Preliminary
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
[A1]
14131
S1.15
Author Checker
ALS - Alleyn's Lower School
Unnamed
Rev Date By Amendments
C
C
A
A
B
B
11
22
3
3
4
4
5
5
6
6
C
2
C
2
C
2
C
1
C
1
C
5
C
3
C
3
C
5
C
3
C
3
C
5
C
3
180mm thk
RC Wall
180mm thk
RC Wall
215mm thk
RC Wall
215mm thk
RC Wall
215mm thk
RC Wall
215mm thk
RC Wall
215mm thk
RC Wall
215mm thk
RC Wall
180mm thk
RC Wall
C
3
C
3
C
3
C
3
C
3
WP3
WP3
WP3
WP3
WP3
WP3
WP3
WP3
W
P3W
P3
W
P3W
P3
W
P3
W
P3
W
P3
W
P3
W
P3
W
P3
W
P3
275 thk RC Slab on
225 thk Cellcore
HXS 9/13
SSL 31.590
Platform lift (by others) it is
assumed that no lift pit is
required
Pairs of Ancon WP3
windposts at each masonry
piers. Posts to be 75x60x5,
connections details by Ancon
Insitu R.C. stair with 200
thk waist and half landing.
Setting out to Architects
details
Insitu R.C. stair with 200
thk waist and half landing.
Setting out to Architects
details
Self supporting masonry
facade to Architects
details. Min brick strength
to be 20N/mm², min mortar
type (iv)
1
S2.02
800 wide x 750 deep RC beam
to perimeter of slab. Recess
detail at edge to receive
external leaf of cavity wall.
W
P3
W
P3
Lintels span between masonry
piers. See elevations and
architects drawings for further
information.
All non-load bearing
masonry walls tied to R.C.
columns and restrained at
first floor soffit as noted on
drawing S0.01
Alignment of entrance
columns and brickwork to
be developed with the
Architect in the next
design stage.
Allow for horizontal wind posts between
vertical posts to restrain brickwork at
bottom of windows. For costing allow for
WP3. For more information refer to
elevation drawings.
175 wide x 5 thk ms flat fixed to R.C. columns
via 200 long section of 100x100x8 EA at high
level. Flat fixed to angle with 2No. M16 bolts.
Angle fixed to column with 2No. M16 resin
anchors. Anchors to miss column reinforcement.
Ancon FHR head restraint straps between flat
and nonstructural wall.
B6 B6
B6
B6
Where lintels span onto RC columns
allow for 150mm long section of
100x100x8 EA to be fixed to column to
receive lintel. Angle fixed to column with
2No. M16 resin anchors.
1
S4.01
2
S4.01
3
S4.01
1652
4
S4.01
344
459
215
1652
344
434
1236
1236
540540
439
599
1652
344
474
215
215
215
215
1
S1.10
2
S1.10
2
S2.02
Slab edgeSlab edge
WP3
WP3
WP3
180mm thk
RC Wall
WP3
WP3
WP3 WP3
WP3
WP3
WP3
W
P3
Preliminary
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
1 : 100 [A1]
P2
14131
S1.03
SKD JH
ALS - Alleyn's Lower School
Ground Floor Plan
DEC 2015
Structural Column Schedule
Type Mark Type
C1 720x180 RC Column
C2 720x215 RC Column
C3 720x200 RC Column
C4 UC152x152x37
C5 605x200 RC Column
C6 100x100x8 RSA
WP3 AnconWP3_75x60x5mm
Steel Beam Schedule
Steel Beam Type
B1 UB254x146x43
B2 UC254x254x89
B3 UB203x133x30
B5 UC152x152x23
B6 5x175
B7 15x150
B8 100x100x10RSA
B9 90x90x10RSA
B10 RHS200x150x10.0 +
8x250 plate
B11 RHS250x150x10.0 +
8x250 plate
B12 RHS200x100x10.0
P1 8x50 FLAT
Rev Date By Amendments
1 09.10.15 TGJ PreliminaryIssue
2 27.11.15 SKD PreliminaryIssue
C
C
A
A
B
B
11
22
3
3
4
4
5
5
6
6
C
3
C
3
C
3
C
5
C
2
C
3
C
5
C
2
C
2
C
5
180mm thk
RC Wall
215mm thk
RC Wall
215mm thk
RC Wall
180mm thk
RC Wall
215mm thk
RC Wall
215mm thk
RC Wall
Underside of
slab tapers to
150mm thk
Underside of
slab tapers to
150mm thk
Underside of
slab tapers to
150mm thk
Void
180mm thk
RC Wall
180mm thk
RC Wall
C
3
C
3
C
3
C
3
275 thk RC Slab
SSL=35.200
C
3
C
3
WP3
WP3
WP3
WP3
WP3
WP3
WP3
WP3
W
P3
W
P3
W
P3W
P3
W
P3W
P3
W
P3W
P3
W
P3W
P3
W
P3
W
P3W
P3
W
P3
W
P3
Pairs of Ancon WP3
windposts at each masonry
piers. posts to be 75x60x5,
connections details by Ancon
Insitu R.C. stair with 200
thk waiste and half landing.
Setting out to Architects
details
Insitu R.C. stair with 200
thk waiste and half landing.
Setting out to Architects
details
Self supporting masonry
facade to Architects
details. Min brick strength
to be 20N/mm², min mortar
type (iv)Void for platform lift. Dims and
setting out tbc by Architect
1
S2.02
215mm thk
RC Wall
215mm thk
RC Wall
Refer to Roof Plan S1.05 for
Cornice / Lintel Support
Ancon masonry support
bracket attached to first floor
