SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Downloaden Sie, um offline zu lesen
Muhammad Shahzad Akbar
PEC # ELECT/40142
E&I Engineer
Contact No.:+92346-7113140/ +92333-0453553
E-Mail: shahzad.akbar87@gmail.com
PROFILE SUMMARY
 Graduate of Bachelor of Science in Electrical Engineering with more than 3.5 years of Experience in:
Operation& Maintenance, Electrical, Electronics, Automation & Instrumentation, Project Management &
Execution.
 Installation, Commissioning , Operation & Maintenance of TWO Coal Fired Boilers each 55 ton/hr, 5.3MPa,
490°c.
 Installation, Commissioning, Operation & Maintenance of Steam Turbine 12MW, 3000rpm, 4.9MPa, Double
Extraction & Condensate Mode.
 Installation, Commissioning, Operation & Maintenance of Alternator 15MW, 3000rpm, DVR Excitation System,
NARI Synchronization & Protection System.
 Operation and Maintenance of 3x1.5MW CAT 3516 Industrial Gensets. with 3x1875kVA, 50Hz, 1500RPM,
400V Alternator with Brushless excitation and Digital Automatic Voltage Regulator. .
 Installation, Commissioning, Operation and Maintenance of 2 x 1.6 MW CAT 3517B Diesel Gensets with
2x2000KVA, 50Hz, 1500RPM, 400V Synchronous Generators with Brushless excitation and Digital Automatic
Voltage Regulator.
 Installation, Commissioning and Troubleshooting of NARI NSC200NT SCADA Electrical Control & Protections
Monitoring system)
 Installation, Commissioning, Operation & Maintenance of DCS (SIEMENS PCS7, NT6000 DEH+ETS, PLC
(Siemens), BENTLEY NEVADA Turbine Protection System.
 Installation, Commissioning, Operation & Maintenance of Instruments (Temperature, Flow, Level and Pressure
Gauges/Transmitters, control valves, Analyzers) etc.
 Manages the plant’s operations, projects, and maintenance.
 Control on inventory, budget and compliance with safety regulations.
 Training of staff including Trainee Engineers, Supervisors, & trade workers.
 Development of Sequence of Procedures (SOP) for maintenance of E&I equipment’s according to ISO Standards.
 E&I BOQ's, study of P&ID, Installation, Commissioning and MBO’s (Management by Objectives).
 Well aware of Electrical Engineering Methodologies as well as the corresponding Equipments, materials,
consumables, tools and Manpower Allocations related to (HT & LT) Electrical Operation, Maintenance and
Installation Works.
 A keen planner, strategist & implementer with demonstrated abilities in Managing entire E&I (Electrical, Automation
and Instrumentation).
EMPLOYMENT DETAILS
Since October 2015 till date. Ingredion, Rafhan Maize Product. Co. LTD
Pakistan as E&I Engineer.
Working as E&I Engineer on coal fired power plant having capacity of 15MW Electricity Generation.
RESPONSIBILITIES:
ELECTRICAL:
 Scheduling, planning & executing jobs during the shift including Procurement, Contract Management &
Work order Generation.
 Preventive maintenance of E & I installations including Generators, Transformers, DCS system, VFDs, E
& I Control and Protection Cabinets, Motors, Instruments including control valves, transmitter, analyzers,
level transmitters and control system.
 In the main control room, monitor Power, Automation and Control System equipment for challenges to
integrity issues using Supervisory Control systems (SCADA) and Distributed Control System (DCS).
 Coordinate and supervise planned and emergent maintenance items, while ensuring timely completion and
adherence to industrial and electrical safety standards.
 Installation, Commissioning, Operation and Maintenance of 1 x 15 MW Synchronous Generator with
Brushless excitation and Digital Automatic Voltage Regulator.
 Operation and Maintenance of 3x1.5MW CAT 3516 Industrial Gensets. with 3x1875kVA, 50Hz,
1500RPM, 400V Alternator with Brushless excitation and Digital Automatic Voltage Regulator. .
 Installation, Testing, Commissioning, Operation and Maintenance of electrical equipments like
Transformers, Generator, LV / MV Switchgear Breakers, NGR panel, Protection Relays, Batteries, Motors,
Control and Protections etc.
 Hi-pot test of MV cables, Transformers and Generator, Meggar test of LV cables, LV panels and motors.
 Installation, Testing, Commissioning, Operation and Maintenance of Generator Protection & Synchronization
panels.
 Installation, Operation and Maintenance of VFD Panels of 2.2 to 315 KW
 Installation, Commissioning, Operation and Maintenance of Coal Handling, Coal Crushing & Conveying System,
Limestone Powder preparation.
