SlideShare ist ein Scribd-Unternehmen logo
1 von 26
CONNECT EVERYTHING
2020
Product
Development
System
Assessment
FlexSteel Results Presentation
2/25/2020
Agenda
– EAC
– PDS Assessment
– Assessment Results
– Potential Solutions & Roadmap
– Next Steps
Our Mission
The EAC Value Model
• About you
• About us
• Business &
Improvement Initiatives
• People, Process,
Team, &Tools
• Plan
• Deliverables
• BusinessCase
• Measures
• Accountability
• Problem Solve
• Process Improvement
• Installation &
Configuration
• Educate
• Design & Develop
• Learn, LEAN,Optimize
• Go!
• Measure
• Validate
• Get it right
Positive Business Outcomes PBO
• Achieve optimal Customer Success and satisfaction.
• Decrease product development Cost.
• Accelerate product introduction timing.
• Increase Growth and Market Share by optimizing internal
processes and systems.
Agenda
– EAC
– PDS Assessment
– Assessment Results
– Potential Solutions & Roadmap
– Next Steps
PDSA Input & Output
PDS
Assessment
• PDSA
Questionnaire
• Interview(s)
with Process
Stakeholders
• Prioritized Business
Value Opportunities
• Consolidated
Improvement Initiatives
• Process Capability GAP
Assessment
• Recommended PDS
Roadmap
• Potential Financial
Impact
Agenda
– EAC
– PDS Assessment
– Assessment Results
– Potential Solutions & Roadmap
– Next Steps
Who we heard from…
Thank you to the 20+ team members
for participating!
Special thanks to JagThethy and Dale
Marietta for sponsoring & hosting this
event.
EACTeam:
Mike, Dan, Chris, Bill, Steve
From questionnaire - Ranking the importance of the following strategic business objectives to your business.
Strategic Business Objectives
Value
Growth
Profitability
Grow by protecting market share
Grow by more efficient order fulfillment
Grow market share
Grow through innovation
Grow & profit from product value
Grow consumable sales and after-market
Profit from efficient product lifecycle costs
Profit from efficient use of asset base
Profit from product cost efficiencies
1
2
3
4
5
6
7
8
9
6.3
3.6
3.6
4.1
1.9
2.5
2.5
2.9
3.5
Listed
in
order
of
Importance
from
Top
Active Improvement Initiatives (top 10)
From questionnaire - Please score your sense of the relative importance of the following improvement initiatives to your company.
Improve collaboration with manufacturing
Improve internal engineering collaboration and concurrent engineering
Reduce the time to generate customer quotes
Apply standard work within product development
Improve collaboration with the supply chain
Standardize the product development processes
Improve product cost management and the product lifecycle cost management
Improve cross-discipline collaboration among CAD and software groups
Improve idea capture and management
Improve agency and regulatory compliance
10.0
9.5
8.4
7.3
6.2
5.9
5.7
5.7
4.6
4.1
Consolidated Process Maturity
Level 3 equates to systematic operation of Processes Some Processes are more mature in execution than others
Each process scored on a maturity level scale of 1-4 (4 is Most Mature)
as is
to be
“What We Heard”
“If 2 or 3 people quit, we’d be in huge trouble. Few of our processes are recorded or able to
be duplicated, it’s all tribal knowledge”
“We don’t have written instructions, we simply
hire people who are mechanically inclined”
“We could easily be twice as
efficient with a properly
implemented PLM system”
“Our service is terrible. Our documentation is terrible or
non-existent or wrong. EVERYTHING is done manually with
emails. There is no BOM.”
“We’re trying to do PLM
manually, but purchasing
doesn’t know what to
order and manufacturing
doesn’t know what
they’re making.
Everything is reactive.”
“We crippled production because of a
small engineering problem and the lack
of a system to catch it”
Our customer: “We love your products, but
we hate you and everything about you!”
“If everyone is doing their part right, it
could take weeks to do it with our
current method. IT COULD TAKE HOURS
IF A PLM SYSTEM WAS USED!”
“We had to completely redo
400 hours of work because of
wrong engineering data!”
“We’re constantly fire fighting”
“We kill manufacturing everyday
we’re delayed, they have to work
double time once material is sourced
and finally arrives”
“At least 50% of our customer
deliveries are late”
“We waste tons of money flying
materials, paying expediting fees
and working overtime because
procurement is out of the loop”
Our customer: “We love your
products, but we hate you and
everything about you!”
Magic Wand Responses
• Protected Intellectual Property
• Seamless Communications
• Fast Customer Responses
• Integrated System for Self-Serve
• Latest Info on Product Changes
• Get Info at a Fingertip
• In 2019 there were 821 ECNs or 3 ECNs per day wasting a minimum of 2 hours per day
searching for information to process these ECNs for anyone working on an ECN.
• Much of our processes are managed via email and manual efforts, easily adding a week to
every ECN to completion on average.
• There could be at least a 50% productivity improvement in processes if we had clean, linked,
automated product and process management—could easily double our speed.
• Hired one full time employee just to handle manual effort and research required to ensure
proper creation of a service NCR.
• We had 400 hrs. in manufacturing a fitting for a custom order, only to find out it was not
what the customer asked for and we had to put in another 400 hrs. to remake them.
“What We Heard”… Metrics Summary
PDM/PLM Improvements
Average Improvements in Manufacturing according to:
Product Info Search
40% Reduction
Manual Data Entry
60% Reduction
Part Reuse
20% Increase
Gross Margin
2% Increase
BOM
65% Increase in Accuracy
50% Decrease in Cost & Mgmt
Time To Market (TTM)
25% Reduction
New Part Introduction
10% Reduction in new part introduction
20% Reduction in part cost introduction
Product Life Cycle Capacity (Productivity)
20% Increase in capacity
ECO Volume, Cost, Cycle Time
25% Reduction in volume
25% Reduction in cost
60% Reduction in cycle time
Scrap and Rework
15% Reduction in scrap and rework
Client’s actual % improvements will depend on their current As-Is situation
Estimated based on average benefits results
from real world industry examples for these
categories using information given by
FlexSteel in questionnaires.
• Part/Design Reuse
• Redundant Data Entry
• Product Information Search
• Design Review Meetings
• Engineering Rework
• Manufacturing Scrap & Rework
• Legacy System Support
• GCR CycleTime
• Physical Prototypes
• Supply Chain Coordination
• Doc Repository Support
• Document Distribution & Mailings
• Legacy System Maintenance
• InventoryObsolescence
• WarrantyClaims
• New ProductCycleTime
• Time to Market
• Manufacturing Downtime
Potential Financial Benefits
PDS Potential Benefit Summary
REVENUE $500,000,000
Min Max
Total Potential Benefit Range $8,865,000 $22,952,000
