 Normal
P-5533 Normal P-5477 Normal D-5457A Normal
V-5430 Normal TK-5470 Normal D-5457B Normal
WS-5437 Normal TK-5478 Normal D-5467A Normal
WS-5439 Normal V-5424 Normal D-5467B Normal
P-5150 Normal V-5425 Normal V-5400 Normal
P-5151 Normal HX-5401 Normal V-5455 Normal
P-5155 Normal P-5542 Normal V-5465 Normal
Note: this analysis involves only the equipment covered under the EBC Handheld program, as agreed with the operations team.
Additional equipment coverage may be added if necessary.
Report Issuance Date: 22 May 2016
Completed,
60%
Missed,
40%

Weitere ähnliche Inhalte

Andere mochten auch

03 tercera sesión interactiva definitiva
03 tercera sesión interactiva definitiva03 tercera sesión interactiva definitiva
03 tercera sesión interactiva definitivaAlfredo Prieto Martín
 
Динара Шаймерден-Приложение рецептов-Конкуренты
Динара Шаймерден-Приложение рецептов-КонкурентыДинара Шаймерден-Приложение рецептов-Конкуренты
Динара Шаймерден-Приложение рецептов-КонкурентыДинара Шаймерден
 
A CRITICAL REVIEW OF NANOTECHNOLOGY APPLICATION IN DRILLING FLUID OVER THE LA...
A CRITICAL REVIEW OF NANOTECHNOLOGY APPLICATION IN DRILLING FLUID OVER THE LA...A CRITICAL REVIEW OF NANOTECHNOLOGY APPLICATION IN DRILLING FLUID OVER THE LA...
A CRITICAL REVIEW OF NANOTECHNOLOGY APPLICATION IN DRILLING FLUID OVER THE LA...Syed Dzafeer Syed Idrus
 
Кондитерская Sweet time+ Команда Five
Кондитерская Sweet time+ Команда FiveКондитерская Sweet time+ Команда Five
Кондитерская Sweet time+ Команда FiveSymbatik Ospanova
 
Tour nha trang tết âm lịch 2016
Tour nha trang tết âm lịch 2016Tour nha trang tết âm lịch 2016
Tour nha trang tết âm lịch 2016Tour Vietbalo
 
Sistema de Informacion Hidrica de la Cuenca del Lago Poopó
Sistema de Informacion Hidrica de la Cuenca del Lago PoopóSistema de Informacion Hidrica de la Cuenca del Lago Poopó
Sistema de Informacion Hidrica de la Cuenca del Lago Poopócuencapoopo
 
ISO 9001:2008 para Prendamex
ISO 9001:2008 para PrendamexISO 9001:2008 para Prendamex
ISO 9001:2008 para PrendamexPrendamex
 
Guia metodológica para la enseñanza de lenguaje y comunicación
Guia metodológica para la enseñanza de lenguaje y comunicaciónGuia metodológica para la enseñanza de lenguaje y comunicación
Guia metodológica para la enseñanza de lenguaje y comunicaciónguest301f7126
 

Andere mochten auch (9)

03 tercera sesión interactiva definitiva
03 tercera sesión interactiva definitiva03 tercera sesión interactiva definitiva
03 tercera sesión interactiva definitiva
 
Динара Шаймерден-Приложение рецептов-Конкуренты
Динара Шаймерден-Приложение рецептов-КонкурентыДинара Шаймерден-Приложение рецептов-Конкуренты
Динара Шаймерден-Приложение рецептов-Конкуренты
 
A CRITICAL REVIEW OF NANOTECHNOLOGY APPLICATION IN DRILLING FLUID OVER THE LA...
A CRITICAL REVIEW OF NANOTECHNOLOGY APPLICATION IN DRILLING FLUID OVER THE LA...A CRITICAL REVIEW OF NANOTECHNOLOGY APPLICATION IN DRILLING FLUID OVER THE LA...
A CRITICAL REVIEW OF NANOTECHNOLOGY APPLICATION IN DRILLING FLUID OVER THE LA...
 
Кондитерская Sweet time+ Команда Five
Кондитерская Sweet time+ Команда FiveКондитерская Sweet time+ Команда Five
Кондитерская Sweet time+ Команда Five
 
Tour nha trang tết âm lịch 2016
Tour nha trang tết âm lịch 2016Tour nha trang tết âm lịch 2016
Tour nha trang tết âm lịch 2016
 
Sistema de Informacion Hidrica de la Cuenca del Lago Poopó
Sistema de Informacion Hidrica de la Cuenca del Lago PoopóSistema de Informacion Hidrica de la Cuenca del Lago Poopó
Sistema de Informacion Hidrica de la Cuenca del Lago Poopó
 
ISO 9001:2008 para Prendamex
ISO 9001:2008 para PrendamexISO 9001:2008 para Prendamex
ISO 9001:2008 para Prendamex
 
Housing Market Trends Report: Spring 2016
Housing Market Trends Report: Spring 2016Housing Market Trends Report: Spring 2016
Housing Market Trends Report: Spring 2016
 