 Installation, Commissioning, Operation and Maintenance of Boiler makeup water treatment plant, Cooling tower
& Circulating water system, electrostatic Precipitators with 72KV Rectifying Transformers.
 Installation, Commissioning and Maintenance of Siemens Power Transformers having rating of 10-13MVA, 20-
26MVA which includes: IR (Insulation test), No load test, Full load test, Impedance measurement test of power
transformer, Safeties testing of power transformer, Dielectric Insulation test of transformer oil.
 Thermo-graphy of whole plant electric joints.
 Installation, Testing, Commissioning, Operation and Maintenance of Public Address system, Fire Alarm and Fire
Protection system and CCTV Cameras system.
 Installation, testing and Maintenance of Earthing, Structural Grounding & Lightning Arrester system of whole
plant.
 Erection and commissioning of area lighting, equipment lighting and street light poles up to 500W.
INSTRUMENT & CONTROL:
 Installation, Operation and Maintenance of SIEMENS PCS-7 DCS of 2676 I/O’s at coal fired Power Plant w.r.t
hardware, software, logical working and communication.
 Installation, Operation and Maintenance of SCIYON NT6000 DCS for Turbine Safeties of 300 I/O’s like (Thermal
Expansions, Axial Displacements, Condenser Vacuum, Lube Oil Pressure and Temperatures, Thrust Pad and
Radial Tile Temperatures interlocks) at coal fired Power Plant w.r.t hardware, software, logical working and
communication.
 Installation, Operation and Maintenance of TSI (Turbine Supervisory Instrument System make Bently Nevada) like
(Tile Vibrations, Rotations, Turbine Over-speed) for Turbine Internal Safeties at coal fired Power Plant w.r.t
hardware and communication.
 Working on calibration, Installation and loop testing (regarding DCS) of all types of Field instruments (Pneumatic
and Motorized Control valves, Shut-off valves, Transmitters (level, flow, pressure, temperature), Switches
(pressure, level, position, vibration), Analyzers (P.H, Conductivity, Oxygen), Coal flow rate & totalizer system.
 Installation, Operation and Maintenance of Ignition Diesel Burner for Coal Fired Boiler startup.
UTILITIES:
Air Compressors (0.8MPa, 60 tons/hr), Cooling Towers (4800m3), Water Treatment Plant (60m3/hr), Coal
Crusher 100 tons/hr, ESP 110 tons/hr 3-Electric Fields 72KV, Ash Silo 40 tons/hr, Slag Disposal System 10 tons/hr,
Lime Stone Powder System 30 tons/hr in coal fired power plant.
Since July, 2013 to October, 2015 International Airport, Multan, Pakistan.
as Electrical Engineer.
RESPOSIBILITIES:
ELECTRICAL:
 Installation, Testing, Commissioning, Operation and Maintenance of 2 x 1.6 MW Caterpillar 3517B Diesel Gensets
with 2x2000KVA, 50Hz, 1500RPM, 400V Synchronous Generators with Brushless excitation and Digital
Automatic Voltage Regulator.
 Installation, Testing, Commissioning, Operation and Maintenance of electrical equipments like Transformers,
Generator, LV / MV Switchgear Breakers, NGR panel, Protection Relays, Batteries, Motors, Control and
Protections etc.
 Hi-pot test of MV cables, Transformers and Generator, Meggar test of LV cables, LV panels and motors.
 Installation, Testing, Commissioning, Operation and Maintenance of Generator Protection & Synchronization
panels.
 3x2.5MVA Power Transformers, (2x100KVA,2x300KVA,4x400KVA) Distribution Transformers, Power Factor
Improvement Pannels
 Installation, Testing, Commissioning, Operation and Maintenance of Public Address system, Fire Alarm and Fire
Protection system and CCTV Cameras system, FIDs (Flight Information Displays), Aeroplane Parking System
 Installation, testing and Maintenance of Earthing, Structural Grounding & Lightning Arrester system of whole
plant.
 Erection and commissioning of area lighting, equipment lighting and road light poles up to 500W.
UTILITIES:
Utility Building (2x1.6MW Diesel Generators), Passengers Terminal Buildings, Offices Blocks, Officers and Staff
Mess & Resendencies, Cargo Building, Passengers Car Parking & Aeroplanes Runway & Parking
EDUCATION
2013 B.Sc.(Electrical Engineering) (3.52/4.0 CGPA) University of Management and Technology (UMT), Lahore.
TRAININGS
 Six Sigma white belt & KAIZEN trained
 2 days training on Safety measures at Plant and Offices
 3 days training on Process Hazard Analysis and Risk Assessment
PERSONAL DETAILS
Date of Birth: 16th
April, 1987
Languages Known: English, Urdu
Nationality: Pakistani
Marital Status: Single

