What is formwork?
• Formwork is a mould including all supporting structures, used
to shape and support the concrete until it attains sufficient
strength to carry its own weight.
• It should be capable of carrying all imposed dead and live
loads apart from its own weight.
Requirements good formwork
1. It should be strong enough to withstand all types of dead and live loads.
2. It should be rigidly constructed and efficiently propped and braced both
horizontally and vertically, so as to retain its shape.
3. The joints in the formwork should be tight against leakage of cement grout.
4. Construction of formwork should permit removal of various parts in desired
sequences without damage to the concrete.
5. The material of the formwork should be cheap, easily available and should
be suitable for reuse.
6. The formwork should be set accurately to the desired line and levels should
have plane surface.
7. It should be as light as possible.
8. The material of the formwork should not warp or get distorted when
exposed to the elements.
9. It should rest on firm base.
Economy in formwork
• The cost of formwork may range between 30 to 40% of the cost of
concrete work.
• Special structure like bridge ,tall chimneys, dams etc; the cost of formwork
may range between 50 to 100%.
• The building should be planned in such a way that there are minimum
number of various in the size rooms, floor area etc. so as to permit reuse
of the formwork moulds repeatedly.
• Formwork shall be made of low cost materials, energy and labor if
possible.
• Formwork care and maintenance should be done according to
specifications.
Types of formwork
• Timber formwork
• Steel formwork
• Plywood formwork
• Aluminum formwork
• Plastics formwork
Timber formwork
• It should be well seasoned.
• It should be light weight.
• It should be easily workable
with nail without splitting.
• It should be free from knots.
Advantage of timber formwork
• Easy handling because it is light weight.
• Easy to disassemble.
• Damaged parts can be replaced with new one.
• Very flexible.
• Easy to produce.
• Easily available.
Disadvantage of timber formwork
• Limited size of shape.
• Excessive loss of heat.
• A very smooth surface will be produced which would give
problems for finishing process.
• Limited fixing.
STEEL FORMWORK
• This consists of panels fabricated out of the thin steel plates
stiffened along the edges by small steel angles.
• The panel units can be held together through the use of
suitable clamps or bolts and nuts.
• The panels can be fabricated in large number in any desired
modular shape or size.
• Steel forms are largely used in large projects or in situation
where large number reuses of the shuttering is possible.
• This type of shuttering is considered most suitable for circular
or curved structures.
Advantages of steel formwork
• It can be used for a no. of times.
• It is non absorbent.
• Smooth finish surface obtained.
• No shrinkage of formwork occurs.
• Easy to use.
• Its volume is less.
• Its strength is more.
Disadvantage of steel formwork
• Limited size or shape.
• Excessive loss of heat.
• A very smooth surface will be produced which would give
problems for finishing process.
• Limited fixing.
Aluminum formwork
• Manufactured using light weight aluminum.
• Made up of aluminum metal frame that provides very sturdy
and durable mold for pouring concrete.
Advantages of aluminum formwork
• Quickly and accurately assembled.
• Reduces the labor cost owing to its easy installation.
• Light weight component provides low pressure on the lower part of the
buildings.
• Aluminum metal surface offers easy cleaning after concrete is removed.
• Faster construction cycles.
• Easy to handle.
• High quality finishes.
• Can be easily recycled.
• Can be repeatedly used without losing quality
• Safe work platforms.
Disadvantages of aluminum formwork
• Initial high investment.
• Compares very poorly on modifications, against brick work
constructions.
• Fear of theft of valuable Aluminum Extrusions & sheets &
hence kit not being complete at critical stages of construction.
• Mass Housing projects are not as high for investing in large
number of Aluminum Formwork.
Plywood formwork
• The plywood is built up of odd number of layers with grain of
adjacent layers perpendicular to each other.
• Plywood is used extensively for formwork for concrete,
especially for sheathing, decking and form linings.
• There are two types of plywood – internal and exterior.
• The interior type is bonded with water resistant glue and
exterior type is bonded with water proof glue.
Plywood formwork
Advantages of plywood formwork
• Easily cut to shape on site.
• Reusable.
• Thinner plywood is used to facilitate bending.
• Thicker plywood is used when the weight of concrete caused
a standard thickness plywood to blow out, it might distorting
the concrete face.
Disadvantages of plywood formwork
• The layering effect in plywood makes it porous and
susceptible to water damage if exposed over time.
• Plywood becomes heavy when wet and should be covered if
left outside to reduce the risk of water damage.
PLASTIC FORMWORK
• Lightweight
• Reusable
• Chemical resistant
• Fungus and termites resistant
• Can be easily cut and nail by
using wood working tools
• Non degradable
Construction of formwork
• Propping and centering.
• Shuttering.
• Provision of camber.
• Cleaning and surface treatment.
Order and method of removing
formwork
• Shuttering forming the vertical faces of walls, beams and
column sides should be removed first as they bear no
load but only retain the concrete.
• Shuttering forming soffit of slabs should be removed
next.
• Shuttering forming soffit of beams, girders or other
heavily loaded shuttering should be removed in the end.
RCC column formwork
Stair formwork
Causes of formwork failure
• Improper stripping and shore
removal
• Inadequate bracing
• Vibration
• Unstable soil under mudsills,
shoring not plumb
• Inadequate control of
concrete placement
• Lack of attention to
formwork details
Safety precaution
• Material used for the construction of formwork must
fulfill the specification.
• Formwork is fixed firmly & properly
• Construction area must be protected to prevent
vandalism of formwork.
Period for removal of formwork
S.No Description of structural member Period of time
1 Walls Columns and vertical sides of beam 1 to 2 days
2 Slab 3 days
3 Beam soffits 7 days
4 Removal of props to slabs:
(a)For slabs spanning up to 4.5 m
(b) For slabs spanning over 4.5 m
7 days
14 days
5 Removal of props to beams and arches
(a)Spanning up to 6 m
(b)Spanning over 6 m
14 days
21 days
THE END