Direct Cost Benefits
Total $656,000 $1,942,000
Productivity Benefits
Total $6,994,000 $17,081,000
Additional Revenue/Profit Benefit
Total $1,215,000 $3,929,000
Benefits per Year
Flexsteel Key Takeaways
• Industry leading products.
• Successful due to the incredible efforts of key employees.
• While customers love your product, they have extreme difficulty working
with your company.
• Data and process management methods are not at the same level as your
business.
• Majority of your process and business knowledge is not documented and
rely heavily on a handful of key employees.
Capture and manage key lifecycle
information from your product fleet
using Digital Twins
Apply predictive data analytics to
improve current and future products
Improved products, both in the field and
future generations
Proactively improve customer outcomes
New business models from evergreen
products
New revenue opportunities from product
performance data
Lowered costs based on insights from
product operation
Enable in-context access to all relevant data for better engineering decisions
Introduce AR/VR technologies into the design process
Create the complete digital design that satisfies requirements for all stakeholders
Drive business results and continuous innovation by
transforming your engineering practices and
product designs
How to get there Results
Use system and functional modeling to design for connectivity
and innovation
Analyze and optimize products using massive data sets about
similar designs and their performance in the field
Use platform-based product design to easily deliver product
variations
Design to take advantage of additive manufacturing capabilities
in production
Lowered development costs and time-to-market
New product and service model opportunities
Usage-based requirements drive better product
development
Improved efficiency of product development
Reduced cost
Improved quality
Data Driven
Design
Digital Product
Traceability
UNDERSTAND
ADVANCE
OUTPERFORM
Digital
Twin
Predictive
Performance
Improvements
Distributed AR/VR
Product Review
Constant
Analysis
Collaborative
AR/VR Design
Design for
Connectivity
Digital
Product
Definition
Performance
Based
Analysis
Universal Data
Access
Outcome-Based
Design
TODAY
Design Transformation Path
Take the next step with EAC
Complete Transformation
Design Manufacturing Service
Manufacturing Journey
Improve and perfect production processes
Improve profitability
Reduce unplanned downtime
Shorten lead times
Improve agility and responsiveness
Enhance existing infrastructure with smart sensors and modern technologies
Simplify data in up-to-the-minute role-based views of operational performance
Broadcast real-time alerts about assets and performance anomalies
Connect diverse and disparate assets, sensors, business systems and external data
sources in real time
Continuously improve your operations
performance and flexibility through digital
manufacturing, real-time intelligence and
predictive analytics.
How to get there Results
Utilize analytics to recommend actions that
optimize performance
Synchronize resources to ensure flawless
execution of production
Implement consistent KPIs and corporate-
wide performance benchmarking to identify and
deploy best practices
Extend real-time visibility and control across the
supply
Utilize agile methodologies to rapidly create & continuously
evolve manufacturing applications
Digitally design your manufacturing processes & quality plans
Employ intuitive, in-context 3D and augmented reality to
guide workers
Apply predictive analytics to machine health and quality processes
Accelerate continuous improvement
Increased speed and flexibility
Increased workforce efficiency
Improved product quality
Optimized maintenance processes
Digital
Thread
Predictive
Analytics
UNDERSTAND
ADVANCE
OUTPERFORM
Performance
Benchmarking
Synchronized
Operations
Agile
Innovation
AR Enabled
Operations
TODAY
Unified
Connectivity
Real-Time Issue
Identification
Operational
Intelligence
Prescriptive
Analytics
Supply Chain
Visibility
Change your go-to-market approach to position
for product-as-service and develop outcome-
based contracts
Create and deploy new value-added
service offerings
Restructure and retrain your organization
as needed Customer lifetime value and retention
increases
Increased revenue streams and growth from
new offerings
Visualize enterprise service data in a unified role-based view
Incorporate insights to take action and improve service processes
Instantaneously track and monitor product location, performance, utilization,
and condition
Access up-to-date digital service information and part catalogs for seamless
identification and ordering
Drive unprecedented value for your customers and
your organization by
redefining the entire service model
How to get there Results
Apply connectivity and predictive analytics to new data sets in
order to drive proactive service and automate scheduling
Empower technicians with up-to-date content and AR/VR
guidance
Enable remote service and software updates
Optimize parts forecasting and pricing through advanced
modeling
Reduced cost of ownership for customers
Increased product uptime and output
Lowered total cost to serve and improved utilization
of technicians
UNDERSTAND
ADVANCE
OUTPERFORM
TODAY
Service
Visibility
Digital
Service
Content
Real-Time
Product
Data
Optimized
Inventory
Remote
Service
Proactive &
Predictive
Maintenance
Optimized
Technical
Workforce
Digital
Twin
Product as a
Service
Constant
Analytics
New Revenue
Streams
More Profitable
Contracts
Service Journey
Agenda
– EAC
– PDS Assessment
– Assessment Results
– Potential Solutions & Roadmap
– Next Steps
Potential Solutions & Roadmap
• The following is a high-level roadmap defining a recommended
path for Flexsteel to optimize:
– Design
– Manufacturing
– Service data.
• By following this roadmap you can expect to correct most of
the pains outlined in this presentation to this point.
Phase 2
Manufacturing Planning
• Manufacturing BoM
• Manufacturing Planning /
Work instructions
• Operator Advisor
• Tooling and Machine data
management and linking
• Enhance Integration to
ERP/CRM
Pilot
Product Management Pilot
• Work with single sample
product
• Windchill CAD Data
Management
• EBoM, MBoM and SBoM
Product Management
• Manufacturing process
planning and work
instructions
• Integration to ERP/CRM
Phase 3
Service Information
Management
• Service BoM Management
• Service Parts List
Management / Part
Catalogs
• Electronic Service
Information delivery
contactors and customers
• Optimize CRM and ERP
integrations
Timelines are estimated. Actual timeline to be defined during service project engagement.
Recommended Flexsteel Roadmap - PLM
Product Management
Foundation
• Windchill CAD Data
Management
• Engineering BoM and
Product Management
• ECR ECN Process
Management
• Quality processes, NCR,
CAPA
Phase 1

