Rehabilitation of a DN 300 sewer rising main with a single
length of 800 m for United Utilities
Client:
United Utilities, United Kingdom
Year of Realisation:
July 2016
Type of Project:
Rehabilitation of a ductile iron DN 300 sewer rising main
Our Services:
•	 Delivery of the flexible Primus Liner DN 300 PN 12
•	 Delivery of the Primus Line connectors with DIN flanges DN 300 PN 10
•	 Supervising the installation of the Primus Line®
system
Task:
The network operator United Utilities plc and Amey plc, located in the Northern part of the United Kingdom,
were confronted with a leaking sewer rising main. The ductile iron pipe was installed in the 1970s and show-
ed significant deterioration. Pinholes were present and the wall thickness was reduced to 1-2 mm, especially
at the bottom of the pipe due to abrasion and chemical degradation. The section to be renovated had a total
length of 800 meters and four 45 degree bends were present. The sewer rising main is operated with a maxi-
mum pressure of 2 bar. The client was looking for a renovation method with long installation lengths that could
traverse bends, but also work with a reduced deployment of machinery since the close-by one-way street had
to remain open for traffic.
Job Report
renovated pipeline
Technical Details:
Material of host pipe:	 Ductile iron
Transported Medium:	 Residential waste water
Host Pipe Diameter:	 DN 300
Operating Pressure:	 2 bar
Primus Line®
System:	 Primus Liner DN 300 PN 12 with ID = 270 mm
	 2 connectors with DIN flanges DN 300 PN 10
Total Length:	 771 m  	
Number of sections:	 installed in one section
Installation time:	 5 working days (including cleaning, insertion and inflating of
	 the liner, and installation of the connectors)
Rehabilitation System:
For this challenging task United Utilities plc and Amey plc decided to use the Primus Line®
system, a flexible
sliplining solution for the trenchless rehabilitation of pressure pipes. The Primus Line®
system provides clients
with long insertion lengths of 1,000 meters and more in one single step, the product’s ability to traverse bends
of up to 45 degree, and a fast installation with up to 600 meters per hour. The system has a strong track record
with numerous successful installations all over the world for different applications, such as potable water, gas
mains, and crude oil pipelines.
Project Description:
In June 2016, the trenchless expert Warrior Trenchless Solutions Ltd, was entrusted with the rehabilitation of
this sewer rising main deploying the Primus Line®
system. In a first step, a by-pass overpumping system made
of HDPE was set-up to seclude the pipe to be renovated from the network. The pipe was opened and the rope
connection for the entire length of 800 meters was produced using a special inflatable bag and a vac truck.
Once the rope connection was created, the transport reel (l = 4.2 meters) with the pre-folded Primus Liner was
placed in a 90 degree angle to the axis of the host pipe due to the confined space situation. The auxiliary winch
was placed at the destination pit and a Bagela winch (10 tons) was placed at the start pit. The pulling head
was mounted to the liner. The cleaning of the host pipe was performed with pull-through rubber (pigging) discs
and the remaining silt in the 45 degree bends of the host pipe, was removed with water jetting. Once the free
inner diameter of the host pipe was verified with a CCTV, the liner was installed uphill with a height difference
of approximately 15 meters due to the confined space situation of the site. The maximum pulling forces were
2.8 tons and an installation speed of 220 meters per hour could be achieved. After the liner was tension-free,
the liner was turned back into a round shape using compressed air and the Primus Line connectors with DIN
flanges DN 300 PN 10 were installed. After a subsequent pressure test and re-integration into the network, the
rehabilitation works were completed. The system could convince with the ease of use, long insertion lengths,
the ability to traverse bends, and the minimal working space needed on-site. In addition, the flow rate was
improved by approximately 6.5 %.
©RädlingerprimuslineGmbH,08/2016,Thisdocumentcannotbeusedtoderiveanylegallybindingassurance
orwarrantyforcertainpropertiesoftheproductorthesuitabilityoftheproductforaspecificapplication.
Rädlinger primus line GmbH
Kammerdorfer Straße 16 · 93413 Cham · Germany
Tel.: +49 9971 4003 - 100 · Fax: +49 9971 4003 - 123
primusline@raedlinger.com · www.primusline.com

Weitere ähnliche Inhalte

Was ist angesagt?

Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPTCherylwitmer
 
Process Boilers PPT
Process Boilers PPTProcess Boilers PPT
Process Boilers PPTSahilRana67
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & AbandonmentStatoil
 
Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)James Gormley
 
Information on Concrete Batching Plant from Apollo Infratech Pvt. Ltd.
Information on Concrete Batching Plant from Apollo Infratech Pvt. Ltd. Information on Concrete Batching Plant from Apollo Infratech Pvt. Ltd.
Information on Concrete Batching Plant from Apollo Infratech Pvt. Ltd. kelvin larsen
 

Was ist angesagt? (8)

Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPT
 
Process Boilers PPT
Process Boilers PPTProcess Boilers PPT
Process Boilers PPT
 
Reflex notable projects
Reflex notable projectsReflex notable projects
Reflex notable projects
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)
 
VAIBHAV RESUME
VAIBHAV RESUMEVAIBHAV RESUME
VAIBHAV RESUME
 
Information on Concrete Batching Plant from Apollo Infratech Pvt. Ltd.
Information on Concrete Batching Plant from Apollo Infratech Pvt. Ltd. Information on Concrete Batching Plant from Apollo Infratech Pvt. Ltd.
Information on Concrete Batching Plant from Apollo Infratech Pvt. Ltd.
 
