SlideShare ist ein Scribd-Unternehmen logo
1 von 2
SHARISE L. HEENAN
E: Sharise.Heenan@gmail.com  M:315-406-7707
MATERIALS AND INVENTORY MANAGEMENT
Passionate, versatile, results driven Supply Chain Manager with demonstrated record of streamlining processes, improving
customer satisfaction and reducing expenses. Highly analytical with the ability to integrate processes and procedures of
organizational departments for optimized operations. Knowledgeable in Lean Manufacturing, 5S and ERP systems (SAP, AS400,
MAS90, E1). Inquisitive,decisive, Greenbelt Certified, ISO Internal Auditor.
PROFESSIONAL EXPERIENCE
Alcoa Forging and Extrusions  Midway, GA  2016 -
A global leader in aerospacejetengine components. Nonferrous forgingmanufacturer, low volume, low mix.
Supply Chain Manager
Led the supply chain fromraw material acquisition to customer shipments for a 250+employee manufacturingfacility that
supplies critical rotatingdisksfor jetengines.
• Created policies and procedures to closemajor auditfinding.
• Reduced agingarrears over three months old 90%
• Eliminated lateto launch work orders
B/E AEROSPACE  Winston-Salem, NC  2015 - 2016
A tier one aerospacemanufacturer of airplaneseatingwith global customers. Low volume, lowmix assembly operation.
Materials Manager & Inventory Control
Guided the materials team (50 employees) in on time delivery of parts to production for a 300+ employee facility that
manufactures airplaneseating. Responsiblefor material flow,warehouse layout, inventory accuracy and production
downtime.
• Inventory accuracy improvement of 14% through improved reconciliation methods and trainingof employees.
• Developed metrics to understand trends and implement corrective actions when negative inventory trends occurred.
• Implemented pickingstrategy on one lineto improve delivery and reduce downtime.
• Improved parts selection efficiency through trainingand workload balancingresultingin a 10%decrease in headcount.
UTC – BIS CARRIER REPLACEMENT COMPONENTS  Syracuse, NY  2011 - 2015
A world leader in high technology heating, refrigeration and air conditioningsolutions offeringa wide range of aftermarket
components to their customers. It is a highly season productwith large volume and largeSKU mix.
Inventory Planning Manager
Managed fill rates and inventory dollars to meet company goals for over 100,000 SKUs with purchaseparts spend of over
$250Mdollars on highly seasonal product. Responsiblefor reduction of excess and obsolete inventory and for assuring
component availability for new productintroductions. Team Lead for custom forecastingsoftware from the Barkawi Group.
• Implemented Auto Work Order and PurchaseOrder creation process to reduce non-valueadded time by 15%.
• Created critical KPIsto track and improve fill rates 10%whilereducinginventory 15%.
• Maintained inventory and fill ratelevels whilesales increased 13%.
• Developed kit schedulingprocess,evaluated lotsizingand order frequency for improved work cell efficiency;resource
planningand work order completion rate. Achieved work order completion rate improvement of over 25%.
• Assessed customer demand and vendor capacity constraints to determine required level loadingand impacton
warehouse floor space. Negotiated with vendor for improved capacity and pricingwhere appropriate.
• Evaluated flowof materials through the kittingprocess;developed material flowlanes to assureFIFO completion of
work orders and providevisual management of material on the floor.
• Implemented process to review, act on, and categorized dormant stores.
ITT RESIDENTIAL & COMMERIAL WATER (XYLEM INC.)  Auburn, NY  2006 - 2011
A world leader in water technology, providing industrial and residential pumps for water and wastewater applications. Job shop
manufacturing,seasonal make to stock and configure to order pumps.
Inventory Planning Manager
Managed a team of 38 employees in the on-time delivery of residential and commercial maketo stock and configureto order
pumps. Responsiblefor scheduling,planningand materialsflowfor a 15,000 sku/12,000 component facility. Material Lead for
Lean Manufacturingimplementation on the floor.
• Spearheaded customer OTD project resultingin a 10% OTD improvement with a 42% reduction in standard deviation.
• Developed Lean supermarkets leadingto a 15% reduction in labor hours.
• Assessed material flowin the facility;established receivingwarehouse,material flowlanes atthe work cell and system
generated material signalsfor material movement to the floor.
• Utilizinginformation fromthe S&OP plan,created reports for capacity constraintsand equipment utilization,developed
level loadingplan for the constrained work cells to assurefill rates duringpeak season.
• Implemented and drove multipleprojects resultingin a 40% reduction in inventory dollars .
• Developed inventory review process that uncovered over $500,000 of errors related to unitof measure and the scrap
process.
• Implemented Manage by Objective and Standard Work for all subordinates .
• Created visual management related to parts storage and management on the floor.
• Established VMI for hardware(small parts) and the process for auto refillingby vendor.
GE SILICONES (MOMENTIVE PERFORMANCE MATERIALS INC.)  Waterford, NY  2002 - 2006
One of the world’s largestproducers of silicones and siliconederivatives. Batch and continuous flow chemical manufacturing
facility.
Warehouse Operations Team Leader
Responsiblefor shipping,receivingand inventory accuracy in a chemical manufacturingfacility with 26 hourly direct reports
working three different shifts. Safety Lead for warehouse employees. Lead for SAP trainingand procedure development.
• Guided cost reduction through the disposition of out of specification material resultingin 25%increasein usable
warehouse space.
• Participated in development of and responsiblefor implementing optimized material move process decreasingmove
time from 5 days to 2 days.
• Planned,managed and led annual Physical Inventory resultingin less than 1%variance.
• Led Lean action workout on Return Material reducingstored return material by 90%.
EDUCATION
Master of Science in Manufacturing Management and Leadership
ROCHESTER INSTITUTE OF TECHNOLOGY  Rochester, NY  1999
Bachelor of Science in Interior Design
Northern Arizona University  Flagstaff, AZ  1987
ADDITIONAL TRAINING
Lean Training – 40 hour Course – J&J Ortho Clinical Diagnostics (“OCD”)
Lean Champion Training – OCD
Train the Trainer Training – OCD
Value Stream Mapping – OCD
Training to See – GE Silicones
QSA-RAB Lead Internal Auditor Training – GE Silicones
Business Process Value Streams – GE Silicones
Standard Work – ITT Residential and Commercial Water (“ITT R&CW”)
Material Pull Systems – ITT R&CW
ITT Lean Transformation Training Guide – ITT R&CW
Six Sigma Greenbelt – University of Michigan
Improving Leadership Effectiveness – ITT R&CW
ITO University Foundations – UTC Carrier Replacement Components
ACE Associate Certification – UTC Carrier Replacement Components