slab. Allow for M16 anchors in
Rawl R-Kem + resin at 200
c/c. Min embedment = 200mm
Floor void. Dimensions
and setting out to
architects details.
Col under
Col
under
1236
4
S4.01
2
S2.02
1
S4.02
2
S4.02
4
S4.02
2
S1.10
Sim
1
S1.10
Sim
3
S4.02
1
S4.03
Voids in Walls below First
Floor Slab.
WP3
WP3
WP3
WP3
WP3
WP3
WP3
WP3
WP3
WP3
WP3
WP3 WP3
Preliminary
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
1 : 100 [A1]
P2
14131
S1.04
TGJ JH
ALS - Alleyn's Lower School
First Floor Plan
Oct 2015
Structural Column Schedule
Type Mark Type
C1 720x180 RC Column
C2 720x215 RC Column
C3 720x200 RC Column
C4 UC152x152x37
C5 605x200 RC Column
C6 100x100x8 RSA
WP3 AnconWP3_75x60x5mm
Rev Date By Amendments
1 09.10.15 TGJ PreliminaryIssue
2 27.11.15 SKD PreliminaryIssue
C
C
A
A
B
B
11
22
3
3
4
4
5
5
6
6
B3
B3
B3
B1
B1 B1
B10 B10
B11
B1
B1
B10
B10
B10
1
S2.02
T1
T1
T1
T1
B3
B3
B3
B3
Temporary propping to
Atrium roof required during
construction
In the permanent condition overall
stabillity of the roof structure relies
on the RC columns below and
diaphragm action of timber roof.
The contractor is to consider the
need for temporary bracing.
Cranked beams span
between RC columns and
steel beams.
Pre-fabricated brick cornice
to Architects details. Allow
for cornice to be strapped
back to eaves beam.
Double up rafters to trim
rooflights [typ]
Trusses fabricated from
203x133x30 UB sections.
Refer to sections for further
information.
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B12
B12
B12
B12
B12B12
B12
B12
B2
B2
B2
B2
B12
T2
T1
T1T1
T1
T2
T2
T1
T1
T1
T1
T2
T2
T2
B1B1
B1
B1
B1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B10
TRUSS-1
TRUSS-2
TRUSS-1
TRUSS-1
TRUSS-2
TRUSS-1
TRUSS-2
TRUSS-1
TRUSS-1
B7
B7B7
1
S4.03
2
S4.03
3
S4.03
4
S4.03
3
S4.04
Stainless steel Cornice
support/lintel to full perimeter.
Discontinious at movement
joints spanning over windows
min. 150mm bearing each
side.
Refer to Architects Details
X
S1.12
Sim
1
S4.06
Sim
B10
B10
B10
B10
B10
B11
B11B10
B1
Preliminary
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
1 : 100 [A1]
P2
14131
S1.05
SKD Checker
ALS - Alleyn's Lower School
Roof Plan
N
Rev Date By Amendments
1 09.10.15 TGJ PreliminaryIssue
2 27.11.15 SKD PreliminaryIssue
Steel Beam Schedule
Steel Beam Type
B1 UB254x146x43
B2 UC254x254x89
B3 UB203x133x30
B5 UC152x152x23
B6 5x175
B7 15x150
B8 100x100x10RSA
B9 90x90x10RSA
B10 RHS200x150x10.0 +
8x250 plate
B11 RHS250x150x10.0 +
8x250 plate
B12 RHS200x100x10.0
P1 8x50 FLAT
Timber Rafter Schedule
Type Mark Type
T1 50x225 C24 @ 600 ctrs
T2 50x200 C24 @ 600 ctrs
Note:
Min 18mm thk ply screwd to top of all
rafters with 75mm long No.10 screws
@ 300 c/c's.
B
1
4
3
S1.10
1
6
4
S1.10
03 - GROUND FLOOR SSL
+31.590
04 - FIRST FLOOR SSL
+35.200
1 2
02 - FOUNDATION LEVEL
+31.315
3610
8250
(TYP.)
275
03 - GROUND FLOOR SSL
+31.590
04 - FIRST FLOOR SSL
+35.200
1 2
8250
275
Preliminary
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
1 : 50 [A1]
14131
S1.10
Author Checker
ALS - Alleyn's Lower School
STAIRS
Rev Date By Amendments
1 : 50
STAIR-1
1 : 50
STAIR-2
1 : 50
SECTION 3-3
3
1 : 50
S1.10
SECTION 4-44
3D VIEW STAIR-1
5
3D VIEW STAIR-26
A
4 6
B1
B1
B1
B1
M20 Bolts M20 Bolts
B3
B1
B3
B3
B1
B3
B3
15mm End Plate
15mm End Plate
15mm End Plate
1
S1.12
A
S1.12
B
S1.12
2
S1.12
3
S1.12
4
S1.12
Y
Z
924 931
X
S1.14
05 - TOP OF STEEL
+38.354
B1
2 No. M20 Bolts
540
215
215
B1
B1
6
B1
B3
B3
215
15mm End Plates
150
147
05 - TOP OF STEEL
+38.354
392
C4C4
10
10mm End Plate
B1
15mm Armatherm FRR
Thermal Break connection
plate with washers and
Bushing details
4
05 - TOP OF STEEL
+38.354B1
15mm Steel End Plate
6mm FW
05 - TOP OF STEEL
+38.354
B3
15mm Steel End Plate
6mm FW
Preliminary
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
As indicated
[A1]
14131
S1.12
SKD TR
ALS - Alleyn's Lower School
CHIMNEY DETAILS-Sheet 1
Nov.`15
Rev Date By Amendments
1 : 10
S1.05
Plan on Chimney at +38.354X
1 : 5
S1.12
Section 1-11
3D OVERALL VIEW OF CHIMNEY AREA10
1 : 5
S1.12
Enlarged Plan at +38.354A
1 : 5
S1.12
Plan B at +38.354B
1 : 10
S1.12
Section 2-22
1 : 5
S1.12
Section 3-33
1 : 5
S1.12
Section 4-44
3D VIEW Y5 3D VIEW Z6
A 46
