SlideShare ist ein Scribd-Unternehmen logo
1 von 19
PASSIVE COOLING ARCHITECTURE
EARTH BERMING
EARTH AIR TUNNEL
WIND TOWER
VARY THERMAL WALL
Done by
Shamitha k.
Sowjanya B.L.
Sravya S.
Harika V.
EARTH BERMING
• A Bermed house may be built above
grade or partially below grade,
with earth covering one or more walls.
• An “elevational” bermed design
exposes one elevation or face of the
house and covers the other side
and sometimes the roof with earth to
protect and insulate the house.
• The exposed front of the house, usually
facing south, allows the sun to light
and heat the interior.
• placed skylights can ensure adequate
ventilation and daylight in the northern
portions of the house.
2
ADVANTAGES AND DISADVANTAGES
• An earth-sheltered home is less susceptible
to the impact of extreme outdoor air
temperatures than a conventional house.
• Earth-sheltered houses also require less
outside maintenance, and the earth
surrounding the house provides
soundproofing.
• In addition, plans for most earth-sheltered
houses "blend" the building into the
landscape more harmoniously than a
conventional home.
• Finally, earth-sheltered houses can cost less
to insure because they offer extra protection
against high winds, hailstorms, and natural
disasters such as tornados and hurricanes.
3
• The principal downsides to earth-sheltered
houses are the initial cost of construction,
which can be up to 20% more than a
conventional house, and the increased level
of care required to avoid moisture problems,
both during construction and over the life of
the house.
• It can also take more diligence to resell an
earth-sheltered home, and buyers may have
more hurdles to clear in the mortgage
application process.
SITE-SPECIFIC FACTORS FOR EARTH-SHELTERED DESIGN
• Before deciding to design and build an earth-sheltered house, you’ll need to
consider your building,
o Site's climate
o Topography
o Soil
o Groundwater level.
• Climate: earth-sheltered houses are more cost-effective in
climates that have significant temperature extremes and low
humidity.
• Rocky Mountains and northern Great Plains.
• Earth temperatures vary much less than air temperatures.
• Earth can absorb extra heat from the house in hot weather or
insulate the house to maintain warmth in cold weather.
Topography:
• A modest slope requires more
excavation than a steep one.
• A flat site is the most demanding,
needing extensive excavation.
• South-facing slope in a region with
moderate to long winters .
• South-facing windows can let in
sunlight for direct heating, while the
rest of the house is set back into the
slope.
• Regions with mild winters and hot
summers, a north-facing slope might
be ideal
5
Soil
• soil at your site is another
critical consideration. Granular
soils such as sand and gravel
are best for earth sheltering.
• These soils compact well for
bearing the weight of the
construction materials and are
very permeable, allowing
water to drain quickly.
• The poorest soils are cohesive,
like clay, which may expand
when wet and has poor
permeability.
Groundwater Level
• The groundwater level at
your building site is also
important.
• Natural drainage away from
the building is the best way
to avoid water pressure
against underground walls,
but installed drainage
systems can be used to
draw water away from the
structure.
Other Construction
Considerations
• Waterproofing
• Humidity
• Insulation
• Air exchange
CASE STUDY
• Gophers and Hobbits are not the only creatures
who enjoy living in underground homes. In the U.
S. there are over 6,000 underground homes built
all across the country.
• One of the main advantages of underground
homes, are cooler than conventional homes, and
are resistant to natural disasters like hurricanes,
tornadoes. But, the number one feature of
underground homes is the energy savings.
• Use of solar panel system, free from paying energy
bills. Being underground, these homes have quality
of noise insulation which makes them soundproof.
6
EARTH AIR TUNNELSThe Earth Air Tunnel (EAT) systems utilizes the
heat-storing capacity of earth.
• Temperature remain four meter below the
surface remains almost constant throughout the
year.
• That makes it potentially useful in providing
buildings with air-conditioning.
• It depends on the ambient temperature of the
location, the EAT system can be used to provide
both cooling during the summer and heating
during winter.
• The tunnels would be especially useful for large
buildings with ample surrounding ground.
• The EAT system can not be cost effective for
small individual residential buildings.
• The ground temperature remains constant and
air if pumped in appropriate amount that allows
sufficient contact time for the heat transfer to the
medium attains the same temperature as the
ground temperature. 7
EARTH-AIR TUNNEL: PRINCIPAL
Underground heat exchanger
Also called:
oEarth-Air Heat Exchangers
oAir-to-soil Heat Exchangers
oEarth Canals
8YOUR COMPANY NAME
AIR FLOW RATE
For a given tube diameter, increase in airflow rate
results in:
Increase in total heat transfer Increase in outlet
temperature
High flow rates desirable for closed systems
For open systems airflow rate must be selected by
considering:
Outlet temperature Total cooling or heating capacity
9
TUBE MATERIAL
The main considerations in
selecting tube material are:
oCost
oStrength
oCorrosion
oResistance
oDurability
Tube material has little influence
on performance.
Selection would be determined
by other factors like ease of
installation, corrosion resistance
etc.
Spacing between tubes should
enough so that tubes are
thermally independent to
maximize benefits.
10
EAT can be used in either:
oClosed loop system
oOpen loop system
• Open loop system: outdoor air is drawn
into tubes and delivered to AHU or directly
to the inside of the building provides
ventilation while hopefully cooling or
