SlideShare ist ein Scribd-Unternehmen logo
1 von 17
5 STEPS FOR STORING YOUR
DUST COLLECTION
EQUIPMENT LONG-TERM
www.slyinc.com
800-334-2957
sales@slyinc.com
WHAT IS “LONG-TERM” STORAGE?
• Storage in excess of one month
• Generally, fabrication and shipment of
equipment should be matched to jobsite
readiness so it can be installed straightaway
• If needed, long-term storage procedures are
used to prevent damage and preserve
operational capabilities of
dust collector
1. UNPROTECTED OPENINGS
• Plenums will be generally be covered with
plywood, plastic, or plugs
– Leave these intact
– Designed to keep out moisture
• Any unprotected openings should be plugged
with plastic wrap, plastic plugs, or wooden
coverings
– Depending on size of opening
2. CONTROLLED ENVIRONMENT
• Store collector housings, auxiliary
components, and parts indoors in a
temperature and humidity controlled
environment
• Place sorbent packs in any electrical
enclosures
2. CONTROLLED ENVIRONMENT
(cont.)
• Collector parts, bags, cages, etc. can be
stored in a dry, totally enclosed trailer or
shed if appropriate controlled storage is not
available
• Collector housings and larger components
can be stored in a weather protected shed or
off the ground
– Protect fully with tarpaulin or heavy plastic
weather coverings
3. PAINT-PROTECTED EQUIPMENT
• Cover all paint-protected steel components
– Especially during seasonal changes or severe
weather
• Paint is designed to give “long-term” weather
protection for the material, but materials such
as support steel are generally stored on their
side
– Horizontal storage causes water pools on surfaces
and hastens corrosion
4. INSPECT PERIODICALLY
• Monitor the integrity of the weather cover
and condition of painted surfaces
– Repair any rips or tears in coverings
• Any areas where water or debris are
collecting should be propped up to reduce
the probability of future problems
5. AREAS REQUIRING SPECIAL CARE
• Certain areas require special care and should
be examined during periodic inspection
– Rotary airlock valves
– Screw conveyors
– Exhaust fans
ROTARY AIRLOCK VALVES
• Spray the interior of the valve with anti-rust
preservative oil prior to storage
• Provide and install metal covers for the inlet
and outlet flanges with at least four cap
screws in each flange
– Keep these covers on until you are ready to use
the valves for service
ROTARY AIRLOCK VALVES (cont.)
• Completely fill the worm gear speed reducers
with oil
• Replace the vented fill plug with a solid plug
– Retain vented plug for future operations
• Read and follow manufacturer’s specific
instructions for long-term storage
ROTARY AIRLOCK VALVES (cont.)
• Plug all conduit box openings on the motors
and switches
– Store valves off the floor in a dry, adequately
ventilated, indoor area with a steady
temperature
• Turn the rotor a couple of revolutions every
six months
– Leave in a different angular
position after each turning
SCREW CONVEYORS
• Spray the interior of the trough and screw
with the same anti-rust preservative oil used
on the rotary airlock valves
• Again, provide and install metal or wood
covers for the inlet and outlet flanges
SCREW CONVEYORS (cont.)
• Identical to rotary airlock procedures
• Completely fill the worm gear speed reducers
with oil
• Replace the vented fill plug with a solid plug
– Retain vented plug for future operations
• Read and follow manufacturer’s specific
instructions for long-term storage
SCREW CONVEYORS (cont.)
• Again, plug all conduit box openings on the
motors and switches
– Store screw conveyors off the floor in a dry,
adequately ventilated, indoor area with a steady
temperature
• Turn the flighting a couple of revolutions
every six months
– Leave in a different angular
position after each turning
EXHAUST FANS
• Use tarp or other weather covering for
protection
– Avoid black plastic tarps that promote
condensation
• Purge bearings monthly with new grease to
remove condensation
• Rotate fan wheel by hand at least once every
two weeks
EXHAUST FANS (cont.)
• Isolate fan from any nearby vibrations that
can cause damage to fan and motor bearings
• Before using, purge the bearings with new
grease according to manufacturer
specifications
5 STEPS FOR
STORING YOUR DUST
COLLECTION
EQUIPMENT LONG-
TERM
www.slyinc.com
800-334-2957
sales@slyinc.com
/SlyIncorporatedStrongsville
@tweetslyinc
/company/sly-incorporated
/SlyIncorporatedStrongsville

