SlideShare ist ein Scribd-Unternehmen logo
1 von 16
Scope of Discussion
• Introduction- Telecom, Testing
• Telecom Activities
• Why to Automate Telecom Process?
• Telecom Workflow
• Testing Overview
• Testing Team
• Testing Workflow
• Types of Testing
• Automated Testing
• Q & A - interactive
Telecom Activities
• Pre Sales: Handles all the sales information like promos,
discounts, services etc.
• Ordering: Applying for a new connection or changing /
modifying/ disconnecting a connection is under this division.
• Provisioning: This division deals with the physical connection
between customer and telecom service provider (TSP).
• Billing: All billing works is done under this division.
• Service Assurance: This division maintains the service of
TSP. In case of any failure in the connection this division
corrects the problem.
• Inventory Systems: This is the repository of all information.
• Tracking: This division tracks the ordering system and the
status of an order.
• Each of these tasks can be treated as a Department.
Why to Automate Telecom Process?
• Prior to automation, it took about 6 to 12 months for TSP to
carry out all the activities with more or less 100 % manual
involvement. That too with lots of erroneous outputs
• Then came small individual applications with its own
conventions, which took about 3 months for the whole
processes.
• Later on the applications were merged / reduced so that the
automation was given more focus, the process duration is less
than 3 weeks and with drastic reduction in errors.
The following 2 concepts were used for the same.
• Concepts of Zero: Reducing manual touch points and
increasing automation in different divisions.
• Concepts of One: Consolidating all small related applications
to a single application. Ex. User Login, Ordering.
Telecom Workflow
• TSP approaches customers (marketing)
• Customer generates enquiry (quotation)
• Customer orders a service to TSP
• Then after provisioning (technical evaluation),
implementation of order takes place.
• Here tracking system tracks the order status, if the order
implementation stops at any stage, tracks and tries to fix it.
• After the implementation is over and the client starts using the
service, the billing starts.
• Now to support the customer service, Service Assurance team
works.
• Software will have applications to support each of these
Testing Overview
• Telecom being a vast domain, will have many software
systems to automate the same & Testing is an integrated
Part of successful software development.
• 20 to 30 % of the project effort can go into testing related
activities. Test effort is estimated (History data helps)
• Focus on White and Black box testing.
• Do Manual and Automated testing based on the needs
• Follow a documented testing process
• Supports enhancements (including migration) and
production issues
Team
• Form a team with mix of experience (domain, testing,
interest, language)
• Members are inducted to applications and trained
• Test Engineers should be allotted to projects from the
beginning based on their experience so that they have good
control over the testing.
• Should have good clarity about the requirements
• Should be focused on finding faults in system flow. To be
specific, think yourself as a customer and simulate his
approach.
• Ensure growth and value to company and self
• Concept of independent test team
Testing Workflow
Project Starts
Tester Assigned
Requirements
Shared
Plan Test
Prepare Test
Execute Test
Raise Defects
Check defects
Complete
Consider the following
1. Dependency
2. Risks
3. Impact of change
4. Schedule issues
5. Resource issues
6. Tools availability
Types of Testing
• Based on project’s needs, we can do almost all types of
testing.
• Few of them are ST, IST / IPWT / SIT, Test Only, Test
Support Only, Table Update, performance, volume etc.
• Have separate ST environments
• May support customer driven tests also.
Automated testing
• We are having initiatives to use Rational Robot to do
functional, UI, regression testing & load and performance
testing.
• Uses DRTT for defect tracking.
• Uses RMT and TMT for requirement and test
management.
• RPM is used for project tracking
• Few project uses Win runner, Load runner & Test Director
also
Process Followed
• In AT&T account we are following Express one process.
E1 Test Level
Unit Test
Integration Test
System Test
Pre-Production Test (IST, IPWT, UAT)
Post-Production Test (ORT, UCT, NVT, EVT,NMVT)
Pre-Production Tests:
IST=Intersystem Test
IPWT=Integrated Pairwise Test
UAT=User Acceptance Test
Post-Production Tests:
UCT=User Certification Test
ORT=Operational Readiness Test
EFVT=Equipment Field Verification Test
NVT=Network Verification Test
NMVT=Network Management Verification
Test
RPM (Rational Portfolio
Manager)
TMT (Test Management Tool)
DRTT (Defect Recording &
Tracking Tool)
Q & A
• Questions Please…….
Telecom testing

Weitere ähnliche Inhalte

Was ist angesagt?