Weitere ähnliche Inhalte

Was ist angesagt?

Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerSrivenkatesh Padmanaban
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technicianchandrabhushan rao
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cvKarthi keyan
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
RAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRavi D
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Resume Instrumentation Engineer
Resume Instrumentation EngineerResume Instrumentation Engineer
Resume Instrumentation Engineerdhiresh kumar
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTmuhammad jamil
 

Was ist angesagt? (20)

Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technician
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
RAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument Technician
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Resume Instrumentation Engineer
Resume Instrumentation EngineerResume Instrumentation Engineer
Resume Instrumentation Engineer
 
E&I Engineer CV
E&I Engineer CVE&I Engineer CV
E&I Engineer CV
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
Instrument Technician
Instrument TechnicianInstrument Technician
Instrument Technician
 

Andere mochten auch

Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard
 
aaronparkerresume (5)
aaronparkerresume (5)aaronparkerresume (5)
aaronparkerresume (5)Aaron Parker
 
03_August_2016_Richard_Bailey_Resume[1]
03_August_2016_Richard_Bailey_Resume[1]03_August_2016_Richard_Bailey_Resume[1]
03_August_2016_Richard_Bailey_Resume[1]Richard Bailey
 
1ResumeDEC2016Phillip Lopez
1ResumeDEC2016Phillip Lopez1ResumeDEC2016Phillip Lopez
1ResumeDEC2016Phillip Lopezphillip Lopez
 
Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015Peter Gervais
 
Updated resume 1 (1) (1)
Updated resume 1 (1) (1)Updated resume 1 (1) (1)
Updated resume 1 (1) (1)Paul Clay
 
Simon Chen Resume 07252016
Simon Chen Resume 07252016Simon Chen Resume 07252016
Simon Chen Resume 07252016Simon Chen
 
Chirko, Kenneth Resume - long
Chirko, Kenneth Resume - longChirko, Kenneth Resume - long
Chirko, Kenneth Resume - longKenneth Chirko
 
Katia frye resume 2016 no address
Katia frye resume 2016   no addressKatia frye resume 2016   no address
Katia frye resume 2016 no addressKatia Frye
 
Full resume dr_russell_john_childs_2016
Full resume dr_russell_john_childs_2016Full resume dr_russell_john_childs_2016
Full resume dr_russell_john_childs_2016Russell Childs
 
RICHARD FINN RESUME - Jun2016
RICHARD FINN RESUME - Jun2016RICHARD FINN RESUME - Jun2016
RICHARD FINN RESUME - Jun2016Richard R Finn
 