Weitere ähnliche Inhalte

Was ist angesagt?

Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed ConcreteRavi Savani
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shutteringKishor Ade
 
Structural systems notes
Structural systems notesStructural systems notes
Structural systems notesAaqib Iqbal
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiakamal bhatia
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Flat slab design
Flat slab designFlat slab design
Flat slab designMoussa Rili
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Simran Aggarwal
 
Temporary structures
Temporary structuresTemporary structures
Temporary structuresDivya Vishnoi
 
Types of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionTypes of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionEr.Karan Chauhan
 

Was ist angesagt? (20)

Underpinning
UnderpinningUnderpinning
Underpinning
 
Shoring and underpinning
Shoring and underpinningShoring and underpinning
Shoring and underpinning
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Foundations
FoundationsFoundations
Foundations
 
Structural systems notes
Structural systems notesStructural systems notes
Structural systems notes
 
Flat slab
Flat slabFlat slab
Flat slab
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatia
 
Mat foundation
Mat foundationMat foundation
Mat foundation
 
Framed structures
Framed structures Framed structures
Framed structures
 
Roof truss
Roof trussRoof truss
Roof truss
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
Temporary structures
Temporary structuresTemporary structures
Temporary structures
 
Plastering
PlasteringPlastering
Plastering
 
Types of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionTypes of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building Construction
 

Andere mochten auch

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsHamdija Velagic
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryAbhishek Shah
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineeringFazal-E- Jalal
 
Formwork presentation my gp
Formwork presentation my gpFormwork presentation my gp
Formwork presentation my gpcheeweishan
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueSandeep Jain
 
formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid shaikh khalid
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2Gali Suresh
 
Kompetensi 2 lengkap
Kompetensi 2 lengkapKompetensi 2 lengkap
Kompetensi 2 lengkapZul Hilmi
 
7 Types of Cladding
7 Types of Cladding7 Types of Cladding
7 Types of CladdingScullivan
 
FORM WORK AND SUPPORT WORK
FORM WORK AND SUPPORT WORKFORM WORK AND SUPPORT WORK
FORM WORK AND SUPPORT WORKElsje Nel
 

Andere mochten auch (20)

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 
Formwork
FormworkFormwork
Formwork
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Formwork presentation my gp
Formwork presentation my gpFormwork presentation my gp
Formwork presentation my gp
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction Technique
 
Formwork
FormworkFormwork
Formwork
 
formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Form Work
Form Work Form Work
Form Work
 
Kompetensi 2 lengkap
Kompetensi 2 lengkapKompetensi 2 lengkap
Kompetensi 2 lengkap
 