B8
B8
B5
B5
B5
B5
C4
C4
C4C4
B5
B8
B5
4511125
1180
928
1
S1.13
2
S1.13
Z1
X
S1.14
A
06 - ROOF LEVEL
+39.785
07 - CHIMNEY STEEL LEVEL
+39.924
B5
B5
B8
C4
C4
05 - TOP OF STEEL
+38.354
06 - ROOF LEVEL
+39.785
07 - CHIMNEY STEEL LEVEL
+39.924
B5 B5
C4
C4
P1
C4
C4
B1
B8 B8
15mm Artherm FRR
Thermal Break connection
plate with washers and
bushing details
Preliminary
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
1 : 10 [A1]
14131
S1.13
Author Checker
ALS - Alleyn's Lower School
CHIMNEY DETAILS-Sheet 2
Rev Date By Amendments
1 : 10
S1.07
Plan on Chimney at +39.785X
1 : 10
S1.13
Section 1-11
1 : 10
S1.13
Section 2-22
THE WHOLE FRAME IS TO BE WELDED BY 6mm F.W
3D VIEW Z1Z1
A 46
1190
To Inside face of Brickwork
A1
X
S1.14
07 - CHIMNEY STEEL LEVEL
+39.924
B8
103 102.5 Brick
Preliminary
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
As indicated
[A1]
14131
S1.14
Author Checker
ALS - Alleyn's Lower School
CHIMNEY DETAILS-Sheet 3
Rev Date By Amendments
3D VIEW A11
1 : 10
Plan on Chimney at +39.785 Showing Brickwork2
1 : 2
S1.12
Section X-XX
Tender
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
[A1]
15182
S2.06
Author Checker
Hazeley Down House
Unnamed
Rev Date By Amendments
1
S2.01
1 2 3 4 5 6
D
E
F
G
H
I
J
3500500300037759502000
1800 1500 5100 1650 4900
25225 25 225
15400
17774
11177
25225
7460
3005
510
250
25 225
1175
252 431205
1775
175
544
175
8888
336
745
322
835
T.O.C +46.600
2
S2.01
3
S2.02
175
175
350
175
175
350
C1
C1
C1
250
250
250
250
1
S4.02
2
S4.02
3
S4.02
6
S4.02
25225
50200
15235
250
675
88
175
2952
300mm THK. R.C SLAB
4
S2.02
PRELIMINARY
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
1 : 50 [A1]
15182
S1.02
SKD R.R
Hazeley Down House
Basement Plan
16.11.15
1 : 50
Basement Slab
3
P1
P2
P2
Rev Date By Amendments
16.11.15 SKD Preliminary
19.11.15 SKD Preliminary
B1-Basement SSL
+46.750
1
150
225 25
250 mm R.C. Wall
B1-Basement SSL
+46.750
175
150
300
B1-Basement SSL
+46.750
J
177
250
1001
00-Ground Floor SSL
+49.600
1
1000150
200 250
450
265
SHS100x100x10.0
450x700DP RC
BEAM
300
00-Ground Floor SSL
+49.600
DE
1000
700
450
SHS100x100x10.0
300
VOID
450x700 dp Mass Concrete
Foundation
VOID
20mm Movement Joint
225mm Thk. R.C Slab
Min. 100mm wide blockwork
dwarf wall
150mm Dp. O/A Beam & Block
@ 300 c/c
225
180700
450
225 225
00-Ground Floor SSL
+49.600
B1-Basement SSL
+46.750
EF
950
300
50 200
250
3000
PRELIMINARY
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
1 : 20 [A1]
15182
S4.02
SKD R.R
Hazeley Down House
Substructure Sections & Details
Rev Date By Amendments
16.11.15 SKD Preliminary
19.11.15 SKD Preliminary
1 : 20
Section 1 - 1
1 1 : 20
Section 2 - 2
2 1 : 20
Section 3 - 3
31 : 20
Section 4 - 4
4
1 : 20
Section 5 - 5
5
1 : 20
Section 6 - 6
6
3D View of Section 6-6
7
P1
P2
P2
4
B
SHS100x100x10.0
1
A
SHS100x100x10.0
PFC380x100x54
PFC380x100x54
150x150x10mm Steel Angle
PFC380x100x54
PFC380x100x54
SHS100x100x10.0
150x150x10mm Steel Angle
welded / bolted to adjoining PFC`s
1
C
PFC380x100x54PFC380x100x54
SHS100x100x10.0
UC152x152x30
460x380 Steel plate
bolted/welded to PFC`s
PFC380x100x54
PFC380x100x54
UC152x152x30
SHS100x100x10.0
2
B
UC203x203x60 UC203x203x60
UC152x152x30UC152x152x30
SHS100x100x10.0
4 No. 100x125 Steel Plates
welded to SHS and bolted
to Uc`s
UC203x203x60
UC152x152x30
UC152x152x30
UC203x203x60
100x125x10mm thk.
Steel Plate
PRELIMINARY
Scale:
London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0)
20 7354 5402 eocengineers.com
Drawing Title
Project Title
Drawing Status
Project Number
Date
Drawn By Checked By
Drawing Number Revision
General Notes
1. This drawing is to be read in conjunction with all
relevant architects & engineers drawings &
specifications.
2. The contractor is to be responsible for all dimensions
& for the correct setting out of the works on
site.
3. Do not scale from this drawing.
1 : 10 [A1]
15182
S4.11
SKD R.R
Hazeley Down House
Superstructure Sections & Details
16.11.15
Rev Date By Amendments
16.11.15 SKD Preliminary
19.11.15 SKD Preliminary
1 : 10
Plan on SHS
1 1 : 10
Detail-2 Plan
2
3D-Detail 2A
2b 1 : 10
Detail-3 Plan
3
3D-Detail 3A
3b
P1
1 : 10
Detail-4 Plan
4
3D-Detail 4A
4a
P2
P2