Weitere ähnliche Inhalte

Was ist angesagt?

ALM Application und Service Lifecycle Management mit TFS
ALM Application und Service Lifecycle Management mit TFSALM Application und Service Lifecycle Management mit TFS
ALM Application und Service Lifecycle Management mit TFSDigicomp Academy AG
 
Nidec Global PLM Past, Present & Future
Nidec Global PLM Past, Present & FutureNidec Global PLM Past, Present & Future
Nidec Global PLM Past, Present & FutureAras
 
Slides Apde2002 Enhance
Slides Apde2002 EnhanceSlides Apde2002 Enhance
Slides Apde2002 Enhancempereda
 
Swasen Introduction
Swasen IntroductionSwasen Introduction
Swasen Introductionswamysenthil
 
Talent Management Preswith Ptc5 15 08
Talent Management Preswith Ptc5 15 08Talent Management Preswith Ptc5 15 08
Talent Management Preswith Ptc5 15 08kcurley
 
Prism-IND Windchill ESI
Prism-IND Windchill ESIPrism-IND Windchill ESI
Prism-IND Windchill ESIPrism-IND
 
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...PTC
 
PTC Acquires Leading Internet of Things Platform Provider ThingWorx
PTC Acquires Leading Internet of Things Platform Provider ThingWorxPTC Acquires Leading Internet of Things Platform Provider ThingWorx
PTC Acquires Leading Internet of Things Platform Provider ThingWorxPTC
 