ITIL Incident management
ITIL Incident managementITIL Incident management
ITIL Incident management
ManageEngine
 
Order management, provisioning and activation
Order management, provisioning and activationOrder management, provisioning and activation
Order management, provisioning and activation
VijayIndra Shekhawat
 
ITSM and ITOM Coming Together
ITSM and ITOM Coming TogetherITSM and ITOM Coming Together
ITSM and ITOM Coming Together
OpsRamp
 

Was ist angesagt? (20)

Incident and Problem management simplified
Incident and Problem management simplifiedIncident and Problem management simplified
Incident and Problem management simplified
 
Making Problem Management Work for Your Organization
Making Problem Management Work for Your OrganizationMaking Problem Management Work for Your Organization
Making Problem Management Work for Your Organization
 
ITIL Incident management
ITIL Incident managementITIL Incident management
ITIL Incident management
 
Order management, provisioning and activation
Order management, provisioning and activationOrder management, provisioning and activation
Order management, provisioning and activation
 
Testing Services
Testing ServicesTesting Services
Testing Services
 
Incident Management
 Incident Management Incident Management
Incident Management
 
Problem Management Overview
Problem Management OverviewProblem Management Overview
Problem Management Overview
 
SERVICENOW PPT BY PAVANKUMAR
SERVICENOW PPT BY PAVANKUMARSERVICENOW PPT BY PAVANKUMAR
SERVICENOW PPT BY PAVANKUMAR
 
Network Operations Center
Network Operations Center  Network Operations Center
Network Operations Center
 
Agile QA presentation
Agile QA presentationAgile QA presentation
Agile QA presentation
 
Managed Services Presentation
Managed Services PresentationManaged Services Presentation
Managed Services Presentation
 
ITSM and ITOM Coming Together
ITSM and ITOM Coming TogetherITSM and ITOM Coming Together
ITSM and ITOM Coming Together
 
ITIL PPT
ITIL PPTITIL PPT
ITIL PPT
 
Introduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service managementIntroduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service management
 
Network Architecture Review Checklist
Network Architecture Review ChecklistNetwork Architecture Review Checklist
Network Architecture Review Checklist
 
Servicenow ppt
Servicenow pptServicenow ppt
Servicenow ppt
 
Cyber Security and Cloud Computing
Cyber Security and Cloud ComputingCyber Security and Cloud Computing
Cyber Security and Cloud Computing
 
ITIL Incident Management Workflow - Process Guide
	 ITIL Incident Management Workflow - Process Guide	 ITIL Incident Management Workflow - Process Guide
ITIL Incident Management Workflow - Process Guide
 
Managed it services
Managed it servicesManaged it services
Managed it services
 
ITSM Presentation
ITSM PresentationITSM Presentation
ITSM Presentation
 

Andere mochten auch

Order Management Overview
Order Management OverviewOrder Management Overview
Order Management Overview
Robert Ransom
 
Software testing basic concepts
Software testing basic conceptsSoftware testing basic concepts
Software testing basic concepts
Hưng Hoàng
 
Concept of market potential,crmmm market share & buying decision process
Concept of market potential,crmmm market share & buying decision processConcept of market potential,crmmm market share & buying decision process
Concept of market potential,crmmm market share & buying decision process
Vikash Kumar Bibhakar
 
Energy Strategy Group_Report 2012 efficienza energetica
Energy Strategy Group_Report 2012 efficienza energeticaEnergy Strategy Group_Report 2012 efficienza energetica
Energy Strategy Group_Report 2012 efficienza energetica
Eugenio Bacile di Castiglione
 
