SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Downloaden Sie, um offline zu lesen
This drawing is copyright. All rights described in Chapter IV of the Copyright, Designs and Patents Act 1988 have generally been asserted. All
dimensions to be checked on site. Do not scale. Any discrepancy between this drawing and other information to be reported to GFA. This
drawing shows Design Intent Only.
C a r d i f f & L o n d o n
Capital Tower | Greyfriars Road | Cardiff CF10 3AG | T: 029 2023 3993 | W: GauntFrancis.co.uk
Project No Rev
Client
Scale
Drawing No
Drawing Status
Project
Title
FOR PLANNING
Drawn CheckedDate
I
1 : 100 @ A1
GA(03)10014015
G r o u n d F l o o r P l a n - P r o p o s e d
292 to 298 High Street, Slough
M&M Asset Management
G r o u n d F l o o r P l a n - P r o p o s e d
WK WK22/10/14
H I G H S T R E E T
SUB-
STATION
H A T F I E L D R O A D
CAR PARK
Water
Intake
Gas
Intake
Boilers &
Plant
Refuse &
Recycling
NEW
LANDSCAPED
PEDESTRIAN
STREET
ENTRANCE
TO NEW
APARTMENTS
Lifts
RECEPTION FOR NEW APARTMENTS
NEW UNIT
135m2
Dry Riser
Intake
1
2
3
4
5
6
7
9
10
11
12
13
1415
0 5 10 m
Refuse for
Retail Unit
29O 288 278 - 286
300
UNITS NOT PART OF APPLICATION PROPOSALS
Refuse
for 288-290
8
Electric Intake
New planting and trees
NOTES
1. For detailed notes on
materials see the Design Access
& Sustainability Statement (DAS)
Shared surface
paving
New planting
Rev Date Description By
A 11/17/14 dry riser path, lines over & car park wall added WK
B 11/24/14 additional detail WK
C 12/03/14 block B omitted,parking layout revised in accordance with
transport consultant advice
WK
D 12/11/14 layout revised, detail added WK
E 12/11/14 parking bay numbers corrected WK
F 15/01/14 Unit 294 retained, parking, cycle storage, unit 296, roof terrace DJP
G 28/01/15 Car Parking adjusted, bikes added. MRH
H 02/02/15 Ground Floor layout updated to accommodate 50 Bikes MRH
I 10/02/15 Drawing updated in line with comments MRH
UNIT 292
86m2
Relabelas
retail cycle
storage (4no.)
Existing staircase
removed
Cycle Storage (50no.)
Removable/sinkable
bollard
Existing staircase removed,
enclose opening to roof.
Plat.
Lift
Escape
UNIT NOT PART OF
APPLICATION
PROPOSALS
294

Weitere ähnliche Inhalte

Was ist angesagt?

GE Energy_PowerPoint_Template 05
GE Energy_PowerPoint_Template 05GE Energy_PowerPoint_Template 05
GE Energy_PowerPoint_Template 05Gianluca Cavina
 
Sample 1
Sample 1Sample 1
Sample 1Raja S
 
SKHPP-1005-Geologic Section of Dam Site(Rev1)-Layout1
SKHPP-1005-Geologic Section of Dam Site(Rev1)-Layout1SKHPP-1005-Geologic Section of Dam Site(Rev1)-Layout1
SKHPP-1005-Geologic Section of Dam Site(Rev1)-Layout1Fahad Ejaz
 
BIM Show Live 2015: Man City Stadium Construction
BIM Show Live 2015: Man City Stadium ConstructionBIM Show Live 2015: Man City Stadium Construction
BIM Show Live 2015: Man City Stadium ConstructionBuiltEnvironmentUBM
 
Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 ExpansionKwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 ExpansionGrant Hepburn
 
Integrys Presentation
Integrys PresentationIntegrys Presentation
Integrys PresentationCALSTART
 
2018 Asia Pacific LNG Map Brochure Cover
2018 Asia Pacific LNG Map Brochure Cover2018 Asia Pacific LNG Map Brochure Cover
2018 Asia Pacific LNG Map Brochure Coverarapublication
 
Heatkal Container Design Solutions (EN 12079)
Heatkal   Container Design Solutions (EN 12079)Heatkal   Container Design Solutions (EN 12079)
Heatkal Container Design Solutions (EN 12079)Pankaj Kalaskar
 
Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19ChandrakantSoni5
 
SANTA BARBARA COURT HOUSE CLOCK TOWER 01.PDF
SANTA BARBARA COURT HOUSE CLOCK TOWER 01.PDFSANTA BARBARA COURT HOUSE CLOCK TOWER 01.PDF
SANTA BARBARA COURT HOUSE CLOCK TOWER 01.PDFJuan Salguero
 
