1
Final
Assessment
Sxxxx
The Most Challenging Project & Service in my Career
在以往职业生涯中的最具挑战性的项目和服务
Sui Liang --- 梁 绥
Sinopec Zhenhai MAV Project Implementation
2
Final	Assessment
Project Backgrounds Zhenhai MAV Project
Most important and Greatest project to Honeywell and Sinopec
ZRCC	(Zhenhai	Refinery	&	Chemical	
Co.	Ltd)
Founded	in	1974,	in	Zhenhai	
District,	Ningbo	of	Zhejiang	Prov.
The	Sinopec	branch	of	the	most	
strongest	Profitability
The	largest	crude	oil	processing	
capacity	of	23	MTA(Million	Tons	
Annually)	in	China
Refining	capacity	ranked	in	the	17th
around	the	world	in	2008
Became	the	largest	integrated	
refining	business	in	China	after	1000	
KTA	Ethylene	project	in	Apr,2010
Customers
The	total	(Not	only	control	system)investment	up	
to	21.9B	RMB	with	220	hectares	area	occupied
DCS	MAV	Project	Order	Value	is	<omitted>
The	biggest	project	in	Honeywell	China	history
The	first	Experion	PKS	widely	used	project	in	China	
Petrochemical	industry.
Most	complex	Petrochemical	units
1000	KTA	Ethylene	- Sinopec	&	ABB	Lummus
650	KTA	EO/EG	- DOW	Chemical
28.5/62.5	KTA	PO/SM	- Lyondell
450	KTA	LLDPE	- Univation
Other	6	process	units	from	domestic	
technology	like	300	KTA	PP	and	etc.
Other	Auxiliary	units	like	Power,	Cycle	water	
and	etc.
Projects
3
Final	Assessment
My Responsibilities - 1
• A	core	team	member	involved	from	the	very	beginning
– 2007	Q4	to	2010	Q2
Only 5 Honeywellers were keep on during the whole long project phase
• FEED	(Front	End	Engineering	Design)	Phase
– FEED	Documentation	– AMS	Functional	Detailed	Specification	
– Review	of	AMS	part	of	Technical	Proposal.
– Lead	and	Perform	an	interoperability	test	with	valves	from	
Mansoneilan/Samson/Yamatake.
– Provide	help	and	support	for	other	team	members	(Project	
Manager/Engineering	Manager/Hardware	Engineer/Software	
Engineer)	in	other	activities
• Polyethylene	process	backgrounds
• The	experience	on	the	cooperation	with	EPCs	in	the	past
4
Final	Assessment
My Responsibilities - 2
• Execution	Phase
– Project	Engineering	Power	in	CCR4	till	FAT	and	shipment
– As	the	Engineering	and	site	service	leader	of	CCR3
• Office	work
– Hardware	and	Software	Design
– Project	Planning	and	Project	Schedule	- cooperate	with	Project	Controller
– Enhance	the	engineering	standardization	via	FEED	document
– Enhance	the	customer	management,	push	customer	to	provide	the	design	input	on	
time	on	quality
• Factory	Acceptance	Test	&	Site	Services
– Open	crate/installation	instruction/power	on/Site	Commissioning/Site	Training/Plant	
Startup	Support
– Coach	2	new	Honeywell	employees,	who	are	in	charge	of	5	other	Units	and	
administer	3rd party	resources.
Zhenhai MAV contains 4 CCRs. Each CCR has an Engineering Leader
5
Final	Assessment
My Challenges & Solutions 1 - New Technology
After the project I am already an expert in New DCS system.
Totally	New	Technology	to	the	
whole	engineering	team.	
New	means	more	bugs	and	
unpredicted	risk
The	first	Experion	PKS	and	C300	
hardware	of	large	sale	use	in	
Sinopec	Market
I	have	only	limited	experience	
knowledge	base	of	Experion.	
Differences	between	TPS	I	am	
familiar	and	PKS
Challenges
Keeping	on	learning	and	master	the	details
Make	good	use	of	Honeywell	Intranet	resources
Ask	help	from	global	expert	and	experienced	
engineers
Top	management	involved	to	set	up	a	high	
priority	communication	channel	for	
Development	team	to	us
Document	all	the	guidelines	for	team	sharing.
My	rolling	average	calculation	is	very	precise	
and	is	used	as	a	template	to	share	with	other	
project	engineers.
Use	configuration	template	and	standard	
procedure	to	make	the	teamwork	more	effective	
and	standardized.
Solutions
6
Final	Assessment
My Challenges & Solutions 2 - Freshman on job coach
The 2 new employees grow up to be qualified Lead Engineers
It	is	impossible	to	use	all	
experienced		Honeywell	engineers	
due	to	other	mega	projects.
There	are	2	fresh	engineers	who	are	
direct	report	to	me,	they	are	quite	
new	to	Process	industry
For	long	term	professional	
development	new	employee	need	
more	challenges	to	be	trained	as	a	
lead	engineer.
Challenges Solutions
To	Honeywell	New	Employee
More	encourage	and	share	the	experience	of	