Automated Testing for IBM i
Automated Testing for IBM iAutomated Testing for IBM i
Automated Testing for IBM iADC Austin Tech
 
Testing Guide for SAP SuccessFactors
Testing Guide for SAP SuccessFactorsTesting Guide for SAP SuccessFactors
Testing Guide for SAP SuccessFactorsWorksoft
 
Lights-Out Testing for Lights-On Business
Lights-Out Testing for Lights-On BusinessLights-Out Testing for Lights-On Business
Lights-Out Testing for Lights-On BusinessWorksoft
 
Transform a classic IT department into a Lean delivery machine for digital se...
Transform a classic IT department into a Lean delivery machine for digital se...Transform a classic IT department into a Lean delivery machine for digital se...
Transform a classic IT department into a Lean delivery machine for digital se...Institut Lean France
 
InterConnect 2016 Continuous Visibility DTA-3268
InterConnect 2016 Continuous Visibility DTA-3268InterConnect 2016 Continuous Visibility DTA-3268
InterConnect 2016 Continuous Visibility DTA-3268Carmen DeArdo
 
Five Steps to DevOps Success - Avoiding the High Cost of Downtime
Five Steps to DevOps Success - Avoiding the High Cost of DowntimeFive Steps to DevOps Success - Avoiding the High Cost of Downtime
Five Steps to DevOps Success - Avoiding the High Cost of DowntimeAppDynamics
 
What's New with Worksoft Certify
What's New with Worksoft CertifyWhat's New with Worksoft Certify
What's New with Worksoft CertifyWorksoft
 
Key criteria for choosing APM solutions for the next normal: analysis of surv...
Key criteria for choosing APM solutions for the next normal: analysis of surv...Key criteria for choosing APM solutions for the next normal: analysis of surv...
Key criteria for choosing APM solutions for the next normal: analysis of surv...eG Innovations
 

Was ist angesagt? (20)

ALM Application und Service Lifecycle Management mit TFS
ALM Application und Service Lifecycle Management mit TFSALM Application und Service Lifecycle Management mit TFS
ALM Application und Service Lifecycle Management mit TFS
 
Nidec Global PLM Past, Present & Future
Nidec Global PLM Past, Present & FutureNidec Global PLM Past, Present & Future
Nidec Global PLM Past, Present & Future
 
Slides Apde2002 Enhance
Slides Apde2002 EnhanceSlides Apde2002 Enhance
Slides Apde2002 Enhance
 
Swasen Introduction
Swasen IntroductionSwasen Introduction
Swasen Introduction
 
Talent Management Preswith Ptc5 15 08
Talent Management Preswith Ptc5 15 08Talent Management Preswith Ptc5 15 08
Talent Management Preswith Ptc5 15 08
 
Rexx Shih
Rexx ShihRexx Shih
Rexx Shih
 
Prism-IND Windchill ESI
Prism-IND Windchill ESIPrism-IND Windchill ESI
Prism-IND Windchill ESI
 
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
 
Company Presentation
Company PresentationCompany Presentation
Company Presentation
 
NCG CAM
NCG CAMNCG CAM
NCG CAM
 
PTC Acquires Leading Internet of Things Platform Provider ThingWorx
PTC Acquires Leading Internet of Things Platform Provider ThingWorxPTC Acquires Leading Internet of Things Platform Provider ThingWorx
PTC Acquires Leading Internet of Things Platform Provider ThingWorx
 
Automated Testing for IBM i
Automated Testing for IBM iAutomated Testing for IBM i
Automated Testing for IBM i
 
Testing Guide for SAP SuccessFactors
Testing Guide for SAP SuccessFactorsTesting Guide for SAP SuccessFactors
Testing Guide for SAP SuccessFactors
 
My path to you
My path to youMy path to you
My path to you
 
Lights-Out Testing for Lights-On Business
Lights-Out Testing for Lights-On BusinessLights-Out Testing for Lights-On Business
Lights-Out Testing for Lights-On Business
 
Transform a classic IT department into a Lean delivery machine for digital se...
Transform a classic IT department into a Lean delivery machine for digital se...Transform a classic IT department into a Lean delivery machine for digital se...
Transform a classic IT department into a Lean delivery machine for digital se...
 
