its talking about one of the project's of king bhumibol adulyadej and this is one of the projects in Thailand. This project is about the DAM built near pasak river in Thailand.
2. CONTENT
■ The royal development project.
■ The official name of the PASAK dam.
■ Why was the PASAK dam built ?
■ PASAK river basin museum, LOPBURI province.
■ Tourists area and features.
■ The first railway inThailand built across the PASAK river
dam.
■ Reference
3. THE ROYAL DEVELOPMENT PROJECT
■ King Bhumibol Adulyadej initiated a project to
develop the Pa Sak River valley and lower Chao
Phraya valley on 19 February 1989 as part of the
Maenam Pa Sak Royal Development Project.
4. OFFICIAL NAME OF PASAK DAM
■ On 20 October 1991 King Bhumibol Adulyadej gave
the dam its official name, Pa Sak Cholasit.The king
also presided over the inauguration of the dam on
25 November 1999.
5. WHYWAS PASAK DAM BUILT?
■ The PASAK river is important to
the people living in the lower
central plains suffering from water
shortages during droughts and
affected by flooding during the
rainy season. An expanded
economy and population growth
has led to a growing need for
water.
6. PASAK RIVER BASIN
MUSEUM, LOPBURI
PROVINCE
■ Apart from being a major source for agriculture,
industry and drinking water in Lop Buri and Saraburi,
the Pa Sak Jolasid Dam also helps prevent flooding on
the Pasak riverside and in Bangkok and outlying areas
of the city. Morever, the dam provides a large-scale,
fresh-water fish source and will be developed as a
major tourist attraction.
7. TOURISTSAREA AND FEATURES
■ Pasak Jolasid Dam is now a major
tourist attraction for people
traveling in Lopburi Province.
■ There were monkeys too in the
PASAK river
■ Between November and January
when the sunflower fields are
blooming with bright yellow colors.
There are plenty of food and picnic
along the waterfront
8. THE FIRST RAILWAY INTHAILAND
BUILTACROSSTHE PASAK RIVER DAM
■ In view of the urgency of the Pasak River Basin
Royal Development Project, a committee, with
various subcommittees, formed to enhance the
efficiency of the project. After the Royal Irrigation
Development constructed the Pa Sak Jolasid Dam.
9. OBJECTIVES
■ TO INCREASETHE AGRICULTURAL LAND
PRODUCTIVITY AND FARMER'S INCOME
THROUGHTHE PROVISION OF STABLE
IRRIGATIONWATER SUPPLY, IMPROVED
DRAINAGE CONDITION, ESTABLISHMENT OF
DOUBLE CROPPING SYSTEM AND
MODERNIZATION OFTHE FARMING
TECHNIQUES.