myself	as	a	new	comer	
Request	them	to	write	down	the		working	
procedures	to	share	with	each	other
More	communications	with	customers	and	
EPCs	to	help	them	feel	ease
Learn	from	each	other.	One	is	good	at	
network	and	the	other	is	good	at	PLC.
Results
The	2	Honeywell	new	engineers	turn	to	be	
qualified	to	be	in	charge	of		one	complex	
chemical	unit	as	a	lead	engineer.
7
Final	Assessment
My Challenges & Solutions 2 - Freshman on job coach
Many 3rd party HMI Resources grow up to be Configuration Engineers
Many	new	external	fresh	Low	Cost	
Engineers	from	subcontractors	for	
cost	reasons	and	resources	
limitations.
Even	to	Honeywell’s	subcontract	
partners	most	of	experienced		
resources	are	already	occupied	by	
other	mega	projects.
Most	of	the	LCEs		are	zero	
experienced	in	career.
All	LCEs	are	eager	to	learn	some	
new	things	and	strong	willing	to	be	
growing	up	enough.
Challenges Solutions
To	LCEs
Trust	them	and	treat	them	the	same	as		
Honeywellers
Effective	on-job	training	by	myself
Give	them	great	responsibilities	and	keep	
good	tracking	of	the	quality.	
Results
Motivated	and	active
Through	the	practice	in	my	team,	3	Junior	
new	comers		subcontractors		is	turned	out		to	
be		qualified	engineers.	Their	labor	rate	
increased	form	5	to	10-15USD/Hr.
Example:	LCE	learn	to	testing	logic
8
Final	Assessment
My Challenges & Solutions 3 - Project Management
LLDPE has the most contributions to additional labor order.
The	biggest	order	value	project	in	
Honeywell	China.	The	initial	margin	
rate	is	nearly	0,	which	is	quite	tough	
from	the	prospect	of	project	
management.
Cost
Lower	value	win	the	bid
Strict	Cost	Control
Resource
Apply	for	external	resource
Coach		supervise	and	inspect
Internal	competition	
Change	management
Detailed	scope	definition
Change	Records
Challenges
Change	my	work	style	of	only	focusing	on	the	task	
in	my	hand	and	force	me	to	stop	for	a	while	to	
think	about	more	about	other	topics	such	as	
scope/cost/schedule/resource/document	 delivery.
Use	timesheet	to	compare	the	real	cost	with	
budget
Use	schedule	tool	to	update	the	planning
Bi-weekly	working	Commissioning	Report	to	
win	the	customers	and	PM’s	confidence	in	
my	team.
Cost	pressure	and	resource	apply	complexity
Resource	plan	detailed	enough
Prefer	to	use	new	low	cost	resource	with	
effective	training	and	motivation
Rely	on	customers	help	and	other	project	
data	to	support	resource	allocation	request
Solutions
9
Final	Assessment
Project Results
Strengthen long term relationship between Honeywell and Sinopec Zhenhai
Project	&	service	delivery	on	time	
with	qualified	deliverables
Engineering	cost	and	schedule	were	
controlled,	contract	value	and	
margin	were	increased	by	effective	
change	management
Order	value	grew	up	to	
<Omitted>	from	initial	Value.
Margin	rate	from	0	to	
<Omitted>
Qualified	mega	project	team
Trust	and	relationship	with	Sinopec
To Honeywell
Successful	one	time	startup	in	main	units
PE	startup	on	Mar	26th,2010
Ethylene	startup	on	Apr	20th,2010
Control	system	investment	within	the	initial	budget
More	valued	added	service	investment	
Become	the	largest	integrated	refining	business	in	
China	by	magzine
Revenue	up	to	141B	RMB
Profits	up	to	50B+	RMB	in	continuous	3	years
Ethylene	Production	of	2012	up	to	1102.7	
KTA,	top	1	in	scope	of	Sinopec
To ZRCC
Unit Engineering Site	Service Total
PE 4xxxxHrs 2xxxHrs 6xxxxHrs
CCR3 6xxxxHrs 3xxxHrs 10xxxHrs
10
Final	Assessment
My Achievements
• Myself
– Technical	expert	in	Experion	PKS
– Capable	to	lead	and	coach	a	team	in	a	mega	project
– Good	at	project	management	activities
• Planning/Schedules/Resources/Change	 Management	and	etc
• PM	experience	help	me	pass	the	PMP	exam	and	obtain	the	certificate
Tech Expertise and PM capabilities are greatly beneficial to future projects.
• My	Team
– Thanks-giving	letters	from	customers
– Magnificent	growth	of	2	Honeywell	freshers	in	team
– Great	growth	of	2	LCEs	from	our	partners
• The	whole	Team
– 2010	Q2	China-India	Excellence	Award
11
Final	Assessment
Thanks giving letter from customers
The customers awarded CCR3 team the magnificent honour
12
Final	Assessment
Questions and Answers
Thanks you very much!!
13
Final	Assessment
The END

