An Introduction to Lean Six
Sigma
“We don’t know what we don’t know.
We can’t act on what we don’t know.
We won’t know until we search.
We won’t search for what we don’t question.
We don’t question what we don’t measure.
Hence, we just don’t know.”
Dr. Mikel Harry
Process Improvement
1. Initial Perception of problem
2. Clarify Problem
3. Locate Point of Cause
4. Root Cause Analysis
5. Design Solutions
6. Measure Effectiveness
7. Standardize
Lean Six Sigma Process Improvement
• Lean Six Sigma Seeks to improve the quality
of manufacturing and business process by:
– identifying and removing the causes of defects
(errors) and variation.
– Identifying and removing sources of waste
within the process
– Focusing on outputs that are critical to
customers Define
Measure
AnalyzeImprove
Control
Lean Six Sigma Process Improvement
• LSS is a management philosophy that seeks to drive a
quality culture change through a multi-level based
program
Level Training
Green Belt LSS Methodology and basic tool
set
Black Belt Green Belt content plus
advanced data analysis
Master Black Belt Black belt content plus program
management, leadership skills,
some advanced tools
1930 19501900
Ford
Assembly Line
Guinness
Brewery
Shewhart
Introduces SPC
Gilbreth, Inc.
•Management
Theory
•Industrial
Engineering
Deming
•14 Points
•7 Deadly Diseases
Toyota Production
System
Lean Six Sigma Timeline
1990 20001980
Motorola
Introduces Six
Sigma
Just – in–Time
SPC
Lean Mfg.
TQM
AlliedSIgnal
GE Adapt LSS to
Business Processes
Lean Six Sigma Timeline
Background on Lean
• Lean comes out of the industrial engineering world
• Taiichi Ohno – Toyota Production System.
– 1940s-1950s company was on verge of bankruptcy
– Dynamics of industry were changing – moving from mass
production to more flexible, shorter, varied batch runs (people
wanted more colors, different features, more models, etc).
• Ohno was inspired by 3 observations on a trip to America
– Henry Ford’s assembly line inspired the principle of flow (keep
products moving because no value is added while it is sitting
still)
– The Indy 500 – Rapid Changeover
– The American Grocery Store – led to the Pull system – material
use signals when and how stock needs to be replenished
Path To Lean
Theory Waste is Deadly
Application 1. Define Value – act on what is
important to the customer
2. Identify Value Stream – understand
what steps in the process add value
and which don’t
3. Make it flow – keep the work moving
at all times and eliminate waste that
creates delay
4. Let customer pull -- Avoid making more
or ordering more inputs for customer
demand you don’t have
5. Pursue perfection -- there is no
optimum level of performance
Focus Flow Focused
Assumptions Non-Value added steps exit
Results Reduced cycle time
Waste Defined
Wastes Healthcare Examples
Transport 1. Moving patients from room to room
2. Poor workplace layouts, for patient services
3. Moving equipment in and out of procedure room or operating room
Inventory 1. Overstocked medications on units/floors or in pharmacy
2. Physician orders building up to be entered
3. Unnecessary instruments contained in operating kits
Motion 1. Leaving patient rooms to:
• Get supplies or record
• Documents care provided
2. Large reach/walk distance to complete a process step
Waiting 1. Idle equipment/people
2. Early admissions for procedures later in the day
3. Waiting for internal transport between departments
Over-Production 1. Multiple signature requirements
2. Extra copies of forms
3. Multiple information systems entries
4. Printing hard copy of report when digital is sufficient
Over-Processing 1. Asking the patient the same questions multiple times
2. Unnecessary carbon copying
3. Batch printing patient labels
Defects 1. Hospital-acquired illness
2. Wrong-site surgeries
3. Medication errors
4. Dealing with service complaints
5. Illegible, handwritten information
6. Collection of incorrect patient information
Skills 1. Not using people’s mental, creative, and physical abilities
2. Staff not involved in redesigning processes in their workplace
3. Nurses and Doctors spending time locating equipment and supplies
4. Staff rework due to system failures
Lean Foundations
• Standardized Work – people should analyze their work
and define the way that best meets the needs of all
stakeholders.
– “The current one best way to safely complete an activity
with the proper outcome and the highest quality, using the
fewest possible resources”
– Standardized not Identical – mindless conformity and the
thoughtful setting of standards should not be confused
– Written by those who do the work.
• Level loading – smoothing the workflow and patient
flow throughout the hospital.
• Kaizen – continuous improvement
Lean Methods
• Kaizen Events (or SCORE events)
– Planned and structured process that enables a small group of people