InterConnect 2016 Continuous Visibility DTA-3268
InterConnect 2016 Continuous Visibility DTA-3268InterConnect 2016 Continuous Visibility DTA-3268
InterConnect 2016 Continuous Visibility DTA-3268
 
Five Steps to DevOps Success - Avoiding the High Cost of Downtime
Five Steps to DevOps Success - Avoiding the High Cost of DowntimeFive Steps to DevOps Success - Avoiding the High Cost of Downtime
Five Steps to DevOps Success - Avoiding the High Cost of Downtime
 
What's New with Worksoft Certify
What's New with Worksoft CertifyWhat's New with Worksoft Certify
What's New with Worksoft Certify
 
Key criteria for choosing APM solutions for the next normal: analysis of surv...
Key criteria for choosing APM solutions for the next normal: analysis of surv...Key criteria for choosing APM solutions for the next normal: analysis of surv...
Key criteria for choosing APM solutions for the next normal: analysis of surv...
 

Ähnlich wie PDSA Results Flexsteel

Plm & windchill
Plm & windchillPlm & windchill
Plm & windchillsumanrao33
 
Why Value Stream is key to Digital Product Delivery
Why Value Stream is key to Digital Product Delivery Why Value Stream is key to Digital Product Delivery
Why Value Stream is key to Digital Product Delivery Mani Maun
 
Sage 100 Manufacturing
Sage 100 ManufacturingSage 100 Manufacturing
Sage 100 ManufacturingNet at Work
 
Transform Software Delivery to Address Market Complexity and Change
Transform Software Delivery to Address Market Complexity and ChangeTransform Software Delivery to Address Market Complexity and Change
Transform Software Delivery to Address Market Complexity and ChangeIBM Danmark
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Imaginet
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations managementshart sood
 
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...Zensar Technologies Ltd.
 
Pmac It Project Management 2010
Pmac It Project Management 2010Pmac It Project Management 2010
Pmac It Project Management 2010nseiersen
 
Draft - Digital Transformation Rough Plan.pdf
Draft - Digital Transformation Rough Plan.pdfDraft - Digital Transformation Rough Plan.pdf
Draft - Digital Transformation Rough Plan.pdfEnricoJohanes1
 
Zero Wait-State Agile EC MCAD Implementation Quick Start Presentation
Zero Wait-State Agile EC MCAD Implementation Quick Start PresentationZero Wait-State Agile EC MCAD Implementation Quick Start Presentation
Zero Wait-State Agile EC MCAD Implementation Quick Start PresentationZero Wait-State
 
Quantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROIQuantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROIDevOps for Enterprise Systems
 
Speed Up Your Sales Assembly Line with Microsoft – Featuring Duncan Taylor IS...
Speed Up Your Sales Assembly Line with Microsoft – Featuring Duncan Taylor IS...Speed Up Your Sales Assembly Line with Microsoft – Featuring Duncan Taylor IS...
Speed Up Your Sales Assembly Line with Microsoft – Featuring Duncan Taylor IS...Apttus
 
Production & opeartions management
Production & opeartions managementProduction & opeartions management
Production & opeartions managementShimelis Mutera
 
Hyperautomation and AI/ ML: A Strategy for Digital Transformation Success
 Hyperautomation and AI/ ML: A Strategy for Digital Transformation Success Hyperautomation and AI/ ML: A Strategy for Digital Transformation Success
Hyperautomation and AI/ ML: A Strategy for Digital Transformation SuccessPrecisely
 
Lean quote to order SalesLogix
Lean quote to order   SalesLogixLean quote to order   SalesLogix
Lean quote to order SalesLogixSteve Brown
 
Hyperautomation & AI/ML: Keys to Digital Transformation Success
Hyperautomation & AI/ML: Keys to Digital Transformation SuccessHyperautomation & AI/ML: Keys to Digital Transformation Success
Hyperautomation & AI/ML: Keys to Digital Transformation SuccessPrecisely
 
Using Web Data to Drive Revenue and Reduce Costs
Using Web Data to Drive Revenue and Reduce CostsUsing Web Data to Drive Revenue and Reduce Costs
Using Web Data to Drive Revenue and Reduce CostsConnotate
 

Ähnlich wie PDSA Results Flexsteel (20)

Plm & windchill
Plm & windchillPlm & windchill
Plm & windchill
 
Why Value Stream is key to Digital Product Delivery
Why Value Stream is key to Digital Product Delivery Why Value Stream is key to Digital Product Delivery
Why Value Stream is key to Digital Product Delivery
 
Sage 100 Manufacturing
Sage 100 ManufacturingSage 100 Manufacturing
Sage 100 Manufacturing
 
Transform Software Delivery to Address Market Complexity and Change
Transform Software Delivery to Address Market Complexity and ChangeTransform Software Delivery to Address Market Complexity and Change
Transform Software Delivery to Address Market Complexity and Change
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
 
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
 
Pmac It Project Management 2010
Pmac It Project Management 2010Pmac It Project Management 2010
Pmac It Project Management 2010
 