Weitere ähnliche Inhalte

Andere mochten auch

DIAPOSITIVA SOBRE LA HIGIENE DEL HOGAR - TAPS
DIAPOSITIVA SOBRE LA HIGIENE DEL HOGAR - TAPS DIAPOSITIVA SOBRE LA HIGIENE DEL HOGAR - TAPS
DIAPOSITIVA SOBRE LA HIGIENE DEL HOGAR - TAPS CAROLINA ORDOÑEZ
 
Pc arriba las manos
Pc arriba las manosPc arriba las manos
Pc arriba las manosSarinred
 
CV Boosting Brochure_for_web
CV Boosting Brochure_for_webCV Boosting Brochure_for_web
CV Boosting Brochure_for_webNicole Riley
 
Ainon päiväkirja - Aino's diary in Turkey
Ainon päiväkirja - Aino's diary in TurkeyAinon päiväkirja - Aino's diary in Turkey
Ainon päiväkirja - Aino's diary in Turkeylauttasaari
 
Pass4sure 1Z0-599 Latest Exam Material
Pass4sure 1Z0-599 Latest Exam MaterialPass4sure 1Z0-599 Latest Exam Material
Pass4sure 1Z0-599 Latest Exam MaterialZacharyMChristensen
 
Diaa Eldin CV
Diaa Eldin CVDiaa Eldin CV
Diaa Eldin CVdiaaali55
 
Efemerides hoy del 1 al 8 de mayo 2016
Efemerides hoy del 1 al 8 de mayo 2016Efemerides hoy del 1 al 8 de mayo 2016
Efemerides hoy del 1 al 8 de mayo 2016crazulia
 
Frasat e momin by ibrahim bin abudullah al hazimi
Frasat e momin by ibrahim bin abudullah al hazimiFrasat e momin by ibrahim bin abudullah al hazimi
Frasat e momin by ibrahim bin abudullah al hazimiMuhammad Tariq
 
Introduction à l'étude de droit semestre3
Introduction à l'étude de droit semestre3Introduction à l'étude de droit semestre3
Introduction à l'étude de droit semestre3Jamal Yasser
 