to improve some aspect of their business in a quick, focused manner.
• Select
• Clarify
• Organize
• Run
• Evaluate
• 5S – this methodology reduces waste through improved workplace
organization and visual management
– Sort, Store, Shine, Standardize and Sustain
• Kanban – a Japanese term that can be translated as “signal,” “card,”
or “sign.”
– Most often a physical signal (paper card of plastic bin), that indicates
when it is time to order more, from whom, and in what quantity.
Lean vs. Six Sigma
• Lean tends to be used for shorter, less complex problems. Often
time driven. Focus is on eliminating wasteful steps and practices.
• Six Sigma is a bigger more analytical approach – often quality driven
– it tends to have a statistical approach. Focus on optimizing the
important steps – reducing defects.
• Some argue Lean moves the mean, SixSigma moves the variance.
But they are often used together and should not be viewed as
having different objectives.
– Waste elimination eliminates an opportunity to make a defect
– Less rework means faster cycle times
• Six Sigma training might be specialized to the “quality” department,
but everyone in the organization should be trained in Lean
VOC vs. VOP
Voice of Customer
Voice of Process
The Voice of the Process is independent of
the Voice of the Customer
Sigma
Capability
Defects per
Million
Opportunities
% Yield
2 308,537 69.15%
3 66,807 93.32%
4 6,210 99.38%
5 233 99.98%
6 3.4 99.99966%
What’s good enough?
99% Good (3.8 Sigma) 99.99966% Good (6 Sigma)
20,000 lost articles of mail per hour
(based on 2,000,000/hr)
7 articles lost per hour
Unsafe drinking water for almost 15
minutes each day
1 unsafe minute every 7 months
5,000 incorrect surgical operations per
week
1.7 incorrect operations per week
2 short or long landings daily at an
airport with 200 flights/day
1 short or long landing every 5 years
2,000,000 wrong drug prescriptions
each year
680 wrong prescriptions per year
No electricity for almost 7 hours each
month
1 hour without electricity every 34
years
Goals of Lean Six Sigma
LSL USL
Customer Target
DefectsDefects
Prevent Defects by
Reducing Variation
LSL USL
Customer Target
Defects
Prevent Defects by
Centering ProcessLSL USL
Customer Target
Meet Customer
Requirements
What Makes a Good Lean Six Sigma
Project?
• There is no known solution
• The root cause is not known
• The problem is complex and needs statistical
analysis
• The problem is part of a process
• The process is repeatable
• A defect can be defined
• Project will take 3-6 months
• There are data available
The DMAIC Methodology
• Define – describe the problem quantifiably and the
underlying process to determine how performance will
be measured.
• Measure – use measures or metrics to understand
performance and the improvement opportunity.
• Analyze – identify the true root cause(s) of the
underlying problem.
• Improve – identify and test the best improvements that
address the root causes.
• Control – identify sustainment strategies that ensure
process performance maintains the improved state.
Define
• Define Scope of the Problem
– Document the Process
– Collect and Translate the Voice of the Customer
• Determine Project Objective and Benefits
– Define Metrics and Defects
– Establish Preliminary Baseline
– Develop Problem & Objective Statements
– Estimate Financial Benefit
Define (continued)
• Create Project Charter
– Confirm Improvement Methodology
– Define Project Roles and Responsibilities
– Identify Risks
– Establish Timeline
– Managerial Buy-in
• Focus here is on the problem
Measure
Measure what is measurable, and make measurable what is not so” – Galileo
• Define “As Is” process
– Value stream map/process flow diagram
• Validate Measurement System for Outputs
– Don’t assume your measurements are accurate –
measuring system must accurately tell what is
happening
• Quantify Process Performance
– Collect data (Y’s)
– Examine process stability/capability analysis
Analyze
• Identify Potential Causes (X’s)
• Investigate Significance of X’s
– Collect data on x’s
– Graphical/Quantitative analysis
• Pareto Chart
• Fishbone Diagram (cause and effect)
• Chi Square Test
• Regression Analysis
• Failure Mode Effects Analysis
• Identify Significant Causes to focus on (y=f(X))
– Evaluate the impact of x’s on y
• Here you identify the critical factors of a “good” output and
the root causes of defects or “bad” output.
Improve
• Generate Potential Solutions
• Select & Test Solution
• Develop Implementation Plan
Control
• Create Control & Monitoring Plan
– Mistake proof the process
– Determine the x’s to control and methods
– Determine Y’s to monitor
• Implement Full Scale Solution
– Revise/develop process
– Implement and evaluate solution
• Finalize Transition
– Develop transition plan
– Handoff process to owner