Weitere ähnliche Inhalte

Was ist angesagt?

Case cx210 crawler excavator parts catalogue manual
Case cx210 crawler excavator parts catalogue manualCase cx210 crawler excavator parts catalogue manual
Case cx210 crawler excavator parts catalogue manualfjjkskekfsxswamem
 
EJECTOR-ASSEMBLY.PDF
EJECTOR-ASSEMBLY.PDFEJECTOR-ASSEMBLY.PDF
EJECTOR-ASSEMBLY.PDFFarhad Ighani
 
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v75 tracto...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v75 tracto...Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v75 tracto...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v75 tracto...ufjjdjkksekmd
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawingsGirish Ravikumar
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examplesLoren Davis
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 -v85 tractor...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 -v85 tractor...Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 -v85 tractor...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 -v85 tractor...ufjjsekkdmmd
 
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v80 tracto...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v80 tracto...Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v80 tracto...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v80 tracto...fusjejfskekem
 
Mc cormick v series cab tier 2 (2003 2005) - rp02 - v85 tractor service repai...
Mc cormick v series cab tier 2 (2003 2005) - rp02 - v85 tractor service repai...Mc cormick v series cab tier 2 (2003 2005) - rp02 - v85 tractor service repai...
Mc cormick v series cab tier 2 (2003 2005) - rp02 - v85 tractor service repai...ufjjdjkksekmd
 
Mc cormick t series tier 3 (2007 2010) - cp02 - t80 f-m tractor service repai...
Mc cormick t series tier 3 (2007 2010) - cp02 - t80 f-m tractor service repai...Mc cormick t series tier 3 (2007 2010) - cp02 - t80 f-m tractor service repai...
Mc cormick t series tier 3 (2007 2010) - cp02 - t80 f-m tractor service repai...ufjjdjkksekmd
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeRichard Clark
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00Mansoor Sakharkar
 
Genset Installation Methodology
Genset Installation MethodologyGenset Installation Methodology
Genset Installation MethodologyJoost Heystek
 
ELKHAM OFFICE STRUCT-S-1
ELKHAM OFFICE STRUCT-S-1ELKHAM OFFICE STRUCT-S-1
ELKHAM OFFICE STRUCT-S-1matthew giffe
 

Was ist angesagt? (19)

Case cx210 crawler excavator parts catalogue manual
Case cx210 crawler excavator parts catalogue manualCase cx210 crawler excavator parts catalogue manual
Case cx210 crawler excavator parts catalogue manual
 
COURTYARD-STAIR
COURTYARD-STAIRCOURTYARD-STAIR
COURTYARD-STAIR
 
EJECTOR-ASSEMBLY.PDF
EJECTOR-ASSEMBLY.PDFEJECTOR-ASSEMBLY.PDF
EJECTOR-ASSEMBLY.PDF
 
Masters s
Masters sMasters s
Masters s
 
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v75 tracto...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v75 tracto...Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v75 tracto...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v75 tracto...
 
GDT_Final Project
GDT_Final ProjectGDT_Final Project
GDT_Final Project
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
TYE82000 Series Rev B
TYE82000 Series Rev BTYE82000 Series Rev B
TYE82000 Series Rev B
 
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 -v85 tractor...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 -v85 tractor...Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 -v85 tractor...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 -v85 tractor...
 
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v80 tracto...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v80 tracto...Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v80 tracto...
Mc cormick v series cab tier 2 new generation (2005 2007) - rp03 - v80 tracto...
 
Mc cormick v series cab tier 2 (2003 2005) - rp02 - v85 tractor service repai...
Mc cormick v series cab tier 2 (2003 2005) - rp02 - v85 tractor service repai...Mc cormick v series cab tier 2 (2003 2005) - rp02 - v85 tractor service repai...
Mc cormick v series cab tier 2 (2003 2005) - rp02 - v85 tractor service repai...
 
Mc cormick t series tier 3 (2007 2010) - cp02 - t80 f-m tractor service repai...
Mc cormick t series tier 3 (2007 2010) - cp02 - t80 f-m tractor service repai...Mc cormick t series tier 3 (2007 2010) - cp02 - t80 f-m tractor service repai...
Mc cormick t series tier 3 (2007 2010) - cp02 - t80 f-m tractor service repai...
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO Office
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00
 
Genset Installation Methodology
Genset Installation MethodologyGenset Installation Methodology
Genset Installation Methodology
 
Biddeford_7.28.15
Biddeford_7.28.15Biddeford_7.28.15
Biddeford_7.28.15
 
ELKHAM OFFICE STRUCT-S-1
ELKHAM OFFICE STRUCT-S-1ELKHAM OFFICE STRUCT-S-1
ELKHAM OFFICE STRUCT-S-1
 

Andere mochten auch

SAMPLE RC DRAWINGS-SUNIT K DHINGRA-COMPLETE
SAMPLE RC DRAWINGS-SUNIT K DHINGRA-COMPLETESAMPLE RC DRAWINGS-SUNIT K DHINGRA-COMPLETE
SAMPLE RC DRAWINGS-SUNIT K DHINGRA-COMPLETESunit Dhingra
 
Лоббирование раскрытия данных
Лоббирование раскрытия данныхЛоббирование раскрытия данных
Лоббирование раскрытия данныхopedatahackathon
 
Big Data глазами клиента или потребность в новом опыте
Big Data  глазами клиента или потребность в новом опытеBig Data  глазами клиента или потребность в новом опыте
Big Data глазами клиента или потребность в новом опытеАндрей Янбухтин
 
