SlideShare ist ein Scribd-Unternehmen logo
1 von 49
Downloaden Sie, um offline zu lesen
www.seai.ie
This event is being recorded
WebEx Housekeeping
2 www.seai.ie
Attendees are muted with cameras off
Questions submitted by clicking Q&A bubble
Questions will be answered at end of event
An FAQ will be created and shared from all questions submitted
A recording and slides will be distributed after the event
Quality Management Systems
Training
Grants, Compliance & Support
Better Energy Homes & Solar PV
Monday 7th November 2022
3
• Grants are intended to support homeowners
undertake energy upgrades to their homes
• Homeowner pays for the upgrade and claims the
grant on eligible works
• Funded by the Exchequer
• SEAI administer the grants on behalf of the
government and the Irish taxpayer
• Governance responsibilities
 Appropriate use of public funds
 Works achieve the emissions reductions & energy efficiency
targets
 Works meet minimum installation standards
Individual energy upgrade grants
4 www.seai.ie
Good compliance - stakeholder benefits
5 www.seai.ie
Contractors/Installers
 Reduced costs
 Faster payments
 Fewer reworks
 Higher customer
satisfaction
 Good compliance
record
Homeowners
 Faster grant payment
 High quality installation
 Genuine energy
savings
 More comfortable &
healthy living
environment
 Higher customer
satisfaction
Taxpayer
 Emissions reductions
 Improved energy
efficiency in housing
stock
 Return on investment
 Achievement of climate
action targets
Supports Available
6 www.seai.ie
• SEAI website: www.seai.ie
• ‘Support for Contractors’ webpage: www.seai.ie/grants/supports-for-contractors/
 Scheme Documents
 Training Videos
 Technical Bulletins
 Guidance Documents
• Solar PV webpage: www.seai.ie/grants/home-energy-grants/solar-electricity-grant/
 Scheme Documents
 Technical Bulletins
 Guidance Documents
Better Energy Homes Contact
 General queries: 01 808 2004 or
contractor@betterenergyhomes.ie
 Inspection/technical queries: 01 277 6977 or
inspections@betterenergyhomes.ie
Solar PV Contact
 General queries: 01 808 2004 or SolarPV@seai.ie
 Inspection/technical queries: 01 277 6977 or
solarpv@seaiauditing.ie
Thank you!
© Optien Ltd
Quality Management System
Training
Prepared for: SEAI
Presented By: Richard Morrison
Contact richard.morrison@optien.ie
Date: 7th November 2022
© Optien Ltd 9
Introduction
Richard Morrison Optien
 Lead Management System Auditor
 QMS Auditor on behalf of SEAI
 LEAN 6 Sigma Blackbelt
 Implementing management systems
 TC 301 ISO committee member
 Member of NSAI Standards committee
© Optien Ltd
1 www.seai.ie
General principles of Quality Management
5 Minute Break
Planning for quality success
Installation Works
QA Checks
Questions & Answers
Agenda
© Optien Ltd 11
Definitions
quality: the standard of something
as measured against other things
of a similar kind; the degree of
excellence of something.
Example: "an improvement in
product quality"
© Optien Ltd 12
What is a Quality Management System?
A quality management system (QMS) is defined as
“a formalized system that documents processes, procedures, and
responsibilities for achieving quality policies and objectives”.
A QMS helps coordinate and direct an organization’s activities to meet
customer and regulatory requirements and improve its effectiveness and
efficiency on a continuous basis.
Source: American Society for Quality
© Optien Ltd 13
Frameworks
Quality Management frameworks should be closely modelled
on the ISO9001, ISO14001, ISO45001 and ISO50001
management system models of continuous improvement and
all generally follow the Demmings cycle of continuous
improvement the Plan - Do - Check - Act (PDCA) Cycle
Plan: establish the objectives of the system and plan the associated
processes, and resources required
Do: implement the process
Check: monitor the process and associated results and compare these to
the planned objectives
Act: Take corrective action to improve the process
© Optien Ltd 14
ISO 9001 Representation of PDCA
© Optien Ltd 15
QMS Inputs
 Context
 Internal and external issues
 Customer Requirements
 Grants, function, QA,
customer service, schedule
cost etc.
 Needs and Expectations
 Customers
 SEAI
 ESB Networks, Gas
Networks Ireland
 Regulators, planners, etc.
 RECI, RGI, NSAI,
© Optien Ltd 16
QMS Leadership
 Demonstrate Leadership
 Commitment to Quality
 Quality Policy
 Integration of Quality into
business processes
 Provide necessary
resources
 Ensure intended
outcomes are delivered
 Continuous quality
improvement
 Customer focus
© Optien Ltd 17
QMS Planning
 Risks & Opportunities
 Identify risks and
opportunities associated
with quality
 Take action to address
risks
 Quality Objectives
 Set Quality Objectives
 Planning of Changes
 Plan for changes to the
QMS
 Understand Quality risks
© Optien Ltd 18
QMS Support & Operations
 Resources
 Determine and provide
necessary resources
 Infrastructure
 Determine and provide
necessary infrastructure i.e.
ICT, buildings transport, etc.
 Environment
 Culture of organisation
 Monitoring & Measuring
 Competence
 Awareness
 Communication
 Operation
 Inputs-Process-Outputs
© Optien Ltd 19
QMS Performance Evaluation
 Monitoring &
Measurement
 Process monitoring
(inspections)
 Customer satisfaction
 Evaluation of
performance
 Internal Audits
 Routine checking that
process works (not
inspections)
 Management Review
 Strategic review of QMS
© Optien Ltd 20
QMS Improvement
 Improvement Opportunities
 To meet customer
requirements
 Enhance customer
satisfaction
 Nonconformity
 Identify, record, react, control
and prevent future NC’s
 Continual Improvement
 Suitability, adequacy and
effectiveness of QMS
© Optien Ltd 21
QMS Planning
 Customer Satisfaction
 Meeting Needs and
Expectations of interested
parties
© Optien Ltd 22
Benefits of Quality Management
Benefits
Meet with customer requirements
Compliance with Legal and
Contractual requirements in cost
effective manner
Instil confidence (more customers,
increased sales, etc)
Defined processes
Reduced waste
Prevents mistakes and reworks
Lowers costs
Upskilling through training
Barriers
We are too busy for this QMS
We know what the customer
wants
We have been doing this for 20
years…..
We have no complaints
We never make mistakes
Costs are always rising anyway
We don’t need training
© Optien Ltd
2 www.seai.ie
General principles of Quality Management
5 Minute Break
Planning for quality success
Installation Works
QA Checks
Questions & Answers
Agenda
© Optien Ltd
2 www.seai.ie
General principles of Quality Management
5 Minute Break
Planning for quality success
Installation Works
QA Checks
Questions & Answers
Agenda
© Optien Ltd 25
“If you fail to plan, you are planning to fail”
Source: Benjamin Franklin, Winston Churchill, Roy Keane
© Optien Ltd 26
Quality Policy
Develop a quality policy or statement outlining the scope of the quality framework, i.e. what
measures activities and schemes are included
 The policy should contain a commitment to:
 deliver high quality Energy Measures.
 continuously improve the quality framework.
 comply with the requirements of the respective schemes within the scope of the quality
framework and take cognisance of the scheme guidance.
 commit the necessary resources for the delivery of the policy objectives.
Communicate the policy to pertinent stakeholders and interested parties.
© Optien Ltd 27
General Requirements