heating the building interior improves IAQ
• Closed loop system: interior air circulates
through eats increases efficiency reduces
problem with humidity condensing inside
tubes.
• Hybrid system: eathe system is coupled to
another heating/cooling system, which
may be an air conditioner , evaporative
cooling system or solar air heater
TUBE
ARRANGEMENTS
• EAT can be used in either:
o One-tube system
o Parallel tubes system
• One tube system may not be
appropriate to meet air
conditioning requirements of a
building, resulting in the tube
being too large
• Parallel tubes system
o More pragmatic design
o option Reduce pressure
o drop Raise thermal
performance
• Classification of EATHE system
o According to layout of pipe in ground
o According to mode of arrangement
• There are four different types according to layout of pipe in the
ground
• Horizontal/ straight Loop Vertical Looped Slinky/ spiral Looped
Pond/Helical Looped
WIND TOWER
• Wind tower is generally used in hot and
dry climate for cooling purpose.
• The tower is meant to catch the wind at
higher elevations and direct in to the
living space.
• The air passing in the tower may have
equal or different areas.
• The tower may have only one opening
facing wind direction ,if the wind is
predominantly in one direction, or
many openings in all directions in
locations with variable window
directions.
12
WORKING PRINCIPAL
In the presence of wind the cool night air enters the tower and forces itself down into the structure.
Thought. It is warmed slight during the process, sufficient cooling can be achieved due to forced
circulation. Again cooling due to noctumal radiation adds to this process
13
• Windcatchers tend to have one, four, or eight
openings. The construction of a windcatcher
depends on the direction of airflow at that specific
location.
• if the wind tends to blow from only one side, it is
built with only one downwind opening.
FUNCTION:
• The windcatcher can function in three ways:
Directing airflow downward using direct wind entry,
Directing airflow upwards using a wind-assisted
Temperature gradient, or directing airflow upwards
using a solar-assisted temperature gradient
14
TORRENT RESEARCH CENTRE BUILDING...
• Location: GIDC Bhat, Bhat,
Ahmedabad, Gujarat, India.
• Architect and interior consultants:
Nimish Patel and parul Zaveri,
Abhikram, Ahmedabad.
• Total built-up area -19700sqm
• Project period :1994-1999
15
16
CONSEQUENCES:
• The consequences of this major experiment have been under observation since the
first occupation of the building and will continue to be carried for the coming years.
• In the summers, the inside temperature have generally not exceeded 31℃ to 32℃,when the
outside temperature have risen up to44℃,a 12℃ -13℃ drop
• The temperature fluctuation inside the building have rarely exceeded beyond 3℃ to4℃
any 24 hour period, when the temperature fluctuations outside were as much as 14℃ to
• The economic viability of the project is demonstrated by the following indicators, which are
computed for the total project, on the basis of the results from the building under
observation.
• Additional civil works cost of the project including insulation etc. Works out to about
12%to13% of the conventional building.
• 200M.tonnes of amount energy is saved from Air-conditioning plant.
• The cumulative capital cost of the civil works and the A.C.plant works out of approx. 50lakhs
50lakhs more then the conventionally designed buildings.
• The annual saving in the electrical consumption including the saving on account of less use
of artificial lighting during the day is approximately 60lakhs.
• The pay back period of the additional capacity cost, from the saving of the electrical
consumption alone, works out to a little less than 1 year.
• The pay-back period for the cost of the construction of the entire complex, from the
if the electrical consumption as well as plant replacement costs, work out at around 15
THERMAL WALL
17
• Thermal mass is the ability of a material to absorb and store heat energy.
• A lot of heat energy is required to change the temperature of high density materials like
concrete, bricks and tiles. They are therefore said to have high thermal mass.
• Lightweight materials such as timber have low thermal mass.
• Appropriate use of thermal mass can make a big difference to comfort and heating and cooling
bills.
• Thermal mass can store solar energy during the day and re-radiate it at night.
• Thermal mass, correctly used, moderates internal temperatures by averaging out diurnal
(day−night) extremes. This increases comfort and reduces energy costs.
• Poor use of thermal mass can exacerbate the worst extremes of the climate and can be a huge
energy and comfort liability.
• It can radiate heat to you all night as you attempt to sleep during a summer heatwave or absorb
all the heat you produce on a winter night.
• To be effective, thermal mass must be integrated with sound passive design techniques.
• This means having appropriate areas of glazing facing appropriate directions with appropriate
levels of shading, ventilation, insulation and thermal mass.
HOW THERMAL MASS WORKS
18
• Thermal mass acts as a thermal battery.
• During summer it absorbs heat during the day and releases it by night to cooling breezes or
clear night skies, keeping the house comfortable.
• In winter the same thermal mass can store the heat from the sun or heaters to release it at night,
helping the home stay warm.
• Thermal mass is not a substitute for insulation.
• Thermal mass stores and re-releases heat; insulation stops heat flowing into or out of the
building.
• A high thermal mass material is not generally a good thermal insulator (see Rammed earth).
• Thermal mass is particularly beneficial where there is a big difference between day and night
outdoor temperatures
• . winter summer
THANK YOU
Email Address here
Website here