Alta White Paper D2C eCommerce Case Study 2016
Alta White Paper D2C eCommerce Case Study 2016Alta White Paper D2C eCommerce Case Study 2016
Alta White Paper D2C eCommerce Case Study 2016
Patrick Nicholson
 

Andere mochten auch (20)

Telecom BSS
Telecom BSSTelecom BSS
Telecom BSS
 
Order Management Overview
Order Management OverviewOrder Management Overview
Order Management Overview
 
Best Practices for Testing in salesforce.com
Best Practices for Testing in salesforce.comBest Practices for Testing in salesforce.com
Best Practices for Testing in salesforce.com
 
Software testing basic concepts
Software testing basic conceptsSoftware testing basic concepts
Software testing basic concepts
 
Smart transmitter
Smart transmitterSmart transmitter
Smart transmitter
 
Brand cannibalization
Brand cannibalizationBrand cannibalization
Brand cannibalization
 
Concept of market potential,crmmm market share & buying decision process
Concept of market potential,crmmm market share & buying decision processConcept of market potential,crmmm market share & buying decision process
Concept of market potential,crmmm market share & buying decision process
 
Lifting Sling Safety
Lifting Sling SafetyLifting Sling Safety
Lifting Sling Safety
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
Credit Card
Credit Card Credit Card
Credit Card
 
12 steps to achieve excellence in debt collection and recovery
12 steps to achieve excellence in debt collection and recovery12 steps to achieve excellence in debt collection and recovery
12 steps to achieve excellence in debt collection and recovery
 
Next generation OSS/BSS architecture
Next generation OSS/BSS architectureNext generation OSS/BSS architecture
Next generation OSS/BSS architecture
 
RF Planning & Optimization
RF Planning & OptimizationRF Planning & Optimization
RF Planning & Optimization
 
Company Profile Sample
Company Profile SampleCompany Profile Sample
Company Profile Sample
 
Overview Of CRM
Overview Of CRMOverview Of CRM
Overview Of CRM
 
Top 100 Most Common Coupon Code Phrases
Top 100 Most Common Coupon Code PhrasesTop 100 Most Common Coupon Code Phrases
Top 100 Most Common Coupon Code Phrases
 
A six step content marketing model
A six step content marketing modelA six step content marketing model
A six step content marketing model
 
Energy Strategy Group_Report 2012 efficienza energetica
Energy Strategy Group_Report 2012 efficienza energeticaEnergy Strategy Group_Report 2012 efficienza energetica
Energy Strategy Group_Report 2012 efficienza energetica
 
Alta White Paper D2C eCommerce Case Study 2016
Alta White Paper D2C eCommerce Case Study 2016Alta White Paper D2C eCommerce Case Study 2016
Alta White Paper D2C eCommerce Case Study 2016
 
mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2
mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2
mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2
 

Ähnlich wie Telecom testing

Acceptance Testing Practical Guideline.pptx
Acceptance Testing Practical Guideline.pptxAcceptance Testing Practical Guideline.pptx
Acceptance Testing Practical Guideline.pptx
Shaikh848892
 

Ähnlich wie Telecom testing (20)

AMI Case Studies
AMI Case StudiesAMI Case Studies
AMI Case Studies
 
AMI Lessons Learned
AMI Lessons LearnedAMI Lessons Learned
AMI Lessons Learned
 
AMI Case Studies
AMI Case StudiesAMI Case Studies
AMI Case Studies
 
Acceptance Testing Practical Guideline.pptx
Acceptance Testing Practical Guideline.pptxAcceptance Testing Practical Guideline.pptx
Acceptance Testing Practical Guideline.pptx
 
Meter Shops of the Future
Meter Shops of the FutureMeter Shops of the Future
Meter Shops of the Future
 