 Identify relevant Stakeholders and Interested Parties relevant to the
delivery of high quality measures
 Identify their needs and expectations
 Document how these needs and expectations will be met.
© Optien Ltd 28
Legal Requirements
 Identify Legal, contractual, grant requirements associated with the
schemes within the scope of the QMS.
 Identify list of requirements,
 Document how these requirements will be met.
© Optien Ltd 29
Responsibilities
 Identify who is responsible for the Stakeholders and Interested Parties
relevant to the delivery of high quality measures
 Identify their needs and expectations
 Document how these needs and expectations will be met.
© Optien Ltd 30
Competency
 Identify what competencies are required for the installation of the various
measures and the completion of the applicable tasks
 Identify the tasks required to be completed, include both installation,
commissioning and checking of the works.
 Document the competency requirements and expectations of your organisation
© Optien Ltd 31
DTSS Appendix 2 Installer Competencies
© Optien Ltd 32
Communications
 Identify the communication requirements for the installation of the various
measures and the completion of the applicable tasks
 Identify the communication topic, means of communication, the recipient of the
communication and the frequency of communications.
 Complete as appropriate to the size, complexity of your organisation.
© Optien Ltd 33
Operations Process
The Scheme Delivery Contractor should define a Quality Process, which
incorporates the following key elements:
1. Inputs required
2. Process and its interactive effects
3. Outputs expected from the process
4. Monitoring points throughout the process in order to ensure consistency
Throughout the process the roles and responsibilities of various stakeholders
in the process should be defined and the process should be regularly
reviewed for improvement.
© Optien Ltd 34
Representation of a Process
Source: ISO9001:2015
© Optien Ltd 35
Operations Process
Inputs
 Customer base and engagement,
 Competency requirements for the
measures being implemented,
 Identification of risks to project
execution,
 Identification of appropriate
personnel to install the measures,
 Identification of Scheme Guidance
and standards,
 Information required for to
support the QA process of SEAI
and other stakeholders in the
scheme,
 Previous energy measures
implemented associated with the
customer
Process
 Document the process
associated with the
implementation of the measure,
 Record evidence of the correct
implementation of the measure
 Complete the QA checks on the
measure and,
 Retain documented information
associated with the
implementation of the measure
(Photos, QADP, installation and
or commissioning certification,
Declaration of works, Customer
Waver etc.)
Output
 Complete the QA Checks
 File the QA Documentation on
the appropriate system for
record retention
 Complete the contractual
elements of the engagement
with the customer
© Optien Ltd 36
Monitoring and Measurement
 Quality of works should be monitored including.
 Competency of installers and sub contractors
 Snag list or internal inspection results
 External inspection reports
 Internal Audits
 Customer complaints
 Issues identified should be recorded.
 Issues inform the continuous improvement process
© Optien Ltd 37
Internal Audits
 Internal Audit of a statistically significant proportion of measures installed.
 When developing the audit schedule, consider
 track record of installers and subcontractors,
 results of previous audits and inspections
 the region serviced,
 number of measures implemented
 identified risks
 Issues identified should be recorded.
 Issues inform the continuous improvement process
© Optien Ltd 38
Senior Management Review
 Completed at planned intervals to ensure the continuing suitability
adequacy and effectiveness of the quality management system considering
the following:
 Strategic review
 Risks (SEAI Inspection Rate, Penalty Points, Contractor performance, etc)
 Opportunities
 Performance from quality perspective
 Customer complaints
© Optien Ltd 39
Non-Conformities
 Develop a system for recording and managing non-conformities and issues. The
system should include the following:
 Identifying and recording the issue
 Taking action to correct the issue and to adequately deal with its consequences
 Analyse the potential for recurrence and taking action to prevent this
 Periodically review the effectiveness of corrections taken
 When reacting to non-conformances the appropriateness of the response should
be appropriate to the severity of the non-conformance.
 Note: this is a key element of continuous improvement
© Optien Ltd
4 www.seai.ie
General principles of Quality Management
5 Minute Break
Planning for quality success
Installation Works
QA Checks
Questions & Answers
Agenda
© Optien Ltd 41
Installation Works DTSS
Domestic Technical Standards and Specifications
 A reference for Contractors carrying out dwelling energy upgrade works
under SEAI domestic programmes including: Better Energy Homes, Better
Energy Warmer Homes, Solar PV, Warmth and Wellbeing, National Home
Energy Upgrade Scheme (One Stop Shop Service), and others.
It sets out the following:
 general competence,
 standards and specifications
that Contractors should possess, and adhere to, in carrying out works
supported by the Programmes.
© Optien Ltd 42
Installation Works
© Optien Ltd 43
NSAI SR 54
Code of practice for the energy efficient retrofit of dwellings
The S.R. provides technical guidance on the energy efficient retrofit of the
building fabric and services, the application of retrofit measures on a whole
dwelling basis, general building science and the management of retrofit
projects.
The intended audience for this Standard Recommendation are property
managers, designers, specifiers and installers working on energy efficient
retrofit projects for dwellings.
© Optien Ltd
4 www.seai.ie
General principles of Quality Management
5 Minute Break
Planning for quality success
Installation Works
QA Checks
Questions & Answers
Agenda
© Optien Ltd 45
Inspection and QA
Purpose of the inspection is as outlined in the definition:
 Definition of inspection:
 the act of looking at something carefully, or an official visit to a building or organization to check that
something is in good condition, or that rules are being obeyed.
 We need to ensure that the inspections of the works check that:
 Rules are being followed (DTSS)
 Compliance with legal requirements (RGII, RECI, etc)
 Measure functions as intended
 Records of inspection need to be maintained
 QADP checklist for the measure or similar inspection
© Optien Ltd 46
Heat Pump Installation Example
© Optien Ltd 47
Inspection Process
 Develop your QA checklist based on the following:
 SEAI QADP,
 NSAI SR 54
 Manufacturers recommendations
 Experience (previous audit findings, customer complaints etc.)
 Provide training on the use of the inspection checklist
 Record the results on checklist
 Transfer the issues into the NC log for tracking and continuous
improvement log
 Track the issues to closure
 Learn from issues to improve the system
© Optien Ltd
4 www.seai.ie
General principles of Quality Management
5 Minute Break
Planning for quality success
Installation Works
QA Checks
Questions & Answers
Agenda
© Optien Ltd 49
Thank you for your attention
Contact richard.morrison@optien.ie