Guia metodológica para la enseñanza de lenguaje y comunicación
Guia metodológica para la enseñanza de lenguaje y comunicaciónGuia metodológica para la enseñanza de lenguaje y comunicación
Guia metodológica para la enseñanza de lenguaje y comunicación
 

Ähnlich wie XXX EBC Data Analysis Biweekly Report

Leading Indicator Program OverView Rev A
Leading  Indicator Program OverView Rev ALeading  Indicator Program OverView Rev A
Leading Indicator Program OverView Rev APhil Rochette
 
User Manual - Final Project 2015
User Manual - Final Project 2015User Manual - Final Project 2015
User Manual - Final Project 2015Chafic Bouchakra
 
SoftQL - Telecom Triage Services
SoftQL - Telecom Triage Services SoftQL - Telecom Triage Services
SoftQL - Telecom Triage Services Amar Uppalapati
 
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...IRJET Journal
 
IRJET- Optimum Design of PSO based Tuning using PID Controller for an Automat...
IRJET- Optimum Design of PSO based Tuning using PID Controller for an Automat...IRJET- Optimum Design of PSO based Tuning using PID Controller for an Automat...
IRJET- Optimum Design of PSO based Tuning using PID Controller for an Automat...IRJET Journal
 
A Comparative Study of PID and Fuzzy Controller for Speed Control of Brushles...
A Comparative Study of PID and Fuzzy Controller for Speed Control of Brushles...A Comparative Study of PID and Fuzzy Controller for Speed Control of Brushles...
A Comparative Study of PID and Fuzzy Controller for Speed Control of Brushles...IRJET Journal
 
2018 Ford 6.7L Charging System
2018 Ford 6.7L Charging System 2018 Ford 6.7L Charging System
2018 Ford 6.7L Charging System OBD Codex
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsJim White
 
QCP user manual EN.pdf
QCP user manual EN.pdfQCP user manual EN.pdf
QCP user manual EN.pdfEmerson Ceras
 
Integrated master plan (imp) - the foundation of the program success
Integrated master plan (imp) - the foundation of the program successIntegrated master plan (imp) - the foundation of the program success
Integrated master plan (imp) - the foundation of the program successGlen Alleman
 
Misión, Función y Estructura Organizacional de los Servicios del Departamento...
Misión, Función y Estructura Organizacional de los Servicios del Departamento...Misión, Función y Estructura Organizacional de los Servicios del Departamento...
Misión, Función y Estructura Organizacional de los Servicios del Departamento...Rigoberto José Meléndez Cuauro
 
PE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdfPE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdfClaudiomarConceioCos
 
IRJET- Design, Analysis and Implementation of Spirometer
IRJET-  	  Design, Analysis and Implementation of SpirometerIRJET-  	  Design, Analysis and Implementation of Spirometer
IRJET- Design, Analysis and Implementation of SpirometerIRJET Journal
 
RBI for Power Generation
RBI for Power GenerationRBI for Power Generation
RBI for Power GenerationNikhil Kumar
 
huawei-s5731-s24n4x2q-a-brochure-datasheet.pdf
huawei-s5731-s24n4x2q-a-brochure-datasheet.pdfhuawei-s5731-s24n4x2q-a-brochure-datasheet.pdf
huawei-s5731-s24n4x2q-a-brochure-datasheet.pdfHi-Network.com
 
Pcu230 pi pump_controlwithpf400drives_rev_a
Pcu230 pi pump_controlwithpf400drives_rev_aPcu230 pi pump_controlwithpf400drives_rev_a
Pcu230 pi pump_controlwithpf400drives_rev_aconfidencial
 
David Chase, Reducing Energy Consumption
David Chase, Reducing Energy ConsumptionDavid Chase, Reducing Energy Consumption
David Chase, Reducing Energy ConsumptionDavid Chase
 

Ähnlich wie XXX EBC Data Analysis Biweekly Report (20)

Fmea
FmeaFmea
Fmea
 
Leading Indicator Program OverView Rev A
Leading  Indicator Program OverView Rev ALeading  Indicator Program OverView Rev A
Leading Indicator Program OverView Rev A
 
User Manual - Final Project 2015
User Manual - Final Project 2015User Manual - Final Project 2015
User Manual - Final Project 2015
 
SoftQL - Telecom Triage Services
SoftQL - Telecom Triage Services SoftQL - Telecom Triage Services
SoftQL - Telecom Triage Services
 
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
 
IRJET- Optimum Design of PSO based Tuning using PID Controller for an Automat...
IRJET- Optimum Design of PSO based Tuning using PID Controller for an Automat...IRJET- Optimum Design of PSO based Tuning using PID Controller for an Automat...
IRJET- Optimum Design of PSO based Tuning using PID Controller for an Automat...
 
A Comparative Study of PID and Fuzzy Controller for Speed Control of Brushles...
A Comparative Study of PID and Fuzzy Controller for Speed Control of Brushles...A Comparative Study of PID and Fuzzy Controller for Speed Control of Brushles...
A Comparative Study of PID and Fuzzy Controller for Speed Control of Brushles...
 