Weitere ähnliche Inhalte

Was ist angesagt?

SIX SIGMA Green Belt Training
SIX SIGMA Green Belt TrainingSIX SIGMA Green Belt Training
SIX SIGMA Green Belt Trainingchaudhryshailja
 
Six sigma an overview | Online Mini MBA (Free)
Six sigma  an overview | Online Mini MBA (Free)Six sigma  an overview | Online Mini MBA (Free)
Six sigma an overview | Online Mini MBA (Free)mybskool-online-courses
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Abhay Yadav
 
Basic understanding of lean six sigma approach for improvement
Basic understanding of lean six sigma approach for improvementBasic understanding of lean six sigma approach for improvement
Basic understanding of lean six sigma approach for improvementViral Jain
 
6 sigma basic best ppt
6 sigma basic best ppt6 sigma basic best ppt
6 sigma basic best pptJayesh Sarode
 
Lean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingLean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingQualsys Ltd
 
Lean Six Sigma White Belt Webinar
Lean Six Sigma White Belt WebinarLean Six Sigma White Belt Webinar
Lean Six Sigma White Belt WebinarMcOWLMarketing
 
Six Sigma
Six SigmaSix Sigma
Six Sigmauzukhan
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvementSarfraz Ashraf
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awarenesssawate
 
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis LearningWhat is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis LearningInvensis Learning
 
WEBINAR: Introduction to DMAIC
WEBINAR: Introduction to DMAICWEBINAR: Introduction to DMAIC
WEBINAR: Introduction to DMAICGoLeanSixSigma.com
 

Was ist angesagt? (20)

SIX SIGMA Green Belt Training
SIX SIGMA Green Belt TrainingSIX SIGMA Green Belt Training
SIX SIGMA Green Belt Training
 
Basics of Six Sigma
Basics of Six SigmaBasics of Six Sigma
Basics of Six Sigma
 
Six sigma an overview | Online Mini MBA (Free)
Six sigma  an overview | Online Mini MBA (Free)Six sigma  an overview | Online Mini MBA (Free)
Six sigma an overview | Online Mini MBA (Free)
 
Six sigma
Six sigma Six sigma
Six sigma
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)
 
Lean six sigma
Lean six sigmaLean six sigma
Lean six sigma
 
LEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINALLEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINAL
 
Basic understanding of lean six sigma approach for improvement
Basic understanding of lean six sigma approach for improvementBasic understanding of lean six sigma approach for improvement
Basic understanding of lean six sigma approach for improvement
 
6 sigma basic best ppt
6 sigma basic best ppt6 sigma basic best ppt
6 sigma basic best ppt
 
Lean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingLean six sigma explained: Beginners training
Lean six sigma explained: Beginners training
 
Six sigma foundation and principles
Six sigma foundation and principlesSix sigma foundation and principles
Six sigma foundation and principles
 
Lean And Six Sigma
Lean And Six SigmaLean And Six Sigma
Lean And Six Sigma
 
Lean Six Sigma White Belt Webinar
Lean Six Sigma White Belt WebinarLean Six Sigma White Belt Webinar
Lean Six Sigma White Belt Webinar
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvement
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awareness
 
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis LearningWhat is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
 
Dmaic
DmaicDmaic
Dmaic
 
WEBINAR: Introduction to DMAIC
WEBINAR: Introduction to DMAICWEBINAR: Introduction to DMAIC
WEBINAR: Introduction to DMAIC
 
Six sigma
Six sigma Six sigma
Six sigma
 

Andere mochten auch

Six Sigma Project Replication Webinar Slides
Six Sigma Project Replication Webinar SlidesSix Sigma Project Replication Webinar Slides
Six Sigma Project Replication Webinar SlidesPowerSteering Software
 
Lean Manufacturing: Improve Productivity, Quality, and Lead-Time
Lean Manufacturing: Improve Productivity, Quality, and Lead-TimeLean Manufacturing: Improve Productivity, Quality, and Lead-Time
Lean Manufacturing: Improve Productivity, Quality, and Lead-TimeDarren Dolcemascolo
 
