1. Contact no. 403 616 9452 (C)
403 475 2415 (H)
E-Mail ID: Shahiramesh76@gmail.com
Name: RAMESH SHAHI
Title: SR. Design Specialist
Education: Civil Structural Diploma 1984 to 1986 from Industrial Training Institute. In India
Canadian Citizen
Career Synopsis:
Overall Experience of over 27 years in the Field of Civil/ Structural Design,
• Direct & manage team of Civil Structural designers from conceptualization to completion
of design engineering activities such as 3D modeling, drafting preparation, checking,
coordinating with other engineering disciplines for Mega engineering projects in the field
of Oil & Gas, Heavy industrial plants.
• Ensuring design deliverables meet project standards, specifications & also ensuring
deliverables are issued on schedule & with in budget.
• Prepare man hour estimates for design engineering efforts.
• Plan & coordinate design engineering activities for effective utilization of available
resource to meet project objectives.
• Monitor & control project progress to ensure project performance is in compliance with
plan.
• Prepare EWP for construction to specify scope of work as per area.
• Prepare EDS estimate.
• Develop & raise Trend
• Prepare working level schedule to compliance of project as per level 3 schedules.
• Direct dealing with client & Field support from design office & visit to site as required.
• Response of RFI & Shop drawings Review, Construction support.
• RE responsibilities for Field Erected buildings & Lab building
• Develop & support work share office to meet client Expectations as project work share
coordinator.
• Metrical control & update MTO Creep sheet.
• SP3D, PDS, Microstation, Auto cad. MS Office
Representative Project Experience:
a) North West Red Water Partnership (Sturgeon Refinery) (Jan 2015 to Cont.): As a Sr.
Squad Leader involved in quality checking, squad checking and work share coordination.
Brief description –Cooling tower, Steam condensate area, Utility building pipe rack, Process
module etc.
October 2009 1
2. Shahi, Ramesh
b) CNRL Kirby North (Mar 2012 to Jan 2015.): As a Sr. Squad Leader involved in DBM, EDS
Estimating, , MTO tracking, Preparation EWP, drawings checking, Progress, Planning ,
scheduling, Vendor drawings squad checking, RE responsibility, Contract clarification, work
share coordination, RFI response, Shop drawings review, Train & develop work share office to
meet client expectation, delivered quality deliverables and construction support. (About
85,000 man-hours).
Brief description –Steam generation, Oil treating, Water treatment, Salt cavern, Butane,
Tank farm and Pipe rack.
c) Imprial Oil CLPP Nabiye plant (July 2011 to Mar 2012.): As a Sr. Squad Leader involved
Estimating, Schedule, MTO tracking and drawing checking. Deliver excellent quality
deliverable to client.
Brief description – OTSG, Heat Recovery steam generator (HRSG), Combustion
turbine/power generator, Backup Generator, HPBFW Pump, Exchanger, Vessels, Storage
Tank, Compressor, Pipe rack Module and Building Modules etc.
d) Suncor Energy Inc, Firebag Stage 3,4, SAGD (Steam Assisted Gravity Drainage) project
at Ft. McMurray, Alberta, Canada (Nov 2010 to July 2011.): As a Sr. Squad Leader
Involved in Construction Support & Sustaining project.
Brief description – Issued DCN, RFI answer & prepared CWP & EWP. For sustaining
project.
e) Suncor Energy Inc, Well Pad 106/116 project at Ft. McMurray, Alberta, Canada (Jun
2010 to Oct 2010.): As a Sr. Squad Leader I was involved in Estimating, Schedule, men
power estimating, staffing plan, Progress report. Deliver excellent quality deliverable to client.