Presentazione aeropan aerogips workshop rimini febbraio 2015
Presentazione aeropan aerogips workshop rimini febbraio 2015Presentazione aeropan aerogips workshop rimini febbraio 2015
Presentazione aeropan aerogips workshop rimini febbraio 2015infoprogetto
 
Personal Professional Leadership
Personal Professional LeadershipPersonal Professional Leadership
Personal Professional LeadershipJames Kabucho
 
Teacher’s Role and Learner’s Role in Postmethod Era
Teacher’s Role and Learner’s Role in Postmethod EraTeacher’s Role and Learner’s Role in Postmethod Era
Teacher’s Role and Learner’s Role in Postmethod EraMahdie Ghanbari
 
mazd-company-profile 2015
mazd-company-profile 2015mazd-company-profile 2015
mazd-company-profile 2015Rizki Arnosa
 
Borja encontro rces
Borja encontro rcesBorja encontro rces
Borja encontro rcessatelite1
 
Concept Application.edited
Concept Application.editedConcept Application.edited
Concept Application.editedBruna Furlan
 
Diana nenos soldado
Diana nenos soldadoDiana nenos soldado
Diana nenos soldadosatelite1
 
Alba rodríguez imágenes sobre la guerra
Alba rodríguez imágenes sobre la guerraAlba rodríguez imágenes sobre la guerra
Alba rodríguez imágenes sobre la guerrasatelite1
 

Andere mochten auch (17)

SAMPLE RC DRAWINGS-SUNIT K DHINGRA-COMPLETE
SAMPLE RC DRAWINGS-SUNIT K DHINGRA-COMPLETESAMPLE RC DRAWINGS-SUNIT K DHINGRA-COMPLETE
SAMPLE RC DRAWINGS-SUNIT K DHINGRA-COMPLETE
 
Trabajo Social II
Trabajo Social IITrabajo Social II
Trabajo Social II
 
Лоббирование раскрытия данных
Лоббирование раскрытия данныхЛоббирование раскрытия данных
Лоббирование раскрытия данных
 
Big Data глазами клиента или потребность в новом опыте
Big Data  глазами клиента или потребность в новом опытеBig Data  глазами клиента или потребность в новом опыте
Big Data глазами клиента или потребность в новом опыте
 
Presentazione aeropan aerogips workshop rimini febbraio 2015
Presentazione aeropan aerogips workshop rimini febbraio 2015Presentazione aeropan aerogips workshop rimini febbraio 2015
Presentazione aeropan aerogips workshop rimini febbraio 2015
 
Personal Professional Leadership
Personal Professional LeadershipPersonal Professional Leadership
Personal Professional Leadership
 
Teacher’s Role and Learner’s Role in Postmethod Era
Teacher’s Role and Learner’s Role in Postmethod EraTeacher’s Role and Learner’s Role in Postmethod Era
Teacher’s Role and Learner’s Role in Postmethod Era
 
mazd-company-profile 2015
mazd-company-profile 2015mazd-company-profile 2015
mazd-company-profile 2015
 
Borja encontro rces
Borja encontro rcesBorja encontro rces
Borja encontro rces
 
Concept Application.edited
Concept Application.editedConcept Application.edited
Concept Application.edited
 
HAFEEZ
HAFEEZHAFEEZ
HAFEEZ
 
Diana nenos soldado
Diana nenos soldadoDiana nenos soldado
Diana nenos soldado
 
Revit dubai day-05
Revit dubai day-05Revit dubai day-05
Revit dubai day-05
 
Revit dubai day-06
Revit dubai day-06Revit dubai day-06
Revit dubai day-06
 
Day 03-revit-notes
Day 03-revit-notesDay 03-revit-notes
Day 03-revit-notes
 
Alba rodríguez imágenes sobre la guerra
Alba rodríguez imágenes sobre la guerraAlba rodríguez imágenes sobre la guerra
Alba rodríguez imágenes sobre la guerra
 
ARC4
ARC4ARC4
ARC4
 

Ähnlich wie SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C

Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
Drawings of Revit project for D type qtr.
Drawings of Revit project for  D type qtr.Drawings of Revit project for  D type qtr.
Drawings of Revit project for D type qtr.mahfooz alam khan
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
FOUNDATION_lAYOUT
FOUNDATION_lAYOUTFOUNDATION_lAYOUT
FOUNDATION_lAYOUTamroz S.K
 
Reinforced Concrete Frame Structure
Reinforced Concrete Frame Structure Reinforced Concrete Frame Structure
Reinforced Concrete Frame Structure Tantish QS, UTM
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Projectcharliewynn_3
 
02 custodie eng
02 custodie eng02 custodie eng
02 custodie engHai Pham
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural DrawingsTodd Mordoh
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko
 
PDR Presentation
PDR PresentationPDR Presentation
PDR PresentationNate Pham
 
structural-calculations-balcony-1.pdf
structural-calculations-balcony-1.pdfstructural-calculations-balcony-1.pdf
structural-calculations-balcony-1.pdfssusere0c44d
 
3 Baobabs Lodge As Built
3 Baobabs Lodge As Built3 Baobabs Lodge As Built
3 Baobabs Lodge As BuiltGrant Hepburn
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfCanberra Institute of technology
 

Ähnlich wie SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C (20)

3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
portfolio small 66
portfolio small 66portfolio small 66
portfolio small 66
 
Drawings of Revit project for D type qtr.
Drawings of Revit project for  D type qtr.Drawings of Revit project for  D type qtr.
Drawings of Revit project for D type qtr.
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
SAMPLE WORK
SAMPLE WORKSAMPLE WORK
SAMPLE WORK
 
FOUNDATION_lAYOUT
FOUNDATION_lAYOUTFOUNDATION_lAYOUT
FOUNDATION_lAYOUT
 
Reinforced Concrete Frame Structure
Reinforced Concrete Frame Structure Reinforced Concrete Frame Structure
Reinforced Concrete Frame Structure
 