Lab Optimizer
Lab OptimizerLab Optimizer
Lab Optimizer
 
Draft - Digital Transformation Rough Plan.pdf
Draft - Digital Transformation Rough Plan.pdfDraft - Digital Transformation Rough Plan.pdf
Draft - Digital Transformation Rough Plan.pdf
 
Zero Wait-State Agile EC MCAD Implementation Quick Start Presentation
Zero Wait-State Agile EC MCAD Implementation Quick Start PresentationZero Wait-State Agile EC MCAD Implementation Quick Start Presentation
Zero Wait-State Agile EC MCAD Implementation Quick Start Presentation
 
SharePoint in Discrete Manufacturing
SharePoint in Discrete Manufacturing SharePoint in Discrete Manufacturing
SharePoint in Discrete Manufacturing
 
Quantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROIQuantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROI
 
Speed Up Your Sales Assembly Line with Microsoft – Featuring Duncan Taylor IS...
Speed Up Your Sales Assembly Line with Microsoft – Featuring Duncan Taylor IS...Speed Up Your Sales Assembly Line with Microsoft – Featuring Duncan Taylor IS...
Speed Up Your Sales Assembly Line with Microsoft – Featuring Duncan Taylor IS...
 
Production & opeartions management
Production & opeartions managementProduction & opeartions management
Production & opeartions management
 
Hyperautomation and AI/ ML: A Strategy for Digital Transformation Success
 Hyperautomation and AI/ ML: A Strategy for Digital Transformation Success Hyperautomation and AI/ ML: A Strategy for Digital Transformation Success
Hyperautomation and AI/ ML: A Strategy for Digital Transformation Success
 
Unit v
Unit vUnit v
Unit v
 
Lean quote to order SalesLogix
Lean quote to order   SalesLogixLean quote to order   SalesLogix
Lean quote to order SalesLogix
 
Hyperautomation & AI/ML: Keys to Digital Transformation Success
Hyperautomation & AI/ML: Keys to Digital Transformation SuccessHyperautomation & AI/ML: Keys to Digital Transformation Success
Hyperautomation & AI/ML: Keys to Digital Transformation Success
 
Using Web Data to Drive Revenue and Reduce Costs
Using Web Data to Drive Revenue and Reduce CostsUsing Web Data to Drive Revenue and Reduce Costs
Using Web Data to Drive Revenue and Reduce Costs
 

Kürzlich hochgeladen

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Kürzlich hochgeladen (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