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (15)

Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)
 
Storage Tank Farms Layout and Piping
Storage Tank Farms Layout and PipingStorage Tank Farms Layout and Piping
Storage Tank Farms Layout and Piping
 
ATECO GENERAL CATALOGUE JP
ATECO GENERAL CATALOGUE JPATECO GENERAL CATALOGUE JP
ATECO GENERAL CATALOGUE JP
 
Storage of solids
Storage of solidsStorage of solids
Storage of solids
 
Pallet Ramp and Drum Cradles - DENIOS US
Pallet Ramp and Drum Cradles - DENIOS USPallet Ramp and Drum Cradles - DENIOS US
Pallet Ramp and Drum Cradles - DENIOS US
 
Ateco general power point presentation
Ateco general power point presentationAteco general power point presentation
Ateco general power point presentation
 
valve maintenance-packing-replacement
valve maintenance-packing-replacementvalve maintenance-packing-replacement
valve maintenance-packing-replacement
 
Chesterton's Best Practices for Reducing Methane Emissions for Valve Seals
Chesterton's Best Practices for Reducing Methane Emissions for Valve SealsChesterton's Best Practices for Reducing Methane Emissions for Valve Seals
Chesterton's Best Practices for Reducing Methane Emissions for Valve Seals
 
Storagetanks2010edition
Storagetanks2010editionStoragetanks2010edition
Storagetanks2010edition
 
Spill Carts - DENIOS US
Spill Carts - DENIOS USSpill Carts - DENIOS US
Spill Carts - DENIOS US
 
Types of storage racking & layout
Types of storage racking & layout Types of storage racking & layout
Types of storage racking & layout
 
Pipe specials (1)
Pipe specials (1)Pipe specials (1)
Pipe specials (1)
 
Expansion Joint Applications for Thermal Growth Webinar
Expansion Joint Applications for Thermal Growth WebinarExpansion Joint Applications for Thermal Growth Webinar
Expansion Joint Applications for Thermal Growth Webinar
 
Manufacturing of Stuffing box
Manufacturing of Stuffing boxManufacturing of Stuffing box
Manufacturing of Stuffing box
 
Know about pipes and fittings
Know about pipes and fittingsKnow about pipes and fittings
Know about pipes and fittings
 

Andere mochten auch

Andere mochten auch (20)

Stephanie Taunton | How to Train Your Dog To Roll Over
Stephanie Taunton | How to Train Your Dog To Roll Over Stephanie Taunton | How to Train Your Dog To Roll Over
Stephanie Taunton | How to Train Your Dog To Roll Over
 
Literatura hebrea
Literatura hebreaLiteratura hebrea
Literatura hebrea
 
Personalidade e Resultados em Team Building
Personalidade e Resultados em Team BuildingPersonalidade e Resultados em Team Building
Personalidade e Resultados em Team Building
 
Iris and Mitch Interview CAMDEN INVESTIGATIONS
Iris and Mitch Interview CAMDEN INVESTIGATIONSIris and Mitch Interview CAMDEN INVESTIGATIONS
Iris and Mitch Interview CAMDEN INVESTIGATIONS
 
tesfa
tesfatesfa
tesfa
 
Resume updated
Resume updatedResume updated
Resume updated
 
shady samy cv
shady samy cvshady samy cv
shady samy cv
 
Introduction to SPC
Introduction to SPCIntroduction to SPC
Introduction to SPC
 
Clinica
ClinicaClinica
Clinica
 
LA SITUATION SOCIALE ET ECONOMIQUE
LA SITUATION SOCIALE ET ECONOMIQUELA SITUATION SOCIALE ET ECONOMIQUE
LA SITUATION SOCIALE ET ECONOMIQUE
 
Nadeem CURRICULUM VITAE
Nadeem CURRICULUM VITAENadeem CURRICULUM VITAE
Nadeem CURRICULUM VITAE
 
Rekabentuk mesra OKU
Rekabentuk mesra OKURekabentuk mesra OKU
Rekabentuk mesra OKU
 