Weitere ähnliche Inhalte

Was ist angesagt?

Energy management-1 (intro).pptx
Energy management-1 (intro).pptxEnergy management-1 (intro).pptx
Energy management-1 (intro).pptxNasirRafique10
 
Project on energy audit (mahindra & mahindra)
Project on energy audit (mahindra & mahindra)Project on energy audit (mahindra & mahindra)
Project on energy audit (mahindra & mahindra)Prithu Sureka
 
Overview on iso 50001 energy management system
Overview on iso 50001 energy management systemOverview on iso 50001 energy management system
Overview on iso 50001 energy management systemiso50001consultant
 
Design, an easy tool to integrate the Circular Economy
Design, an easy tool to integrate the Circular EconomyDesign, an easy tool to integrate the Circular Economy
Design, an easy tool to integrate the Circular EconomyWiithaa
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Anish Maman
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit Darshan Vithani
 
Presentation On German Renewable Energy On 23
Presentation On German Renewable Energy On 23Presentation On German Renewable Energy On 23
Presentation On German Renewable Energy On 23Jasbir Arora
 
Tips for energy conservation for industries
Tips for energy conservation for industriesTips for energy conservation for industries
Tips for energy conservation for industriesKamlesh Hariyani
 
Reduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar PresentationReduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar PresentationSustainableEnergyAut
 
Metso 2017 H1 Half-year Review presentation
Metso 2017 H1 Half-year Review presentationMetso 2017 H1 Half-year Review presentation
Metso 2017 H1 Half-year Review presentationMetso Group
 
Solar product business plan
Solar product business planSolar product business plan
Solar product business planKamlesh Kumar
 
ISO 50001 & Energy Management System (EMS)
ISO 50001 & Energy Management System (EMS)ISO 50001 & Energy Management System (EMS)
ISO 50001 & Energy Management System (EMS)TecnoVeritas
 
Strategic Purchasing Supply Initiatives
Strategic Purchasing Supply InitiativesStrategic Purchasing Supply Initiatives
Strategic Purchasing Supply Initiativesignasuhe
 

Was ist angesagt? (20)

EV Smart Charger
EV Smart Charger EV Smart Charger
EV Smart Charger
 
Energy management-1 (intro).pptx
Energy management-1 (intro).pptxEnergy management-1 (intro).pptx
Energy management-1 (intro).pptx
 
Energy Management
Energy ManagementEnergy Management
Energy Management
 
ISO 20400:2017 (Sustainable Procurement) Awareness Training
ISO 20400:2017 (Sustainable Procurement) Awareness TrainingISO 20400:2017 (Sustainable Procurement) Awareness Training
ISO 20400:2017 (Sustainable Procurement) Awareness Training
 
Project on energy audit (mahindra & mahindra)
Project on energy audit (mahindra & mahindra)Project on energy audit (mahindra & mahindra)
Project on energy audit (mahindra & mahindra)
 
Overview on iso 50001 energy management system
Overview on iso 50001 energy management systemOverview on iso 50001 energy management system
Overview on iso 50001 energy management system
 
Making trade work for EU climate policy: Carbon border adjustment or product ...
Making trade work for EU climate policy: Carbon border adjustment or product ...Making trade work for EU climate policy: Carbon border adjustment or product ...
Making trade work for EU climate policy: Carbon border adjustment or product ...
 