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (19)

SHeenanR1
SHeenanR1SHeenanR1
SHeenanR1
 
Roy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIMRoy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIM
 
Tyler Bloodworth Resume
Tyler Bloodworth ResumeTyler Bloodworth Resume
Tyler Bloodworth Resume
 
J Greisiger
J Greisiger  J Greisiger
J Greisiger
 
JGreisiger Resume
JGreisiger ResumeJGreisiger Resume
JGreisiger Resume
 
Resume J.Martinez
Resume J.MartinezResume J.Martinez
Resume J.Martinez
 
Juan Barajas resume 2018
Juan Barajas resume 2018Juan Barajas resume 2018
Juan Barajas resume 2018
 
CV-AK Padhi
CV-AK PadhiCV-AK Padhi
CV-AK Padhi
 
My Resume 2008
My Resume 2008My Resume 2008
My Resume 2008
 
Carol Sutton updated resume
Carol Sutton updated resume Carol Sutton updated resume
Carol Sutton updated resume
 
Rick Inserra_Resume
Rick Inserra_ResumeRick Inserra_Resume
Rick Inserra_Resume
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011
 
Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )
 
Results Driven Mgr, MBA - Sean Blocker
Results Driven Mgr, MBA - Sean BlockerResults Driven Mgr, MBA - Sean Blocker
Results Driven Mgr, MBA - Sean Blocker
 
Mary In
Mary InMary In
Mary In
 
vinayaktiwari (1)
vinayaktiwari (1)vinayaktiwari (1)
vinayaktiwari (1)
 
Resume (Urtiaga Larry)
Resume (Urtiaga Larry)Resume (Urtiaga Larry)
Resume (Urtiaga Larry)
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015
 

Ähnlich wie HeenanResume2016 R1

Ähnlich wie HeenanResume2016 R1 (20)

Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
Res Jeffrey Wittrock
Res Jeffrey WittrockRes Jeffrey Wittrock
Res Jeffrey Wittrock
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017
 
RES_Bob_Polcyn_2015
RES_Bob_Polcyn_2015RES_Bob_Polcyn_2015
RES_Bob_Polcyn_2015
 
Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016
 
jg resume 2017
jg resume 2017jg resume 2017
jg resume 2017
 
Callaio_Resume
Callaio_ResumeCallaio_Resume
Callaio_Resume
 
Joe Crews Resume
Joe Crews Resume Joe Crews Resume
Joe Crews Resume
 
Marie Bavin-resume 2015 Dec
Marie Bavin-resume 2015 DecMarie Bavin-resume 2015 Dec
Marie Bavin-resume 2015 Dec
 
My Resume 2008
My Resume 2008My Resume 2008
My Resume 2008
 
Mark Lamanna Resume Final
Mark Lamanna Resume FinalMark Lamanna Resume Final
Mark Lamanna Resume Final
 
E Ferraro Resume 061215
E Ferraro Resume 061215E Ferraro Resume 061215
E Ferraro Resume 061215
 
KachurResume 11-13-14
KachurResume 11-13-14KachurResume 11-13-14
KachurResume 11-13-14
 
Kati Sr BUYER
Kati Sr BUYER Kati Sr BUYER
Kati Sr BUYER
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
 
Welsh Resume
Welsh ResumeWelsh Resume
Welsh Resume
 
John Tobin Resume
John Tobin ResumeJohn Tobin Resume
John Tobin Resume
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
Jacobo Maria Sandoval Resume 13-11-14
Jacobo Maria Sandoval Resume 13-11-14Jacobo Maria Sandoval Resume 13-11-14
Jacobo Maria Sandoval Resume 13-11-14
 
Kirchner_J_Resume_2016_v2.2
Kirchner_J_Resume_2016_v2.2Kirchner_J_Resume_2016_v2.2
Kirchner_J_Resume_2016_v2.2
 