GA-01.pdf
GA-01.pdfGA-01.pdf
GA-01.pdf
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
02 custodie eng
02 custodie eng02 custodie eng
02 custodie eng
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016
 
PDR Presentation
PDR PresentationPDR Presentation
PDR Presentation
 
structural-calculations-balcony-1.pdf
structural-calculations-balcony-1.pdfstructural-calculations-balcony-1.pdf
structural-calculations-balcony-1.pdf
 
Roof structure
Roof structureRoof structure
Roof structure
 
3 Baobabs Lodge As Built
3 Baobabs Lodge As Built3 Baobabs Lodge As Built
3 Baobabs Lodge As Built
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C

  • 1. Preliminary Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. [A1] 14131 S1.15 Author Checker ALS - Alleyn's Lower School Unnamed Rev Date By Amendments
  • 2. C C A A B B 11 22 3 3 4 4 5 5 6 6 C 2 C 2 C 2 C 1 C 1 C 5 C 3 C 3 C 5 C 3 C 3 C 5 C 3 180mm thk RC Wall 180mm thk RC Wall 215mm thk RC Wall 215mm thk RC Wall 215mm thk RC Wall 215mm thk RC Wall 215mm thk RC Wall 215mm thk RC Wall 180mm thk RC Wall C 3 C 3 C 3 C 3 C 3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 W P3W P3 W P3W P3 W P3 W P3 W P3 W P3 W P3 W P3 W P3 275 thk RC Slab on 225 thk Cellcore HXS 9/13 SSL 31.590 Platform lift (by others) it is assumed that no lift pit is required Pairs of Ancon WP3 windposts at each masonry piers. Posts to be 75x60x5, connections details by Ancon Insitu R.C. stair with 200 thk waist and half landing. Setting out to Architects details Insitu R.C. stair with 200 thk waist and half landing. Setting out to Architects details Self supporting masonry facade to Architects details. Min brick strength to be 20N/mm², min mortar type (iv) 1 S2.02 800 wide x 750 deep RC beam to perimeter of slab. Recess detail at edge to receive external leaf of cavity wall. W P3 W P3 Lintels span between masonry piers. See elevations and architects drawings for further information. All non-load bearing masonry walls tied to R.C. columns and restrained at first floor soffit as noted on drawing S0.01 Alignment of entrance columns and brickwork to be developed with the Architect in the next design stage. Allow for horizontal wind posts between vertical posts to restrain brickwork at bottom of windows. For costing allow for WP3. For more information refer to elevation drawings. 175 wide x 5 thk ms flat fixed to R.C. columns via 200 long section of 100x100x8 EA at high level. Flat fixed to angle with 2No. M16 bolts. Angle fixed to column with 2No. M16 resin anchors. Anchors to miss column reinforcement. Ancon FHR head restraint straps between flat and nonstructural wall. B6 B6 B6 B6 Where lintels span onto RC columns allow for 150mm long section of 100x100x8 EA to be fixed to column to receive lintel. Angle fixed to column with 2No. M16 resin anchors. 1 S4.01 2 S4.01 3 S4.01 1652 4 S4.01 344 459 215 1652 344 434 1236 1236 540540 439 599 1652 344 474 215 215 215 215 1 S1.10 2 S1.10 2 S2.02 Slab edgeSlab edge WP3 WP3 WP3 180mm thk RC Wall WP3 WP3 WP3 WP3 WP3 WP3 WP3 W P3 Preliminary Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. 1 : 100 [A1] P2 14131 S1.03 SKD JH ALS - Alleyn's Lower School Ground Floor Plan DEC 2015 Structural Column Schedule Type Mark Type C1 720x180 RC Column C2 720x215 RC Column C3 720x200 RC Column C4 UC152x152x37 C5 605x200 RC Column C6 100x100x8 RSA WP3 AnconWP3_75x60x5mm Steel Beam Schedule Steel Beam Type B1 UB254x146x43 B2 UC254x254x89 B3 UB203x133x30 B5 UC152x152x23 B6 5x175 B7 15x150 B8 100x100x10RSA B9 90x90x10RSA B10 RHS200x150x10.0 + 8x250 plate B11 RHS250x150x10.0 + 8x250 plate B12 RHS200x100x10.0 P1 8x50 FLAT Rev Date By Amendments 1 09.10.15 TGJ PreliminaryIssue 2 27.11.15 SKD PreliminaryIssue
  • 3. C C A A B B 11 22 3 3 4 4 5 5 6 6 C 3 C 3 C 3 C 5 C 2 C 3 C 5 C 2 C 2 C 5 180mm thk RC Wall 215mm thk RC Wall 215mm thk RC Wall 180mm thk RC Wall 215mm thk RC Wall 215mm thk RC Wall Underside of slab tapers to 150mm thk Underside of slab tapers to 150mm thk Underside of slab tapers to 150mm thk Void 180mm thk RC Wall 180mm thk RC Wall C 3 C 3 C 3 C 3 275 thk RC Slab SSL=35.200 C 3 C 3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 W P3 W P3 W P3W P3 W P3W P3 W P3W P3 W P3W P3 W P3 W P3W P3 W P3 W P3 Pairs of Ancon WP3 windposts at each masonry piers. posts to be 75x60x5, connections details by Ancon Insitu R.C. stair with 200 thk waiste and half