Design, an easy tool to integrate the Circular Economy
Design, an easy tool to integrate the Circular EconomyDesign, an easy tool to integrate the Circular Economy
Design, an easy tool to integrate the Circular Economy
 
GHG Protocol Scope 2 Guidance: Electricity procurement
GHG Protocol Scope 2 Guidance: Electricity procurementGHG Protocol Scope 2 Guidance: Electricity procurement
GHG Protocol Scope 2 Guidance: Electricity procurement
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit
 
Energy Audit in buildings
Energy Audit in buildings Energy Audit in buildings
Energy Audit in buildings
 
Monitoring process
Monitoring processMonitoring process
Monitoring process
 
Presentation On German Renewable Energy On 23
Presentation On German Renewable Energy On 23Presentation On German Renewable Energy On 23
Presentation On German Renewable Energy On 23
 
Tips for energy conservation for industries
Tips for energy conservation for industriesTips for energy conservation for industries
Tips for energy conservation for industries
 
Reduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar PresentationReduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar Presentation
 
Metso 2017 H1 Half-year Review presentation
Metso 2017 H1 Half-year Review presentationMetso 2017 H1 Half-year Review presentation
Metso 2017 H1 Half-year Review presentation
 
Solar product business plan
Solar product business planSolar product business plan
Solar product business plan
 
ISO 50001 & Energy Management System (EMS)
ISO 50001 & Energy Management System (EMS)ISO 50001 & Energy Management System (EMS)
ISO 50001 & Energy Management System (EMS)
 
Strategic Purchasing Supply Initiatives
Strategic Purchasing Supply InitiativesStrategic Purchasing Supply Initiatives
Strategic Purchasing Supply Initiatives
 

Ähnlich wie SEAI Quality Management Systems Fundimentals

Quality Awareness Program.ppt
Quality Awareness Program.pptQuality Awareness Program.ppt
Quality Awareness Program.pptqcselva1
 
opm101chapter5_000.ppt
opm101chapter5_000.pptopm101chapter5_000.ppt
opm101chapter5_000.pptNBAdypcet
 
Total quality management
Total quality managementTotal quality management
Total quality managementUsamaMasood27
 
ISO 22301:2019 (Business Continuity Management Systems) Awareness Training
ISO 22301:2019 (Business Continuity Management Systems) Awareness TrainingISO 22301:2019 (Business Continuity Management Systems) Awareness Training
ISO 22301:2019 (Business Continuity Management Systems) Awareness TrainingOperational Excellence Consulting
 
ISO 9001 Foundation Training Course - Sample Slides
ISO 9001 Foundation Training Course - Sample SlidesISO 9001 Foundation Training Course - Sample Slides
ISO 9001 Foundation Training Course - Sample SlidesStratos Lazaridis
 
Process Measurement - BPM Roundtable QLD
Process Measurement - BPM Roundtable QLDProcess Measurement - BPM Roundtable QLD
Process Measurement - BPM Roundtable QLDLeonardo Consulting
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptOswaldo Gonzales
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality ManagementZia Mohi U Din
 
Gas Service Excellence Presentation 20 May 2010 Ms Final
Gas Service Excellence Presentation   20 May 2010   Ms   FinalGas Service Excellence Presentation   20 May 2010   Ms   Final
Gas Service Excellence Presentation 20 May 2010 Ms Finalmseaborn
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Evbex
 
The MALCOM Baldrige national quality award
The MALCOM Baldrige national quality awardThe MALCOM Baldrige national quality award
The MALCOM Baldrige national quality awardRuqaiya Vasi
 
Deepak_Jain_12NOV15
Deepak_Jain_12NOV15Deepak_Jain_12NOV15
Deepak_Jain_12NOV15Deepak Jain
 
Mc phillips integrated management system manual (1)
Mc phillips integrated management system manual (1)Mc phillips integrated management system manual (1)
Mc phillips integrated management system manual (1)Abid Iqbal
 
Mc phillips integrated management system manual
Mc phillips integrated management system manualMc phillips integrated management system manual
Mc phillips integrated management system manualAbid Iqbal
 
ISO/IEC 27001 vs ISO 22301 vs ISO 31000: What you need to know
ISO/IEC 27001 vs ISO 22301 vs ISO 31000: What you need to knowISO/IEC 27001 vs ISO 22301 vs ISO 31000: What you need to know
ISO/IEC 27001 vs ISO 22301 vs ISO 31000: What you need to knowPECB
 

Ähnlich wie SEAI Quality Management Systems Fundimentals (20)

Quality Awareness Program.ppt
Quality Awareness Program.pptQuality Awareness Program.ppt
Quality Awareness Program.ppt
 
opm101chapter5_000.ppt
opm101chapter5_000.pptopm101chapter5_000.ppt
opm101chapter5_000.ppt
 
opm101chapter5_000.ppt
opm101chapter5_000.pptopm101chapter5_000.ppt
opm101chapter5_000.ppt
 
TQM.ppt
TQM.pptTQM.ppt
TQM.ppt
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
ISO 22301:2019 (Business Continuity Management Systems) Awareness Training
ISO 22301:2019 (Business Continuity Management Systems) Awareness TrainingISO 22301:2019 (Business Continuity Management Systems) Awareness Training
ISO 22301:2019 (Business Continuity Management Systems) Awareness Training
 
ISO 9001 Foundation Training Course - Sample Slides
ISO 9001 Foundation Training Course - Sample SlidesISO 9001 Foundation Training Course - Sample Slides
ISO 9001 Foundation Training Course - Sample Slides
 
GREEN BUILDING ONE STOP SERVICE
GREEN BUILDING  ONE STOP SERVICEGREEN BUILDING  ONE STOP SERVICE
GREEN BUILDING ONE STOP SERVICE
 