Magazine evaluation1
Magazine evaluation1Magazine evaluation1
Magazine evaluation1
 
GMPacketFLAAB(20)
GMPacketFLAAB(20)GMPacketFLAAB(20)
GMPacketFLAAB(20)
 
klinik medika edukasi PJK
klinik medika edukasi PJKklinik medika edukasi PJK
klinik medika edukasi PJK
 
Content marketing 101
Content marketing 101Content marketing 101
Content marketing 101
 
BVPresentation
BVPresentationBVPresentation
BVPresentation
 
Presentation to Corporate-chain business (1)
Presentation to Corporate-chain business (1)Presentation to Corporate-chain business (1)
Presentation to Corporate-chain business (1)
 
Stress and reproduction
Stress and reproductionStress and reproduction
Stress and reproduction
 
7 simple rules to totally rock as a new lom
7 simple rules to totally rock as a new lom7 simple rules to totally rock as a new lom
7 simple rules to totally rock as a new lom
 

Ähnlich wie 5 Steps For Storing Your Dust Collection Equipment Long-Term

Power Equipment Preparation For All Seasons
Power Equipment Preparation For All SeasonsPower Equipment Preparation For All Seasons
Power Equipment Preparation For All Seasonsgoldeagle21
 
MATERIAL STORAGE HANDLING PRESERVATION.pptx
MATERIAL STORAGE  HANDLING  PRESERVATION.pptxMATERIAL STORAGE  HANDLING  PRESERVATION.pptx
MATERIAL STORAGE HANDLING PRESERVATION.pptxssuser0f0529
 
Pharma Mfg BASICS for new learners useful information
Pharma Mfg BASICS for new learners useful informationPharma Mfg BASICS for new learners useful information
Pharma Mfg BASICS for new learners useful informationraviralagiri02
 
Detailing Air Barriers
Detailing Air BarriersDetailing Air Barriers
Detailing Air BarriersW. R. Meadows
 
John Boleyn - Building Maintenance & Longevity
John Boleyn - Building Maintenance & LongevityJohn Boleyn - Building Maintenance & Longevity
John Boleyn - Building Maintenance & LongevityJohn Blue
 
Matt Cunningham - Building Maintenance & Longevity
Matt Cunningham - Building Maintenance & LongevityMatt Cunningham - Building Maintenance & Longevity
Matt Cunningham - Building Maintenance & LongevityJohn Blue
 
High pressure system- Anaesthesia Machine
High pressure system- Anaesthesia MachineHigh pressure system- Anaesthesia Machine
High pressure system- Anaesthesia MachineDr.Daber Pareed
 
Module 5 – R,AC.ppt
Module 5 – R,AC.pptModule 5 – R,AC.ppt
Module 5 – R,AC.pptGopa Krishnan
 
STRUCTURE & APPLICATIONS OF A LABORATORY BIOREACTOR.pptx
STRUCTURE  & APPLICATIONS OF A LABORATORY BIOREACTOR.pptxSTRUCTURE  & APPLICATIONS OF A LABORATORY BIOREACTOR.pptx
STRUCTURE & APPLICATIONS OF A LABORATORY BIOREACTOR.pptxTANISHKA RAJESH KUMAR
 
PRESSURE VESSELS Presentation Codes And Standards
PRESSURE VESSELS Presentation Codes And StandardsPRESSURE VESSELS Presentation Codes And Standards
PRESSURE VESSELS Presentation Codes And StandardsZainSalleh1
 
Safe Handling of Compressed Gases by UCSD
Safe Handling of Compressed Gases by UCSDSafe Handling of Compressed Gases by UCSD
Safe Handling of Compressed Gases by UCSDAtlantic Training, LLC.
 