Lean Manufacturing and Lean Six Sigma
Lean Manufacturing and Lean Six SigmaLean Manufacturing and Lean Six Sigma
Lean Manufacturing and Lean Six SigmaDarren Dolcemascolo
 
5A - US Cities Climate Action Best Practices
5A - US Cities Climate Action Best Practices5A - US Cities Climate Action Best Practices
5A - US Cities Climate Action Best Practicesjohncleveland
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageAnand Subramaniam
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best pptRabia Sgh S
 
Fundamentos de Administración de Seis Sigma
Fundamentos de Administración de Seis SigmaFundamentos de Administración de Seis Sigma
Fundamentos de Administración de Seis SigmaJuan Carlos Fernandez
 

Andere mochten auch (10)

Six Sigma Project Replication Webinar Slides
Six Sigma Project Replication Webinar SlidesSix Sigma Project Replication Webinar Slides
Six Sigma Project Replication Webinar Slides
 
Lean Manufacturing: Improve Productivity, Quality, and Lead-Time
Lean Manufacturing: Improve Productivity, Quality, and Lead-TimeLean Manufacturing: Improve Productivity, Quality, and Lead-Time
Lean Manufacturing: Improve Productivity, Quality, and Lead-Time
 
Lean Manufacturing and Lean Six Sigma
Lean Manufacturing and Lean Six SigmaLean Manufacturing and Lean Six Sigma
Lean Manufacturing and Lean Six Sigma
 
5A - US Cities Climate Action Best Practices
5A - US Cities Climate Action Best Practices5A - US Cities Climate Action Best Practices
5A - US Cities Climate Action Best Practices
 
Six Sigma
Six Sigma Six Sigma
Six Sigma
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Fundamentos de Administración de Seis Sigma
Fundamentos de Administración de Seis SigmaFundamentos de Administración de Seis Sigma
Fundamentos de Administración de Seis Sigma
 

Ähnlich wie An introduction to lean six sigma

Lean six sigma
Lean six sigmaLean six sigma
Lean six sigmaBLUEZ09
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian KalacJulian Kalac P.Eng
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC Julian Kalac P.Eng
 
Process Improvement Through Use Of Lean Six Sigma Methods 110609
Process Improvement Through Use Of Lean Six Sigma Methods 110609Process Improvement Through Use Of Lean Six Sigma Methods 110609
Process Improvement Through Use Of Lean Six Sigma Methods 110609maedog
 
Process improvement through use of lean six sigma methods 110609
Process improvement through use of lean six sigma methods 110609Process improvement through use of lean six sigma methods 110609
Process improvement through use of lean six sigma methods 110609maedog
 
Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsNilesh Sawant
 
Quality Clinic - Lean Six Sigma Fundamentals Training - Sample
Quality Clinic - Lean Six Sigma Fundamentals Training - SampleQuality Clinic - Lean Six Sigma Fundamentals Training - Sample
Quality Clinic - Lean Six Sigma Fundamentals Training - SampleMark H. Davis
 
Alternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionAlternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionHarold Philbrick
 
The lean hospital what is mean
The lean hospital what is meanThe lean hospital what is mean
The lean hospital what is meanEmad Kotb
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxRoopaDNDandally
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 materialjeashabab
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 materialjeashabab
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 materialjeashabab
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerSamantha Abalos
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006Omnex Inc.
 

Ähnlich wie An introduction to lean six sigma (20)

Lean six sigma
Lean six sigmaLean six sigma
Lean six sigma
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian Kalac
 
Lean concepts and quality indicators final
Lean concepts and quality indicators finalLean concepts and quality indicators final
Lean concepts and quality indicators final
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
 
Process Improvement Through Use Of Lean Six Sigma Methods 110609
Process Improvement Through Use Of Lean Six Sigma Methods 110609Process Improvement Through Use Of Lean Six Sigma Methods 110609
Process Improvement Through Use Of Lean Six Sigma Methods 110609
 
Process improvement through use of lean six sigma methods 110609
Process improvement through use of lean six sigma methods 110609Process improvement through use of lean six sigma methods 110609
Process improvement through use of lean six sigma methods 110609
 
TPN-LOM - IIM(R).pptx
TPN-LOM - IIM(R).pptxTPN-LOM - IIM(R).pptx
TPN-LOM - IIM(R).pptx
 
Innovation training
Innovation trainingInnovation training
Innovation training
 
Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc Tools
 
Quality Clinic - Lean Six Sigma Fundamentals Training - Sample
Quality Clinic - Lean Six Sigma Fundamentals Training - SampleQuality Clinic - Lean Six Sigma Fundamentals Training - Sample
Quality Clinic - Lean Six Sigma Fundamentals Training - Sample
 
