CABLE SIZING CALCULATIONS
BY
SIDDHARTHA MUDGAL
ELECTRICAL ENGINEERING DEPARTMENT
MEERUT INSTITUTE OF ENGINEERING AND TECHNOLOGY,
MEERUT,UTTAR PRADESH
Dr. APJ ABDUL KALAM TECHNICAL UNIVERSITY(AKTU)
(Formerly known as UPTU)
What is Cable Sizing ?
The determination of conductor's parameters to get efficient, safe and economic
operation of transmission.
Importance of Cable Sizing
The proper sizing of an electrical cable(Which is bearing load) is important to
ensure that the cable can:
• Operate without any interruptions.
• Withstand the full load currents.
• Bear the voltage as well as transients .
• Minimize the initial capital investment.
• Provide effective and efficient transmission of electrical energy.
Major Solution providers for conductors in INDIA:-
• Havells India Ltd.
• Polycab Wires Pvt. Ltd.
• Sterlite Technologies Ltd.
• Finolex Cables Ltd.
• Diamond Power Infrastructure Ltd.
Techniqes of Cable Sizing:-
• Cable sizing methods do differ across international standards (e.g. IEC, NEC,
BS, etc) and some standards emphasise certain things over others. However
the general principles underlying any cable sizing calculation do not change.
As per IEC As per NEC
Common STEPS:-
• STEP 1:- Gathering the data about the cable, it's installation conditions and
the load which it needs to be supply.
• STEP 2:- Determine the minimum cable size based on the following:-
i)Current Carrying Capacity.
ii)Voltage Drop.
iii)Short circuit Temprature rise.
iv)Earth fault loop impedance.
• STEP 3:- Selection of the cable which have highest sizing based on the
above parameters
What we look for in STEP-1 ?
A)LOAD:-
• Type of load which is to be supplied.
• Maximum current required by the load.
• Voltage capacity of the system.
• Expected power factor of the system.
• Distance of load from the source.
B)CONTRUCTION OF CABLE:-
• CONDUCTOR MATERIAL:- Normally copper or aluminium.
• CONDCTOR TYPE:- Stranded or solid.
• CONDCUTOR SURFACE COATING:- Plain (no coating), tinned, silver or Ni.
• INSULATION TYPE:- PVC, XLPE, EPR.
• TYPE OF CORE:- Single core or multicore.
c)INSTALLATION CONDITIONS:-
• Installation medium:-
i)eg. Underground or overhead, soil thermal resistivity for underground cables,
etc.
• Arrangement:-
i)For underground cables whether it is placed directly or in a conduit, for
overhead wires whether it is installed supported by the walls, on the cable
towers etc.
ii)Depth of laying
iii)Bunching of cables, spacing b/w them.
• Atmospheric Temprature:-
i)Ambient of soil temprature.
ii)Soil thermal resistivity, in the case of undergrond cables.
What we look for in STEP-2 ?
A)Current carrying capacity:-
The current plays a vital role while deciding the sizing for a cable due to
following factors:-
i)Copper lossess.
ii)Thermal capacity of cable
iii)Reactive power.
iv)Insulation,bedding,armour and other components of cable
Thus depending upon these parameters we find out the minimum possible and
feasible size for the cable.
i)Base current ratings:-
Cable manufactuers maintains a table for base current rating for different type
of cables. These ratings are taken out in base environmental conditions and ths
these ratings are relevant for base installation conditions.
ii)Installed Current Rating:-
Whenever there is difference b/w the base conditions and actual instllation
conditions, then the derating factor is used in order to find out the actual
installed crrent ratings.
i) In ground Installation (Direct Burial)
C =Cs * Cg * Cd *Ct
Where, Cs = Rating factor for variation in ground temperature
Cg= Rating factor for Group of cables
Cd= Rating factor for Depth of laying
Ct=Rating for thermal resistivity
ii) Above Ground Installation
C = Ca * Cg
Where, Ca= Rating factor for variation in ambient air temperature
Cg= Rating factor for Grouping cables
Then installation current rating is obtained as:-
I(new) = I(base) * C
B)VOLTAGE DROP:-
Current flow through the cable – the higher the
current flow, the higher the voltage drop.
Impedance of the conductor – the larger the
impedance, the higher the voltage drop.
As, For a three phase system:-
For a single phase system:-
For a DC system:-
1000
)sincos(3
3
LXRI
V cc 