Steyr f4 de9484 engine service repair manual
Steyr f4 de9484 engine service repair manualSteyr f4 de9484 engine service repair manual
Steyr f4 de9484 engine service repair manualfjjjskekksmem
 

Ähnlich wie 5 Steps For Storing Your Dust Collection Equipment Long-Term (20)

Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Power Equipment Preparation For All Seasons
Power Equipment Preparation For All SeasonsPower Equipment Preparation For All Seasons
Power Equipment Preparation For All Seasons
 
MATERIAL STORAGE HANDLING PRESERVATION.pptx
MATERIAL STORAGE  HANDLING  PRESERVATION.pptxMATERIAL STORAGE  HANDLING  PRESERVATION.pptx
MATERIAL STORAGE HANDLING PRESERVATION.pptx
 
Jindex Pinch Valve
Jindex Pinch ValveJindex Pinch Valve
Jindex Pinch Valve
 
Refrigerant Recovery system (3)
Refrigerant Recovery system (3)Refrigerant Recovery system (3)
Refrigerant Recovery system (3)
 
Pharma Mfg BASICS for new learners useful information
Pharma Mfg BASICS for new learners useful informationPharma Mfg BASICS for new learners useful information
Pharma Mfg BASICS for new learners useful information
 
Batch Reactor
Batch ReactorBatch Reactor
Batch Reactor
 
Detailing Air Barriers
Detailing Air BarriersDetailing Air Barriers
Detailing Air Barriers
 
John Boleyn - Building Maintenance & Longevity
John Boleyn - Building Maintenance & LongevityJohn Boleyn - Building Maintenance & Longevity
John Boleyn - Building Maintenance & Longevity
 
Matt Cunningham - Building Maintenance & Longevity
Matt Cunningham - Building Maintenance & LongevityMatt Cunningham - Building Maintenance & Longevity
Matt Cunningham - Building Maintenance & Longevity
 
Winterization
WinterizationWinterization
Winterization
 
High pressure system- Anaesthesia Machine
High pressure system- Anaesthesia MachineHigh pressure system- Anaesthesia Machine
High pressure system- Anaesthesia Machine
 
Stored Machinery Preservation
Stored Machinery PreservationStored Machinery Preservation
Stored Machinery Preservation
 
Medical gas Cylinder
Medical gas CylinderMedical gas Cylinder
Medical gas Cylinder
 
Module 5 – R,AC.ppt
Module 5 – R,AC.pptModule 5 – R,AC.ppt
Module 5 – R,AC.ppt
 
Applications of rac
Applications of racApplications of rac
Applications of rac
 
STRUCTURE & APPLICATIONS OF A LABORATORY BIOREACTOR.pptx
STRUCTURE  & APPLICATIONS OF A LABORATORY BIOREACTOR.pptxSTRUCTURE  & APPLICATIONS OF A LABORATORY BIOREACTOR.pptx
STRUCTURE & APPLICATIONS OF A LABORATORY BIOREACTOR.pptx
 
PRESSURE VESSELS Presentation Codes And Standards
PRESSURE VESSELS Presentation Codes And StandardsPRESSURE VESSELS Presentation Codes And Standards
PRESSURE VESSELS Presentation Codes And Standards
 
Safe Handling of Compressed Gases by UCSD
Safe Handling of Compressed Gases by UCSDSafe Handling of Compressed Gases by UCSD
Safe Handling of Compressed Gases by UCSD
 
Steyr f4 de9484 engine service repair manual
Steyr f4 de9484 engine service repair manualSteyr f4 de9484 engine service repair manual
Steyr f4 de9484 engine service repair manual
 

Kürzlich hochgeladen

Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...PsychicRuben LoveSpells
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...rajputriyana310
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfBasel Ahmed
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...kauryashika82
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 

