SlideShare ist ein Scribd-Unternehmen logo
1 von 17
An integrated
functional design approach
for safety related tunnel processes




        Thijs Ruland, Bas van Duijnhoven and René Krouwel


                            March 14th, 2012, New York
Agenda


A new design approach:
 Why?
              Developments
              Effects
      Diamond model: overview and highlights
      Conclusions and future work




2   ISTSS 2012| 14th March 2012
Why?



        More systems
                                  More tunnels
                                           Traffic management


                                                    Safety
3   ISTSS 2012| 14th March 2012
Why?




Developments of rules and roles:
 European legislation: safety officer
 Dutch legislation: important advice before opening tunnel
 Dutch safety officer requires:
              Adequate safety measures in design
              Proof that systems work properly, as designed
              Proof that the organization is properly prepared for its job
4   ISTSS 2012| 14th March 2012
Why?

     Principal:
             D&C contracts
             Application of
                     Systems Engineering (SE)
                     RAMS
     Contractor:
             SE and RAMS are no common
              practice
     Contracts:
             Still piles of low level technical
              requirements instead of high level
              functional requirements


5   ISTSS 2012| 14th March 2012
Effects




     Many projects:
      Lots of data, but no overview
      Installations and control design still made bottom-up
      Poor integration, poor interface management
      Discussions focused on the technical requirements instead of
        desired functionality
      Stakeholders cannot understand design sufficiently
      Difficulties in demonstration of safety to Safety Officer
      Long delays and budget overruns
    Source picture: Wikipedia



6      ISTSS 2012| 14th March 2012
What then?


We need a design approach that:
 Can handle systems and functions
 Supports SE: top down
 Helps keeping an overview of the information
 Is truly integrated
 Is consistent
 Is transparent
 Enables proof of functionality (safety)
              Systems (2nd requirement safety officer)
              Organization (3rd requirement safety officer)
      Is practical!

7   ISTSS 2012| 14th March 2012
Our answer: a model


For systems and functions:
 Structured: supports SE
 Unambiguous
 True integration
              Enables traceability between requirements and design
              Secures consistency between design elements
              Hardware, software, data, personnel and procedures
      Can handle dynamics
      Includes RAMS
      Information can be viewed in many ways
      Large amounts of information can still be handled

8   ISTSS 2012| 14th March 2012
Our model: the diamond model




9   ISTSS 2012| 14th March 2012
Coentunnel project




10   ISTSS 2012| 14th March 2012
Filling the diamond model in 11 steps




11   ISTSS 2012| 14th March 2012
Step 2: Describing scenarios




12   ISTSS 2012| 14th March 2012
Step 4: Describing interaction entities




13   ISTSS 2012| 14th March 2012
Modelling language: SysML


       Introduced in 2006
       A graphical modeling language
       Supports the analysis, specification, design, verification,
        and validation of systems
       Holistic set of system views
       Eases exchange of SE information amongst tools
       General ICT purpose: not specifically developed for
        tunnels




14   ISTSS 2012| 14th March 2012
Conclusions


 Worked very well for the Coentunnel project:
  Different views eased communication with stakeholders
  No postponement of important design decisions
  Correctness, consistency and completeness demonstrated
  Design accepted by all parties as the correct functional
   system description
  Model can now be used as basis for safety plans and
   safety management organization

 Advantages of using a model demonstrated



15   ISTSS 2012| 14th March 2012
Future work


       Re-use of the basic set
       Make even better use of the possibilities of SysML
       Westerscheldetunnel: existing tunnel (6,6 km)




16   ISTSS 2012| 14th March 2012
Thank you for your attention!




                                   www.royalhaskoning.com
                                      www.soltegro.nl


17   ISTSS 2012| 14th March 2012

Weitere ähnliche Inhalte

Ähnlich wie Presentation ISTSS 2012: An integrated approach for safety related tunnel processes

The Demonstrator Principle
The Demonstrator PrincipleThe Demonstrator Principle
The Demonstrator PrincipleBart Kusse
 
Ist africa2012 alert system in case of excess drawing of ground water_1
Ist africa2012 alert system in case of excess drawing of ground water_1Ist africa2012 alert system in case of excess drawing of ground water_1
Ist africa2012 alert system in case of excess drawing of ground water_1Karel Charvat
 
Why is Test Driven Development for Analytics or Data Projects so Hard?
Why is Test Driven Development for Analytics or Data Projects so Hard?Why is Test Driven Development for Analytics or Data Projects so Hard?
Why is Test Driven Development for Analytics or Data Projects so Hard?Phil Watt
 