Ken_Wu_Resume_2017N
Ken_Wu_Resume_2017NKen_Wu_Resume_2017N
Ken_Wu_Resume_2017NKen Wu
 

Andere mochten auch (14)

General Resume
General ResumeGeneral Resume
General Resume
 
2017 RESUME
2017 RESUME2017 RESUME
2017 RESUME
 
Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2
 
aaronparkerresume (5)
aaronparkerresume (5)aaronparkerresume (5)
aaronparkerresume (5)
 
03_August_2016_Richard_Bailey_Resume[1]
03_August_2016_Richard_Bailey_Resume[1]03_August_2016_Richard_Bailey_Resume[1]
03_August_2016_Richard_Bailey_Resume[1]
 
1ResumeDEC2016Phillip Lopez
1ResumeDEC2016Phillip Lopez1ResumeDEC2016Phillip Lopez
1ResumeDEC2016Phillip Lopez
 
Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015
 
Updated resume 1 (1) (1)
Updated resume 1 (1) (1)Updated resume 1 (1) (1)
Updated resume 1 (1) (1)
 
Simon Chen Resume 07252016
Simon Chen Resume 07252016Simon Chen Resume 07252016
Simon Chen Resume 07252016
 
Chirko, Kenneth Resume - long
Chirko, Kenneth Resume - longChirko, Kenneth Resume - long
Chirko, Kenneth Resume - long
 
Katia frye resume 2016 no address
Katia frye resume 2016   no addressKatia frye resume 2016   no address
Katia frye resume 2016 no address
 
Full resume dr_russell_john_childs_2016
Full resume dr_russell_john_childs_2016Full resume dr_russell_john_childs_2016
Full resume dr_russell_john_childs_2016
 
RICHARD FINN RESUME - Jun2016
RICHARD FINN RESUME - Jun2016RICHARD FINN RESUME - Jun2016
RICHARD FINN RESUME - Jun2016
 
Ken_Wu_Resume_2017N
Ken_Wu_Resume_2017NKen_Wu_Resume_2017N
Ken_Wu_Resume_2017N
 

Ähnlich wie Resume E&I Engineer

Ähnlich wie Resume E&I Engineer (20)

SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&M
 
Resume
ResumeResume
Resume
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume Projects
 
bala.1
bala.1bala.1
bala.1
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
bala.1
bala.1bala.1
bala.1
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
 
electrician
electricianelectrician
electrician
 
RamCV1
RamCV1RamCV1
RamCV1
 
Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood Butt
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc tech
 
Resume Francis
Resume FrancisResume Francis
Resume Francis
 
muhammad Usman CV
muhammad Usman CVmuhammad Usman CV
muhammad Usman CV
 
Techno Quest - Profile
Techno Quest -  ProfileTechno Quest -  Profile
Techno Quest - Profile
 