landing. Setting out to Architects details Insitu R.C. stair with 200 thk waiste and half landing. Setting out to Architects details Self supporting masonry facade to Architects details. Min brick strength to be 20N/mm², min mortar type (iv)Void for platform lift. Dims and setting out tbc by Architect 1 S2.02 215mm thk RC Wall 215mm thk RC Wall Refer to Roof Plan S1.05 for Cornice / Lintel Support Ancon masonry support bracket attached to first floor slab. Allow for M16 anchors in Rawl R-Kem + resin at 200 c/c. Min embedment = 200mm Floor void. Dimensions and setting out to architects details. Col under Col under 1236 4 S4.01 2 S2.02 1 S4.02 2 S4.02 4 S4.02 2 S1.10 Sim 1 S1.10 Sim 3 S4.02 1 S4.03 Voids in Walls below First Floor Slab. WP3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 WP3 Preliminary Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. 1 : 100 [A1] P2 14131 S1.04 TGJ JH ALS - Alleyn's Lower School First Floor Plan Oct 2015 Structural Column Schedule Type Mark Type C1 720x180 RC Column C2 720x215 RC Column C3 720x200 RC Column C4 UC152x152x37 C5 605x200 RC Column C6 100x100x8 RSA WP3 AnconWP3_75x60x5mm Rev Date By Amendments 1 09.10.15 TGJ PreliminaryIssue 2 27.11.15 SKD PreliminaryIssue
  • 4. C C A A B B 11 22 3 3 4 4 5 5 6 6 B3 B3 B3 B1 B1 B1 B10 B10 B11 B1 B1 B10 B10 B10 1 S2.02 T1 T1 T1 T1 B3 B3 B3 B3 Temporary propping to Atrium roof required during construction In the permanent condition overall stabillity of the roof structure relies on the RC columns below and diaphragm action of timber roof. The contractor is to consider the need for temporary bracing. Cranked beams span between RC columns and steel beams. Pre-fabricated brick cornice to Architects details. Allow for cornice to be strapped back to eaves beam. Double up rafters to trim rooflights [typ] Trusses fabricated from 203x133x30 UB sections. Refer to sections for further information. B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B12 B12 B12 B12 B12B12 B12 B12 B2 B2 B2 B2 B12 T2 T1 T1T1 T1 T2 T2 T1 T1 T1 T1 T2 T2 T2 B1B1 B1 B1 B1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B10 TRUSS-1 TRUSS-2 TRUSS-1 TRUSS-1 TRUSS-2 TRUSS-1 TRUSS-2 TRUSS-1 TRUSS-1 B7 B7B7 1 S4.03 2 S4.03 3 S4.03 4 S4.03 3 S4.04 Stainless steel Cornice support/lintel to full perimeter. Discontinious at movement joints spanning over windows min. 150mm bearing each side. Refer to Architects Details X S1.12 Sim 1 S4.06 Sim B10 B10 B10 B10 B10 B11 B11B10 B1 Preliminary Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. 1 : 100 [A1] P2 14131 S1.05 SKD Checker ALS - Alleyn's Lower School Roof Plan N Rev Date By Amendments 1 09.10.15 TGJ PreliminaryIssue 2 27.11.15 SKD PreliminaryIssue Steel Beam Schedule Steel Beam Type B1 UB254x146x43 B2 UC254x254x89 B3 UB203x133x30 B5 UC152x152x23 B6 5x175 B7 15x150 B8 100x100x10RSA B9 90x90x10RSA B10 RHS200x150x10.0 + 8x250 plate B11 RHS250x150x10.0 + 8x250 plate B12 RHS200x100x10.0 P1 8x50 FLAT Timber Rafter Schedule Type Mark Type T1 50x225 C24 @ 600 ctrs T2 50x200 C24 @ 600 ctrs Note: Min 18mm thk ply screwd to top of all rafters with 75mm long No.10 screws @ 300 c/c's.
  • 5. B 1 4 3 S1.10 1 6 4 S1.10 03 - GROUND FLOOR SSL +31.590 04 - FIRST FLOOR SSL +35.200 1 2 02 - FOUNDATION LEVEL +31.315 3610 8250 (TYP.) 275 03 - GROUND FLOOR SSL +31.590 04 - FIRST FLOOR SSL +35.200 1 2 8250 275 Preliminary Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. 1 : 50 [A1] 14131 S1.10 Author Checker ALS - Alleyn's Lower School STAIRS Rev Date By Amendments 1 : 50 STAIR-1 1 : 50 STAIR-2 1 : 50 SECTION 3-3 3 1 : 50 S1.10 SECTION 4-44 3D VIEW STAIR-1 5 3D VIEW STAIR-26
  • 6. A 4 6 B1 B1 B1 B1 M20 Bolts M20 Bolts B3 B1 B3 B3 B1 B3 B3 15mm End Plate 15mm End Plate 15mm End Plate 1 S1.12 A S1.12 B S1.12 2 S1.12 3 S1.12 4 S1.12 Y Z 924 931 X S1.14 05 - TOP OF STEEL +38.354 B1 2 No. M20 Bolts 540 215 215 B1 B1 6 B1 B3 B3 215 15mm End Plates 150 147 05 - TOP OF STEEL +38.354 392 C4C4 10 10mm End Plate B1 15mm Armatherm FRR Thermal Break connection plate with washers and Bushing details 4 05 - TOP OF STEEL +38.354B1 15mm Steel End Plate 6mm FW 05 - TOP OF STEEL +38.354 B3 15mm Steel End Plate 6mm FW Preliminary Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. As indicated [A1] 14131 S1.12 SKD TR ALS - Alleyn's Lower School CHIMNEY DETAILS-Sheet 1 Nov.`15 Rev Date By Amendments 1 : 10 S1.05 Plan on Chimney at +38.354X 1 : 5 S1.12 Section 1-11 3D OVERALL VIEW OF CHIMNEY AREA10 1 : 5 S1.12 Enlarged Plan at +38.354A 1 : 5 S1.12 Plan B at +38.354B 1 : 10 S1.12 Section 2-22 1 : 5 S1.12 Section 3-33 1 : 5 S1.12 Section 4-44 3D VIEW Y5 3D VIEW Z6