1000
)sincos(2
1
LXRI
V cc 



1000
2 LIR
V c
dc 
C)SHORT CIRCUIT TEMPRATRUE RISE:-
During a short circuit, a high amount of current
can flow through a cable for a short time. This
surge in current flow causes a temperature
rise within the cable.
k
ti
A
2

k
ti
A
2

Minimum Cable Size Due to
Short Circuit Temperature
Rise:-
The temperature rise constant is calculated
based on the material properties of the
conductor and the initial and final conductor
temperatures









i
if
k


5.234
1ln226









i
if
k


228
1ln148
(for copper conductors)
(for aluminum conductors)
D)EARTH FAULT LOOP
IMPEDANCE:-
EARTH FAULT LOOP IMPEDANCE
Zs = Zc + Ze
Where Zs is the earth fault loop
impedance (Ω)
Zc is the impedance of the active
conductor (Ω)
Ze is the impedance of the earth
conductor (Ω)
    



 
22
1000
ececs XXRR
L
Z
Implementation examples of Cable Selection process
EXAMPLE 1
EXAMPLE 2
 Electrical Details:- Electrical Load of 80KW, Distance between Source and Load is 200 Meter,
System Voltage 415V Three Phase, Power Factor is 0.8,Permissible Voltage drop is 5%,
Demand Factor is 1,
 Cable Laying Detail:- Cable is directly buried in Ground in trench at the depth of 1 meter.
Ground Temperature is approximate 35 Deg. No of Cable per Trench is 1. No of Run of Cable is
1 Run.
 Soil Details:- Thermal Resistivity of Soil is not known. Nature of Soil is Damp Soil
Risk and Impact of Wrong Sizing
• High voltage drops, which increases reactive power.
• Sudden increase in cable temprature.
• Damage of cable components, such as armour, bed sheath, insulation etc.
• Damage of protective components.
• Poor power factor.
• Non continuous supply.
• Shorter Life span of cables.
• Increase in maintainance cost of the system.
Conclusion
Efficient, safe and economic operation of transmission can be obtained by
proper sizing and selection of cables
References
Wikipedia,
https://wiki.openelectrical.org/index.php?title=Cable_Sizing_Calculation
Electrical Engineering Portal,
https://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-
cable
My Electrical Engineering
https://myelectrical.com
Elements Of Power System,by U.A.BAKSHI
Thank You

Weitere ähnliche Inhalte

Was ist angesagt?

Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology wessam alaslmi
 
Capacitive voltage transformer (1)
Capacitive voltage transformer (1)Capacitive voltage transformer (1)
Capacitive voltage transformer (1)kaushal boghani
 
Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)RP6997
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Cable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - ExampleCable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - ExampleLeonardo ENERGY
 
Power cables
Power cablesPower cables
Power cablescollege
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guideSlides Hub
 
Protective relay
Protective relay Protective relay
Protective relay Uday Wankar
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmissionSumit Kumar
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.Sheikh Nazmul Islam
 

Was ist angesagt? (20)

Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology Power cable selection, cable selection Methodology
Power cable selection, cable selection Methodology
 
Capacitive voltage transformer (1)
Capacitive voltage transformer (1)Capacitive voltage transformer (1)
Capacitive voltage transformer (1)
 
Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
Cable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - ExampleCable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - Example
 
Power cables
Power cablesPower cables
Power cables
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
Mcb Breaker
Mcb Breaker Mcb Breaker
Mcb Breaker
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Substation
Substation Substation
Substation
 
Protective relay
Protective relay Protective relay
Protective relay
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmission
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 

Ähnlich wie Cable Sizing Calculations

Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDMahesh Chandra Manav
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authorityMahesh Chandra Manav
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authorityMahesh Chandra Manav
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS LtdMahesh Chandra Manav
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTDMahesh Chandra Manav
 
Impressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCPImpressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCPTauseef bin Abdul Rashid
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS LtdMahesh Chandra Manav
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1Mahesh Chandra Manav
 
