PARTICIPATORY MULTI-HAZARD
 DISASTER RISK REDUCTION
    PROJECT in ARMENIA

     funded by DIPECHO
        and Oxfam GB

        2010 – 2011
Principal objective

To increase resilience and reduce vulnerability
 of local communities and national institutions
 by supporting strategies that enable them to
  prepare for, mitigate and respond to natural
                    disasters
Location of operation – 10 communities
         in Vayots Dzor region
1. Yelpin
2. Chiva
3. Arpi
4. Areni
5. Khachik
6. Agarakadzor
7. Getap
8. Artabuynk
9. Horbategh
10.Martiros
Direct beneficiaries – 12690 people
Indirect beneficiaries - 500 000 people
Activities and results
COMMUNITY EMERGENCY GROUPS (CEG)
composed from 15 volunteers are established in
all project communities

CEG is divided into subgroups:
• rescuers
• first aid providers
• organizers
CEG members are trained on DRR and First Aid
                provision
Trainings are provided in close cooperation with ARCS and
               Regional Rescue Department
CEG are equipped with first aid kits, special
  equipment and clothing for rescuers
• Participatory
              hazard mapping and
community emergency plans are developed
in 10 communities
• Plans and maps are distributed among
 Regional Rescue Department
 Regional Government
• 60 teachers of project communities’
schools are trained on DRR and First Aid
provision
• Teachers provided trainings for about
350 children of secondary school
• Painting competition on DRR themes is
conducted among 200 school children of
all project communities’ schools
Winner paintings
First aid kits , fire stands , printing materials
    are provided to schools of 10 project
                   communities




          before                  now
Small-scale low cost demonstrative mitigation
 projects are conducted in project communities


CEGs participated in development of proposals for
                mitigation projects


   Local governments made contribution in all
    projects . After completion the projects are
     handed over to communities for further
                    maintenance
Khachik village
• Repair of the road bridge and cleaning/upgrading of mud canal
• Relocation/construction of drinking water pipeline L= 150m
Artabuynk village
• Repair of the road bridge
• Construction of mud canal
Chiva village
• Reconstruction of school main entrance
• Construction of protection zone
  for water catchment




Arpi village
• Reconstruction and cleaning of 3 mud canals
Areni village
• Cleaning of drainage canal
Chiva, Areni, Arpi, Agarakadzor, Artabuynk,
Horbategh, Martiros villages
• Tree planting – 900 trees
In close cooperation with regional state
    rescue department and regional
       government the simulation
     event/rescue drills for CEGs is
        conducted in June, 2011
Result:
• CEG members demonstrated the
obtained knowledge and skills as well as
cooperation with the regional rescue
department in the cases of emergency
PROJECT SUPPORTING ACTIVITIES

 The database of project beneficiaries is
developed
After completion of training on first aid
provision the additional training via SMS is
conducted for beneficiaries
 In the framework of livelihood project
implemented by Oxfam GB Armenia our
project beneficiaries were provided SMS on
forecast during March-May, 2011
THANK YOU

Weitere ähnliche Inhalte

Ähnlich wie Participatory Multi-Hazard Disaster Risk Reduction Project in Armenia

CRP Presentation
CRP PresentationCRP Presentation
CRP Presentationkashif81
 
Maharashtra's performance in TSC_Nitin Mane_2012
Maharashtra's performance in TSC_Nitin Mane_2012Maharashtra's performance in TSC_Nitin Mane_2012
Maharashtra's performance in TSC_Nitin Mane_2012India Water Portal
 
Cambodia School-Community Water Hygiene and Sanitation
Cambodia School-Community Water Hygiene and SanitationCambodia School-Community Water Hygiene and Sanitation
Cambodia School-Community Water Hygiene and Sanitationinfosanitasi
 
Citizen engagement in conservation
Citizen engagement in  conservationCitizen engagement in  conservation
Citizen engagement in conservationSkumartsa177
 
ESD and the destabilization of techno-centric neoclassical education tendenci...
ESD and the destabilization of techno-centric neoclassical education tendenci...ESD and the destabilization of techno-centric neoclassical education tendenci...
ESD and the destabilization of techno-centric neoclassical education tendenci...ESD UNU-IAS
 
Rural Sanitation.pptx
Rural Sanitation.pptxRural Sanitation.pptx
Rural Sanitation.pptxPALKAMITTAL
 
