220 KV GRID SUB STATION IG NAGAR JAIPUR :-
SUBMITTED TO:- SUBMITTED BY:-
Miss. VICKY JAIN SURENDRA KUMAR MEENA
Lecturer
SINE INTERNATIONAL INSTITUTE OF TECHNOLOGY,
JAIPUR
RAJASTHAN TECHNICAL UNIVERSITY, KOTA
In India Electrecal power is Generated at a voltage
of 11kv to 33kv ,which is taken stepped up to the
transmission level in the range of 66kv to 400kv
member of transmission and switching have to be
created these are known as ”Substation”.
Substation is an assembly of apparatus ,which
transform the characteristics of electrical energy
from one form to another say from one voltage
level to another level. hence a substation is an
Intermedate link between the Genrating station
and consumer
Fig.1 – 220 KV GSS ,IG NAGAR JAIPUR
Substations have switching, protection and control equipment and one
or more transformers. In a large substation, circuit breaker are used to
interrupt any short-circuits or overload currents that may occur on the
network
220KV INDRA GANDHI NAGAR
GRID SUBSTATION
220kv IGN s/s is a convensional, hybrid substaion.
It is part of transmission system.
33kv substation is gas insulated substation which is
inside the control room.
 for communication purpose PLCC is used.
INCOMING FEEDER:
 220KV PURANA GHAT LINE-1.
 220KV PURANA GHAT LINE-2.
 220KV BASSI LINE.
 220KV HEERAPURA LINE.
OUTGOING FEEDER:
 132KV PURANAGHAT.
 132KV SITAPURA.
 132KV MNIT(UNDER CONSTRUTION).
33KV FEEDER:
 JAGATPURA.
 INDRA GANDHI NAGAR.
 BISALPUR.
 SIDDHARTH MARG.
 PRADHAN MARG.
CONTENTS:-
 LIGHTNING ARRESTOR.
 INSULATER.
 POWER TRANSFORMER.
 CURRENT TRANSFOMER.
 CIRCUIT BREAKER.
 BUSBARS.
 PROTECTIVE RELAY.
 CONTROL PANEL.
 POTENTIAL TRANSFORMER
 SINGLE LINE DIAGRAM
 WAVE TRAP.
 CONCLUSION
LIGHTNING ARRESTOR
 Lightning arrestor provide protection to all the
equipment against the HV.an electric discharge
between cloud and earth ,between cloud and
charge enters of some loud is known as lightning.
 It is provide to safety transmission &distribution
line.
INSULATER
An electrical insulator is
a material whose
internal electric charge
do not flow freely and
therefor make it very
hard to conduct an
electric current under
the influence of an
electric field.
POWER TRANSFORMER
•For stepping up or down the system voltage, power transformers are used in
the substations. At generating end, the voltage is only stepped up for
transmission of power while at all the subsequent substations the voltage is
gradually stepped down to reach finally to working voltage level
CURRENT TRANSFORMER
The current
transformer are used to
stepped down .
It is used to
measurement/control/
protection.
CIRCUIT BREAKER
 Circuit breaker are used for
switching and protection.
 Brake a circuit and
automatically under fault
condition.
 A circuit breaker consist of
fixed and moving contact
called electrode under
normal condition.
BUSBARS
 Bus bars are common
electrical component
through which a
large no. of feeders
operating at some
voltage have to
connected.
 It is used to connect
to transmission line
which go to
electricity.
 It is used to high
material conductor.
PROTECTIVE REALAY
 A Protective relay is a
device which detect
the fault.
 It is to detect after
their go to command
circuit breaker
 It is provide to safety
in electrical
equipments.
CONTROL PANEL
CONTROL PANEL
 Color coding:-
1. 33kv (Green)
2. 132kv (black)
3. 220kv (Broun)
4. 440kv (indigo)
5. 110kv (orange)
POTENTIAL TRANSFORMER
The potential transformer is used to one electrical
form to another form .
It is used to measurment of current &voltage.
WAVE TRAP:-
SINGLE LINE DIAGRAM:-
CONCLUSION
 An Engineer need to have not just theoretical but
practical as well as and so every student is supposed to
undergo a practical training .session after 3rd year
where I have impaired the knowledge about
transmission ,distribution .during the 45 days training
session. we have acquainted with the repairing of a
transformer and testing of transformer. At last is
would like to say that practical training taken at 220kv
gss ig nagar has broadened my knowledge and
widened my thinking as a professional.
ANY QUERY

Weitere ähnliche Inhalte

Was ist angesagt?

PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
Ishank Ranjan
 

Was ist angesagt? (20)

Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
A 220kV Substation
A 220kV SubstationA 220kV Substation
A 220kV Substation
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopur
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
Substations
SubstationsSubstations
Substations
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
Transmission lines
Transmission linesTransmission lines
Transmission lines
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmission
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
 
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
 

Andere mochten auch

circuit breakers ppt by gaurav
circuit breakers ppt by gauravcircuit breakers ppt by gaurav
circuit breakers ppt by gaurav
Ankit Vij
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technology
siddhartha muduli
 

Andere mochten auch (12)

Fuses
FusesFuses
Fuses
 
circuit breakers ppt by gaurav
circuit breakers ppt by gauravcircuit breakers ppt by gaurav
circuit breakers ppt by gaurav
 
Physics ppt on fuse
Physics ppt on fuse Physics ppt on fuse
Physics ppt on fuse
 
ppt of Elcb( earth leakage circuit breaker)
ppt of Elcb( earth leakage circuit breaker)ppt of Elcb( earth leakage circuit breaker)
ppt of Elcb( earth leakage circuit breaker)
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technology
 