Weitere ähnliche Inhalte

Was ist angesagt?

Project Himurja Office Building, Shimla
Project Himurja Office Building, ShimlaProject Himurja Office Building, Shimla
Project Himurja Office Building, Shimla
arvindkrishan
 

Was ist angesagt? (20)

The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case study
 
Climatic zones. warm and humid
Climatic zones. warm and humid Climatic zones. warm and humid
Climatic zones. warm and humid
 
CEPT UNIVERSITY PPT
CEPT UNIVERSITY PPTCEPT UNIVERSITY PPT
CEPT UNIVERSITY PPT
 
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
 
SPA VIJAYAWADA -case study
SPA VIJAYAWADA -case studySPA VIJAYAWADA -case study
SPA VIJAYAWADA -case study
 
Sangath
SangathSangath
Sangath
 
Composite climate
Composite climateComposite climate
Composite climate
 
Passive solar hostel jodhpur
Passive solar hostel jodhpurPassive solar hostel jodhpur
Passive solar hostel jodhpur
 
Hot and dry climate architecture
Hot and dry climate architectureHot and dry climate architecture
Hot and dry climate architecture
 
Natural ventilation for Building Artitechture
Natural ventilation for Building ArtitechtureNatural ventilation for Building Artitechture
Natural ventilation for Building Artitechture
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
college campus Case study
college campus Case studycollege campus Case study
college campus Case study
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
 
natural ventilation case study
natural ventilation case study  natural ventilation case study
natural ventilation case study
 
Vernacular Architecture
Vernacular ArchitectureVernacular Architecture
Vernacular Architecture
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and griha
 
Project Himurja Office Building, Shimla
Project Himurja Office Building, ShimlaProject Himurja Office Building, Shimla
Project Himurja Office Building, Shimla
 
Sangath- An Architect's Studio
Sangath- An Architect's StudioSangath- An Architect's Studio
Sangath- An Architect's Studio
 
"warm and humid" climate and their designs
"warm and humid" climate and their designs"warm and humid" climate and their designs
"warm and humid" climate and their designs
 
Cept Case study
Cept Case studyCept Case study
Cept Case study
 

Ähnlich wie Passive cooling architecture

ACTIVE AND PASSIVE TECHNIQUES.pptx
ACTIVE AND PASSIVE TECHNIQUES.pptxACTIVE AND PASSIVE TECHNIQUES.pptx
ACTIVE AND PASSIVE TECHNIQUES.pptx
anujdhuppad
 

Ähnlich wie Passive cooling architecture (20)

SOLAR PANELS
SOLAR PANELSSOLAR PANELS
SOLAR PANELS
 
Passive architecture
Passive architecturePassive architecture
Passive architecture
 
Passive cooling
Passive coolingPassive cooling
Passive cooling
 
Passive cooling-techniques
Passive cooling-techniquesPassive cooling-techniques
Passive cooling-techniques
 