HeenanResume2016 R1

  • 1. SHARISE L. HEENAN E: Sharise.Heenan@gmail.com  M:315-406-7707 MATERIALS AND INVENTORY MANAGEMENT Passionate, versatile, results driven Supply Chain Manager with demonstrated record of streamlining processes, improving customer satisfaction and reducing expenses. Highly analytical with the ability to integrate processes and procedures of organizational departments for optimized operations. Knowledgeable in Lean Manufacturing, 5S and ERP systems (SAP, AS400, MAS90, E1). Inquisitive,decisive, Greenbelt Certified, ISO Internal Auditor. PROFESSIONAL EXPERIENCE Alcoa Forging and Extrusions  Midway, GA  2016 - A global leader in aerospacejetengine components. Nonferrous forgingmanufacturer, low volume, low mix. Supply Chain Manager Led the supply chain fromraw material acquisition to customer shipments for a 250+employee manufacturingfacility that supplies critical rotatingdisksfor jetengines. • Created policies and procedures to closemajor auditfinding. • Reduced agingarrears over three months old 90% • Eliminated lateto launch work orders B/E AEROSPACE  Winston-Salem, NC  2015 - 2016 A tier one aerospacemanufacturer of airplaneseatingwith global customers. Low volume, lowmix assembly operation. Materials Manager & Inventory Control Guided the materials team (50 employees) in on time delivery of parts to production for a 300+ employee facility that manufactures airplaneseating. Responsiblefor material flow,warehouse layout, inventory accuracy and production downtime. • Inventory accuracy improvement of 14% through improved reconciliation methods and trainingof employees. • Developed metrics to understand trends and implement corrective actions when negative inventory trends occurred. • Implemented pickingstrategy on one lineto improve delivery and reduce downtime. • Improved parts selection efficiency through trainingand workload balancingresultingin a 10%decrease in headcount. UTC – BIS CARRIER REPLACEMENT COMPONENTS  Syracuse, NY  2011 - 2015 A world leader in high technology heating, refrigeration and air conditioningsolutions offeringa wide range of aftermarket components to their customers. It is a highly season productwith large volume and largeSKU mix. Inventory Planning Manager Managed fill rates and inventory dollars to meet company goals for over 100,000 SKUs with purchaseparts spend of over $250Mdollars on highly seasonal product. Responsiblefor reduction of excess and obsolete inventory and for assuring component availability for new productintroductions. Team Lead for custom forecastingsoftware from the Barkawi Group. • Implemented Auto Work Order and PurchaseOrder creation process to reduce non-valueadded time by 15%. • Created critical KPIsto track and improve fill rates 10%whilereducinginventory 15%. • Maintained inventory and fill ratelevels whilesales increased 13%. • Developed kit schedulingprocess,evaluated lotsizingand order frequency for improved work cell efficiency;resource planningand work order completion rate. Achieved work order completion rate improvement of over 25%. • Assessed customer demand and vendor capacity constraints to determine required level loadingand impacton warehouse floor space. Negotiated with vendor for improved capacity and pricingwhere appropriate. • Evaluated flowof materials through the kittingprocess;developed material flowlanes to assureFIFO completion of work orders and providevisual management of material on the floor. • Implemented process to review, act on, and categorized dormant stores. ITT RESIDENTIAL & COMMERIAL WATER (XYLEM INC.)  Auburn, NY  2006 - 2011 A world leader in water technology, providing industrial and residential pumps for water and wastewater applications. Job shop manufacturing,seasonal make to stock and configure to order pumps.
  • 2. Inventory Planning Manager Managed a team of 38 employees in the on-time delivery of residential and commercial maketo stock and configureto order pumps. Responsiblefor scheduling,planningand materialsflowfor a 15,000 sku/12,000 component facility. Material Lead for Lean Manufacturingimplementation on the floor. • Spearheaded customer OTD project resultingin a 10% OTD improvement with a 42% reduction in standard deviation. • Developed Lean supermarkets leadingto a 15% reduction in labor hours. • Assessed material flowin the facility;established receivingwarehouse,material flowlanes atthe work cell and system generated material signalsfor material movement to the floor. • Utilizinginformation fromthe S&OP plan,created reports for capacity constraintsand equipment utilization,developed level loadingplan for the constrained work cells to assurefill rates duringpeak season. • Implemented and drove multipleprojects resultingin a 40% reduction in inventory dollars . • Developed inventory review process that uncovered over $500,000 of errors related to unitof measure and the scrap process. • Implemented Manage by Objective and Standard Work for all subordinates . • Created visual management related to parts storage and management on the floor. • Established VMI for hardware(small parts) and the process for auto refillingby vendor. GE SILICONES (MOMENTIVE PERFORMANCE MATERIALS INC.)  Waterford, NY  2002 - 2006 One of the world’s largestproducers of silicones and siliconederivatives. Batch and continuous flow chemical manufacturing facility. Warehouse Operations Team Leader Responsiblefor shipping,receivingand inventory accuracy in a chemical manufacturingfacility with 26 hourly direct reports working three different shifts. Safety Lead for warehouse employees. Lead for SAP trainingand procedure development. • Guided cost reduction through the disposition of out of specification material resultingin 25%increasein usable warehouse space. • Participated in development of and responsiblefor implementing optimized material move process decreasingmove time from 5 days to 2 days. • Planned,managed and led annual Physical Inventory resultingin less than 1%variance. • Led Lean action workout on Return Material reducingstored return material by 90%. EDUCATION Master of Science in Manufacturing Management and Leadership ROCHESTER INSTITUTE OF TECHNOLOGY  Rochester, NY  1999 Bachelor of Science in Interior Design Northern Arizona University  Flagstaff, AZ  1987 ADDITIONAL TRAINING Lean Training – 40 hour Course – J&J Ortho Clinical Diagnostics (“OCD”) Lean Champion Training – OCD Train the Trainer Training – OCD Value Stream Mapping – OCD Training to See – GE Silicones QSA-RAB Lead Internal Auditor Training – GE Silicones Business Process Value Streams – GE Silicones Standard Work – ITT Residential and Commercial Water (“ITT R&CW”) Material Pull Systems – ITT R&CW ITT Lean Transformation Training Guide – ITT R&CW Six Sigma Greenbelt – University of Michigan Improving Leadership Effectiveness – ITT R&CW ITO University Foundations – UTC Carrier Replacement Components ACE Associate Certification – UTC Carrier Replacement Components