Jmv presentation goods (dfcc) rail project
Jmv  presentation goods (dfcc) rail projectJmv  presentation goods (dfcc) rail project
Jmv presentation goods (dfcc) rail projectMahesh Chandra Manav
 
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd Mahesh Chandra Manav
 
ETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsHimmelstern
 
Basics on Electrical Operation and Control.pptx
Basics on Electrical Operation and Control.pptxBasics on Electrical Operation and Control.pptx
Basics on Electrical Operation and Control.pptxMIDHUNMOHANMP1
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.pptChadWood16
 
Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DCMahesh Chandra Manav
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsMahesh Chandra Manav
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Mahesh Chandra Manav
 

Ähnlich wie Cable Sizing Calculations (20)

Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTD
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS Ltd
 
Effect of grounding
Effect of groundingEffect of grounding
Effect of grounding
 
H046044147
H046044147H046044147
H046044147
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTD
 
Eat 105 Chapter 3
Eat 105  Chapter 3Eat 105  Chapter 3
Eat 105 Chapter 3
 
Impressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCPImpressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCP
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
 
Jmv presentation goods (dfcc) rail project
Jmv  presentation goods (dfcc) rail projectJmv  presentation goods (dfcc) rail project
Jmv presentation goods (dfcc) rail project
 
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
 
ETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway Systems
 
Grounding and Bonding
Grounding and BondingGrounding and Bonding
Grounding and Bonding
 
Basics on Electrical Operation and Control.pptx
Basics on Electrical Operation and Control.pptxBasics on Electrical Operation and Control.pptx
Basics on Electrical Operation and Control.pptx
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.ppt
 
Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DC
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
 

Kürzlich hochgeladen

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Kürzlich hochgeladen (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 