3 lean thinking & jit
3 lean thinking & jit3 lean thinking & jit
3 lean thinking & jit
 
Alternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionAlternate Hourly Lean Introduction
Alternate Hourly Lean Introduction
 
The lean hospital what is mean
The lean hospital what is meanThe lean hospital what is mean
The lean hospital what is mean
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptx
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 material
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 material
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 material
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 Reviewer
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
 

Kürzlich hochgeladen

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Kürzlich hochgeladen (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

An introduction to lean six sigma

  • 2. An Introduction to Lean Six Sigma “We don’t know what we don’t know. We can’t act on what we don’t know. We won’t know until we search. We won’t search for what we don’t question. We don’t question what we don’t measure. Hence, we just don’t know.” Dr. Mikel Harry
  • 3. Process Improvement 1. Initial Perception of problem 2. Clarify Problem 3. Locate Point of Cause 4. Root Cause Analysis 5. Design Solutions 6. Measure Effectiveness 7. Standardize
  • 4. Lean Six Sigma Process Improvement • Lean Six Sigma Seeks to improve the quality of manufacturing and business process by: – identifying and removing the causes of defects (errors) and variation. – Identifying and removing sources of waste within the process – Focusing on outputs that are critical to customers Define Measure AnalyzeImprove Control
  • 5. Lean Six Sigma Process Improvement • LSS is a management philosophy that seeks to drive a quality culture change through a multi-level based program Level Training Green Belt LSS Methodology and basic tool set Black Belt Green Belt content plus advanced data analysis Master Black Belt Black belt content plus program management, leadership skills, some advanced tools
  • 6. 1930 19501900 Ford Assembly Line Guinness Brewery Shewhart Introduces SPC Gilbreth, Inc. •Management Theory •Industrial Engineering Deming •14 Points •7 Deadly Diseases Toyota Production System Lean Six Sigma Timeline
  • 7. 1990 20001980 Motorola Introduces Six Sigma Just – in–Time SPC Lean Mfg. TQM AlliedSIgnal GE Adapt LSS to Business Processes Lean Six Sigma Timeline
  • 8. Background on Lean • Lean comes out of the industrial engineering world • Taiichi Ohno – Toyota Production System. – 1940s-1950s company was on verge of bankruptcy – Dynamics of industry were changing – moving from mass production to more flexible, shorter, varied batch runs (people wanted more colors, different features, more models, etc). • Ohno was inspired by 3 observations on a trip to America – Henry Ford’s assembly line inspired the principle of flow (keep products moving because no value is added while it is sitting still) – The Indy 500 – Rapid Changeover – The American Grocery Store – led to the Pull system – material use signals when and how stock needs to be replenished
  • 9. Path To Lean Theory Waste is Deadly Application 1. Define Value – act on what is important to the customer 2. Identify Value Stream – understand what steps in the process add value and which don’t 3. Make it flow – keep the work moving at all times and eliminate waste that creates delay 4. Let customer pull -- Avoid making more or ordering more inputs for customer demand you don’t have 5. Pursue perfection -- there is no optimum level of performance Focus Flow Focused Assumptions Non-Value added steps exit Results Reduced cycle time
  • 10. Waste Defined Wastes Healthcare Examples Transport 1. Moving patients from room to room 2. Poor workplace layouts, for patient services 3. Moving equipment in and out of procedure room or operating room Inventory 1. Overstocked medications on units/floors or in pharmacy 2. Physician orders building up to be entered 3. Unnecessary instruments contained in operating kits Motion 1. Leaving patient rooms to: • Get supplies or record • Documents care provided 2. Large reach/walk distance to complete a process step Waiting 1. Idle equipment/people 2. Early admissions for procedures later in the day 3. Waiting for internal transport between departments Over-Production 1. Multiple signature requirements 2. Extra copies of forms 3. Multiple information systems entries 4. Printing hard copy of report when digital is sufficient Over-Processing 1. Asking the patient the same questions multiple times 2. Unnecessary carbon copying 3. Batch printing patient labels Defects 1. Hospital-acquired illness 2. Wrong-site surgeries 3. Medication errors 4. Dealing with service complaints 5. Illegible, handwritten information 6. Collection of incorrect patient information Skills 1. Not using people’s mental, creative, and physical abilities 2. Staff not involved in redesigning processes in their workplace 3. Nurses and Doctors spending time locating equipment and supplies 4. Staff rework due to system failures