Resume_Akhilesh
Resume_AkhileshResume_Akhilesh
Resume_Akhilesh
 

Resume E&I Engineer

  • 1. Muhammad Shahzad Akbar PEC # ELECT/40142 E&I Engineer Contact No.:+92346-7113140/ +92333-0453553 E-Mail: shahzad.akbar87@gmail.com PROFILE SUMMARY  Graduate of Bachelor of Science in Electrical Engineering with more than 3.5 years of Experience in: Operation& Maintenance, Electrical, Electronics, Automation & Instrumentation, Project Management & Execution.  Installation, Commissioning , Operation & Maintenance of TWO Coal Fired Boilers each 55 ton/hr, 5.3MPa, 490°c.  Installation, Commissioning, Operation & Maintenance of Steam Turbine 12MW, 3000rpm, 4.9MPa, Double Extraction & Condensate Mode.  Installation, Commissioning, Operation & Maintenance of Alternator 15MW, 3000rpm, DVR Excitation System, NARI Synchronization & Protection System.  Operation and Maintenance of 3x1.5MW CAT 3516 Industrial Gensets. with 3x1875kVA, 50Hz, 1500RPM, 400V Alternator with Brushless excitation and Digital Automatic Voltage Regulator. .  Installation, Commissioning, Operation and Maintenance of 2 x 1.6 MW CAT 3517B Diesel Gensets with 2x2000KVA, 50Hz, 1500RPM, 400V Synchronous Generators with Brushless excitation and Digital Automatic Voltage Regulator.  Installation, Commissioning and Troubleshooting of NARI NSC200NT SCADA Electrical Control & Protections Monitoring system)  Installation, Commissioning, Operation & Maintenance of DCS (SIEMENS PCS7, NT6000 DEH+ETS, PLC (Siemens), BENTLEY NEVADA Turbine Protection System.  Installation, Commissioning, Operation & Maintenance of Instruments (Temperature, Flow, Level and Pressure Gauges/Transmitters, control valves, Analyzers) etc.  Manages the plant’s operations, projects, and maintenance.  Control on inventory, budget and compliance with safety regulations.  Training of staff including Trainee Engineers, Supervisors, & trade workers.  Development of Sequence of Procedures (SOP) for maintenance of E&I equipment’s according to ISO Standards.  E&I BOQ's, study of P&ID, Installation, Commissioning and MBO’s (Management by Objectives).  Well aware of Electrical Engineering Methodologies as well as the corresponding Equipments, materials, consumables, tools and Manpower Allocations related to (HT & LT) Electrical Operation, Maintenance and Installation Works.  A keen planner, strategist & implementer with demonstrated abilities in Managing entire E&I (Electrical, Automation and Instrumentation). EMPLOYMENT DETAILS Since October 2015 till date. Ingredion, Rafhan Maize Product. Co. LTD Pakistan as E&I Engineer. Working as E&I Engineer on coal fired power plant having capacity of 15MW Electricity Generation. RESPONSIBILITIES: ELECTRICAL:  Scheduling, planning & executing jobs during the shift including Procurement, Contract Management & Work order Generation.
  • 2.  Preventive maintenance of E & I installations including Generators, Transformers, DCS system, VFDs, E & I Control and Protection Cabinets, Motors, Instruments including control valves, transmitter, analyzers, level transmitters and control system.  In the main control room, monitor Power, Automation and Control System equipment for challenges to integrity issues using Supervisory Control systems (SCADA) and Distributed Control System (DCS).  Coordinate and supervise planned and emergent maintenance items, while ensuring timely completion and adherence to industrial and electrical safety standards.  Installation, Commissioning, Operation and Maintenance of 1 x 15 MW Synchronous Generator with Brushless excitation and Digital Automatic Voltage Regulator.  Operation and Maintenance of 3x1.5MW CAT 3516 Industrial Gensets. with 3x1875kVA, 50Hz, 1500RPM, 400V Alternator with Brushless excitation and Digital Automatic Voltage Regulator. .  Installation, Testing, Commissioning, Operation and Maintenance of electrical equipments like Transformers, Generator, LV / MV Switchgear Breakers, NGR panel, Protection Relays, Batteries, Motors, Control and Protections etc.  Hi-pot test of MV cables, Transformers and Generator, Meggar test of LV cables, LV panels and motors.  Installation, Testing, Commissioning, Operation and Maintenance of Generator Protection & Synchronization panels.  Installation, Operation and Maintenance of VFD Panels of 2.2 to 315 KW  Installation, Commissioning, Operation and Maintenance of Coal Handling, Coal Crushing & Conveying System, Limestone Powder preparation.  