7 Types of Cladding
7 Types of Cladding7 Types of Cladding
7 Types of Cladding
 
Mesh Training
Mesh Training Mesh Training
Mesh Training
 
Site report
Site reportSite report
Site report
 
Scheme of work
Scheme of workScheme of work
Scheme of work
 
FORM WORK AND SUPPORT WORK
FORM WORK AND SUPPORT WORKFORM WORK AND SUPPORT WORK
FORM WORK AND SUPPORT WORK
 
Fromwork
FromworkFromwork
Fromwork
 

Ähnlich wie Formwork

types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdfReigerRoyal
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdfFaizanSolanki
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction FormworkAnkit Singhai
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringUjasPandya2
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities Pradumn Suryakar
 
STEEL PPT FOR UPLOAD.pptx
STEEL PPT FOR UPLOAD.pptxSTEEL PPT FOR UPLOAD.pptx
STEEL PPT FOR UPLOAD.pptxPRAVII3
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdfNithyashree594058
 
Forms and materials for speedy construction
Forms and materials for speedy constructionForms and materials for speedy construction
Forms and materials for speedy constructionMudassir khan
 
BUILDING MATERIALS.pptx
BUILDING MATERIALS.pptxBUILDING MATERIALS.pptx
BUILDING MATERIALS.pptxPRAVII3
 
The 6 Process Of Aluminium Castings
The 6 Process Of Aluminium CastingsThe 6 Process Of Aluminium Castings
The 6 Process Of Aluminium CastingsTurbo Cast
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar rautSAGAR RAUT
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork adarshkaushik6
 

Ähnlich wie Formwork (20)

types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 
Mivan shuttering
Mivan shutteringMivan shuttering
Mivan shuttering
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Formwork
FormworkFormwork
Formwork
 
STEEL PPT FOR UPLOAD.pptx
STEEL PPT FOR UPLOAD.pptxSTEEL PPT FOR UPLOAD.pptx
STEEL PPT FOR UPLOAD.pptx
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdf
 
Formwork
FormworkFormwork
Formwork
 
Forms and materials for speedy construction
Forms and materials for speedy constructionForms and materials for speedy construction
Forms and materials for speedy construction
 
BUILDING MATERIALS.pptx
BUILDING MATERIALS.pptxBUILDING MATERIALS.pptx
BUILDING MATERIALS.pptx
 
The 6 Process Of Aluminium Castings
The 6 Process Of Aluminium CastingsThe 6 Process Of Aluminium Castings
The 6 Process Of Aluminium Castings
 
Formwork
FormworkFormwork
Formwork
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 