5 Steps For Storing Your Dust Collection Equipment Long-Term

  • 1. 5 STEPS FOR STORING YOUR DUST COLLECTION EQUIPMENT LONG-TERM www.slyinc.com 800-334-2957 sales@slyinc.com
  • 2. WHAT IS “LONG-TERM” STORAGE? • Storage in excess of one month • Generally, fabrication and shipment of equipment should be matched to jobsite readiness so it can be installed straightaway • If needed, long-term storage procedures are used to prevent damage and preserve operational capabilities of dust collector
  • 3. 1. UNPROTECTED OPENINGS • Plenums will be generally be covered with plywood, plastic, or plugs – Leave these intact – Designed to keep out moisture • Any unprotected openings should be plugged with plastic wrap, plastic plugs, or wooden coverings – Depending on size of opening
  • 4. 2. CONTROLLED ENVIRONMENT • Store collector housings, auxiliary components, and parts indoors in a temperature and humidity controlled environment • Place sorbent packs in any electrical enclosures
  • 5. 2. CONTROLLED ENVIRONMENT (cont.) • Collector parts, bags, cages, etc. can be stored in a dry, totally enclosed trailer or shed if appropriate controlled storage is not available • Collector housings and larger components can be stored in a weather protected shed or off the ground – Protect fully with tarpaulin or heavy plastic weather coverings
  • 6. 3. PAINT-PROTECTED EQUIPMENT • Cover all paint-protected steel components – Especially during seasonal changes or severe weather • Paint is designed to give “long-term” weather protection for the material, but materials such as support steel are generally stored on their side – Horizontal storage causes water pools on surfaces and hastens corrosion
  • 7. 4. INSPECT PERIODICALLY • Monitor the integrity of the weather cover and condition of painted surfaces – Repair any rips or tears in coverings • Any areas where water or debris are collecting should be propped up to reduce the probability of future problems
  • 8. 5. AREAS REQUIRING SPECIAL CARE • Certain areas require special care and should be examined during periodic inspection – Rotary airlock valves – Screw conveyors – Exhaust fans
  • 9. ROTARY AIRLOCK VALVES • Spray the interior of the valve with anti-rust preservative oil prior to storage • Provide and install metal covers for the inlet and outlet flanges with at least four cap screws in each flange – Keep these covers on until you are ready to use the valves for service
  • 10. ROTARY AIRLOCK VALVES (cont.) • Completely fill the worm gear speed reducers with oil • Replace the vented fill plug with a solid plug – Retain vented plug for future operations • Read and follow manufacturer’s specific instructions for long-term storage
  • 11. ROTARY AIRLOCK VALVES (cont.) • Plug all conduit box openings on the motors and switches – Store valves off the floor in a dry, adequately ventilated, indoor area with a steady temperature • Turn the rotor a couple of revolutions every six months – Leave in a different angular position after each turning
  • 12. SCREW CONVEYORS • Spray the interior of the trough and screw with the same anti-rust preservative oil used on the rotary airlock valves • Again, provide and install metal or wood covers for the inlet and outlet flanges
  • 13. SCREW CONVEYORS (cont.) • Identical to rotary airlock procedures • Completely fill the worm gear speed reducers with oil • Replace the vented fill plug with a solid plug – Retain vented plug for future operations • Read and follow manufacturer’s specific instructions for long-term storage
  • 14. SCREW CONVEYORS (cont.) • Again, plug all conduit box openings on the motors and switches – Store screw conveyors off the floor in a dry, adequately ventilated, indoor area with a steady temperature • Turn the flighting a couple of revolutions every six months – Leave in a different angular position after each turning
  • 15. EXHAUST FANS • Use tarp or other weather covering for protection – Avoid black plastic tarps that promote condensation • Purge bearings monthly with new grease to remove condensation • Rotate fan wheel by hand at least once every two weeks
  • 16. EXHAUST FANS (cont.) • Isolate fan from any nearby vibrations that can cause damage to fan and motor bearings • Before using, purge the bearings with new grease according to manufacturer specifications
  • 17. 5 STEPS FOR STORING YOUR DUST COLLECTION EQUIPMENT LONG- TERM www.slyinc.com 800-334-2957 sales@slyinc.com /SlyIncorporatedStrongsville @tweetslyinc /company/sly-incorporated /SlyIncorporatedStrongsville