Long wall top coal caving
Long wall top coal cavingLong wall top coal caving
Long wall top coal caving
 

Andere mochten auch

#FIRMday 15 May 2014 Nick Thompson, 'Success on a Shoe String - The Thames Wa...
#FIRMday 15 May 2014 Nick Thompson, 'Success on a Shoe String - The Thames Wa...#FIRMday 15 May 2014 Nick Thompson, 'Success on a Shoe String - The Thames Wa...
#FIRMday 15 May 2014 Nick Thompson, 'Success on a Shoe String - The Thames Wa...Emma Mirrington
 
Countdown to competition in the water industry
Countdown to competition in the water industryCountdown to competition in the water industry
Countdown to competition in the water industryAde Allenby
 
Value of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames WaterValue of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames WaterInstitute of Consulting
 
Prof Graham Ault (Strathclyde)-Renewable Energy Case Study
Prof Graham Ault (Strathclyde)-Renewable Energy Case StudyProf Graham Ault (Strathclyde)-Renewable Energy Case Study
Prof Graham Ault (Strathclyde)-Renewable Energy Case StudyScotland Malawi Partnership
 
Our Yard
Our YardOur Yard
Our YardSofi-77
 
DEADMANS BRIDGE PRESENTATION
DEADMANS BRIDGE PRESENTATIONDEADMANS BRIDGE PRESENTATION
DEADMANS BRIDGE PRESENTATIONBrian Dennehy
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016Charlie Bell
 
Sludge handling and disposal
Sludge handling and disposalSludge handling and disposal
Sludge handling and disposalRakesh Rahar
 
An Introduction To Wastewater And Sludge Principles
An Introduction To Wastewater And Sludge PrinciplesAn Introduction To Wastewater And Sludge Principles
An Introduction To Wastewater And Sludge PrinciplesOliver Grievson
 
Primary and secondary wastewater treatment..
Primary and secondary wastewater treatment..Primary and secondary wastewater treatment..
Primary and secondary wastewater treatment..snehalmenon92
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017Drift
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheLeslie Samuel
 

Andere mochten auch (14)

#FIRMday 15 May 2014 Nick Thompson, 'Success on a Shoe String - The Thames Wa...
#FIRMday 15 May 2014 Nick Thompson, 'Success on a Shoe String - The Thames Wa...#FIRMday 15 May 2014 Nick Thompson, 'Success on a Shoe String - The Thames Wa...
#FIRMday 15 May 2014 Nick Thompson, 'Success on a Shoe String - The Thames Wa...
 
Countdown to competition in the water industry
Countdown to competition in the water industryCountdown to competition in the water industry
Countdown to competition in the water industry
 
Value of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames WaterValue of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames Water
 
Prof Graham Ault (Strathclyde)-Renewable Energy Case Study
Prof Graham Ault (Strathclyde)-Renewable Energy Case StudyProf Graham Ault (Strathclyde)-Renewable Energy Case Study
Prof Graham Ault (Strathclyde)-Renewable Energy Case Study
 
Dr Sam Phiri: HIV and AIDS Situation in Malawi
Dr Sam Phiri: HIV and AIDS Situation in MalawiDr Sam Phiri: HIV and AIDS Situation in Malawi
Dr Sam Phiri: HIV and AIDS Situation in Malawi
 
Our Yard
Our YardOur Yard
Our Yard
 
DEADMANS BRIDGE PRESENTATION
DEADMANS BRIDGE PRESENTATIONDEADMANS BRIDGE PRESENTATION
DEADMANS BRIDGE PRESENTATION
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
 
Sludge handling and disposal
Sludge handling and disposalSludge handling and disposal
Sludge handling and disposal
 
Sludge management and Sludge digesters
Sludge management and Sludge digestersSludge management and Sludge digesters
Sludge management and Sludge digesters
 
An Introduction To Wastewater And Sludge Principles
An Introduction To Wastewater And Sludge PrinciplesAn Introduction To Wastewater And Sludge Principles
An Introduction To Wastewater And Sludge Principles
 
Primary and secondary wastewater treatment..
Primary and secondary wastewater treatment..Primary and secondary wastewater treatment..
Primary and secondary wastewater treatment..
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Ähnlich wie Case Study_Lake Windermere Great Britain_GB

Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologydinesh sharma
 
Sesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technologySesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technologyLTDH2013
 
BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)alois multerer
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillDeanGarratt
 
Types of Pipes & There Applications
Types of Pipes & There ApplicationsTypes of Pipes & There Applications
Types of Pipes & There ApplicationsNatrajPipes
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologyRemya Rajeev
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiberjamieram
 
ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014Xavier MICHEL
 
Trenchless Technology for Laying Underground pipes.
Trenchless Technology for  Laying Underground pipes.Trenchless Technology for  Laying Underground pipes.
Trenchless Technology for Laying Underground pipes.Himanshu Rao
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY MD AMANULLAH
 
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdftrenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdfpawankumar491710
 
ICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyLorella Angelini
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRPdewcraig
 

Ähnlich wie Case Study_Lake Windermere Great Britain_GB (20)

Trenchless Technology
Trenchless TechnologyTrenchless Technology
Trenchless Technology
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Sesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technologySesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technology
 
BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
Types of Pipes & There Applications
Types of Pipes & There ApplicationsTypes of Pipes & There Applications
Types of Pipes & There Applications
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiber
 
ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014
 
Trenchless Technology for Laying Underground pipes.
Trenchless Technology for  Laying Underground pipes.Trenchless Technology for  Laying Underground pipes.
Trenchless Technology for Laying Underground pipes.
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
attcofinal
attcofinalattcofinal
attcofinal
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY
 
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdftrenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
 
ICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening Technology
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRP
 
Site Report
Site ReportSite Report
Site Report
 

Case Study_Lake Windermere Great Britain_GB

  • 1. Rehabilitation of a DN 300 sewer rising main with a single length of 800 m for United Utilities Client: United Utilities, United Kingdom Year of Realisation: July 2016 Type of Project: Rehabilitation of a ductile iron DN 300 sewer rising main Our Services: • Delivery of the flexible Primus Liner DN 300 PN 12 • Delivery of the Primus Line connectors with DIN flanges DN 300 PN 10 • Supervising the installation of the Primus Line® system Task: The network operator United Utilities plc and Amey plc, located in the Northern part of the United Kingdom, were confronted with a leaking sewer rising main. The ductile iron pipe was installed in the 1970s and show- ed significant deterioration. Pinholes were present and the wall thickness was reduced to 1-2 mm, especially at the bottom of the pipe due to abrasion and chemical degradation. The section to be renovated had a total length of 800 meters and four 45 degree bends were present. The sewer rising main is operated with a maxi- mum pressure of 2 bar. The client was looking for a renovation method with long installation lengths that could traverse bends, but also work with a reduced deployment of machinery since the close-by one-way street had to remain open for traffic. Job Report renovated pipeline
  • 2. Technical Details: Material of host pipe: Ductile iron Transported Medium: Residential waste water Host Pipe Diameter: DN 300 Operating Pressure: 2 bar Primus Line® System: Primus Liner DN 300 PN 12 with ID = 270 mm 2 connectors with DIN flanges DN 300 PN 10 Total Length: 771 m Number of sections: installed in one section Installation time: 5 working days (including cleaning, insertion and inflating of the liner, and installation of the connectors) Rehabilitation System: For this challenging task United Utilities plc and Amey plc decided to use the Primus Line® system, a flexible sliplining solution for the trenchless rehabilitation of pressure pipes. The Primus Line® system provides clients with long insertion lengths of 1,000 meters and more in one single step, the product’s ability to traverse bends of up to 45 degree, and a fast installation with up to 600 meters per hour. The system has a strong track record with numerous successful installations all over the world for different applications, such as potable water, gas mains, and crude oil pipelines. Project Description: In June 2016, the trenchless expert Warrior Trenchless Solutions Ltd, was entrusted with the rehabilitation of this sewer rising main deploying the Primus Line® system. In a first step, a by-pass overpumping system made of HDPE was set-up to seclude the pipe to be renovated from the network. The pipe was opened and the rope connection for the entire length of 800 meters was produced using a special inflatable bag and a vac truck. Once the rope connection was created, the transport reel (l = 4.2 meters) with the pre-folded Primus Liner was placed in a 90 degree angle to the axis of the host pipe due to the confined space situation. The auxiliary winch was placed at the destination pit and a Bagela winch (10 tons) was placed at the start pit. The pulling head was mounted to the liner. The cleaning of the host pipe was performed with pull-through rubber (pigging) discs and the remaining silt in the 45 degree bends of the host pipe, was removed with water jetting. Once the free inner diameter of the host pipe was verified with a CCTV, the liner was installed uphill with a height difference of approximately 15 meters due to the confined space situation of the site. The maximum pulling forces were 2.8 tons and an installation speed of 220 meters per hour could be achieved. After the liner was tension-free, the liner was turned back into a round shape using compressed air and the Primus Line connectors with DIN flanges DN 300 PN 10 were installed. After a subsequent pressure test and re-integration into the network, the rehabilitation works were completed. The system could convince with the ease of use, long insertion lengths, the ability to traverse bends, and the minimal working space needed on-site. In addition, the flow rate was improved by approximately 6.5 %. ©RädlingerprimuslineGmbH,08/2016,Thisdocumentcannotbeusedtoderiveanylegallybindingassurance orwarrantyforcertainpropertiesoftheproductorthesuitabilityoftheproductforaspecificapplication. Rädlinger primus line GmbH Kammerdorfer Straße 16 · 93413 Cham · Germany Tel.: +49 9971 4003 - 100 · Fax: +49 9971 4003 - 123 primusline@raedlinger.com · www.primusline.com