Valdas sarunas agile goes mainstream 091013 final1.1
Valdas sarunas agile goes mainstream  091013 final1.1Valdas sarunas agile goes mainstream  091013 final1.1
Valdas sarunas agile goes mainstream 091013 final1.1Agile Lietuva
 
Course Outline Sep 2021 Trimester.pptx
Course Outline Sep 2021 Trimester.pptxCourse Outline Sep 2021 Trimester.pptx
Course Outline Sep 2021 Trimester.pptxMobin26
 
Semic 2012 highlights report
Semic 2012 highlights report Semic 2012 highlights report
Semic 2012 highlights report Semic.eu
 
Open Source Technologies for Contents and Maps
Open Source Technologies for Contents and MapsOpen Source Technologies for Contents and Maps
Open Source Technologies for Contents and MapsTsungWei Hu
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02Rizwan Khurram
 
Chapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptChapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptAhmadTawfigAlRadaide
 
Project Time Managment.pptx
Project Time Managment.pptxProject Time Managment.pptx
Project Time Managment.pptxA ALAM
 
Why is TDD so hard for Data Engineering and Analytics Projects?
Why is TDD so hard for Data Engineering and Analytics Projects?Why is TDD so hard for Data Engineering and Analytics Projects?
Why is TDD so hard for Data Engineering and Analytics Projects?Phil Watt
 
Aragon at al 2012
Aragon at al 2012Aragon at al 2012
Aragon at al 2012karzanwakil
 
Web Application Technical & Financial Proposal
Web Application Technical & Financial ProposalWeb Application Technical & Financial Proposal
Web Application Technical & Financial ProposalMd.Abu Taher (Rujel)
 
The impact of usability in information technology projects
The impact of usability in information technology projectsThe impact of usability in information technology projects
The impact of usability in information technology projectsCSITiaesprime
 
From OSCAR to the OW2 Market Readiness Index, Cédric Thomas, Stéphane Laurièr...
From OSCAR to the OW2 Market Readiness Index, Cédric Thomas, Stéphane Laurièr...From OSCAR to the OW2 Market Readiness Index, Cédric Thomas, Stéphane Laurièr...
From OSCAR to the OW2 Market Readiness Index, Cédric Thomas, Stéphane Laurièr...OW2
 

Ähnlich wie Presentation ISTSS 2012: An integrated approach for safety related tunnel processes (20)

GLENNA: The Nordic cloud
GLENNA: The Nordic cloud GLENNA: The Nordic cloud
GLENNA: The Nordic cloud
 
The Data Management Overhead is rising inexorably
The Data Management Overhead is  rising inexorablyThe Data Management Overhead is  rising inexorably
The Data Management Overhead is rising inexorably
 
The Demonstrator Principle
The Demonstrator PrincipleThe Demonstrator Principle
The Demonstrator Principle
 
Ist africa2012 alert system in case of excess drawing of ground water_1
Ist africa2012 alert system in case of excess drawing of ground water_1Ist africa2012 alert system in case of excess drawing of ground water_1
Ist africa2012 alert system in case of excess drawing of ground water_1
 
Why is Test Driven Development for Analytics or Data Projects so Hard?
Why is Test Driven Development for Analytics or Data Projects so Hard?Why is Test Driven Development for Analytics or Data Projects so Hard?
Why is Test Driven Development for Analytics or Data Projects so Hard?
 
Valdas sarunas agile goes mainstream 091013 final1.1
Valdas sarunas agile goes mainstream  091013 final1.1Valdas sarunas agile goes mainstream  091013 final1.1
Valdas sarunas agile goes mainstream 091013 final1.1
 
Course Outline Sep 2021 Trimester.pptx
Course Outline Sep 2021 Trimester.pptxCourse Outline Sep 2021 Trimester.pptx
Course Outline Sep 2021 Trimester.pptx
 
Spmcasestudy
SpmcasestudySpmcasestudy
Spmcasestudy
 
Semic 2012 highlights report
Semic 2012 highlights report Semic 2012 highlights report
Semic 2012 highlights report
 
Hitchhikers week6
Hitchhikers week6Hitchhikers week6
Hitchhikers week6
 
Open Source Technologies for Contents and Maps
Open Source Technologies for Contents and MapsOpen Source Technologies for Contents and Maps
Open Source Technologies for Contents and Maps
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02
 
Chapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptChapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.ppt
 
Project Time Managment.pptx
Project Time Managment.pptxProject Time Managment.pptx
Project Time Managment.pptx
 
Why is TDD so hard for Data Engineering and Analytics Projects?
Why is TDD so hard for Data Engineering and Analytics Projects?Why is TDD so hard for Data Engineering and Analytics Projects?
Why is TDD so hard for Data Engineering and Analytics Projects?
 