Hinweis der Redaktion

  1. Long-term storage procedures are used to prevent damage to and preserve the operational capabilities of dust collection equipment that cannot be immediately installed when received at the job site. Generally, fabrication and shipment of equipment should be matched to the jobsite readiness so that it can be installed straightaway. But if it this is impossible and it becomes necessary to keep equipment on site for more than one month, it should be protected per the following procedures.
  2. 1. Cover unprotected openings Dust collectors will be shipped to the jobsite with plenums fully gasketed and fastened together to the fullest extent possible. Generally, openings will be covered with plywood, plastic, or plugs. All of these coverings should be left intact if the unit is being moved to storage. If equipment is to be stored, any unprotected openings should be plugged or covered to keep rain, snow, and other moisture from entering the housing. This can be accomplished with plastic wrap, plastic plugs, or wooden coverings, depending on how large the opening is.
  3. 2. Store equipment in a controlled environment If possible, collector housings, auxiliary components, and parts should be stored indoors in a temperature and humidity controlled environment.  For extended storage (longer than one month), place sorbent packs in any electrical enclosures to prevent humid air from damaging electrical components. If sufficient indoor storage for all equipment is not available, collector parts, bags, cages, etc. should be stored indoors or in dry, totally enclosed trailers or sheds.  Collector housings and larger components may be stored outdoors in a weather protected shed or off the ground on appropriate shoring and fully protected with tarpaulin or heavy plastic weather coverings.  
  4. 2. Store equipment in a controlled environment If possible, collector housings, auxiliary components, and parts should be stored indoors in a temperature and humidity controlled environment.  For extended storage (longer than one month), place sorbent packs in any electrical enclosures to prevent humid air from damaging electrical components. If sufficient indoor storage for all equipment is not available, collector parts, bags, cages, etc. should be stored indoors or in dry, totally enclosed trailers or sheds.  Collector housings and larger components may be stored outdoors in a weather protected shed or off the ground on appropriate shoring and fully protected with tarpaulin or heavy plastic weather coverings.  
  5. 3. Cover paint-protected equipment Structural steel supports, framing enclosure steel, hand railings, and platform sections will be shipped in individual component pieces as described on the bill of materials for the unit.  All steel will be painted in accordance with the contract specifications.  The paint will provide adequate surface protection for a period of time. As a general rule, all equipment is finish painted so it possesses “long-term” weather protection for the metal.  However, materials such as support steel are generally stored laying on their side and rain/snow/dirt can pool on the horizontal surfaces. These pools can hasten potential corrosion, especially since contact between surface and moisture is prolonged. If prolonged storage is necessary, the support and access steel should be stored carefully and protected by weather covering, especially during changes in seasons or during severe inclement weather.  
  6. 4. Remember to inspect periodically All equipment stored outdoors should be inspected periodically to monitor the integrity of the weather cover and the condition of the painted surfaces.  Any rips or tears in coverings should be immediately repaired. Any areas on the collector, auxiliary equipment, or support steel members where water or debris are collecting should be propped up to reduce the probability of future problems. These areas can be propped up with wood, other steel members, etc. Think of a camping tent and affix a center pole or cross members to keep rain from pooling on top where it could eventually leak to the inside.
  7.  Rotary airlock valves Remember, interior surfaces of rotary valves are not coated.  Prior to storage, spray the interior of the valve with anti-rust preservative oil. Also, provide and install metal covers for the inlet and outlet flanges with at least four cap screws in each flange.  Keep these covers on until you are ready to use the valves for service. Next, completely fill the worm gear speed reducers with oil and replace the vented fill plug with a solid plug.  Be sure to retain the vented plug for future operation. Then, read and follow the motor, speed reducer, and other equipment manufacturer’s instructions for long-term storage. After completing the above steps, plug all conduit box openings on the motors and switches and store the valves off the floor in a dry, adequately ventilated, indoor area without extreme temperature changes. Turn the rotor a couple of revolutions every six months and leave the rotor in a different angular position after each turning.
  8.  Rotary airlock valves Remember, interior surfaces of rotary valves are not coated.  Prior to storage, spray the interior of the valve with anti-rust preservative oil. Also, provide and install metal covers for the inlet and outlet flanges with at least four cap screws in each flange.  Keep these covers on until you are ready to use the valves for service. Next, completely fill the worm gear speed reducers with oil and replace the vented fill plug with a solid plug.  Be sure to retain the vented plug for future operation. Then, read and follow the motor, speed reducer, and other equipment manufacturer’s instructions for long-term storage. After completing the above steps, plug all conduit box openings on the motors and switches and store the valves off the floor in a dry, adequately ventilated, indoor area without extreme temperature changes. Turn the rotor a couple of revolutions every six months and leave the rotor in a different angular position after each turning.