Fuses and mcb
Fuses and mcbFuses and mcb
Fuses and mcb
 
Circuit Breaker
Circuit BreakerCircuit Breaker
Circuit Breaker
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
Air Circuit breaker
Air Circuit breakerAir Circuit breaker
Air Circuit breaker
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breaker
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 

Ähnlich wie PPT ON 220KV GSS

Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Gangwal
 
220 kv g.s.s, report
 220 kv g.s.s, report 220 kv g.s.s, report
220 kv g.s.s, report
panna rayal
 

Ähnlich wie PPT ON 220KV GSS (20)

Omprakash mahawar ppt
Omprakash mahawar pptOmprakash mahawar ppt
Omprakash mahawar ppt
 
My training
My trainingMy training
My training
 
33kv substation
33kv substation33kv substation
33kv substation
 
Training report on 400 kV GSS
Training report on 400 kV GSSTraining report on 400 kV GSS
Training report on 400 kV GSS
 
220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur 220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95
 
INVERTER BY PANKAJ CHAUDHARY
INVERTER BY PANKAJ CHAUDHARYINVERTER BY PANKAJ CHAUDHARY
INVERTER BY PANKAJ CHAUDHARY
 
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptxTRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
Indian grid system
Indian grid systemIndian grid system
Indian grid system
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substation
 
220 kv g.s.s, report
 220 kv g.s.s, report 220 kv g.s.s, report
220 kv g.s.s, report
 

Kürzlich hochgeladen

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Kürzlich hochgeladen (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 

PPT ON 220KV GSS

  • 1. 220 KV GRID SUB STATION IG NAGAR JAIPUR :- SUBMITTED TO:- SUBMITTED BY:- Miss. VICKY JAIN SURENDRA KUMAR MEENA Lecturer SINE INTERNATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR RAJASTHAN TECHNICAL UNIVERSITY, KOTA
  • 2. In India Electrecal power is Generated at a voltage of 11kv to 33kv ,which is taken stepped up to the transmission level in the range of 66kv to 400kv member of transmission and switching have to be created these are known as ”Substation”. Substation is an assembly of apparatus ,which transform the characteristics of electrical energy from one form to another say from one voltage level to another level. hence a substation is an Intermedate link between the Genrating station and consumer
  • 3. Fig.1 – 220 KV GSS ,IG NAGAR JAIPUR Substations have switching, protection and control equipment and one or more transformers. In a large substation, circuit breaker are used to interrupt any short-circuits or overload currents that may occur on the network
  • 4. 220KV INDRA GANDHI NAGAR GRID SUBSTATION 220kv IGN s/s is a convensional, hybrid substaion. It is part of transmission system. 33kv substation is gas insulated substation which is inside the control room.  for communication purpose PLCC is used.
  • 5. INCOMING FEEDER:  220KV PURANA GHAT LINE-1.  220KV PURANA GHAT LINE-2.  220KV BASSI LINE.  220KV HEERAPURA LINE.
  • 6. OUTGOING FEEDER:  132KV PURANAGHAT.  132KV SITAPURA.  132KV MNIT(UNDER CONSTRUTION). 33KV FEEDER:  JAGATPURA.  INDRA GANDHI NAGAR.  BISALPUR.  SIDDHARTH MARG.  PRADHAN MARG.
  • 7. CONTENTS:-  LIGHTNING ARRESTOR.  INSULATER.  POWER TRANSFORMER.  CURRENT TRANSFOMER.  CIRCUIT BREAKER.  BUSBARS.  PROTECTIVE RELAY.  CONTROL PANEL.  POTENTIAL TRANSFORMER  SINGLE LINE DIAGRAM  WAVE TRAP.  CONCLUSION
  • 8. LIGHTNING ARRESTOR  Lightning arrestor provide protection to all the equipment against the HV.an electric discharge between cloud and earth ,between cloud and charge enters of some loud is known as lightning.  It is provide to safety transmission &distribution line.
  • 9. INSULATER An electrical insulator is a material whose internal electric charge do not flow freely and therefor make it very hard to conduct an electric current under the influence of an electric field.
  • 10. POWER TRANSFORMER •For stepping up or down the system voltage, power transformers are used in the substations. At generating end, the voltage is only stepped up for transmission of power while at all the subsequent substations the voltage is gradually stepped down to reach finally to working voltage level
  • 11. CURRENT TRANSFORMER The current transformer are used to stepped down . It is used to measurement/control/ protection.
  • 12. CIRCUIT BREAKER  Circuit breaker are used for switching and protection.  Brake a circuit and automatically under fault condition.  A circuit breaker consist of fixed and moving contact called electrode under normal condition.
  • 13. BUSBARS  Bus bars are common electrical component through which a large no. of feeders operating at some voltage have to connected.  It is used to connect to transmission line which go to electricity.  It is used to high material conductor.
  • 14. PROTECTIVE REALAY  A Protective relay is a device which detect the fault.  It is to detect after their go to command circuit breaker  It is provide to safety in electrical equipments.
  • 16. CONTROL PANEL  Color coding:- 1. 33kv (Green) 2. 132kv (black) 3. 220kv (Broun) 4. 440kv (indigo) 5. 110kv (orange)
  • 17. POTENTIAL TRANSFORMER The potential transformer is used to one electrical form to another form . It is used to measurment of current &voltage.
  • 20. CONCLUSION  An Engineer need to have not just theoretical but practical as well as and so every student is supposed to undergo a practical training .session after 3rd year where I have impaired the knowledge about transmission ,distribution .during the 45 days training session. we have acquainted with the repairing of a transformer and testing of transformer. At last is would like to say that practical training taken at 220kv gss ig nagar has broadened my knowledge and widened my thinking as a professional.
  • 21.