Community resilience michael_gurden
Community resilience michael_gurdenCommunity resilience michael_gurden
Community resilience michael_gurdenECC_flood
 
Project panii jibon jagoroni chakra foundation
Project panii jibon jagoroni chakra foundationProject panii jibon jagoroni chakra foundation
Project panii jibon jagoroni chakra foundationRazib Tuhin
 
Integrated Community Water-Sanitation for Luanda: June 11, 2013
 Integrated Community Water-Sanitation for Luanda: June 11, 2013 Integrated Community Water-Sanitation for Luanda: June 11, 2013
Integrated Community Water-Sanitation for Luanda: June 11, 2013Development Workshop Angola
 
Oxfam India Response to conflict in Assam
Oxfam India Response to conflict in AssamOxfam India Response to conflict in Assam
Oxfam India Response to conflict in AssamOxfam India
 
Kyrgyz Mountains Environmental Education and Citizen Science Project (KMEECS)...
Kyrgyz Mountains Environmental Education and Citizen Science Project (KMEECS)...Kyrgyz Mountains Environmental Education and Citizen Science Project (KMEECS)...
Kyrgyz Mountains Environmental Education and Citizen Science Project (KMEECS)...Right to Research
 
19 December Wash in Schools, Jhapper Singh Vishokarma, DoE
19 December Wash in Schools, Jhapper Singh Vishokarma, DoE  19 December Wash in Schools, Jhapper Singh Vishokarma, DoE
19 December Wash in Schools, Jhapper Singh Vishokarma, DoE SEIU_WASH_NEPAL
 
Mayordonnaholadaymasccc2014
Mayordonnaholadaymasccc2014Mayordonnaholadaymasccc2014
Mayordonnaholadaymasccc2014Jen Boudrie
 

Ähnlich wie Participatory Multi-Hazard Disaster Risk Reduction Project in Armenia (20)

CRP Presentation
CRP PresentationCRP Presentation
CRP Presentation
 
Maharashtra's performance in TSC_Nitin Mane_2012
Maharashtra's performance in TSC_Nitin Mane_2012Maharashtra's performance in TSC_Nitin Mane_2012
Maharashtra's performance in TSC_Nitin Mane_2012
 
Cambodia School-Community Water Hygiene and Sanitation
Cambodia School-Community Water Hygiene and SanitationCambodia School-Community Water Hygiene and Sanitation
Cambodia School-Community Water Hygiene and Sanitation
 
Citizen engagement in conservation
Citizen engagement in  conservationCitizen engagement in  conservation
Citizen engagement in conservation
 
[Mr. Yoo] Alllights Village Project
[Mr. Yoo] Alllights Village Project[Mr. Yoo] Alllights Village Project
[Mr. Yoo] Alllights Village Project
 
ESD and the destabilization of techno-centric neoclassical education tendenci...
ESD and the destabilization of techno-centric neoclassical education tendenci...ESD and the destabilization of techno-centric neoclassical education tendenci...
ESD and the destabilization of techno-centric neoclassical education tendenci...
 
Kenya - Nairobi informal settlements - maji na ufanisi
Kenya - Nairobi informal settlements - maji na ufanisi Kenya - Nairobi informal settlements - maji na ufanisi
Kenya - Nairobi informal settlements - maji na ufanisi
 
CELIM Albania - Presentation
CELIM Albania - PresentationCELIM Albania - Presentation
CELIM Albania - Presentation
 
Rural Sanitation.pptx
Rural Sanitation.pptxRural Sanitation.pptx
Rural Sanitation.pptx
 
Community resilience michael_gurden
Community resilience michael_gurdenCommunity resilience michael_gurden
Community resilience michael_gurden
 
Project panii jibon jagoroni chakra foundation
Project panii jibon jagoroni chakra foundationProject panii jibon jagoroni chakra foundation
Project panii jibon jagoroni chakra foundation
 
Integrated Community Water-Sanitation for Luanda: June 11, 2013
 Integrated Community Water-Sanitation for Luanda: June 11, 2013 Integrated Community Water-Sanitation for Luanda: June 11, 2013
Integrated Community Water-Sanitation for Luanda: June 11, 2013
 
Oxfam India Response to conflict in Assam
Oxfam India Response to conflict in AssamOxfam India Response to conflict in Assam
Oxfam India Response to conflict in Assam
 
Thrive AGM 2015
Thrive AGM 2015Thrive AGM 2015
Thrive AGM 2015
 
Kyrgyz Mountains Environmental Education and Citizen Science Project (KMEECS)...
Kyrgyz Mountains Environmental Education and Citizen Science Project (KMEECS)...Kyrgyz Mountains Environmental Education and Citizen Science Project (KMEECS)...
Kyrgyz Mountains Environmental Education and Citizen Science Project (KMEECS)...
 
