SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Downloaden Sie, um offline zu lesen
SP JULY 2009
NOTES:
Report all errors and discrepancies promptly to architects before proceeding with
the works.
Do not scale drawing. Figured dimensions to be worked to in all cases.
The contractor is responsible for checking dimensions, tolerances and references.
All structural information to be taken from engineers drawings.
NOTES:
Report all errors and discrepancies promptly to architects before proceeding with
the works.
Do not scale drawing. Figured dimensions to be worked to in all cases.
The contractor is responsible for checking dimensions, tolerances and references.
All structural information to be taken from engineers drawings. www.crawfordpartnership.co.uk
Company number 3499361
info@crawfordpartnership.co.uk
Tel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnership
www.crawfordpartnership.co.uk
Company number 3499361
info@crawfordpartnership.co.uk
Tel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnership
WORKING DRAWINGS UNLESS LABELLED OTHERWISE
82A Colney Hatch Lane.plnK:0000 Crawford Partnership Projects2009-236 (82a Colney Hatch Lane)000.15.drawings000.15.02 drawings2 - Planning82A Colney Hatch Lane.pln
1:50 @ A2
Sections
AC
82A COLNEY HATCH LANE
2009-236-2-106
MR K. WILSON & MS C. HARDMAN
CHECKED:
REV REVISION / AUTHORDATE
DRAWING NO.:
DRAWING TITLE:
PROJECT:
REV:
CLIENT:
STATUS:
DRAWN: DATE:
SCALE:
+3015 GROUND FLOOR CEILING
-2156 STREET LEVEL
BE DRO OM
BEDROOM BATHROOM HALL CUPBOARD LIVING ROOM
-220 BASEMENT CEILING
SECTION AA
0 GROUND FLOOR LEVEL
-2500 NEW BASEMENT FLOOR
SECTION BB

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (9)

cv english
cv englishcv english
cv english
 
inte building 1-Section 2
inte building 1-Section 2inte building 1-Section 2
inte building 1-Section 2
 
Self Build Warranty Quote Indication
Self Build Warranty Quote IndicationSelf Build Warranty Quote Indication
Self Build Warranty Quote Indication
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
Ex Stone
Ex StoneEx Stone
Ex Stone
 
M.samir resume
M.samir resume M.samir resume
M.samir resume
 
inte building 1-Elev 2
inte building 1-Elev 2inte building 1-Elev 2
inte building 1-Elev 2
 
George Samir_s C V
George Samir_s C VGeorge Samir_s C V
George Samir_s C V
 
C.V ENG. FAWZY AMER-1
C.V ENG. FAWZY AMER-1C.V ENG. FAWZY AMER-1
C.V ENG. FAWZY AMER-1
 

Ähnlich wie portfolio small 77

John H Collins CV March 2016 Word Doc
John H Collins CV March  2016 Word DocJohn H Collins CV March  2016 Word Doc
John H Collins CV March 2016 Word DocJohn Collins
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016ivan fletcher
 
constructions project
constructions projectconstructions project
constructions projectRICARDOLOUIS1
 
WDT November 2016 IStructE Advert
WDT November 2016 IStructE AdvertWDT November 2016 IStructE Advert
WDT November 2016 IStructE AdvertMartin Dendle
 
METRO COMPANY PROFILE
METRO COMPANY PROFILEMETRO COMPANY PROFILE
METRO COMPANY PROFILEDal Manku
 
S_Whitehead_Architects_Residential
S_Whitehead_Architects_ResidentialS_Whitehead_Architects_Residential
S_Whitehead_Architects_ResidentialSimon Whitehead
 
WDT October 2016 IStructE Advert
WDT October 2016 IStructE AdvertWDT October 2016 IStructE Advert
WDT October 2016 IStructE AdvertMartin Dendle
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUMEselva raj
 
WDT September 2016 IStructE Advert
WDT September 2016 IStructE AdvertWDT September 2016 IStructE Advert
WDT September 2016 IStructE AdvertMartin Dendle
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGary Randall
 
Matt King SQPeng Introduction FEB15
Matt King SQPeng Introduction FEB15Matt King SQPeng Introduction FEB15
Matt King SQPeng Introduction FEB15Matt King
 

Ähnlich wie portfolio small 77 (20)

portfolio small 66
portfolio small 66portfolio small 66
portfolio small 66
 
portfolio small 73
portfolio small 73portfolio small 73
portfolio small 73
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
 
John H Collins CV March 2016 Word Doc
John H Collins CV March  2016 Word DocJohn H Collins CV March  2016 Word Doc
John H Collins CV March 2016 Word Doc
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
 
nick sumners Cv (1)
nick sumners Cv (1)nick sumners Cv (1)
nick sumners Cv (1)
 
constructions project
constructions projectconstructions project
constructions project
 
WDT November 2016 IStructE Advert
WDT November 2016 IStructE AdvertWDT November 2016 IStructE Advert
WDT November 2016 IStructE Advert
 