Installation, Commissioning, Operation and Maintenance of Boiler makeup water treatment plant, Cooling tower & Circulating water system, electrostatic Precipitators with 72KV Rectifying Transformers.  Installation, Commissioning and Maintenance of Siemens Power Transformers having rating of 10-13MVA, 20- 26MVA which includes: IR (Insulation test), No load test, Full load test, Impedance measurement test of power transformer, Safeties testing of power transformer, Dielectric Insulation test of transformer oil.  Thermo-graphy of whole plant electric joints.  Installation, Testing, Commissioning, Operation and Maintenance of Public Address system, Fire Alarm and Fire Protection system and CCTV Cameras system.  Installation, testing and Maintenance of Earthing, Structural Grounding & Lightning Arrester system of whole plant.  Erection and commissioning of area lighting, equipment lighting and street light poles up to 500W. INSTRUMENT & CONTROL:  Installation, Operation and Maintenance of SIEMENS PCS-7 DCS of 2676 I/O’s at coal fired Power Plant w.r.t hardware, software, logical working and communication.  Installation, Operation and Maintenance of SCIYON NT6000 DCS for Turbine Safeties of 300 I/O’s like (Thermal Expansions, Axial Displacements, Condenser Vacuum, Lube Oil Pressure and Temperatures, Thrust Pad and Radial Tile Temperatures interlocks) at coal fired Power Plant w.r.t hardware, software, logical working and communication.  Installation, Operation and Maintenance of TSI (Turbine Supervisory Instrument System make Bently Nevada) like (Tile Vibrations, Rotations, Turbine Over-speed) for Turbine Internal Safeties at coal fired Power Plant w.r.t hardware and communication.  Working on calibration, Installation and loop testing (regarding DCS) of all types of Field instruments (Pneumatic and Motorized Control valves, Shut-off valves, Transmitters (level, flow, pressure, temperature), Switches (pressure, level, position, vibration), Analyzers (P.H, Conductivity, Oxygen), Coal flow rate & totalizer system.  Installation, Operation and Maintenance of Ignition Diesel Burner for Coal Fired Boiler startup. UTILITIES: Air Compressors (0.8MPa, 60 tons/hr), Cooling Towers (4800m3), Water Treatment Plant (60m3/hr), Coal Crusher 100 tons/hr, ESP 110 tons/hr 3-Electric Fields 72KV, Ash Silo 40 tons/hr, Slag Disposal System 10 tons/hr, Lime Stone Powder System 30 tons/hr in coal fired power plant.
  • 3. Since July, 2013 to October, 2015 International Airport, Multan, Pakistan. as Electrical Engineer. RESPOSIBILITIES: ELECTRICAL:  Installation, Testing, Commissioning, Operation and Maintenance of 2 x 1.6 MW Caterpillar 3517B Diesel Gensets with 2x2000KVA, 50Hz, 1500RPM, 400V Synchronous Generators with Brushless excitation and Digital Automatic Voltage Regulator.  Installation, Testing, Commissioning, Operation and Maintenance of electrical equipments like Transformers, Generator, LV / MV Switchgear Breakers, NGR panel, Protection Relays, Batteries, Motors, Control and Protections etc.  Hi-pot test of MV cables, Transformers and Generator, Meggar test of LV cables, LV panels and motors.  Installation, Testing, Commissioning, Operation and Maintenance of Generator Protection & Synchronization panels.  3x2.5MVA Power Transformers, (2x100KVA,2x300KVA,4x400KVA) Distribution Transformers, Power Factor Improvement Pannels  Installation, Testing, Commissioning, Operation and Maintenance of Public Address system, Fire Alarm and Fire Protection system and CCTV Cameras system, FIDs (Flight Information Displays), Aeroplane Parking System  Installation, testing and Maintenance of Earthing, Structural Grounding & Lightning Arrester system of whole plant.  Erection and commissioning of area lighting, equipment lighting and road light poles up to 500W. UTILITIES: Utility Building (2x1.6MW Diesel Generators), Passengers Terminal Buildings, Offices Blocks, Officers and Staff Mess & Resendencies, Cargo Building, Passengers Car Parking & Aeroplanes Runway & Parking EDUCATION 2013 B.Sc.(Electrical Engineering) (3.52/4.0 CGPA) University of Management and Technology (UMT), Lahore. TRAININGS  Six Sigma white belt & KAIZEN trained  2 days training on Safety measures at Plant and Offices  3 days training on Process Hazard Analysis and Risk Assessment PERSONAL DETAILS Date of Birth: 16th April, 1987 Languages Known: English, Urdu Nationality: Pakistani Marital Status: Single