  • 11. Lean Foundations • Standardized Work – people should analyze their work and define the way that best meets the needs of all stakeholders. – “The current one best way to safely complete an activity with the proper outcome and the highest quality, using the fewest possible resources” – Standardized not Identical – mindless conformity and the thoughtful setting of standards should not be confused – Written by those who do the work. • Level loading – smoothing the workflow and patient flow throughout the hospital. • Kaizen – continuous improvement
  • 12. Lean Methods • Kaizen Events (or SCORE events) – Planned and structured process that enables a small group of people to improve some aspect of their business in a quick, focused manner. • Select • Clarify • Organize • Run • Evaluate • 5S – this methodology reduces waste through improved workplace organization and visual management – Sort, Store, Shine, Standardize and Sustain • Kanban – a Japanese term that can be translated as “signal,” “card,” or “sign.” – Most often a physical signal (paper card of plastic bin), that indicates when it is time to order more, from whom, and in what quantity.
  • 13. Lean vs. Six Sigma • Lean tends to be used for shorter, less complex problems. Often time driven. Focus is on eliminating wasteful steps and practices. • Six Sigma is a bigger more analytical approach – often quality driven – it tends to have a statistical approach. Focus on optimizing the important steps – reducing defects. • Some argue Lean moves the mean, SixSigma moves the variance. But they are often used together and should not be viewed as having different objectives. – Waste elimination eliminates an opportunity to make a defect – Less rework means faster cycle times • Six Sigma training might be specialized to the “quality” department, but everyone in the organization should be trained in Lean
  • 14. VOC vs. VOP Voice of Customer Voice of Process The Voice of the Process is independent of the Voice of the Customer Sigma Capability Defects per Million Opportunities % Yield 2 308,537 69.15% 3 66,807 93.32% 4 6,210 99.38% 5 233 99.98% 6 3.4 99.99966%
  • 15. What’s good enough? 99% Good (3.8 Sigma) 99.99966% Good (6 Sigma) 20,000 lost articles of mail per hour (based on 2,000,000/hr) 7 articles lost per hour Unsafe drinking water for almost 15 minutes each day 1 unsafe minute every 7 months 5,000 incorrect surgical operations per week 1.7 incorrect operations per week 2 short or long landings daily at an airport with 200 flights/day 1 short or long landing every 5 years 2,000,000 wrong drug prescriptions each year 680 wrong prescriptions per year No electricity for almost 7 hours each month 1 hour without electricity every 34 years
  • 16. Goals of Lean Six Sigma LSL USL Customer Target DefectsDefects Prevent Defects by Reducing Variation LSL USL Customer Target Defects Prevent Defects by Centering ProcessLSL USL Customer Target Meet Customer Requirements
  • 17. What Makes a Good Lean Six Sigma Project? • There is no known solution • The root cause is not known • The problem is complex and needs statistical analysis • The problem is part of a process • The process is repeatable • A defect can be defined • Project will take 3-6 months • There are data available
  • 18. The DMAIC Methodology • Define – describe the problem quantifiably and the underlying process to determine how performance will be measured. • Measure – use measures or metrics to understand performance and the improvement opportunity. • Analyze – identify the true root cause(s) of the underlying problem. • Improve – identify and test the best improvements that address the root causes. • Control – identify sustainment strategies that ensure process performance maintains the improved state.
  • 19. Define • Define Scope of the Problem – Document the Process – Collect and Translate the Voice of the Customer • Determine Project Objective and Benefits – Define Metrics and Defects – Establish Preliminary Baseline – Develop Problem & Objective Statements – Estimate Financial Benefit
  • 20. Define (continued) • Create Project Charter – Confirm Improvement Methodology – Define Project Roles and Responsibilities – Identify Risks – Establish Timeline – Managerial Buy-in • Focus here is on the problem
  • 21. Measure Measure what is measurable, and make measurable what is not so” – Galileo • Define “As Is” process – Value stream map/process flow diagram • Validate Measurement System for Outputs – Don’t assume your measurements are accurate – measuring system must accurately tell what is happening • Quantify Process Performance – Collect data (Y’s) – Examine process stability/capability analysis
  • 22. Analyze • Identify Potential Causes (X’s) • Investigate Significance of X’s – Collect data on x’s – Graphical/Quantitative analysis • Pareto Chart • Fishbone Diagram (cause and effect) • Chi Square Test • Regression Analysis • Failure Mode Effects Analysis • Identify Significant Causes to focus on (y=f(X)) – Evaluate the impact of x’s on y • Here you identify the critical factors of a “good” output and the root causes of defects or “bad” output.
  • 23. Improve • Generate Potential Solutions • Select & Test Solution • Develop Implementation Plan
  • 24. Control • Create Control & Monitoring Plan – Mistake proof the process – Determine the x’s to control and methods – Determine Y’s to monitor • Implement Full Scale Solution – Revise/develop process – Implement and evaluate solution • Finalize Transition – Develop transition plan – Handoff process to owner