ISTQB foundation level - day 2
ISTQB foundation level - day 2ISTQB foundation level - day 2
ISTQB foundation level - day 2
 
Fundamentals of AMI Testing
Fundamentals of AMI TestingFundamentals of AMI Testing
Fundamentals of AMI Testing
 
unit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxunit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptx
 
Fundamentals OF UAT
Fundamentals OF UATFundamentals OF UAT
Fundamentals OF UAT
 
SDLC
SDLCSDLC
SDLC
 
Sandeep Gupta
Sandeep GuptaSandeep Gupta
Sandeep Gupta
 
Chapter6
Chapter6Chapter6
Chapter6
 
Creating Functional Testing Strategy.pptx
Creating Functional Testing Strategy.pptxCreating Functional Testing Strategy.pptx
Creating Functional Testing Strategy.pptx
 
OutSystems community meetup 2018 11 service modules
OutSystems community meetup 2018 11 service modulesOutSystems community meetup 2018 11 service modules
OutSystems community meetup 2018 11 service modules
 
Outsystems community meetup 2018 11 service modules
Outsystems community meetup 2018 11 service modulesOutsystems community meetup 2018 11 service modules
Outsystems community meetup 2018 11 service modules
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
The Challenge of Accepting Software
The Challenge of Accepting SoftwareThe Challenge of Accepting Software
The Challenge of Accepting Software
 
Software testing acceptance testing
Software testing  acceptance testingSoftware testing  acceptance testing
Software testing acceptance testing
 
Software Testing Introduction (Part 3)
 Software Testing Introduction (Part 3) Software Testing Introduction (Part 3)
Software Testing Introduction (Part 3)
 
Meter Operations In a Post AMI World
Meter Operations In a Post AMI WorldMeter Operations In a Post AMI World
Meter Operations In a Post AMI World
 

Mehr von SivaprasanthRentala1975 (20)

Testing using load runner performance testing
Testing using load runner  performance testingTesting using load runner  performance testing
Testing using load runner performance testing
 
Why contract savings are missing
Why contract savings are missingWhy contract savings are missing
Why contract savings are missing
 
Voyager scm
Voyager scmVoyager scm
Voyager scm
 
Volumes
VolumesVolumes
Volumes
 
The new mainframe
The new mainframeThe new mainframe
The new mainframe
 
Test execution may_04_2006
Test execution may_04_2006Test execution may_04_2006
Test execution may_04_2006
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Sdlc models
Sdlc modelsSdlc models
Sdlc models
 
Sdlc
SdlcSdlc
Sdlc
 
Scm
ScmScm
Scm
 
Pt presentation1
Pt presentation1Pt presentation1
Pt presentation1
 
Pp employee learnnig initiative-iss-220-g tle 2007
Pp employee learnnig initiative-iss-220-g tle 2007Pp employee learnnig initiative-iss-220-g tle 2007
Pp employee learnnig initiative-iss-220-g tle 2007
 
Performance testing and rpt
Performance testing and rptPerformance testing and rpt
Performance testing and rpt
 
Patents
PatentsPatents
Patents
 
Xpediter kanbay
Xpediter kanbayXpediter kanbay
Xpediter kanbay
 
Copy of good quotes.ppt
Copy of good quotes.pptCopy of good quotes.ppt
Copy of good quotes.ppt
 
Contract savings new
Contract savings newContract savings new
Contract savings new
 
Contract savings schema
Contract savings schemaContract savings schema
Contract savings schema
 
Contract savings may 10th 2004 by gm euro
Contract savings may 10th 2004 by gm euroContract savings may 10th 2004 by gm euro
Contract savings may 10th 2004 by gm euro
 
Contract savings job overview
Contract savings job overviewContract savings job overview
Contract savings job overview
 

Kürzlich hochgeladen

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Kürzlich hochgeladen (20)