Ush ch. 23 section 2 notes
Ush ch. 23 section 2 notesUsh ch. 23 section 2 notes
Ush ch. 23 section 2 notesskorbar7
 
Research Intro Kyle Harris
Research Intro Kyle HarrisResearch Intro Kyle Harris
Research Intro Kyle Harrishossjob
 
Announcements - Tuesday, May 3, 2016
Announcements - Tuesday, May 3, 2016Announcements - Tuesday, May 3, 2016
Announcements - Tuesday, May 3, 2016Ken Stayner
 

Andere mochten auch (17)

DIAPOSITIVA SOBRE LA HIGIENE DEL HOGAR - TAPS
DIAPOSITIVA SOBRE LA HIGIENE DEL HOGAR - TAPS DIAPOSITIVA SOBRE LA HIGIENE DEL HOGAR - TAPS
DIAPOSITIVA SOBRE LA HIGIENE DEL HOGAR - TAPS
 
Pc arriba las manos
Pc arriba las manosPc arriba las manos
Pc arriba las manos
 
CV Boosting Brochure_for_web
CV Boosting Brochure_for_webCV Boosting Brochure_for_web
CV Boosting Brochure_for_web
 
Guia nº 1
Guia nº 1Guia nº 1
Guia nº 1
 
WilliamWoodsTranscript
WilliamWoodsTranscriptWilliamWoodsTranscript
WilliamWoodsTranscript
 
Ab testování
Ab testováníAb testování
Ab testování
 
Ainon päiväkirja - Aino's diary in Turkey
Ainon päiväkirja - Aino's diary in TurkeyAinon päiväkirja - Aino's diary in Turkey
Ainon päiväkirja - Aino's diary in Turkey
 
Pass4sure 1Z0-599 Latest Exam Material
Pass4sure 1Z0-599 Latest Exam MaterialPass4sure 1Z0-599 Latest Exam Material
Pass4sure 1Z0-599 Latest Exam Material
 
Diaa Eldin CV
Diaa Eldin CVDiaa Eldin CV
Diaa Eldin CV
 
Pos malaysia
Pos malaysiaPos malaysia
Pos malaysia
 
Efemerides hoy del 1 al 8 de mayo 2016
Efemerides hoy del 1 al 8 de mayo 2016Efemerides hoy del 1 al 8 de mayo 2016
Efemerides hoy del 1 al 8 de mayo 2016
 
Frasat e momin by ibrahim bin abudullah al hazimi
Frasat e momin by ibrahim bin abudullah al hazimiFrasat e momin by ibrahim bin abudullah al hazimi
Frasat e momin by ibrahim bin abudullah al hazimi
 
Introduction à l'étude de droit semestre3
Introduction à l'étude de droit semestre3Introduction à l'étude de droit semestre3
Introduction à l'étude de droit semestre3
 
Ush ch. 23 section 2 notes
Ush ch. 23 section 2 notesUsh ch. 23 section 2 notes
Ush ch. 23 section 2 notes
 
Research Intro Kyle Harris
Research Intro Kyle HarrisResearch Intro Kyle Harris
Research Intro Kyle Harris
 
Valucity
ValucityValucity
Valucity
 
Announcements - Tuesday, May 3, 2016
Announcements - Tuesday, May 3, 2016Announcements - Tuesday, May 3, 2016
Announcements - Tuesday, May 3, 2016
 

Ähnlich wie public-Sxxxx job application-Liang Sui_One of my most challenging Project & Service in the past-Final

Mineral Processing Coal Washing Brief-HOT 2023.pptx
Mineral Processing Coal Washing Brief-HOT 2023.pptxMineral Processing Coal Washing Brief-HOT 2023.pptx
Mineral Processing Coal Washing Brief-HOT 2023.pptxTeresaZheng3
 
Umicore Capital Markets Day 2015 : Technology and Innovation
Umicore Capital Markets Day 2015 : Technology and InnovationUmicore Capital Markets Day 2015 : Technology and Innovation
Umicore Capital Markets Day 2015 : Technology and InnovationUmicore
 