Gate 2016 ce paperi mathematics q29
Gate 2016 ce paperi  mathematics q29Gate 2016 ce paperi  mathematics q29
Gate 2016 ce paperi mathematics q29Mickey Boz
 
Synopsis of Projects Suitable For In-Place Recycling
Synopsis of Projects Suitable For In-Place RecyclingSynopsis of Projects Suitable For In-Place Recycling
Synopsis of Projects Suitable For In-Place RecyclingCraig Harrington
 

Was ist angesagt? (19)

TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates ComparisonTPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
 
GE Energy_PowerPoint_Template 05
GE Energy_PowerPoint_Template 05GE Energy_PowerPoint_Template 05
GE Energy_PowerPoint_Template 05
 
Sample 1
Sample 1Sample 1
Sample 1
 
Linkedin
LinkedinLinkedin
Linkedin
 
SKHPP-1005-Geologic Section of Dam Site(Rev1)-Layout1
SKHPP-1005-Geologic Section of Dam Site(Rev1)-Layout1SKHPP-1005-Geologic Section of Dam Site(Rev1)-Layout1
SKHPP-1005-Geologic Section of Dam Site(Rev1)-Layout1
 
Belt Feeder Chute
Belt Feeder ChuteBelt Feeder Chute
Belt Feeder Chute
 
BIM Show Live 2015: Man City Stadium Construction
BIM Show Live 2015: Man City Stadium ConstructionBIM Show Live 2015: Man City Stadium Construction
BIM Show Live 2015: Man City Stadium Construction
 
Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 ExpansionKwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion
 
Integrys Presentation
Integrys PresentationIntegrys Presentation
Integrys Presentation
 
2018 Asia Pacific LNG Map Brochure Cover
2018 Asia Pacific LNG Map Brochure Cover2018 Asia Pacific LNG Map Brochure Cover
2018 Asia Pacific LNG Map Brochure Cover
 
Heatkal Container Design Solutions (EN 12079)
Heatkal   Container Design Solutions (EN 12079)Heatkal   Container Design Solutions (EN 12079)
Heatkal Container Design Solutions (EN 12079)
 
Loading Hopper
Loading HopperLoading Hopper
Loading Hopper
 
Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19
 
SANTA BARBARA COURT HOUSE CLOCK TOWER 01.PDF
SANTA BARBARA COURT HOUSE CLOCK TOWER 01.PDFSANTA BARBARA COURT HOUSE CLOCK TOWER 01.PDF
SANTA BARBARA COURT HOUSE CLOCK TOWER 01.PDF
 
Will mallory 2016
Will mallory 2016Will mallory 2016
Will mallory 2016
 
Will Mallory 2017
Will Mallory 2017Will Mallory 2017
Will Mallory 2017
 
Gate 2016 ce paperi mathematics q29
Gate 2016 ce paperi  mathematics q29Gate 2016 ce paperi  mathematics q29
Gate 2016 ce paperi mathematics q29
 
Synopsis of Projects Suitable For In-Place Recycling
Synopsis of Projects Suitable For In-Place RecyclingSynopsis of Projects Suitable For In-Place Recycling
Synopsis of Projects Suitable For In-Place Recycling
 
Cl1
Cl1Cl1
Cl1
 

Ähnlich wie P15921-1(22) ground Floor Plan Proposed

General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement DrawingsMark Flynn
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 sMike Darwich
 
Pieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter Nortje
 
Pieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter Nortje
 
Pieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter Nortje
 
FWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceFWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceBluesign
 
CMAA OHare and Midway International Airports Capital Improvement Program
CMAA OHare and Midway International Airports Capital Improvement ProgramCMAA OHare and Midway International Airports Capital Improvement Program
CMAA OHare and Midway International Airports Capital Improvement ProgramAusrine Rakauskaite
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03Terence Botha
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush LodgeGrant Hepburn
 
Signature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonSignature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonOrion Realtors
 
12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdfDaizukiIchiro
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Nicholas Naing
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
September 25, 2017 Parkmerced Vision Update
September 25, 2017 Parkmerced Vision UpdateSeptember 25, 2017 Parkmerced Vision Update
September 25, 2017 Parkmerced Vision Updateparkmercedvision
 

Ähnlich wie P15921-1(22) ground Floor Plan Proposed (20)