Passive cooling-techniques
Passive cooling-techniquesPassive cooling-techniques
Passive cooling-techniques
 
Passive methods of cooling
Passive methods of coolingPassive methods of cooling
Passive methods of cooling
 
Shelter for warm-humid climate
Shelter for warm-humid climateShelter for warm-humid climate
Shelter for warm-humid climate
 
hot-dry climate
hot-dry climatehot-dry climate
hot-dry climate
 
Evaporative cooling
Evaporative coolingEvaporative cooling
Evaporative cooling
 
Shelter for hot-dry climate
Shelter for hot-dry climateShelter for hot-dry climate
Shelter for hot-dry climate
 
Low cooling strategies
Low cooling strategiesLow cooling strategies
Low cooling strategies
 
Building science and tech (passive system)
Building science and tech (passive system) Building science and tech (passive system)
Building science and tech (passive system)
 
Orientation, design and principles of polyhouse
Orientation, design and principles of polyhouseOrientation, design and principles of polyhouse
Orientation, design and principles of polyhouse
 
21AR033 PHYSICAL ENVIROMENT PPT.pptx
21AR033 PHYSICAL ENVIROMENT PPT.pptx21AR033 PHYSICAL ENVIROMENT PPT.pptx
21AR033 PHYSICAL ENVIROMENT PPT.pptx
 
Passive cooling design
Passive cooling designPassive cooling design
Passive cooling design
 
ACTIVE AND PASSIVE TECHNIQUES.pptx
ACTIVE AND PASSIVE TECHNIQUES.pptxACTIVE AND PASSIVE TECHNIQUES.pptx
ACTIVE AND PASSIVE TECHNIQUES.pptx
 
Energy storage ppt
Energy storage pptEnergy storage ppt
Energy storage ppt
 
ground cooling or passive earth cooling techniques.
ground cooling or passive earth cooling techniques.ground cooling or passive earth cooling techniques.
ground cooling or passive earth cooling techniques.
 
madhav001 (1).pptx
madhav001 (1).pptxmadhav001 (1).pptx
madhav001 (1).pptx
 
Hot and dry climate case study.
Hot and dry climate case study.Hot and dry climate case study.
Hot and dry climate case study.
 

Mehr von Shamitha Reddy (10)

Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort Street
 
Retrofitting skyscraper
Retrofitting skyscraper Retrofitting skyscraper
Retrofitting skyscraper
 
Fire proof boards and tiles
Fire proof boards and tilesFire proof boards and tiles
Fire proof boards and tiles
 
East kidwai nagar, new delhi
East kidwai nagar, new delhiEast kidwai nagar, new delhi
East kidwai nagar, new delhi
 
Sustainable tall buildings
Sustainable tall buildingsSustainable tall buildings
Sustainable tall buildings
 
Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawan
 
Torrent research building spa
Torrent research building spaTorrent research building spa
Torrent research building spa
 
Green globe
Green globeGreen globe
Green globe
 
Culture &vernacular architecture-jammu&kashmir
Culture &vernacular architecture-jammu&kashmirCulture &vernacular architecture-jammu&kashmir
Culture &vernacular architecture-jammu&kashmir
 
Paradigm shift
Paradigm shiftParadigm shift
Paradigm shift
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 