Process Measurement - BPM Roundtable QLD
Process Measurement - BPM Roundtable QLDProcess Measurement - BPM Roundtable QLD
Process Measurement - BPM Roundtable QLD
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.ppt
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Leaflet Green Building
Leaflet Green BuildingLeaflet Green Building
Leaflet Green Building
 
Gas Service Excellence Presentation 20 May 2010 Ms Final
Gas Service Excellence Presentation   20 May 2010   Ms   FinalGas Service Excellence Presentation   20 May 2010   Ms   Final
Gas Service Excellence Presentation 20 May 2010 Ms Final
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021
 
The MALCOM Baldrige national quality award
The MALCOM Baldrige national quality awardThe MALCOM Baldrige national quality award
The MALCOM Baldrige national quality award
 
Iso 20000 presentation
Iso 20000 presentationIso 20000 presentation
Iso 20000 presentation
 
Deepak_Jain_12NOV15
Deepak_Jain_12NOV15Deepak_Jain_12NOV15
Deepak_Jain_12NOV15
 
Mc phillips integrated management system manual (1)
Mc phillips integrated management system manual (1)Mc phillips integrated management system manual (1)
Mc phillips integrated management system manual (1)
 
Mc phillips integrated management system manual
Mc phillips integrated management system manualMc phillips integrated management system manual
Mc phillips integrated management system manual
 
ISO/IEC 27001 vs ISO 22301 vs ISO 31000: What you need to know
ISO/IEC 27001 vs ISO 22301 vs ISO 31000: What you need to knowISO/IEC 27001 vs ISO 22301 vs ISO 31000: What you need to know
ISO/IEC 27001 vs ISO 22301 vs ISO 31000: What you need to know
 

Mehr von SustainableEnergyAut

SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch SustainableEnergyAut
 
Public Sector Conference 2023 Leadership Showcase
Public Sector Conference  2023 Leadership ShowcasePublic Sector Conference  2023 Leadership Showcase
Public Sector Conference 2023 Leadership ShowcaseSustainableEnergyAut
 
SEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - BriefingSEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - BriefingSustainableEnergyAut
 
Reduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home OfficeReduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home OfficeSustainableEnergyAut
 
SME Business Briefing November 2022
SME Business Briefing November 2022SME Business Briefing November 2022
SME Business Briefing November 2022SustainableEnergyAut
 
Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022SustainableEnergyAut
 
Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022 Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022 SustainableEnergyAut
 
Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022SustainableEnergyAut
 
Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022SustainableEnergyAut
 
Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022SustainableEnergyAut
 
Meet the Buyers Schools Workshop Presentation
Meet the Buyers Schools Workshop  Presentation Meet the Buyers Schools Workshop  Presentation
Meet the Buyers Schools Workshop Presentation SustainableEnergyAut
 
DEAP Ventilation Webinar Presentation Q3 2022
DEAP Ventilation Webinar Presentation Q3 2022 DEAP Ventilation Webinar Presentation Q3 2022
DEAP Ventilation Webinar Presentation Q3 2022 SustainableEnergyAut
 
Professor Patrick Devine-Wright - SEAI National Energy Research & Policy Conf...
Professor Patrick Devine-Wright - SEAI National Energy Research & Policy Conf...Professor Patrick Devine-Wright - SEAI National Energy Research & Policy Conf...
Professor Patrick Devine-Wright - SEAI National Energy Research & Policy Conf...SustainableEnergyAut
 
Dr Claire Haggett - SEAI National Energy Research & Policy Conference 2022
Dr Claire Haggett - SEAI National Energy Research & Policy Conference 2022Dr Claire Haggett - SEAI National Energy Research & Policy Conference 2022
Dr Claire Haggett - SEAI National Energy Research & Policy Conference 2022SustainableEnergyAut
 
Dr Christina Demski - SEAI National Energy Research & Policy Conference 2022
Dr Christina Demski - SEAI National Energy Research & Policy Conference 2022Dr Christina Demski - SEAI National Energy Research & Policy Conference 2022
Dr Christina Demski - SEAI National Energy Research & Policy Conference 2022SustainableEnergyAut
 
Katie Harrington - SEAI National Energy Research & Policy Conference 2022
Katie Harrington - SEAI National Energy Research & Policy Conference 2022Katie Harrington - SEAI National Energy Research & Policy Conference 2022
Katie Harrington - SEAI National Energy Research & Policy Conference 2022SustainableEnergyAut
 
Jean-Pierre Roux - SEAI National Energy Research & Policy Conference 2022
Jean-Pierre Roux - SEAI National Energy Research & Policy Conference 2022Jean-Pierre Roux - SEAI National Energy Research & Policy Conference 2022
Jean-Pierre Roux - SEAI National Energy Research & Policy Conference 2022SustainableEnergyAut
 
Dr Róisín Moriarty - SEAI National Energy Research & Policy Conference 2022
Dr Róisín Moriarty -  SEAI National Energy Research & Policy Conference 2022Dr Róisín Moriarty -  SEAI National Energy Research & Policy Conference 2022
Dr Róisín Moriarty - SEAI National Energy Research & Policy Conference 2022SustainableEnergyAut
 
Dr Noreen Brennan - SEAI National Energy Research & Policy Conference 2022
Dr Noreen Brennan - SEAI National Energy Research & Policy Conference 2022Dr Noreen Brennan - SEAI National Energy Research & Policy Conference 2022
Dr Noreen Brennan - SEAI National Energy Research & Policy Conference 2022SustainableEnergyAut
 
Dr Niall Dunphy - SEAI National Energy Research & Policy Conference 2022
Dr Niall Dunphy - SEAI National Energy Research & Policy Conference 2022Dr Niall Dunphy - SEAI National Energy Research & Policy Conference 2022
Dr Niall Dunphy - SEAI National Energy Research & Policy Conference 2022SustainableEnergyAut
 