Petdrill epc 2013
Petdrill  epc 2013Petdrill  epc 2013
Petdrill epc 2013AP DealFlow
 
Market Research Report :Nuclear Power Market in China 2010
Market Research Report :Nuclear Power Market in China 2010Market Research Report :Nuclear Power Market in China 2010
Market Research Report :Nuclear Power Market in China 2010Netscribes, Inc.
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentJini Rajendran
 
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...dun yang
 
Vmc excutive summaryaug
Vmc excutive summaryaugVmc excutive summaryaug
Vmc excutive summaryaugVietnamMining
 
Products of guilin hongcheng - hch superfine grinding mill
Products of guilin hongcheng  - hch superfine grinding millProducts of guilin hongcheng  - hch superfine grinding mill
Products of guilin hongcheng - hch superfine grinding millGrinding Mill
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020Pomcert
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020Pomcert
 
New base energy news issue 834 dated 20 april 2016
New base energy news issue  834 dated 20 april  2016New base energy news issue  834 dated 20 april  2016
New base energy news issue 834 dated 20 april 2016Khaled Al Awadi
 
Low Coal Seam Mining Technology-HOT Mining
Low Coal Seam Mining Technology-HOT MiningLow Coal Seam Mining Technology-HOT Mining
Low Coal Seam Mining Technology-HOT MiningJing Zhang
 
Thin low coal seam mining technology hot mining
Thin low coal seam mining technology hot miningThin low coal seam mining technology hot mining
Thin low coal seam mining technology hot miningJing Zhang
 
Thin-low coal seam longwall mining technology
Thin-low coal seam longwall mining technologyThin-low coal seam longwall mining technology
Thin-low coal seam longwall mining technologyHeng Huang
 
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_SerenaSerena Fu
 
Technip company profile
Technip company profileTechnip company profile
Technip company profilePrince Patni
 

Ähnlich wie public-Sxxxx job application-Liang Sui_One of my most challenging Project & Service in the past-Final (20)

Khursaniyah Project Brochure
Khursaniyah Project BrochureKhursaniyah Project Brochure
Khursaniyah Project Brochure
 
Mineral Processing Coal Washing Brief-HOT 2023.pptx
Mineral Processing Coal Washing Brief-HOT 2023.pptxMineral Processing Coal Washing Brief-HOT 2023.pptx
Mineral Processing Coal Washing Brief-HOT 2023.pptx
 
Umicore Capital Markets Day 2015 : Technology and Innovation
Umicore Capital Markets Day 2015 : Technology and InnovationUmicore Capital Markets Day 2015 : Technology and Innovation
Umicore Capital Markets Day 2015 : Technology and Innovation
 
Petdrill epc 2013
Petdrill  epc 2013Petdrill  epc 2013
Petdrill epc 2013
 
Market Research Report :Nuclear Power Market in China 2010
Market Research Report :Nuclear Power Market in China 2010Market Research Report :Nuclear Power Market in China 2010
Market Research Report :Nuclear Power Market in China 2010
 
qatar_november_2011_web
qatar_november_2011_webqatar_november_2011_web
qatar_november_2011_web
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
 
Vmc excutive summaryaug
Vmc excutive summaryaugVmc excutive summaryaug
Vmc excutive summaryaug
 
Products of guilin hongcheng - hch superfine grinding mill
Products of guilin hongcheng  - hch superfine grinding millProducts of guilin hongcheng  - hch superfine grinding mill
Products of guilin hongcheng - hch superfine grinding mill
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020
 
New base energy news issue 834 dated 20 april 2016
New base energy news issue  834 dated 20 april  2016New base energy news issue  834 dated 20 april  2016
New base energy news issue 834 dated 20 april 2016
 
Low Coal Seam Mining Technology-HOT Mining
Low Coal Seam Mining Technology-HOT MiningLow Coal Seam Mining Technology-HOT Mining
Low Coal Seam Mining Technology-HOT Mining
 