  • 7. A 46 B8 B8 B5 B5 B5 B5 C4 C4 C4C4 B5 B8 B5 4511125 1180 928 1 S1.13 2 S1.13 Z1 X S1.14 A 06 - ROOF LEVEL +39.785 07 - CHIMNEY STEEL LEVEL +39.924 B5 B5 B8 C4 C4 05 - TOP OF STEEL +38.354 06 - ROOF LEVEL +39.785 07 - CHIMNEY STEEL LEVEL +39.924 B5 B5 C4 C4 P1 C4 C4 B1 B8 B8 15mm Artherm FRR Thermal Break connection plate with washers and bushing details Preliminary Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. 1 : 10 [A1] 14131 S1.13 Author Checker ALS - Alleyn's Lower School CHIMNEY DETAILS-Sheet 2 Rev Date By Amendments 1 : 10 S1.07 Plan on Chimney at +39.785X 1 : 10 S1.13 Section 1-11 1 : 10 S1.13 Section 2-22 THE WHOLE FRAME IS TO BE WELDED BY 6mm F.W 3D VIEW Z1Z1
  • 8. A 46 1190 To Inside face of Brickwork A1 X S1.14 07 - CHIMNEY STEEL LEVEL +39.924 B8 103 102.5 Brick Preliminary Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. As indicated [A1] 14131 S1.14 Author Checker ALS - Alleyn's Lower School CHIMNEY DETAILS-Sheet 3 Rev Date By Amendments 3D VIEW A11 1 : 10 Plan on Chimney at +39.785 Showing Brickwork2 1 : 2 S1.12 Section X-XX
  • 9. Tender Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. [A1] 15182 S2.06 Author Checker Hazeley Down House Unnamed Rev Date By Amendments
  • 10. 1 S2.01 1 2 3 4 5 6 D E F G H I J 3500500300037759502000 1800 1500 5100 1650 4900 25225 25 225 15400 17774 11177 25225 7460 3005 510 250 25 225 1175 252 431205 1775 175 544 175 8888 336 745 322 835 T.O.C +46.600 2 S2.01 3 S2.02 175 175 350 175 175 350 C1 C1 C1 250 250 250 250 1 S4.02 2 S4.02 3 S4.02 6 S4.02 25225 50200 15235 250 675 88 175 2952 300mm THK. R.C SLAB 4 S2.02 PRELIMINARY Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. 1 : 50 [A1] 15182 S1.02 SKD R.R Hazeley Down House Basement Plan 16.11.15 1 : 50 Basement Slab 3 P1 P2 P2 Rev Date By Amendments 16.11.15 SKD Preliminary 19.11.15 SKD Preliminary
  • 11. B1-Basement SSL +46.750 1 150 225 25 250 mm R.C. Wall B1-Basement SSL +46.750 175 150 300 B1-Basement SSL +46.750 J 177 250 1001 00-Ground Floor SSL +49.600 1 1000150 200 250 450 265 SHS100x100x10.0 450x700DP RC BEAM 300 00-Ground Floor SSL +49.600 DE 1000 700 450 SHS100x100x10.0 300 VOID 450x700 dp Mass Concrete Foundation VOID 20mm Movement Joint 225mm Thk. R.C Slab Min. 100mm wide blockwork dwarf wall 150mm Dp. O/A Beam & Block @ 300 c/c 225 180700 450 225 225 00-Ground Floor SSL +49.600 B1-Basement SSL +46.750 EF 950 300 50 200 250 3000 PRELIMINARY Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. 1 : 20 [A1] 15182 S4.02 SKD R.R Hazeley Down House Substructure Sections & Details Rev Date By Amendments 16.11.15 SKD Preliminary 19.11.15 SKD Preliminary 1 : 20 Section 1 - 1 1 1 : 20 Section 2 - 2 2 1 : 20 Section 3 - 3 31 : 20 Section 4 - 4 4 1 : 20 Section 5 - 5 5 1 : 20 Section 6 - 6 6 3D View of Section 6-6 7 P1 P2 P2
  • 12. 4 B SHS100x100x10.0 1 A SHS100x100x10.0 PFC380x100x54 PFC380x100x54 150x150x10mm Steel Angle PFC380x100x54 PFC380x100x54 SHS100x100x10.0 150x150x10mm Steel Angle welded / bolted to adjoining PFC`s 1 C PFC380x100x54PFC380x100x54 SHS100x100x10.0 UC152x152x30 460x380 Steel plate bolted/welded to PFC`s PFC380x100x54 PFC380x100x54 UC152x152x30 SHS100x100x10.0 2 B UC203x203x60 UC203x203x60 UC152x152x30UC152x152x30 SHS100x100x10.0 4 No. 100x125 Steel Plates welded to SHS and bolted to Uc`s UC203x203x60 UC152x152x30 UC152x152x30 UC203x203x60 100x125x10mm thk. Steel Plate PRELIMINARY Scale: London Office 9th Floor, 236 Gray's Inn Rd, London WC1X 8HB +44 (0) 20 7354 5402 eocengineers.com Drawing Title Project Title Drawing Status Project Number Date Drawn By Checked By Drawing Number Revision General Notes 1. This drawing is to be read in conjunction with all relevant architects & engineers drawings & specifications. 2. The contractor is to be responsible for all dimensions & for the correct setting out of the works on site. 3. Do not scale from this drawing. 1 : 10 [A1] 15182 S4.11 SKD R.R Hazeley Down House Superstructure Sections & Details 16.11.15 Rev Date By Amendments 16.11.15 SKD Preliminary 19.11.15 SKD Preliminary 1 : 10 Plan on SHS 1 1 : 10 Detail-2 Plan 2 3D-Detail 2A 2b 1 : 10 Detail-3 Plan 3 3D-Detail 3A 3b P1 1 : 10 Detail-4 Plan 4 3D-Detail 4A 4a P2 P2