Kürzlich hochgeladen

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

Formwork

  • 1. Presentation on FORMWORK Presented by Md. Imadul Islam MD.Samiul Islam Md.Tajmul Islam Md.Mahmudul Hasan Prince Kumar Mondal
  • 2. What is formwork? • Formwork is a mould including all supporting structures, used to shape and support the concrete until it attains sufficient strength to carry its own weight. • It should be capable of carrying all imposed dead and live loads apart from its own weight.
  • 3. Requirements good formwork 1. It should be strong enough to withstand all types of dead and live loads. 2. It should be rigidly constructed and efficiently propped and braced both horizontally and vertically, so as to retain its shape. 3. The joints in the formwork should be tight against leakage of cement grout. 4. Construction of formwork should permit removal of various parts in desired sequences without damage to the concrete. 5. The material of the formwork should be cheap, easily available and should be suitable for reuse. 6. The formwork should be set accurately to the desired line and levels should have plane surface. 7. It should be as light as possible. 8. The material of the formwork should not warp or get distorted when exposed to the elements. 9. It should rest on firm base.
  • 4. Economy in formwork • The cost of formwork may range between 30 to 40% of the cost of concrete work. • Special structure like bridge ,tall chimneys, dams etc; the cost of formwork may range between 50 to 100%. • The building should be planned in such a way that there are minimum number of various in the size rooms, floor area etc. so as to permit reuse of the formwork moulds repeatedly. • Formwork shall be made of low cost materials, energy and labor if possible. • Formwork care and maintenance should be done according to specifications.
  • 5. Types of formwork • Timber formwork • Steel formwork • Plywood formwork • Aluminum formwork • Plastics formwork
  • 6. Timber formwork • It should be well seasoned. • It should be light weight. • It should be easily workable with nail without splitting. • It should be free from knots.
  • 7. Advantage of timber formwork • Easy handling because it is light weight. • Easy to disassemble. • Damaged parts can be replaced with new one. • Very flexible. • Easy to produce. • Easily available.
  • 8. Disadvantage of timber formwork • Limited size of shape. • Excessive loss of heat. • A very smooth surface will be produced which would give problems for finishing process. • Limited fixing.
  • 9. STEEL FORMWORK • This consists of panels fabricated out of the thin steel plates stiffened along the edges by small steel angles. • The panel units can be held together through the use of suitable clamps or bolts and nuts. • The panels can be fabricated in large number in any desired modular shape or size. • Steel forms are largely used in large projects or in situation where large number reuses of the shuttering is possible. • This type of shuttering is considered most suitable for circular or curved structures.
  • 10. Advantages of steel formwork • It can be used for a no. of times. • It is non absorbent. • Smooth finish surface obtained. • No shrinkage of formwork occurs. • Easy to use. • Its volume is less. • Its strength is more.
  • 11. Disadvantage of steel formwork • Limited size or shape. • Excessive loss of heat. • A very smooth surface will be produced which would give problems for finishing process. • Limited fixing.
  • 12. Aluminum formwork • Manufactured using light weight aluminum. • Made up of aluminum metal frame that provides very sturdy and durable mold for pouring concrete.
  • 13. Advantages of aluminum formwork • Quickly and accurately assembled. • Reduces the labor cost owing to its easy installation. • Light weight component provides low pressure on the lower part of the buildings. • Aluminum metal surface offers easy cleaning after concrete is removed. • Faster construction cycles. • Easy to handle. • High quality finishes. • Can be easily recycled. • Can be repeatedly used without losing quality • Safe work platforms.
  • 14. Disadvantages of aluminum formwork • Initial high investment. • Compares very poorly on modifications, against brick work constructions. • Fear of theft of valuable Aluminum Extrusions & sheets & hence kit not being complete at critical stages of construction. • Mass Housing projects are not as high for investing in large number of Aluminum Formwork.
  • 15. Plywood formwork • The plywood is built up of odd number of layers with grain of adjacent layers perpendicular to each other. • Plywood is used extensively for formwork for concrete, especially for sheathing, decking and form linings. • There are two types of plywood – internal and exterior. • The interior type is bonded with water resistant glue and exterior type is bonded with water proof glue.
  • 17. Advantages of plywood formwork • Easily cut to shape on site. • Reusable. • Thinner plywood is used to facilitate bending. • Thicker plywood is used when the weight of concrete caused a standard thickness plywood to blow out, it might distorting the concrete face.
  • 18. Disadvantages of plywood formwork • The layering effect in plywood makes it porous and susceptible to water damage if exposed over time. • Plywood becomes heavy when wet and should be covered if left outside to reduce the risk of water damage.
  • 19. PLASTIC FORMWORK • Lightweight • Reusable • Chemical resistant • Fungus and termites resistant • Can be easily cut and nail by using wood working tools • Non degradable
  • 20. Construction of formwork • Propping and centering. • Shuttering. • Provision of camber. • Cleaning and surface treatment.
  • 21. Order and method of removing formwork • Shuttering forming the vertical faces of walls, beams and column sides should be removed first as they bear no load but only retain the concrete. • Shuttering forming soffit of slabs should be removed next. • Shuttering forming soffit of beams, girders or other heavily loaded shuttering should be removed in the end.
  • 24. Causes of formwork failure • Improper stripping and shore removal • Inadequate bracing • Vibration • Unstable soil under mudsills, shoring not plumb • Inadequate control of concrete placement • Lack of attention to formwork details
  • 25. Safety precaution • Material used for the construction of formwork must fulfill the specification. • Formwork is fixed firmly & properly • Construction area must be protected to prevent vandalism of formwork.
  • 26. Period for removal of formwork S.No Description of structural member Period of time 1 Walls Columns and vertical sides of beam 1 to 2 days 2 Slab 3 days 3 Beam soffits 7 days 4 Removal of props to slabs: (a)For slabs spanning up to 4.5 m (b) For slabs spanning over 4.5 m 7 days 14 days 5 Removal of props to beams and arches (a)Spanning up to 6 m (b)Spanning over 6 m 14 days 21 days