Thin low coal seam mining technology hot mining
Thin low coal seam mining technology hot miningThin low coal seam mining technology hot mining
Thin low coal seam mining technology hot mining
 
Thin-low coal seam longwall mining technology
Thin-low coal seam longwall mining technologyThin-low coal seam longwall mining technology
Thin-low coal seam longwall mining technology
 
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena
 
Technip company profile
Technip company profileTechnip company profile
Technip company profile
 
대림_OVERVIEW(영)_2013
대림_OVERVIEW(영)_2013대림_OVERVIEW(영)_2013
대림_OVERVIEW(영)_2013
 

public-Sxxxx job application-Liang Sui_One of my most challenging Project & Service in the past-Final

  • 1. 1 Final Assessment Sxxxx The Most Challenging Project & Service in my Career 在以往职业生涯中的最具挑战性的项目和服务 Sui Liang --- 梁 绥 Sinopec Zhenhai MAV Project Implementation
  • 2. 2 Final Assessment Project Backgrounds Zhenhai MAV Project Most important and Greatest project to Honeywell and Sinopec ZRCC (Zhenhai Refinery & Chemical Co. Ltd) Founded in 1974, in Zhenhai District, Ningbo of Zhejiang Prov. The Sinopec branch of the most strongest Profitability The largest crude oil processing capacity of 23 MTA(Million Tons Annually) in China Refining capacity ranked in the 17th around the world in 2008 Became the largest integrated refining business in China after 1000 KTA Ethylene project in Apr,2010 Customers The total (Not only control system)investment up to 21.9B RMB with 220 hectares area occupied DCS MAV Project Order Value is <omitted> The biggest project in Honeywell China history The first Experion PKS widely used project in China Petrochemical industry. Most complex Petrochemical units 1000 KTA Ethylene - Sinopec & ABB Lummus 650 KTA EO/EG - DOW Chemical 28.5/62.5 KTA PO/SM - Lyondell 450 KTA LLDPE - Univation Other 6 process units from domestic technology like 300 KTA PP and etc. Other Auxiliary units like Power, Cycle water and etc. Projects
  • 3. 3 Final Assessment My Responsibilities - 1 • A core team member involved from the very beginning – 2007 Q4 to 2010 Q2 Only 5 Honeywellers were keep on during the whole long project phase • FEED (Front End Engineering Design) Phase – FEED Documentation – AMS Functional Detailed Specification – Review of AMS part of Technical Proposal. – Lead and Perform an interoperability test with valves from Mansoneilan/Samson/Yamatake. – Provide help and support for other team members (Project Manager/Engineering Manager/Hardware Engineer/Software Engineer) in other activities • Polyethylene process backgrounds • The experience on the cooperation with EPCs in the past
  • 4. 4 Final Assessment My Responsibilities - 2 • Execution Phase – Project Engineering Power in CCR4 till FAT and shipment – As the Engineering and site service leader of CCR3 • Office work – Hardware and Software Design – Project Planning and Project Schedule - cooperate with Project Controller – Enhance the engineering standardization via FEED document – Enhance the customer management, push customer to provide the design input on time on quality • Factory Acceptance Test & Site Services – Open crate/installation instruction/power on/Site Commissioning/Site Training/Plant Startup Support – Coach 2 new Honeywell employees, who are in charge of 5 other Units and administer 3rd party resources. Zhenhai MAV contains 4 CCRs. Each CCR has an Engineering Leader
  • 5. 5 Final Assessment My Challenges & Solutions 1 - New Technology After the project I am already an expert in New DCS system. Totally New Technology to the whole engineering team. New means more bugs and unpredicted risk The first Experion PKS and C300 hardware of large sale use in Sinopec Market I have only limited experience knowledge base of Experion. Differences between TPS I am familiar and PKS Challenges Keeping on learning and master the details Make good use of Honeywell Intranet resources Ask help from global expert and experienced engineers Top management involved to set up a high priority communication channel for Development team to us Document all the guidelines for team sharing. My rolling average calculation is very precise and is used as a template to share with other project engineers. Use configuration template and standard procedure to make the teamwork more effective and standardized. Solutions