Hinweis der Redaktion

  1. Transition effect for timeline, slide 1 (Basic) Tip: This transition works well for graphics that horizontally span more than one slide. To reproduce the shape effects on this slide, do the following: On the Home tab, in the Slides group, click Layout, and then click Blank. On the Home tab, in the Drawing group, click Shapes, and then under Block Arrows click Chevron (second row, eighth option from the left). On the slide, drag to draw a long, horizontal chevron shape. Select the chevron. Under Drawing Tools, on the Format tab, in the Size group, do the following: In the Shape Height box, enter 0.7”. In the Shape Width box, enter 9.48”. Drag the chevron until the right end is beyond the right edge of the slide, and the left end of the chevron is approximately one inch to the right of the left edge of the slide. Select the chevron. Under Drawing Tools, on the Format tab, in the Shape Styles group, click the arrow next to Shape Fill, point to Gradient, and then click More Gradients. In the Format Shape dialog box, click Fill in the left pane, select Gradient fill in the Fill pane, and then do the following: In the Type list, select Linear. Click the button next to Direction, and then click Linear Up (second row, second option from the left). Under Gradient stops, click Add or Remove until a total of four gradient stops appear in the drop-down list. Also under Gradient stops, customize the gradient stops as follows: Select Stop 1 from the list, and then do the following: In the Stop position box, enter 0%. Click the button next to Color, and then under Theme Colors click White, Background 1 (first row, first option from the left) Select Stop 2 from the list, and then do the following: In the Stop position box, enter 36%. Click the button next to Color, click More Colors, and then in the Colors dialog box, on the Custom tab, enter values for Red: 213, Green: 219, Blue: 221. Select Stop 3 from the list, and then do the following: In the Stop position box, enter 73%. Click the button next to Color, click More Colors, and then in the Colors dialog box, on the Custom tab, enter values for Red: 178, Green: 190, Blue: 194. Select Stop 4 from the list, and then do the following: In the Stop position box, enter 100%. Click the button next to Color, click More Colors, and then in the Colors dialog box, on the Custom tab, enter values for Red: 213, Green: 219, Blue: 221. Also in the Format Shape dialog box, click Line Color in the left pane, and then select No line in the Line Color pane. Also in the Format Shape dialog box, click Shadow in the left pane, and then do the following in the Shadow pane: Click the button next to Presets, and then under Outer click Offset Bottom (first row, second option from the left). In the Transparency box, enter 60%. In the Size box, enter 100%. In the Blur box, enter 4 pt. In the Angle box, enter 90°. In the Distance box, enter 3 pt. Also in the Format Shape dialog box, click 3-D Format in the left pane. In the 3-D Format pane, under Bevel, click the button next to Top, and then under Bevel click Circle (first row, first option from the left). Next to Top, in the Width box, enter 4 pt, and in the Height box, enter 4 pt. On the Insert tab, in the Text group, click Text Box, and then on the slide, drag to draw the text box. Enter text in the text box, select the text, and then on the Home tab, in the Font group, select Gill Sans MT Condensed from the Font list, enter 26 in the Font Size box, click Bold, click the arrow next to Font Color, and then under Theme Colors click White, Background 1, Darker 50% (sixth row, first option from the left). On the Home tab, in the Paragraph group, click Center to center the text in the text box. Select the text box. On the Home tab, in the Clipboard group, click the arrow under Paste, and then click Duplicate. Repeat this process to create a total of three text boxes. Click in each of the two duplicate text boxes, and then edit the text. Drag the text boxes onto the chevron shape to form a row. Press CTRL+A to select all the objects on the slide. On the Home tab, in the Drawing group, click Arrange, point to Align, and then do the following: Click Align to Slide. Click Align Middle. Press and hold SHIFT, and then select all three text boxes. On the Home tab, in the Drawing group, click Arrange, point to Align, and then do the following: Click Align to Slide. Click Distribute Horizontally. To reproduce the animation effects on this slide, do the following: On the Animations tab, in the Transition to This Slide group, click More, and then under Push and Cover click Push Left. On the Animations tab, in the Transitions to This Slide group, in the Transition Speed list, select Slow.