Passive cooling architecture

  • 1. PASSIVE COOLING ARCHITECTURE EARTH BERMING EARTH AIR TUNNEL WIND TOWER VARY THERMAL WALL Done by Shamitha k. Sowjanya B.L. Sravya S. Harika V.
  • 2. EARTH BERMING • A Bermed house may be built above grade or partially below grade, with earth covering one or more walls. • An “elevational” bermed design exposes one elevation or face of the house and covers the other side and sometimes the roof with earth to protect and insulate the house. • The exposed front of the house, usually facing south, allows the sun to light and heat the interior. • placed skylights can ensure adequate ventilation and daylight in the northern portions of the house. 2
  • 3. ADVANTAGES AND DISADVANTAGES • An earth-sheltered home is less susceptible to the impact of extreme outdoor air temperatures than a conventional house. • Earth-sheltered houses also require less outside maintenance, and the earth surrounding the house provides soundproofing. • In addition, plans for most earth-sheltered houses "blend" the building into the landscape more harmoniously than a conventional home. • Finally, earth-sheltered houses can cost less to insure because they offer extra protection against high winds, hailstorms, and natural disasters such as tornados and hurricanes. 3 • The principal downsides to earth-sheltered houses are the initial cost of construction, which can be up to 20% more than a conventional house, and the increased level of care required to avoid moisture problems, both during construction and over the life of the house. • It can also take more diligence to resell an earth-sheltered home, and buyers may have more hurdles to clear in the mortgage application process.
  • 4. SITE-SPECIFIC FACTORS FOR EARTH-SHELTERED DESIGN • Before deciding to design and build an earth-sheltered house, you’ll need to consider your building, o Site's climate o Topography o Soil o Groundwater level. • Climate: earth-sheltered houses are more cost-effective in climates that have significant temperature extremes and low humidity. • Rocky Mountains and northern Great Plains. • Earth temperatures vary much less than air temperatures. • Earth can absorb extra heat from the house in hot weather or insulate the house to maintain warmth in cold weather.
  • 5. Topography: • A modest slope requires more excavation than a steep one. • A flat site is the most demanding, needing extensive excavation. • South-facing slope in a region with moderate to long winters . • South-facing windows can let in sunlight for direct heating, while the rest of the house is set back into the slope. • Regions with mild winters and hot summers, a north-facing slope might be ideal 5 Soil • soil at your site is another critical consideration. Granular soils such as sand and gravel are best for earth sheltering. • These soils compact well for bearing the weight of the construction materials and are very permeable, allowing water to drain quickly. • The poorest soils are cohesive, like clay, which may expand when wet and has poor permeability. Groundwater Level • The groundwater level at your building site is also important. • Natural drainage away from the building is the best way to avoid water pressure against underground walls, but installed drainage systems can be used to draw water away from the structure. Other Construction Considerations • Waterproofing • Humidity • Insulation • Air exchange
  • 6. CASE STUDY • Gophers and Hobbits are not the only creatures who enjoy living in underground homes. In the U. S. there are over 6,000 underground homes built all across the country. • One of the main advantages of underground homes, are cooler than conventional homes, and are resistant to natural disasters like hurricanes, tornadoes. But, the number one feature of underground homes is the energy savings. • Use of solar panel system, free from paying energy bills. Being underground, these homes have quality of noise insulation which makes them soundproof. 6
  • 7. EARTH AIR TUNNELSThe Earth Air Tunnel (EAT) systems utilizes the heat-storing capacity of earth. • Temperature remain four meter below the surface remains almost constant throughout the year. • That makes it potentially useful in providing buildings with air-conditioning. • It depends on the ambient temperature of the location, the EAT system can be used to provide both cooling during the summer and heating during winter. • The tunnels would be especially useful for large buildings with ample surrounding ground. • The EAT system can not be cost effective for small individual residential buildings. • The ground temperature remains constant and air if pumped in appropriate amount that allows sufficient contact time for the heat transfer to the medium attains the same temperature as the ground temperature. 7
  • 8. EARTH-AIR TUNNEL: PRINCIPAL Underground heat exchanger Also called: oEarth-Air Heat Exchangers oAir-to-soil Heat Exchangers oEarth Canals 8YOUR COMPANY NAME
  • 9. AIR FLOW RATE For a given tube diameter, increase in airflow rate results in: Increase in total heat transfer Increase in outlet temperature High flow rates desirable for closed systems For open systems airflow rate must be selected by considering: Outlet temperature Total cooling or heating capacity 9
  • 10. TUBE MATERIAL The main considerations in selecting tube material are: oCost oStrength oCorrosion oResistance oDurability Tube material has little influence on performance. Selection would be determined by other factors like ease of installation, corrosion resistance etc. Spacing between tubes should enough so that tubes are thermally independent to maximize benefits. 10 EAT can be used in either: oClosed loop system oOpen loop system • Open loop system: outdoor air is drawn into tubes and delivered to AHU or directly to the inside of the building provides ventilation while hopefully cooling or heating the building interior improves IAQ • Closed loop system: interior air circulates through eats increases efficiency reduces problem with humidity condensing inside tubes. • Hybrid system: eathe system is coupled to another heating/cooling system, which may be an air conditioner , evaporative cooling system or solar air heater