METRO COMPANY PROFILE
METRO COMPANY PROFILEMETRO COMPANY PROFILE
METRO COMPANY PROFILE
 
S_Whitehead_Architects_Residential
S_Whitehead_Architects_ResidentialS_Whitehead_Architects_Residential
S_Whitehead_Architects_Residential
 
WDT October 2016 IStructE Advert
WDT October 2016 IStructE AdvertWDT October 2016 IStructE Advert
WDT October 2016 IStructE Advert
 
abdi cv
abdi cvabdi cv
abdi cv
 
26th Street Development
26th Street Development26th Street Development
26th Street Development
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUME
 
WDT September 2016 IStructE Advert
WDT September 2016 IStructE AdvertWDT September 2016 IStructE Advert
WDT September 2016 IStructE Advert
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_complete
 
willem cv
willem cvwillem cv
willem cv
 
Matt King SQPeng Introduction FEB15
Matt King SQPeng Introduction FEB15Matt King SQPeng Introduction FEB15
Matt King SQPeng Introduction FEB15
 
Emma McMullan CV 2
Emma McMullan CV 2Emma McMullan CV 2
Emma McMullan CV 2
 

Mehr von Silvia Pizzini (20)

portfolio small 8
portfolio small 8portfolio small 8
portfolio small 8
 
portfolio small 7
portfolio small 7portfolio small 7
portfolio small 7
 
portfolio small 3
portfolio small 3portfolio small 3
portfolio small 3
 
portfolio small 2
portfolio small 2portfolio small 2
portfolio small 2
 
portfolio small 78
portfolio small 78portfolio small 78
portfolio small 78
 
portfolio small 68
portfolio small 68portfolio small 68
portfolio small 68
 
portfolio small 34
portfolio small 34portfolio small 34
portfolio small 34
 
portfolio small 33
portfolio small 33portfolio small 33
portfolio small 33
 
portfolio small 32
portfolio small 32portfolio small 32
portfolio small 32
 
portfolio small 27
portfolio small 27portfolio small 27
portfolio small 27
 
portfolio small 24
portfolio small 24portfolio small 24
portfolio small 24
 
portfolio small 20
portfolio small 20portfolio small 20
portfolio small 20
 
portfolio small 23
portfolio small 23portfolio small 23
portfolio small 23
 
portfolio small 18
portfolio small 18portfolio small 18
portfolio small 18
 
portfolio small 63
portfolio small 63portfolio small 63
portfolio small 63
 
portfolio small 64
portfolio small 64portfolio small 64
portfolio small 64
 
portfolio small 65
portfolio small 65portfolio small 65
portfolio small 65
 
portfolio small 61
portfolio small 61portfolio small 61
portfolio small 61
 
portfolio small 60
portfolio small 60portfolio small 60
portfolio small 60
 
portfolio small 59
portfolio small 59portfolio small 59
portfolio small 59
 

portfolio small 77

  • 1. SP JULY 2009 NOTES: Report all errors and discrepancies promptly to architects before proceeding with the works. Do not scale drawing. Figured dimensions to be worked to in all cases. The contractor is responsible for checking dimensions, tolerances and references. All structural information to be taken from engineers drawings. NOTES: Report all errors and discrepancies promptly to architects before proceeding with the works. Do not scale drawing. Figured dimensions to be worked to in all cases. The contractor is responsible for checking dimensions, tolerances and references. All structural information to be taken from engineers drawings. www.crawfordpartnership.co.uk Company number 3499361 info@crawfordpartnership.co.uk Tel: 020 8444 2070 · Fax: 020 8444 1180 1a Muswell Hill, London, N10 3TH Architecture Interior Design Development crawford partnership www.crawfordpartnership.co.uk Company number 3499361 info@crawfordpartnership.co.uk Tel: 020 8444 2070 · Fax: 020 8444 1180 1a Muswell Hill, London, N10 3TH Architecture Interior Design Development crawford partnership WORKING DRAWINGS UNLESS LABELLED OTHERWISE 82A Colney Hatch Lane.plnK:0000 Crawford Partnership Projects2009-236 (82a Colney Hatch Lane)000.15.drawings000.15.02 drawings2 - Planning82A Colney Hatch Lane.pln 1:50 @ A2 Sections AC 82A COLNEY HATCH LANE 2009-236-2-106 MR K. WILSON & MS C. HARDMAN CHECKED: REV REVISION / AUTHORDATE DRAWING NO.: DRAWING TITLE: PROJECT: REV: CLIENT: STATUS: DRAWN: DATE: SCALE: +3015 GROUND FLOOR CEILING -2156 STREET LEVEL BE DRO OM BEDROOM BATHROOM HALL CUPBOARD LIVING ROOM -220 BASEMENT CEILING SECTION AA 0 GROUND FLOOR LEVEL -2500 NEW BASEMENT FLOOR SECTION BB