  2. Transition effect for timeline, slide 3 (Basic) Tip: This transition works well for graphics that horizontally span more than one slide. To reproduce the shape effects on this slide, do the following: On the Home tab, in the Slides group, click Layout, and then click Blank. On the Home tab, in the Drawing group, click Shapes, and then under Block Arrows, click Chevron (second row, eighth option from the left). On the slide, drag to draw a long, horizontal chevron shape. Select the chevron. Under Drawing Tools, on the Format tab, in the Size group, do the following: In the Shape Height box, enter 0.7”. In the Shape Width box, enter 9.48”. Drag the chevron so that the left end is beyond the left edge of the slide, and the right end is approximately one inch left of the right edge of the slide. Select the chevron. Under Drawing Tools, on the Format tab, in the Shape Styles group, click the arrow next to Shape Fill, click Gradient, and then click More Gradients. In the Format Shape dialog box, click Fill in the left pane, select Gradient fill in the Fill pane, and then do the following: In the Type list, select Linear. Click the button next to Direction, and then click Linear Up (second row, second option from the left). Under Gradient stops, click Add or Remove until a total of four gradient stops appear in the drop-down list. Also under Gradient stops, customize the gradient stops as follows: Select Stop 1 from the list, and then do the following: In the Stop position box, enter 0%. Click the button next to Color, and then under Theme Colors click White, Background 1 (first row, first option from the left). Select Stop 2 from the list, and then do the following: In the Stop position box, enter 36%. Click the button next to Color, click More Colors, and then in the Colors dialog box, on the Custom tab, enter values for Red: 213, Green: 219, Blue: 221. Select Stop 3 from the list, and then do the following: In the Stop position box, enter 73%. Click the button next to Color, click More Colors, and then in the Colors dialog box, on the Custom tab, enter values for Red: 178, Green: 190, Blue: 194. Select Stop 4 from the list, and then do the following: In the Stop position box, enter 100%. Click the button next to Color, click More Colors, and then in the Colors dialog box, on the Custom tab, enter values for Red: 213, Green: 219, Blue: 221. Also in the Format Shape dialog box, click Line Color in the left pane, and then select No line in the Line Color pane. Also in the Format Shape dialog box, click Shadow in the left pane. In the Shadow pane, click the button next to Presets, under Outer click Offset Bottom (first row, second option from the left), and then do the following: In the Transparency box, enter 60%. In the Size box, enter 100%. In the Blur box, enter 4 pt. In the Angle box, enter 90°. In the Distance box, enter 3 pt. Also in the Format Shape dialog box, click 3-D Format in the left pane. In the 3-D Format pane, under Bevel, click the button next to Top, and then under Bevel click Circle (first row, first option from the left). Next to Top, in the Width box, enter 4 pt, and in the Height box, enter 4 pt. On the Insert tab, in the Text group, click Text Box, and then on the slide, drag to draw the text box. Enter text in the text box, select the text, and then on the Home tab, in the Font group, select Gill Sans MT Cond from the Font list, enter 26 in the Font Size box, click Bold, click the arrow next to Font Color, and then under Theme Colors click White, Background 1, Darker 50% (sixth row, first option from the left). On the Home tab, in the Paragraph group, click Center to center the text in the text box. Select the text box. On the Home tab, in the Clipboard group, click the arrow under Paste, and then click Duplicate. Repeat this process to create a total of three text boxes. Click in each of the two duplicate text boxes, and then edit the text. Drag the text boxes onto the chevron shape to form a row. Press CTRL+A to select all the objects on the slide. On the Home tab, in the Drawing group, click Arrange, point to Align, and then do the following: Click Align to Slide. Click Align Middle. Press and hold SHIFT, and then select all three text boxes. On the Home tab, in the Drawing group, click Arrange, point to Align, and then do the following: Click Align to Slide. Click Distribute Horizontally. To reproduce the animation effects on this slide, do the following: On the Animations tab, in the Transition to This Slide group, click More, and then under Push and Cover click Push Left. On the Animations tab, in the Transitions to This Slide group, in the Transition Speed list, select Slow.