  • 11. TUBE ARRANGEMENTS • EAT can be used in either: o One-tube system o Parallel tubes system • One tube system may not be appropriate to meet air conditioning requirements of a building, resulting in the tube being too large • Parallel tubes system o More pragmatic design o option Reduce pressure o drop Raise thermal performance • Classification of EATHE system o According to layout of pipe in ground o According to mode of arrangement • There are four different types according to layout of pipe in the ground • Horizontal/ straight Loop Vertical Looped Slinky/ spiral Looped Pond/Helical Looped
  • 12. WIND TOWER • Wind tower is generally used in hot and dry climate for cooling purpose. • The tower is meant to catch the wind at higher elevations and direct in to the living space. • The air passing in the tower may have equal or different areas. • The tower may have only one opening facing wind direction ,if the wind is predominantly in one direction, or many openings in all directions in locations with variable window directions. 12
  • 13. WORKING PRINCIPAL In the presence of wind the cool night air enters the tower and forces itself down into the structure. Thought. It is warmed slight during the process, sufficient cooling can be achieved due to forced circulation. Again cooling due to noctumal radiation adds to this process 13 • Windcatchers tend to have one, four, or eight openings. The construction of a windcatcher depends on the direction of airflow at that specific location. • if the wind tends to blow from only one side, it is built with only one downwind opening. FUNCTION: • The windcatcher can function in three ways: Directing airflow downward using direct wind entry, Directing airflow upwards using a wind-assisted Temperature gradient, or directing airflow upwards using a solar-assisted temperature gradient
  • 14. 14 TORRENT RESEARCH CENTRE BUILDING... • Location: GIDC Bhat, Bhat, Ahmedabad, Gujarat, India. • Architect and interior consultants: Nimish Patel and parul Zaveri, Abhikram, Ahmedabad. • Total built-up area -19700sqm • Project period :1994-1999
  • 15. 15
  • 16. 16 CONSEQUENCES: • The consequences of this major experiment have been under observation since the first occupation of the building and will continue to be carried for the coming years. • In the summers, the inside temperature have generally not exceeded 31℃ to 32℃,when the outside temperature have risen up to44℃,a 12℃ -13℃ drop • The temperature fluctuation inside the building have rarely exceeded beyond 3℃ to4℃ any 24 hour period, when the temperature fluctuations outside were as much as 14℃ to • The economic viability of the project is demonstrated by the following indicators, which are computed for the total project, on the basis of the results from the building under observation. • Additional civil works cost of the project including insulation etc. Works out to about 12%to13% of the conventional building. • 200M.tonnes of amount energy is saved from Air-conditioning plant. • The cumulative capital cost of the civil works and the A.C.plant works out of approx. 50lakhs 50lakhs more then the conventionally designed buildings. • The annual saving in the electrical consumption including the saving on account of less use of artificial lighting during the day is approximately 60lakhs. • The pay back period of the additional capacity cost, from the saving of the electrical consumption alone, works out to a little less than 1 year. • The pay-back period for the cost of the construction of the entire complex, from the if the electrical consumption as well as plant replacement costs, work out at around 15
  • 17. THERMAL WALL 17 • Thermal mass is the ability of a material to absorb and store heat energy. • A lot of heat energy is required to change the temperature of high density materials like concrete, bricks and tiles. They are therefore said to have high thermal mass. • Lightweight materials such as timber have low thermal mass. • Appropriate use of thermal mass can make a big difference to comfort and heating and cooling bills. • Thermal mass can store solar energy during the day and re-radiate it at night. • Thermal mass, correctly used, moderates internal temperatures by averaging out diurnal (day−night) extremes. This increases comfort and reduces energy costs. • Poor use of thermal mass can exacerbate the worst extremes of the climate and can be a huge energy and comfort liability. • It can radiate heat to you all night as you attempt to sleep during a summer heatwave or absorb all the heat you produce on a winter night. • To be effective, thermal mass must be integrated with sound passive design techniques. • This means having appropriate areas of glazing facing appropriate directions with appropriate levels of shading, ventilation, insulation and thermal mass.
  • 18. HOW THERMAL MASS WORKS 18 • Thermal mass acts as a thermal battery. • During summer it absorbs heat during the day and releases it by night to cooling breezes or clear night skies, keeping the house comfortable. • In winter the same thermal mass can store the heat from the sun or heaters to release it at night, helping the home stay warm. • Thermal mass is not a substitute for insulation. • Thermal mass stores and re-releases heat; insulation stops heat flowing into or out of the building. • A high thermal mass material is not generally a good thermal insulator (see Rammed earth). • Thermal mass is particularly beneficial where there is a big difference between day and night outdoor temperatures • . winter summer
  • 19. THANK YOU Email Address here Website here