Cable Sizing Calculations

  • 1. CABLE SIZING CALCULATIONS BY SIDDHARTHA MUDGAL ELECTRICAL ENGINEERING DEPARTMENT MEERUT INSTITUTE OF ENGINEERING AND TECHNOLOGY, MEERUT,UTTAR PRADESH Dr. APJ ABDUL KALAM TECHNICAL UNIVERSITY(AKTU) (Formerly known as UPTU)
  • 2. What is Cable Sizing ? The determination of conductor's parameters to get efficient, safe and economic operation of transmission. Importance of Cable Sizing The proper sizing of an electrical cable(Which is bearing load) is important to ensure that the cable can: • Operate without any interruptions. • Withstand the full load currents. • Bear the voltage as well as transients . • Minimize the initial capital investment. • Provide effective and efficient transmission of electrical energy.
  • 3. Major Solution providers for conductors in INDIA:- • Havells India Ltd. • Polycab Wires Pvt. Ltd. • Sterlite Technologies Ltd. • Finolex Cables Ltd. • Diamond Power Infrastructure Ltd.
  • 4. Techniqes of Cable Sizing:- • Cable sizing methods do differ across international standards (e.g. IEC, NEC, BS, etc) and some standards emphasise certain things over others. However the general principles underlying any cable sizing calculation do not change. As per IEC As per NEC
  • 5. Common STEPS:- • STEP 1:- Gathering the data about the cable, it's installation conditions and the load which it needs to be supply. • STEP 2:- Determine the minimum cable size based on the following:- i)Current Carrying Capacity. ii)Voltage Drop. iii)Short circuit Temprature rise. iv)Earth fault loop impedance. • STEP 3:- Selection of the cable which have highest sizing based on the above parameters
  • 6. What we look for in STEP-1 ? A)LOAD:- • Type of load which is to be supplied. • Maximum current required by the load. • Voltage capacity of the system. • Expected power factor of the system. • Distance of load from the source. B)CONTRUCTION OF CABLE:- • CONDUCTOR MATERIAL:- Normally copper or aluminium. • CONDCTOR TYPE:- Stranded or solid. • CONDCUTOR SURFACE COATING:- Plain (no coating), tinned, silver or Ni. • INSULATION TYPE:- PVC, XLPE, EPR. • TYPE OF CORE:- Single core or multicore.
  • 7. c)INSTALLATION CONDITIONS:- • Installation medium:- i)eg. Underground or overhead, soil thermal resistivity for underground cables, etc. • Arrangement:- i)For underground cables whether it is placed directly or in a conduit, for overhead wires whether it is installed supported by the walls, on the cable towers etc. ii)Depth of laying iii)Bunching of cables, spacing b/w them. • Atmospheric Temprature:- i)Ambient of soil temprature. ii)Soil thermal resistivity, in the case of undergrond cables.
  • 8. What we look for in STEP-2 ? A)Current carrying capacity:- The current plays a vital role while deciding the sizing for a cable due to following factors:- i)Copper lossess. ii)Thermal capacity of cable iii)Reactive power. iv)Insulation,bedding,armour and other components of cable Thus depending upon these parameters we find out the minimum possible and feasible size for the cable.
  • 9. i)Base current ratings:- Cable manufactuers maintains a table for base current rating for different type of cables. These ratings are taken out in base environmental conditions and ths these ratings are relevant for base installation conditions. ii)Installed Current Rating:- Whenever there is difference b/w the base conditions and actual instllation conditions, then the derating factor is used in order to find out the actual installed crrent ratings.
  • 10. i) In ground Installation (Direct Burial) C =Cs * Cg * Cd *Ct Where, Cs = Rating factor for variation in ground temperature Cg= Rating factor for Group of cables Cd= Rating factor for Depth of laying Ct=Rating for thermal resistivity ii) Above Ground Installation C = Ca * Cg Where, Ca= Rating factor for variation in ambient air temperature Cg= Rating factor for Grouping cables Then installation current rating is obtained as:- I(new) = I(base) * C
  • 11. B)VOLTAGE DROP:- Current flow through the cable – the higher the current flow, the higher the voltage drop. Impedance of the conductor – the larger the impedance, the higher the voltage drop. As, For a three phase system:- For a single phase system:- For a DC system:- 1000 )sincos(3 3 LXRI V cc     1000 )sincos(2 1 LXRI V cc     1000 2 LIR V c dc 
  • 12. C)SHORT CIRCUIT TEMPRATRUE RISE:- During a short circuit, a high amount of current can flow through a cable for a short time. This surge in current flow causes a temperature rise within the cable. k ti A 2  k ti A 2  Minimum Cable Size Due to Short Circuit Temperature Rise:- The temperature rise constant is calculated based on the material properties of the conductor and the initial and final conductor temperatures          i if k   5.234 1ln226          i if k   228 1ln148 (for copper conductors) (for aluminum conductors)
  • 13. D)EARTH FAULT LOOP IMPEDANCE:- EARTH FAULT LOOP IMPEDANCE Zs = Zc + Ze Where Zs is the earth fault loop impedance (Ω) Zc is the impedance of the active conductor (Ω) Ze is the impedance of the earth conductor (Ω)           22 1000 ececs XXRR L Z
  • 14. Implementation examples of Cable Selection process EXAMPLE 1 EXAMPLE 2  Electrical Details:- Electrical Load of 80KW, Distance between Source and Load is 200 Meter, System Voltage 415V Three Phase, Power Factor is 0.8,Permissible Voltage drop is 5%, Demand Factor is 1,  Cable Laying Detail:- Cable is directly buried in Ground in trench at the depth of 1 meter. Ground Temperature is approximate 35 Deg. No of Cable per Trench is 1. No of Run of Cable is 1 Run.  Soil Details:- Thermal Resistivity of Soil is not known. Nature of Soil is Damp Soil
  • 15. Risk and Impact of Wrong Sizing • High voltage drops, which increases reactive power. • Sudden increase in cable temprature. • Damage of cable components, such as armour, bed sheath, insulation etc. • Damage of protective components. • Poor power factor. • Non continuous supply. • Shorter Life span of cables. • Increase in maintainance cost of the system.
  • 16. Conclusion Efficient, safe and economic operation of transmission can be obtained by proper sizing and selection of cables References Wikipedia, https://wiki.openelectrical.org/index.php?title=Cable_Sizing_Calculation Electrical Engineering Portal, https://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical- cable My Electrical Engineering https://myelectrical.com Elements Of Power System,by U.A.BAKSHI