Mehr von SustainableEnergyAut (20)

SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
 
Public Sector Conference 2023 Leadership Showcase
Public Sector Conference  2023 Leadership ShowcasePublic Sector Conference  2023 Leadership Showcase
Public Sector Conference 2023 Leadership Showcase
 
SEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - BriefingSEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - Briefing
 
Reduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home OfficeReduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home Office
 
SME Business Briefing November 2022
SME Business Briefing November 2022SME Business Briefing November 2022
SME Business Briefing November 2022
 
Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022
 
Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022 Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022
 
Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022
 
Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022
 
Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022
 
Meet the Buyers Schools Workshop Presentation
Meet the Buyers Schools Workshop  Presentation Meet the Buyers Schools Workshop  Presentation
Meet the Buyers Schools Workshop Presentation
 
DEAP Ventilation Webinar Presentation Q3 2022
DEAP Ventilation Webinar Presentation Q3 2022 DEAP Ventilation Webinar Presentation Q3 2022
DEAP Ventilation Webinar Presentation Q3 2022
 
Professor Patrick Devine-Wright - SEAI National Energy Research & Policy Conf...
Professor Patrick Devine-Wright - SEAI National Energy Research & Policy Conf...Professor Patrick Devine-Wright - SEAI National Energy Research & Policy Conf...
Professor Patrick Devine-Wright - SEAI National Energy Research & Policy Conf...
 
Dr Claire Haggett - SEAI National Energy Research & Policy Conference 2022
Dr Claire Haggett - SEAI National Energy Research & Policy Conference 2022Dr Claire Haggett - SEAI National Energy Research & Policy Conference 2022
Dr Claire Haggett - SEAI National Energy Research & Policy Conference 2022
 
Dr Christina Demski - SEAI National Energy Research & Policy Conference 2022
Dr Christina Demski - SEAI National Energy Research & Policy Conference 2022Dr Christina Demski - SEAI National Energy Research & Policy Conference 2022
Dr Christina Demski - SEAI National Energy Research & Policy Conference 2022
 
Katie Harrington - SEAI National Energy Research & Policy Conference 2022
Katie Harrington - SEAI National Energy Research & Policy Conference 2022Katie Harrington - SEAI National Energy Research & Policy Conference 2022
Katie Harrington - SEAI National Energy Research & Policy Conference 2022
 
Jean-Pierre Roux - SEAI National Energy Research & Policy Conference 2022
Jean-Pierre Roux - SEAI National Energy Research & Policy Conference 2022Jean-Pierre Roux - SEAI National Energy Research & Policy Conference 2022
Jean-Pierre Roux - SEAI National Energy Research & Policy Conference 2022
 
Dr Róisín Moriarty - SEAI National Energy Research & Policy Conference 2022
Dr Róisín Moriarty -  SEAI National Energy Research & Policy Conference 2022Dr Róisín Moriarty -  SEAI National Energy Research & Policy Conference 2022
Dr Róisín Moriarty - SEAI National Energy Research & Policy Conference 2022
 
Dr Noreen Brennan - SEAI National Energy Research & Policy Conference 2022
Dr Noreen Brennan - SEAI National Energy Research & Policy Conference 2022Dr Noreen Brennan - SEAI National Energy Research & Policy Conference 2022
Dr Noreen Brennan - SEAI National Energy Research & Policy Conference 2022
 
Dr Niall Dunphy - SEAI National Energy Research & Policy Conference 2022
Dr Niall Dunphy - SEAI National Energy Research & Policy Conference 2022Dr Niall Dunphy - SEAI National Energy Research & Policy Conference 2022
Dr Niall Dunphy - SEAI National Energy Research & Policy Conference 2022
 

Kürzlich hochgeladen

VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 

Kürzlich hochgeladen (20)

VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 

SEAI Quality Management Systems Fundimentals

  • 2. This event is being recorded WebEx Housekeeping 2 www.seai.ie Attendees are muted with cameras off Questions submitted by clicking Q&A bubble Questions will be answered at end of event An FAQ will be created and shared from all questions submitted A recording and slides will be distributed after the event
  • 3. Quality Management Systems Training Grants, Compliance & Support Better Energy Homes & Solar PV Monday 7th November 2022 3
  • 4. • Grants are intended to support homeowners undertake energy upgrades to their homes • Homeowner pays for the upgrade and claims the grant on eligible works • Funded by the Exchequer • SEAI administer the grants on behalf of the government and the Irish taxpayer • Governance responsibilities  Appropriate use of public funds  Works achieve the emissions reductions & energy efficiency targets  Works meet minimum installation standards Individual energy upgrade grants 4 www.seai.ie
  • 5. Good compliance - stakeholder benefits 5 www.seai.ie Contractors/Installers  Reduced costs  Faster payments  Fewer reworks  Higher customer satisfaction  Good compliance record Homeowners  Faster grant payment  High quality installation  Genuine energy savings  More comfortable & healthy living environment  Higher customer satisfaction Taxpayer  Emissions reductions  Improved energy efficiency in housing stock  Return on investment  Achievement of climate action targets
  • 6. Supports Available 6 www.seai.ie • SEAI website: www.seai.ie • ‘Support for Contractors’ webpage: www.seai.ie/grants/supports-for-contractors/  Scheme Documents  Training Videos  Technical Bulletins  Guidance Documents • Solar PV webpage: www.seai.ie/grants/home-energy-grants/solar-electricity-grant/  Scheme Documents  Technical Bulletins  Guidance Documents Better Energy Homes Contact  General queries: 01 808 2004 or contractor@betterenergyhomes.ie  Inspection/technical queries: 01 277 6977 or inspections@betterenergyhomes.ie Solar PV Contact  General queries: 01 808 2004 or SolarPV@seai.ie  Inspection/technical queries: 01 277 6977 or solarpv@seaiauditing.ie
  • 8. © Optien Ltd Quality Management System Training Prepared for: SEAI Presented By: Richard Morrison Contact richard.morrison@optien.ie Date: 7th November 2022
  • 9. © Optien Ltd 9 Introduction Richard Morrison Optien  Lead Management System Auditor  QMS Auditor on behalf of SEAI  LEAN 6 Sigma Blackbelt  Implementing management systems  TC 301 ISO committee member  Member of NSAI Standards committee
  • 10. © Optien Ltd 1 www.seai.ie General principles of Quality Management 5 Minute Break Planning for quality success Installation Works QA Checks Questions & Answers Agenda
  • 11. © Optien Ltd 11 Definitions quality: the standard of something as measured against other things of a similar kind; the degree of excellence of something. Example: "an improvement in product quality"
  • 12. © Optien Ltd 12 What is a Quality Management System? A quality management system (QMS) is defined as “a formalized system that documents processes, procedures, and responsibilities for achieving quality policies and objectives”. A QMS helps coordinate and direct an organization’s activities to meet customer and regulatory requirements and improve its effectiveness and efficiency on a continuous basis. Source: American Society for Quality
  • 13. © Optien Ltd 13 Frameworks Quality Management frameworks should be closely modelled on the ISO9001, ISO14001, ISO45001 and ISO50001 management system models of continuous improvement and all generally follow the Demmings cycle of continuous improvement the Plan - Do - Check - Act (PDCA) Cycle Plan: establish the objectives of the system and plan the associated processes, and resources required Do: implement the process Check: monitor the process and associated results and compare these to the planned objectives Act: Take corrective action to improve the process
  • 14. © Optien Ltd 14 ISO 9001 Representation of PDCA
  • 15. © Optien Ltd 15 QMS Inputs  Context  Internal and external issues  Customer Requirements  Grants, function, QA, customer service, schedule cost etc.  Needs and Expectations  Customers  SEAI  ESB Networks, Gas Networks Ireland  Regulators, planners, etc.  RECI, RGI, NSAI,
  • 16. © Optien Ltd 16 QMS Leadership  Demonstrate Leadership  Commitment to Quality  Quality Policy  Integration of Quality into business processes  Provide necessary resources  Ensure intended outcomes are delivered  Continuous quality improvement  Customer focus
  • 17. © Optien Ltd 17 QMS Planning  Risks & Opportunities  Identify risks and opportunities associated with quality  Take action to address risks  Quality Objectives  Set Quality Objectives  Planning of Changes  Plan for changes to the QMS  Understand Quality risks
  • 18. © Optien Ltd 18 QMS Support & Operations  Resources  Determine and provide necessary resources  Infrastructure  Determine and provide necessary infrastructure i.e. ICT, buildings transport, etc.  Environment  Culture of organisation  Monitoring & Measuring  Competence  Awareness  Communication  Operation  Inputs-Process-Outputs
  • 19. © Optien Ltd 19 QMS Performance Evaluation  Monitoring & Measurement  Process monitoring (inspections)  Customer satisfaction  Evaluation of performance  Internal Audits  Routine checking that process works (not inspections)  Management Review  Strategic review of QMS
  • 20. © Optien Ltd 20 QMS Improvement  Improvement Opportunities  To meet customer requirements  Enhance customer satisfaction  Nonconformity  Identify, record, react, control and prevent future NC’s  Continual Improvement  Suitability, adequacy and effectiveness of QMS
  • 21. © Optien Ltd 21 QMS Planning  Customer Satisfaction  Meeting Needs and Expectations of interested parties
  • 22. © Optien Ltd 22 Benefits of Quality Management Benefits Meet with customer requirements Compliance with Legal and Contractual requirements in cost effective manner Instil confidence (more customers, increased sales, etc) Defined processes Reduced waste Prevents mistakes and reworks Lowers costs Upskilling through training Barriers We are too busy for this QMS We know what the customer wants We have been doing this for 20 years….. We have no complaints We never make mistakes Costs are always rising anyway We don’t need training
  • 23. © Optien Ltd 2 www.seai.ie General principles of Quality Management 5 Minute Break Planning for quality success Installation Works QA Checks Questions & Answers Agenda
  • 24. © Optien Ltd 2 www.seai.ie General principles of Quality Management 5 Minute Break Planning for quality success Installation Works QA Checks Questions & Answers Agenda
  • 25. © Optien Ltd 25 “If you fail to plan, you are planning to fail” Source: Benjamin Franklin, Winston Churchill, Roy Keane
  • 26. © Optien Ltd 26 Quality Policy Develop a quality policy or statement outlining the scope of the quality framework, i.e. what measures activities and schemes are included  The policy should contain a commitment to:  deliver high quality Energy Measures.  continuously improve the quality framework.  comply with the requirements of the respective schemes within the scope of the quality framework and take cognisance of the scheme guidance.  commit the necessary resources for the delivery of the policy objectives. Communicate the policy to pertinent stakeholders and interested parties.