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 

Telecom testing

  • 1.
  • 2. Scope of Discussion • Introduction- Telecom, Testing • Telecom Activities • Why to Automate Telecom Process? • Telecom Workflow • Testing Overview • Testing Team • Testing Workflow • Types of Testing • Automated Testing • Q & A - interactive
  • 3. Telecom Activities • Pre Sales: Handles all the sales information like promos, discounts, services etc. • Ordering: Applying for a new connection or changing / modifying/ disconnecting a connection is under this division. • Provisioning: This division deals with the physical connection between customer and telecom service provider (TSP). • Billing: All billing works is done under this division. • Service Assurance: This division maintains the service of TSP. In case of any failure in the connection this division corrects the problem. • Inventory Systems: This is the repository of all information. • Tracking: This division tracks the ordering system and the status of an order. • Each of these tasks can be treated as a Department.
  • 4. Why to Automate Telecom Process? • Prior to automation, it took about 6 to 12 months for TSP to carry out all the activities with more or less 100 % manual involvement. That too with lots of erroneous outputs • Then came small individual applications with its own conventions, which took about 3 months for the whole processes. • Later on the applications were merged / reduced so that the automation was given more focus, the process duration is less than 3 weeks and with drastic reduction in errors. The following 2 concepts were used for the same. • Concepts of Zero: Reducing manual touch points and increasing automation in different divisions. • Concepts of One: Consolidating all small related applications to a single application. Ex. User Login, Ordering.
  • 5. Telecom Workflow • TSP approaches customers (marketing) • Customer generates enquiry (quotation) • Customer orders a service to TSP • Then after provisioning (technical evaluation), implementation of order takes place. • Here tracking system tracks the order status, if the order implementation stops at any stage, tracks and tries to fix it. • After the implementation is over and the client starts using the service, the billing starts. • Now to support the customer service, Service Assurance team works. • Software will have applications to support each of these
  • 6. Testing Overview • Telecom being a vast domain, will have many software systems to automate the same & Testing is an integrated Part of successful software development. • 20 to 30 % of the project effort can go into testing related activities. Test effort is estimated (History data helps) • Focus on White and Black box testing. • Do Manual and Automated testing based on the needs • Follow a documented testing process • Supports enhancements (including migration) and production issues
  • 7. Team • Form a team with mix of experience (domain, testing, interest, language) • Members are inducted to applications and trained • Test Engineers should be allotted to projects from the beginning based on their experience so that they have good control over the testing. • Should have good clarity about the requirements • Should be focused on finding faults in system flow. To be specific, think yourself as a customer and simulate his approach. • Ensure growth and value to company and self • Concept of independent test team
  • 8. Testing Workflow Project Starts Tester Assigned Requirements Shared Plan Test Prepare Test Execute Test Raise Defects Check defects Complete Consider the following 1. Dependency 2. Risks 3. Impact of change 4. Schedule issues 5. Resource issues 6. Tools availability
  • 9. Types of Testing • Based on project’s needs, we can do almost all types of testing. • Few of them are ST, IST / IPWT / SIT, Test Only, Test Support Only, Table Update, performance, volume etc. • Have separate ST environments • May support customer driven tests also.
  • 10. Automated testing • We are having initiatives to use Rational Robot to do functional, UI, regression testing & load and performance testing. • Uses DRTT for defect tracking. • Uses RMT and TMT for requirement and test management. • RPM is used for project tracking • Few project uses Win runner, Load runner & Test Director also
  • 11. Process Followed • In AT&T account we are following Express one process. E1 Test Level Unit Test Integration Test System Test Pre-Production Test (IST, IPWT, UAT) Post-Production Test (ORT, UCT, NVT, EVT,NMVT) Pre-Production Tests: IST=Intersystem Test IPWT=Integrated Pairwise Test UAT=User Acceptance Test Post-Production Tests: UCT=User Certification Test ORT=Operational Readiness Test EFVT=Equipment Field Verification Test NVT=Network Verification Test NMVT=Network Management Verification Test
  • 14. DRTT (Defect Recording & Tracking Tool)
  • 15. Q & A • Questions Please…….