  9.  Rotary airlock valves Remember, interior surfaces of rotary valves are not coated.  Prior to storage, spray the interior of the valve with anti-rust preservative oil. Also, provide and install metal covers for the inlet and outlet flanges with at least four cap screws in each flange.  Keep these covers on until you are ready to use the valves for service. Next, completely fill the worm gear speed reducers with oil and replace the vented fill plug with a solid plug.  Be sure to retain the vented plug for future operation. Then, read and follow the motor, speed reducer, and other equipment manufacturer’s instructions for long-term storage. After completing the above steps, plug all conduit box openings on the motors and switches and store the valves off the floor in a dry, adequately ventilated, indoor area without extreme temperature changes. Turn the rotor a couple of revolutions every six months and leave the rotor in a different angular position after each turning.
  10. Screw conveyors Interior surfaces of screw conveyors are generally not coated.  Prior to storage, spray the interior of the trough and screw with the same anti-rust preservative oil you used on the rotary airlock valves. And again, provide and install metal or wood covers for the inlet and outlet flanges. Make sure the covers are properly secured to provide adequate protection for the internal components. Completely fill the worm gear speed reducers with oil and replace the vented fill plug with a solid plug. Retain the vented plug for future operation. Then, read and follow the motor, speed reducer, and other equipment manufacturer’s instructions for long-term storage. Finally, plug all conduit box openings on motors and switches and store the screw conveyors off the floor in a dry, adequately ventilated, indoor area without extreme temperature changes. Turn the flighting a couple of revolutions every six months and leave it in a different angular position after each turning.
  11. Screw conveyors Interior surfaces of screw conveyors are generally not coated.  Prior to storage, spray the interior of the trough and screw with the same anti-rust preservative oil you used on the rotary airlock valves. And again, provide and install metal or wood covers for the inlet and outlet flanges. Make sure the covers are properly secured to provide adequate protection for the internal components. Completely fill the worm gear speed reducers with oil and replace the vented fill plug with a solid plug. Retain the vented plug for future operation. Then, read and follow the motor, speed reducer, and other equipment manufacturer’s instructions for long-term storage. Finally, plug all conduit box openings on motors and switches and store the screw conveyors off the floor in a dry, adequately ventilated, indoor area without extreme temperature changes. Turn the flighting a couple of revolutions every six months and leave it in a different angular position after each turning.
  12. Screw conveyors Interior surfaces of screw conveyors are generally not coated.  Prior to storage, spray the interior of the trough and screw with the same anti-rust preservative oil you used on the rotary airlock valves. And again, provide and install metal or wood covers for the inlet and outlet flanges. Make sure the covers are properly secured to provide adequate protection for the internal components. Completely fill the worm gear speed reducers with oil and replace the vented fill plug with a solid plug. Retain the vented plug for future operation. Then, read and follow the motor, speed reducer, and other equipment manufacturer’s instructions for long-term storage. Finally, plug all conduit box openings on motors and switches and store the screw conveyors off the floor in a dry, adequately ventilated, indoor area without extreme temperature changes. Turn the flighting a couple of revolutions every six months and leave it in a different angular position after each turning.
  13. Because it’s important that stored fans are protected from dirt and moisture, use a tarp or other weather tight covering for protection.  Take care to avoid the use of black plastic tarps that may promote condensation on the equipment. Bearings should be purged monthly with new grease to remove condensation and the fan wheel should be rotated by hand at least once every two weeks. This prevents bearings from “setting” and redistributes the bearing components. Fans must also be isolated from any nearby vibration. High overall vibration levels can prematurely damage the fan and motor bearings. When you are ready to use the equipment, purge the bearings with new grease before startup. Perform this procedure to operating level according to the bearing manufacturers’ specifications.
  14. Because it’s important that stored fans are protected from dirt and moisture, use a tarp or other weather tight covering for protection.  Take care to avoid the use of black plastic tarps that may promote condensation on the equipment. Bearings should be purged monthly with new grease to remove condensation and the fan wheel should be rotated by hand at least once every two weeks. This prevents bearings from “setting” and redistributes the bearing components. Fans must also be isolated from any nearby vibration. High overall vibration levels can prematurely damage the fan and motor bearings. When you are ready to use the equipment, purge the bearings with new grease before startup. Perform this procedure to operating level according to the bearing manufacturers’ specifications.