PDSA Results Flexsteel

  • 2. Agenda – EAC – PDS Assessment – Assessment Results – Potential Solutions & Roadmap – Next Steps
  • 4. The EAC Value Model • About you • About us • Business & Improvement Initiatives • People, Process, Team, &Tools • Plan • Deliverables • BusinessCase • Measures • Accountability • Problem Solve • Process Improvement • Installation & Configuration • Educate • Design & Develop • Learn, LEAN,Optimize • Go! • Measure • Validate • Get it right
  • 5. Positive Business Outcomes PBO • Achieve optimal Customer Success and satisfaction. • Decrease product development Cost. • Accelerate product introduction timing. • Increase Growth and Market Share by optimizing internal processes and systems.
  • 6. Agenda – EAC – PDS Assessment – Assessment Results – Potential Solutions & Roadmap – Next Steps
  • 7. PDSA Input & Output PDS Assessment • PDSA Questionnaire • Interview(s) with Process Stakeholders • Prioritized Business Value Opportunities • Consolidated Improvement Initiatives • Process Capability GAP Assessment • Recommended PDS Roadmap • Potential Financial Impact
  • 8. Agenda – EAC – PDS Assessment – Assessment Results – Potential Solutions & Roadmap – Next Steps
  • 9. Who we heard from… Thank you to the 20+ team members for participating! Special thanks to JagThethy and Dale Marietta for sponsoring & hosting this event. EACTeam: Mike, Dan, Chris, Bill, Steve
  • 10. From questionnaire - Ranking the importance of the following strategic business objectives to your business. Strategic Business Objectives Value Growth Profitability Grow by protecting market share Grow by more efficient order fulfillment Grow market share Grow through innovation Grow & profit from product value Grow consumable sales and after-market Profit from efficient product lifecycle costs Profit from efficient use of asset base Profit from product cost efficiencies 1 2 3 4 5 6 7 8 9 6.3 3.6 3.6 4.1 1.9 2.5 2.5 2.9 3.5
  • 11. Listed in order of Importance from Top Active Improvement Initiatives (top 10) From questionnaire - Please score your sense of the relative importance of the following improvement initiatives to your company. Improve collaboration with manufacturing Improve internal engineering collaboration and concurrent engineering Reduce the time to generate customer quotes Apply standard work within product development Improve collaboration with the supply chain Standardize the product development processes Improve product cost management and the product lifecycle cost management Improve cross-discipline collaboration among CAD and software groups Improve idea capture and management Improve agency and regulatory compliance 10.0 9.5 8.4 7.3 6.2 5.9 5.7 5.7 4.6 4.1
  • 12. Consolidated Process Maturity Level 3 equates to systematic operation of Processes Some Processes are more mature in execution than others Each process scored on a maturity level scale of 1-4 (4 is Most Mature) as is to be
  • 13. “What We Heard” “If 2 or 3 people quit, we’d be in huge trouble. Few of our processes are recorded or able to be duplicated, it’s all tribal knowledge” “We don’t have written instructions, we simply hire people who are mechanically inclined” “We could easily be twice as efficient with a properly implemented PLM system” “Our service is terrible. Our documentation is terrible or non-existent or wrong. EVERYTHING is done manually with emails. There is no BOM.” “We’re trying to do PLM manually, but purchasing doesn’t know what to order and manufacturing doesn’t know what they’re making. Everything is reactive.” “We crippled production because of a small engineering problem and the lack of a system to catch it” Our customer: “We love your products, but we hate you and everything about you!” “If everyone is doing their part right, it could take weeks to do it with our current method. IT COULD TAKE HOURS IF A PLM SYSTEM WAS USED!” “We had to completely redo 400 hours of work because of wrong engineering data!” “We’re constantly fire fighting” “We kill manufacturing everyday we’re delayed, they have to work double time once material is sourced and finally arrives” “At least 50% of our customer deliveries are late” “We waste tons of money flying materials, paying expediting fees and working overtime because procurement is out of the loop” Our customer: “We love your products, but we hate you and everything about you!”
  • 14. Magic Wand Responses • Protected Intellectual Property • Seamless Communications • Fast Customer Responses • Integrated System for Self-Serve • Latest Info on Product Changes • Get Info at a Fingertip
  • 15. • In 2019 there were 821 ECNs or 3 ECNs per day wasting a minimum of 2 hours per day searching for information to process these ECNs for anyone working on an ECN. • Much of our processes are managed via email and manual efforts, easily adding a week to every ECN to completion on average. • There could be at least a 50% productivity improvement in processes if we had clean, linked, automated product and process management—could easily double our speed. • Hired one full time employee just to handle manual effort and research required to ensure proper creation of a service NCR. • We had 400 hrs. in manufacturing a fitting for a custom order, only to find out it was not what the customer asked for and we had to put in another 400 hrs. to remake them. “What We Heard”… Metrics Summary
  • 16. PDM/PLM Improvements Average Improvements in Manufacturing according to: Product Info Search 40% Reduction Manual Data Entry 60% Reduction Part Reuse 20% Increase Gross Margin 2% Increase BOM 65% Increase in Accuracy 50% Decrease in Cost & Mgmt Time To Market (TTM) 25% Reduction New Part Introduction 10% Reduction in new part introduction 20% Reduction in part cost introduction Product Life Cycle Capacity (Productivity) 20% Increase in capacity ECO Volume, Cost, Cycle Time 25% Reduction in volume 25% Reduction in cost 60% Reduction in cycle time Scrap and Rework 15% Reduction in scrap and rework Client’s actual % improvements will depend on their current As-Is situation
  • 17. Estimated based on average benefits results from real world industry examples for these categories using information given by FlexSteel in questionnaires. • Part/Design Reuse • Redundant Data Entry • Product Information Search • Design Review Meetings • Engineering Rework • Manufacturing Scrap & Rework • Legacy System Support • GCR CycleTime • Physical Prototypes • Supply Chain Coordination • Doc Repository Support • Document Distribution & Mailings • Legacy System Maintenance • InventoryObsolescence • WarrantyClaims • New ProductCycleTime • Time to Market • Manufacturing Downtime Potential Financial Benefits PDS Potential Benefit Summary REVENUE $500,000,000 Min Max Total Potential Benefit Range $8,865,000 $22,952,000 Direct Cost Benefits Total $656,000 $1,942,000 Productivity Benefits Total $6,994,000 $17,081,000 Additional Revenue/Profit Benefit Total $1,215,000 $3,929,000 Benefits per Year