2012 team 8
2012 team 82012 team 8
2012 team 8
 
SustSan workshop: GWP CEE Sustainable Sanitation Programme by Darja Istenic
SustSan workshop: GWP CEE Sustainable Sanitation Programme by Darja IstenicSustSan workshop: GWP CEE Sustainable Sanitation Programme by Darja Istenic
SustSan workshop: GWP CEE Sustainable Sanitation Programme by Darja Istenic
 
19 December Wash in Schools, Jhapper Singh Vishokarma, DoE
19 December Wash in Schools, Jhapper Singh Vishokarma, DoE  19 December Wash in Schools, Jhapper Singh Vishokarma, DoE
19 December Wash in Schools, Jhapper Singh Vishokarma, DoE
 
Mayordonnaholadaymasccc2014
Mayordonnaholadaymasccc2014Mayordonnaholadaymasccc2014
Mayordonnaholadaymasccc2014
 
Nairobi informal settlements mn u - regional consultation
Nairobi informal settlements   mn u - regional consultationNairobi informal settlements   mn u - regional consultation
Nairobi informal settlements mn u - regional consultation
 

Participatory Multi-Hazard Disaster Risk Reduction Project in Armenia

  • 1. PARTICIPATORY MULTI-HAZARD DISASTER RISK REDUCTION PROJECT in ARMENIA funded by DIPECHO and Oxfam GB 2010 – 2011
  • 2. Principal objective To increase resilience and reduce vulnerability of local communities and national institutions by supporting strategies that enable them to prepare for, mitigate and respond to natural disasters
  • 3. Location of operation – 10 communities in Vayots Dzor region 1. Yelpin 2. Chiva 3. Arpi 4. Areni 5. Khachik 6. Agarakadzor 7. Getap 8. Artabuynk 9. Horbategh 10.Martiros Direct beneficiaries – 12690 people Indirect beneficiaries - 500 000 people
  • 4. Activities and results COMMUNITY EMERGENCY GROUPS (CEG) composed from 15 volunteers are established in all project communities CEG is divided into subgroups: • rescuers • first aid providers • organizers
  • 5. CEG members are trained on DRR and First Aid provision Trainings are provided in close cooperation with ARCS and Regional Rescue Department
  • 6. CEG are equipped with first aid kits, special equipment and clothing for rescuers
  • 7. • Participatory hazard mapping and community emergency plans are developed in 10 communities • Plans and maps are distributed among  Regional Rescue Department  Regional Government
  • 8. • 60 teachers of project communities’ schools are trained on DRR and First Aid provision • Teachers provided trainings for about 350 children of secondary school • Painting competition on DRR themes is conducted among 200 school children of all project communities’ schools
  • 10. First aid kits , fire stands , printing materials are provided to schools of 10 project communities before now
  • 11. Small-scale low cost demonstrative mitigation projects are conducted in project communities CEGs participated in development of proposals for mitigation projects Local governments made contribution in all projects . After completion the projects are handed over to communities for further maintenance
  • 12. Khachik village • Repair of the road bridge and cleaning/upgrading of mud canal • Relocation/construction of drinking water pipeline L= 150m
  • 13. Artabuynk village • Repair of the road bridge • Construction of mud canal
  • 14. Chiva village • Reconstruction of school main entrance • Construction of protection zone for water catchment Arpi village • Reconstruction and cleaning of 3 mud canals Areni village • Cleaning of drainage canal Chiva, Areni, Arpi, Agarakadzor, Artabuynk, Horbategh, Martiros villages • Tree planting – 900 trees
  • 15. In close cooperation with regional state rescue department and regional government the simulation event/rescue drills for CEGs is conducted in June, 2011 Result: • CEG members demonstrated the obtained knowledge and skills as well as cooperation with the regional rescue department in the cases of emergency
  • 16.
  • 17. PROJECT SUPPORTING ACTIVITIES  The database of project beneficiaries is developed After completion of training on first aid provision the additional training via SMS is conducted for beneficiaries  In the framework of livelihood project implemented by Oxfam GB Armenia our project beneficiaries were provided SMS on forecast during March-May, 2011