General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement Drawings
 
+
++
+
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s
 
Pieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and auto
 
Pieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and auto
 
Pieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and autoPieter nortje fitter with dual diesel and auto
Pieter nortje fitter with dual diesel and auto
 
FWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceFWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore France
 
CMAA OHare and Midway International Airports Capital Improvement Program
CMAA OHare and Midway International Airports Capital Improvement ProgramCMAA OHare and Midway International Airports Capital Improvement Program
CMAA OHare and Midway International Airports Capital Improvement Program
 
Eden Price List
Eden Price ListEden Price List
Eden Price List
 
5. Afghanistan US Army Approval
5. Afghanistan US Army Approval5. Afghanistan US Army Approval
5. Afghanistan US Army Approval
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
Signature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonSignature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D Gurgaon
 
12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
 
AEP Phasing Plan
AEP Phasing PlanAEP Phasing Plan
AEP Phasing Plan
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
September 25, 2017 Parkmerced Vision Update
September 25, 2017 Parkmerced Vision UpdateSeptember 25, 2017 Parkmerced Vision Update
September 25, 2017 Parkmerced Vision Update
 
COURTYARD-STAIR
COURTYARD-STAIRCOURTYARD-STAIR
COURTYARD-STAIR
 

Mehr von Sophie Christopher Bowes (6)

leaflet3
leaflet3leaflet3
leaflet3
 
property flyer_Layout 1-2
property flyer_Layout 1-2property flyer_Layout 1-2
property flyer_Layout 1-2
 
property flyer_Layout 1-2
property flyer_Layout 1-2property flyer_Layout 1-2
property flyer_Layout 1-2
 
prospectus4 ABingdon Hydro
prospectus4 ABingdon Hydroprospectus4 ABingdon Hydro
prospectus4 ABingdon Hydro
 
1st floor 2d-2 Office Conversion
1st floor 2d-2 Office Conversion 1st floor 2d-2 Office Conversion
1st floor 2d-2 Office Conversion
 
property flyer_Layout 1-2
property flyer_Layout 1-2property flyer_Layout 1-2
property flyer_Layout 1-2
 

P15921-1(22) ground Floor Plan Proposed

  • 1. This drawing is copyright. All rights described in Chapter IV of the Copyright, Designs and Patents Act 1988 have generally been asserted. All dimensions to be checked on site. Do not scale. Any discrepancy between this drawing and other information to be reported to GFA. This drawing shows Design Intent Only. C a r d i f f & L o n d o n Capital Tower | Greyfriars Road | Cardiff CF10 3AG | T: 029 2023 3993 | W: GauntFrancis.co.uk Project No Rev Client Scale Drawing No Drawing Status Project Title FOR PLANNING Drawn CheckedDate I 1 : 100 @ A1 GA(03)10014015 G r o u n d F l o o r P l a n - P r o p o s e d 292 to 298 High Street, Slough M&M Asset Management G r o u n d F l o o r P l a n - P r o p o s e d WK WK22/10/14 H I G H S T R E E T SUB- STATION H A T F I E L D R O A D CAR PARK Water Intake Gas Intake Boilers & Plant Refuse & Recycling NEW LANDSCAPED PEDESTRIAN STREET ENTRANCE TO NEW APARTMENTS Lifts RECEPTION FOR NEW APARTMENTS NEW UNIT 135m2 Dry Riser Intake 1 2 3 4 5 6 7 9 10 11 12 13 1415 0 5 10 m Refuse for Retail Unit 29O 288 278 - 286 300 UNITS NOT PART OF APPLICATION PROPOSALS Refuse for 288-290 8 Electric Intake New planting and trees NOTES 1. For detailed notes on materials see the Design Access & Sustainability Statement (DAS) Shared surface paving New planting Rev Date Description By A 11/17/14 dry riser path, lines over & car park wall added WK B 11/24/14 additional detail WK C 12/03/14 block B omitted,parking layout revised in accordance with transport consultant advice WK D 12/11/14 layout revised, detail added WK E 12/11/14 parking bay numbers corrected WK F 15/01/14 Unit 294 retained, parking, cycle storage, unit 296, roof terrace DJP G 28/01/15 Car Parking adjusted, bikes added. MRH H 02/02/15 Ground Floor layout updated to accommodate 50 Bikes MRH I 10/02/15 Drawing updated in line with comments MRH UNIT 292 86m2 Relabelas retail cycle storage (4no.) Existing staircase removed Cycle Storage (50no.) Removable/sinkable bollard Existing staircase removed, enclose opening to roof. Plat. Lift Escape UNIT NOT PART OF APPLICATION PROPOSALS 294