  • 18. Flexsteel Key Takeaways • Industry leading products. • Successful due to the incredible efforts of key employees. • While customers love your product, they have extreme difficulty working with your company. • Data and process management methods are not at the same level as your business. • Majority of your process and business knowledge is not documented and rely heavily on a handful of key employees.
  • 19. Capture and manage key lifecycle information from your product fleet using Digital Twins Apply predictive data analytics to improve current and future products Improved products, both in the field and future generations Proactively improve customer outcomes New business models from evergreen products New revenue opportunities from product performance data Lowered costs based on insights from product operation Enable in-context access to all relevant data for better engineering decisions Introduce AR/VR technologies into the design process Create the complete digital design that satisfies requirements for all stakeholders Drive business results and continuous innovation by transforming your engineering practices and product designs How to get there Results Use system and functional modeling to design for connectivity and innovation Analyze and optimize products using massive data sets about similar designs and their performance in the field Use platform-based product design to easily deliver product variations Design to take advantage of additive manufacturing capabilities in production Lowered development costs and time-to-market New product and service model opportunities Usage-based requirements drive better product development Improved efficiency of product development Reduced cost Improved quality Data Driven Design Digital Product Traceability UNDERSTAND ADVANCE OUTPERFORM Digital Twin Predictive Performance Improvements Distributed AR/VR Product Review Constant Analysis Collaborative AR/VR Design Design for Connectivity Digital Product Definition Performance Based Analysis Universal Data Access Outcome-Based Design TODAY Design Transformation Path
  • 20. Take the next step with EAC
  • 22. Manufacturing Journey Improve and perfect production processes Improve profitability Reduce unplanned downtime Shorten lead times Improve agility and responsiveness Enhance existing infrastructure with smart sensors and modern technologies Simplify data in up-to-the-minute role-based views of operational performance Broadcast real-time alerts about assets and performance anomalies Connect diverse and disparate assets, sensors, business systems and external data sources in real time Continuously improve your operations performance and flexibility through digital manufacturing, real-time intelligence and predictive analytics. How to get there Results Utilize analytics to recommend actions that optimize performance Synchronize resources to ensure flawless execution of production Implement consistent KPIs and corporate- wide performance benchmarking to identify and deploy best practices Extend real-time visibility and control across the supply Utilize agile methodologies to rapidly create & continuously evolve manufacturing applications Digitally design your manufacturing processes & quality plans Employ intuitive, in-context 3D and augmented reality to guide workers Apply predictive analytics to machine health and quality processes Accelerate continuous improvement Increased speed and flexibility Increased workforce efficiency Improved product quality Optimized maintenance processes Digital Thread Predictive Analytics UNDERSTAND ADVANCE OUTPERFORM Performance Benchmarking Synchronized Operations Agile Innovation AR Enabled Operations TODAY Unified Connectivity Real-Time Issue Identification Operational Intelligence Prescriptive Analytics Supply Chain Visibility
  • 23. Change your go-to-market approach to position for product-as-service and develop outcome- based contracts Create and deploy new value-added service offerings Restructure and retrain your organization as needed Customer lifetime value and retention increases Increased revenue streams and growth from new offerings Visualize enterprise service data in a unified role-based view Incorporate insights to take action and improve service processes Instantaneously track and monitor product location, performance, utilization, and condition Access up-to-date digital service information and part catalogs for seamless identification and ordering Drive unprecedented value for your customers and your organization by redefining the entire service model How to get there Results Apply connectivity and predictive analytics to new data sets in order to drive proactive service and automate scheduling Empower technicians with up-to-date content and AR/VR guidance Enable remote service and software updates Optimize parts forecasting and pricing through advanced modeling Reduced cost of ownership for customers Increased product uptime and output Lowered total cost to serve and improved utilization of technicians UNDERSTAND ADVANCE OUTPERFORM TODAY Service Visibility Digital Service Content Real-Time Product Data Optimized Inventory Remote Service Proactive & Predictive Maintenance Optimized Technical Workforce Digital Twin Product as a Service Constant Analytics New Revenue Streams More Profitable Contracts Service Journey
  • 24. Agenda – EAC – PDS Assessment – Assessment Results – Potential Solutions & Roadmap – Next Steps
  • 25. Potential Solutions & Roadmap • The following is a high-level roadmap defining a recommended path for Flexsteel to optimize: – Design – Manufacturing – Service data. • By following this roadmap you can expect to correct most of the pains outlined in this presentation to this point.
  • 26. Phase 2 Manufacturing Planning • Manufacturing BoM • Manufacturing Planning / Work instructions • Operator Advisor • Tooling and Machine data management and linking • Enhance Integration to ERP/CRM Pilot Product Management Pilot • Work with single sample product • Windchill CAD Data Management • EBoM, MBoM and SBoM Product Management • Manufacturing process planning and work instructions • Integration to ERP/CRM Phase 3 Service Information Management • Service BoM Management • Service Parts List Management / Part Catalogs • Electronic Service Information delivery contactors and customers • Optimize CRM and ERP integrations Timelines are estimated. Actual timeline to be defined during service project engagement. Recommended Flexsteel Roadmap - PLM Product Management Foundation • Windchill CAD Data Management • Engineering BoM and Product Management • ECR ECN Process Management • Quality processes, NCR, CAPA Phase 1