Aniketos trust bus_sept_2012
Aniketos trust bus_sept_2012Aniketos trust bus_sept_2012
Aniketos trust bus_sept_2012
 
Aragon at al 2012
Aragon at al 2012Aragon at al 2012
Aragon at al 2012
 
Web Application Technical & Financial Proposal
Web Application Technical & Financial ProposalWeb Application Technical & Financial Proposal
Web Application Technical & Financial Proposal
 
The impact of usability in information technology projects
The impact of usability in information technology projectsThe impact of usability in information technology projects
The impact of usability in information technology projects
 
From OSCAR to the OW2 Market Readiness Index, Cédric Thomas, Stéphane Laurièr...
From OSCAR to the OW2 Market Readiness Index, Cédric Thomas, Stéphane Laurièr...From OSCAR to the OW2 Market Readiness Index, Cédric Thomas, Stéphane Laurièr...
From OSCAR to the OW2 Market Readiness Index, Cédric Thomas, Stéphane Laurièr...
 

Kürzlich hochgeladen

EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 

Kürzlich hochgeladen (20)

EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Presentation ISTSS 2012: An integrated approach for safety related tunnel processes

  • 1. An integrated functional design approach for safety related tunnel processes Thijs Ruland, Bas van Duijnhoven and René Krouwel March 14th, 2012, New York
  • 2. Agenda A new design approach:  Why?  Developments  Effects  Diamond model: overview and highlights  Conclusions and future work 2 ISTSS 2012| 14th March 2012
  • 3. Why? More systems More tunnels Traffic management Safety 3 ISTSS 2012| 14th March 2012
  • 4. Why? Developments of rules and roles:  European legislation: safety officer  Dutch legislation: important advice before opening tunnel  Dutch safety officer requires:  Adequate safety measures in design  Proof that systems work properly, as designed  Proof that the organization is properly prepared for its job 4 ISTSS 2012| 14th March 2012
  • 5. Why?  Principal:  D&C contracts  Application of  Systems Engineering (SE)  RAMS  Contractor:  SE and RAMS are no common practice  Contracts:  Still piles of low level technical requirements instead of high level functional requirements 5 ISTSS 2012| 14th March 2012
  • 6. Effects Many projects:  Lots of data, but no overview  Installations and control design still made bottom-up  Poor integration, poor interface management  Discussions focused on the technical requirements instead of desired functionality  Stakeholders cannot understand design sufficiently  Difficulties in demonstration of safety to Safety Officer  Long delays and budget overruns Source picture: Wikipedia 6 ISTSS 2012| 14th March 2012
  • 7. What then? We need a design approach that:  Can handle systems and functions  Supports SE: top down  Helps keeping an overview of the information  Is truly integrated  Is consistent  Is transparent  Enables proof of functionality (safety)  Systems (2nd requirement safety officer)  Organization (3rd requirement safety officer)  Is practical! 7 ISTSS 2012| 14th March 2012
  • 8. Our answer: a model For systems and functions:  Structured: supports SE  Unambiguous  True integration  Enables traceability between requirements and design  Secures consistency between design elements  Hardware, software, data, personnel and procedures  Can handle dynamics  Includes RAMS  Information can be viewed in many ways  Large amounts of information can still be handled 8 ISTSS 2012| 14th March 2012
  • 9. Our model: the diamond model 9 ISTSS 2012| 14th March 2012
  • 10. Coentunnel project 10 ISTSS 2012| 14th March 2012
  • 11. Filling the diamond model in 11 steps 11 ISTSS 2012| 14th March 2012
  • 12. Step 2: Describing scenarios 12 ISTSS 2012| 14th March 2012
  • 13. Step 4: Describing interaction entities 13 ISTSS 2012| 14th March 2012
  • 14. Modelling language: SysML  Introduced in 2006  A graphical modeling language  Supports the analysis, specification, design, verification, and validation of systems  Holistic set of system views  Eases exchange of SE information amongst tools  General ICT purpose: not specifically developed for tunnels 14 ISTSS 2012| 14th March 2012
  • 15. Conclusions Worked very well for the Coentunnel project:  Different views eased communication with stakeholders  No postponement of important design decisions  Correctness, consistency and completeness demonstrated  Design accepted by all parties as the correct functional system description  Model can now be used as basis for safety plans and safety management organization Advantages of using a model demonstrated 15 ISTSS 2012| 14th March 2012
  • 16. Future work  Re-use of the basic set  Make even better use of the possibilities of SysML  Westerscheldetunnel: existing tunnel (6,6 km) 16 ISTSS 2012| 14th March 2012
  • 17. Thank you for your attention! www.royalhaskoning.com www.soltegro.nl 17 ISTSS 2012| 14th March 2012