2018 Ford 6.7L Charging System
2018 Ford 6.7L Charging System 2018 Ford 6.7L Charging System
2018 Ford 6.7L Charging System
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE Transactions
 
QCP user manual EN.pdf
QCP user manual EN.pdfQCP user manual EN.pdf
QCP user manual EN.pdf
 
Integrated master plan (imp) - the foundation of the program success
Integrated master plan (imp) - the foundation of the program successIntegrated master plan (imp) - the foundation of the program success
Integrated master plan (imp) - the foundation of the program success
 
FMEA Presentation V1.1
FMEA Presentation V1.1FMEA Presentation V1.1
FMEA Presentation V1.1
 
Misión, Función y Estructura Organizacional de los Servicios del Departamento...
Misión, Función y Estructura Organizacional de los Servicios del Departamento...Misión, Función y Estructura Organizacional de los Servicios del Departamento...
Misión, Función y Estructura Organizacional de los Servicios del Departamento...
 
PE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdfPE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdf
 
IRJET- Design, Analysis and Implementation of Spirometer
IRJET-  	  Design, Analysis and Implementation of SpirometerIRJET-  	  Design, Analysis and Implementation of Spirometer
IRJET- Design, Analysis and Implementation of Spirometer
 
RBI for Power Generation
RBI for Power GenerationRBI for Power Generation
RBI for Power Generation
 
huawei-s5731-s24n4x2q-a-brochure-datasheet.pdf
huawei-s5731-s24n4x2q-a-brochure-datasheet.pdfhuawei-s5731-s24n4x2q-a-brochure-datasheet.pdf
huawei-s5731-s24n4x2q-a-brochure-datasheet.pdf
 
Pcu230 pi pump_controlwithpf400drives_rev_a
Pcu230 pi pump_controlwithpf400drives_rev_aPcu230 pi pump_controlwithpf400drives_rev_a
Pcu230 pi pump_controlwithpf400drives_rev_a
 
Honey process manager
Honey   process  managerHoney   process  manager
Honey process manager
 
David Chase, Reducing Energy Consumption
David Chase, Reducing Energy ConsumptionDavid Chase, Reducing Energy Consumption
David Chase, Reducing Energy Consumption
 

XXX EBC Data Analysis Biweekly Report

  • 1. This report is prepared by the PMO EBC Diagnostic Team using parameter trending and Cumulative Summation (CUSUM) analysis. For questions, comments, and suggestions, please contact M Khairul Syahir (x7434) or Mior Muzaffar (x7646). FOR INTERNAL USE ONLY Page 1 of 1 PMO EBC Data Analysis Report XXX– 18 July 2015 – 1 August 2015 Reliability Management (PRM2) - PRM2/EBC-DA/2015/OSC/1 This report is a biweekly results summary of analysis performed on equipment parameters data as recorded from the EBC Handheld program. EBC ROUNDS COMPLIANCE EBC rounds compliance for the two-week period covered in this report is satisfactory. Recommend further improvements of EBC rounds to increase the accuracy of data analysis. Good EBC rounds compliance (more than 80% completed) is needed to ensure good accuracy of data analysis, and that any early indications of failure can be detected and mitigated. EQUIPMENT STATUS: CLOSE MONITORING REQUIRED From our EBC Handheld data analysis, the following equipment are found to be operating outside of the normal operating envelope, or showing signs of degradation. Close monitoring is recommended. Tag ID Equipment System Findings Generator EDG Battery No 1 HiHi (13.1 Volt) Diesel day tank Firewater System Diesel Day Tank Level LoLo (70%) Fuel gas scrubber Fuel Gas System Inlet temperature showing increasing trending EQUIPMENT STATUS: NORMAL EBC Handheld data analysis does not indicate any cause for concern for the following equipment. Continue with routine EBC rounds. Equipment Status Equipment Status Equipment Status P-5431 Normal P-5156 Normal HX-5402 Normal P-5432 Normal G-5415 Normal P-5543 Normal P-5433 Normal P-5471 Normal TK-5540 Normal P-5434 Normal P-5472 Normal TK-5541 Normal P-5530 Normal P-5473 Normal C-5450 Normal P-5531 Normal P-5474 Normal C-5460 Normal P-5532 Normal P-5475 Normal C-5470 Normal P-5533 Normal P-5477 Normal D-5457A Normal V-5430 Normal TK-5470 Normal D-5457B Normal WS-5437 Normal TK-5478 Normal D-5467A Normal WS-5439 Normal V-5424 Normal D-5467B Normal P-5150 Normal V-5425 Normal V-5400 Normal P-5151 Normal HX-5401 Normal V-5455 Normal P-5155 Normal P-5542 Normal V-5465 Normal Note: this analysis involves only the equipment covered under the EBC Handheld program, as agreed with the operations team. Additional equipment coverage may be added if necessary. Report Issuance Date: 22 May 2016 Completed, 60% Missed, 40%