4. Things went right in Q2 Things went wrong in Q2
1.Less errors because we got all the details in
standard format .
2. Generated more number of Quotes .
3.Hardware price updates are under process.
1.Still there is a lot of scope in following standard
format of initial measurement form.
2. Hardware issues.
3. We have given to many option for one project.
5. Plan for Q3:
We are Shifting to Cloud Version Software to prepare the Quote.
b. We need Standard format for Quotation revision.
Support required:
1. Upgrade / Service of the desktop.
2. Automation of documentation.
3. Reducing number of Option.
7. Things went right in Q2 Things went wrong in Q2
1.Compared to Q1, we have reduced mistakes in
Fabrication Details .
2. Since we have introduced standard format &
Workflow for our design department, we have
reduced fabrication drawings lead Time .
3.Learned a little about the Special Hardware
compatibility & Technical Limitation.
4. We have initiated frequent discussion on design
issues with Our production team, it has helped us
to reduce our mistakes.
1. Design drawings reading issues in Production
Team.
2. Shop drawings Requirement.
3. We are not receiving complete information to
proceed fabrication.
4. Design changes , after release of the BOM.
5. Other department involvement & ownership is
also important.
3 Months Design Data
Total Lead Time 83 Hrs 2.5 Hrs /
project
Total Project 33
8. Plan for Q3:
a. Site Visiting is compulsory for Project, once its approved .
b. Will try to get Complete information before submitting it to the production department.
c. We are Shifting to Cloud Version Software.
Support required:
1. Practically we need Hardware Training.
2. Complete Details is required in order Confirmation forms &
Final Site Measurement.
3. We need proper details on Fan Sizes & Weather Silicone Color.