  • 27. © Optien Ltd 27 General Requirements  Identify relevant Stakeholders and Interested Parties relevant to the delivery of high quality measures  Identify their needs and expectations  Document how these needs and expectations will be met.
  • 28. © Optien Ltd 28 Legal Requirements  Identify Legal, contractual, grant requirements associated with the schemes within the scope of the QMS.  Identify list of requirements,  Document how these requirements will be met.
  • 29. © Optien Ltd 29 Responsibilities  Identify who is responsible for the Stakeholders and Interested Parties relevant to the delivery of high quality measures  Identify their needs and expectations  Document how these needs and expectations will be met.
  • 30. © Optien Ltd 30 Competency  Identify what competencies are required for the installation of the various measures and the completion of the applicable tasks  Identify the tasks required to be completed, include both installation, commissioning and checking of the works.  Document the competency requirements and expectations of your organisation
  • 31. © Optien Ltd 31 DTSS Appendix 2 Installer Competencies
  • 32. © Optien Ltd 32 Communications  Identify the communication requirements for the installation of the various measures and the completion of the applicable tasks  Identify the communication topic, means of communication, the recipient of the communication and the frequency of communications.  Complete as appropriate to the size, complexity of your organisation.
  • 33. © Optien Ltd 33 Operations Process The Scheme Delivery Contractor should define a Quality Process, which incorporates the following key elements: 1. Inputs required 2. Process and its interactive effects 3. Outputs expected from the process 4. Monitoring points throughout the process in order to ensure consistency Throughout the process the roles and responsibilities of various stakeholders in the process should be defined and the process should be regularly reviewed for improvement.
  • 34. © Optien Ltd 34 Representation of a Process Source: ISO9001:2015
  • 35. © Optien Ltd 35 Operations Process Inputs  Customer base and engagement,  Competency requirements for the measures being implemented,  Identification of risks to project execution,  Identification of appropriate personnel to install the measures,  Identification of Scheme Guidance and standards,  Information required for to support the QA process of SEAI and other stakeholders in the scheme,  Previous energy measures implemented associated with the customer Process  Document the process associated with the implementation of the measure,  Record evidence of the correct implementation of the measure  Complete the QA checks on the measure and,  Retain documented information associated with the implementation of the measure (Photos, QADP, installation and or commissioning certification, Declaration of works, Customer Waver etc.) Output  Complete the QA Checks  File the QA Documentation on the appropriate system for record retention  Complete the contractual elements of the engagement with the customer
  • 36. © Optien Ltd 36 Monitoring and Measurement  Quality of works should be monitored including.  Competency of installers and sub contractors  Snag list or internal inspection results  External inspection reports  Internal Audits  Customer complaints  Issues identified should be recorded.  Issues inform the continuous improvement process
  • 37. © Optien Ltd 37 Internal Audits  Internal Audit of a statistically significant proportion of measures installed.  When developing the audit schedule, consider  track record of installers and subcontractors,  results of previous audits and inspections  the region serviced,  number of measures implemented  identified risks  Issues identified should be recorded.  Issues inform the continuous improvement process
  • 38. © Optien Ltd 38 Senior Management Review  Completed at planned intervals to ensure the continuing suitability adequacy and effectiveness of the quality management system considering the following:  Strategic review  Risks (SEAI Inspection Rate, Penalty Points, Contractor performance, etc)  Opportunities  Performance from quality perspective  Customer complaints
  • 39. © Optien Ltd 39 Non-Conformities  Develop a system for recording and managing non-conformities and issues. The system should include the following:  Identifying and recording the issue  Taking action to correct the issue and to adequately deal with its consequences  Analyse the potential for recurrence and taking action to prevent this  Periodically review the effectiveness of corrections taken  When reacting to non-conformances the appropriateness of the response should be appropriate to the severity of the non-conformance.  Note: this is a key element of continuous improvement
  • 40. © Optien Ltd 4 www.seai.ie General principles of Quality Management 5 Minute Break Planning for quality success Installation Works QA Checks Questions & Answers Agenda
  • 41. © Optien Ltd 41 Installation Works DTSS Domestic Technical Standards and Specifications  A reference for Contractors carrying out dwelling energy upgrade works under SEAI domestic programmes including: Better Energy Homes, Better Energy Warmer Homes, Solar PV, Warmth and Wellbeing, National Home Energy Upgrade Scheme (One Stop Shop Service), and others. It sets out the following:  general competence,  standards and specifications that Contractors should possess, and adhere to, in carrying out works supported by the Programmes.
  • 42. © Optien Ltd 42 Installation Works
  • 43. © Optien Ltd 43 NSAI SR 54 Code of practice for the energy efficient retrofit of dwellings The S.R. provides technical guidance on the energy efficient retrofit of the building fabric and services, the application of retrofit measures on a whole dwelling basis, general building science and the management of retrofit projects. The intended audience for this Standard Recommendation are property managers, designers, specifiers and installers working on energy efficient retrofit projects for dwellings.
  • 44. © Optien Ltd 4 www.seai.ie General principles of Quality Management 5 Minute Break Planning for quality success Installation Works QA Checks Questions & Answers Agenda
  • 45. © Optien Ltd 45 Inspection and QA Purpose of the inspection is as outlined in the definition:  Definition of inspection:  the act of looking at something carefully, or an official visit to a building or organization to check that something is in good condition, or that rules are being obeyed.  We need to ensure that the inspections of the works check that:  Rules are being followed (DTSS)  Compliance with legal requirements (RGII, RECI, etc)  Measure functions as intended  Records of inspection need to be maintained  QADP checklist for the measure or similar inspection
  • 46. © Optien Ltd 46 Heat Pump Installation Example
  • 47. © Optien Ltd 47 Inspection Process  Develop your QA checklist based on the following:  SEAI QADP,  NSAI SR 54  Manufacturers recommendations  Experience (previous audit findings, customer complaints etc.)  Provide training on the use of the inspection checklist  Record the results on checklist  Transfer the issues into the NC log for tracking and continuous improvement log  Track the issues to closure  Learn from issues to improve the system
  • 48. © Optien Ltd 4 www.seai.ie General principles of Quality Management 5 Minute Break Planning for quality success Installation Works QA Checks Questions & Answers Agenda
  • 49. © Optien Ltd 49 Thank you for your attention Contact richard.morrison@optien.ie