  • 6. 6 Final Assessment My Challenges & Solutions 2 - Freshman on job coach The 2 new employees grow up to be qualified Lead Engineers It is impossible to use all experienced Honeywell engineers due to other mega projects. There are 2 fresh engineers who are direct report to me, they are quite new to Process industry For long term professional development new employee need more challenges to be trained as a lead engineer. Challenges Solutions To Honeywell New Employee More encourage and share the experience of myself as a new comer Request them to write down the working procedures to share with each other More communications with customers and EPCs to help them feel ease Learn from each other. One is good at network and the other is good at PLC. Results The 2 Honeywell new engineers turn to be qualified to be in charge of one complex chemical unit as a lead engineer.
  • 7. 7 Final Assessment My Challenges & Solutions 2 - Freshman on job coach Many 3rd party HMI Resources grow up to be Configuration Engineers Many new external fresh Low Cost Engineers from subcontractors for cost reasons and resources limitations. Even to Honeywell’s subcontract partners most of experienced resources are already occupied by other mega projects. Most of the LCEs are zero experienced in career. All LCEs are eager to learn some new things and strong willing to be growing up enough. Challenges Solutions To LCEs Trust them and treat them the same as Honeywellers Effective on-job training by myself Give them great responsibilities and keep good tracking of the quality. Results Motivated and active Through the practice in my team, 3 Junior new comers subcontractors is turned out to be qualified engineers. Their labor rate increased form 5 to 10-15USD/Hr. Example: LCE learn to testing logic
  • 8. 8 Final Assessment My Challenges & Solutions 3 - Project Management LLDPE has the most contributions to additional labor order. The biggest order value project in Honeywell China. The initial margin rate is nearly 0, which is quite tough from the prospect of project management. Cost Lower value win the bid Strict Cost Control Resource Apply for external resource Coach supervise and inspect Internal competition Change management Detailed scope definition Change Records Challenges Change my work style of only focusing on the task in my hand and force me to stop for a while to think about more about other topics such as scope/cost/schedule/resource/document delivery. Use timesheet to compare the real cost with budget Use schedule tool to update the planning Bi-weekly working Commissioning Report to win the customers and PM’s confidence in my team. Cost pressure and resource apply complexity Resource plan detailed enough Prefer to use new low cost resource with effective training and motivation Rely on customers help and other project data to support resource allocation request Solutions
  • 9. 9 Final Assessment Project Results Strengthen long term relationship between Honeywell and Sinopec Zhenhai Project & service delivery on time with qualified deliverables Engineering cost and schedule were controlled, contract value and margin were increased by effective change management Order value grew up to <Omitted> from initial Value. Margin rate from 0 to <Omitted> Qualified mega project team Trust and relationship with Sinopec To Honeywell Successful one time startup in main units PE startup on Mar 26th,2010 Ethylene startup on Apr 20th,2010 Control system investment within the initial budget More valued added service investment Become the largest integrated refining business in China by magzine Revenue up to 141B RMB Profits up to 50B+ RMB in continuous 3 years Ethylene Production of 2012 up to 1102.7 KTA, top 1 in scope of Sinopec To ZRCC Unit Engineering Site Service Total PE 4xxxxHrs 2xxxHrs 6xxxxHrs CCR3 6xxxxHrs 3xxxHrs 10xxxHrs
  • 10. 10 Final Assessment My Achievements • Myself – Technical expert in Experion PKS – Capable to lead and coach a team in a mega project – Good at project management activities • Planning/Schedules/Resources/Change Management and etc • PM experience help me pass the PMP exam and obtain the certificate Tech Expertise and PM capabilities are greatly beneficial to future projects. • My Team – Thanks-giving letters from customers – Magnificent growth of 2 Honeywell freshers in team – Great growth of 2 LCEs from our partners • The whole Team – 2010 Q2 China-India Excellence Award
  • 11. 11 Final Assessment Thanks giving letter from customers The customers awarded CCR3 team the magnificent honour