Brief description – Process Module, Pipe rack Module, Well head Module, Building Module,
Gathering line etc.
f) Suncor Energy Inc, Firebag Stage 3,4, SAGD (Steam Assisted Gravity Drainage) project
at Ft. McMurray, Alberta, Canada (Jan 2007 to May 2010.): As a Area Squad Leader
(Steam Generation Area) - Lead a team of Designers towards successful & timely completion
of the project and trained new designer as per Jacob’s & Suncor practice & procedure. (About
42,000 man-hours)
Brief description – Open steel structures for (Steam generation area) process Units, Pipe
rack Module, OTSG foundations, OTSG Building, Amine, compressor & HPBFW building,
Air cooler pipe rack, vertical Module, equipment skid Module. Pile foundations for all
Structures like major Equipment foundations, process buildings, DCN and RFI Response.
Projects work history in Fluor.
g) Saudi International Petrochemical Company (SIPCHIM) Saudi Arab (Jun 06 to Jan 07):
As a Design Supervisor – I was involved in Estimating, Schedule, men power estimating,
Progress report, Checking of Standard drawings, Preparation Layout of pre cast Concrete
Pipe rack, equipment process structure etc. (About 50,000 man-hours).
h) Oman Petrochemical Industries Complex Project (OPIC 1) Oman (Sep 05 to May 06):
Preparation, checking & Estimation of Civil, Roads, Ditch, Culvert, Headwalls Retaining walls
& Cut & fill Drawings.
i) OPTI Canada Inc. Long Lake Up-grader Orcrude Unit at Ft. McMurray, Alberta, Canada
October 2009 2
3. Shahi, Ramesh
(Aug 04 to Sep 05): As a Design Supervisor - Lead a team of Designers towards successful
& timely completion of the project and trained new designer as per Fluor & Opti practice &
procedure. Preparation of drafting room instructions, standard drawing, layout drawing, 3D
models and design drawings, Fabrication drawing Review. Civil, Structural steel & Concrete
Drawings checking, Estimating, Development and monitoring of progress man-hours,
Schedules and Man power. Maintenance of Structural Engineering Project Files, Assembly of
final jobs record book & Close out report. (About 45,000 man-hours).
Brief description – Open steel structures for (Orcrude) process Units, Air cooler Pipe rack
Module & equipment skid Module. Pile foundations for all Structures, major Equipment
foundation.
j) SUNOCO Low Sulfur gasoline 3X project. Marcus hook, Toledo, Philadelphia USA (Aug
03 to Aug 04) Overall Design Supervisor:- Develop & trained new Design Supervisor &
checking Civil works, paving & grading Drawings Man Hole, catch basin, Site preparation,
Under ground & 3D models and design drawings, Estimating, Development and monitoring of
man-hours, Schedules and Man power. Maintenance of Structural Engineering Project Files,
Assembly of final jobs record book & disposition of drawings and files. (About 60,000 man-
hours).
Brief description – Open steel structures, Pipe rack Module & equipment skid Module. Pile
foundations for all Structures, major Equipment & Compressor foundation.
k) Exxon Mobil Low sulfur motor gas project Baytown Texas- USA. (Aug 01 to Mar 03) As
a Design Supervisor: Lead a team of Designers towards successful & timely completion of
the project. Preparation of drafting room instructions, standard drawing, layout drawing, 3D
models and design drawings and Drawings checking, Estimating, Development and
monitoring of man-hours, Schedules and Man power. (About 35,000 man-hours)
Brief description – Open steel structures for process Units, Pipe rack. Pile foundations
for all Structures, major Equipment & Compressor Table Top.
l) Shell Athabasca Oil Sands Downstream Project, Ft. Saskatchewan, Alberta, Canada (Mar
2000 to Aug 2001): Performed as Design Supervisor:- for the structural design related to
piling, foundation and structural steel. Same as above (About 25,000 man-hours).
m) Irving Oil Limited, Sulfuric acid regeneration unit. Canada. (Jan 1999 to Aug
2000):
Performed as Designer: Preparation of standard drawing, layout drawing, 3D models and
Piling, concrete & structural Steel design drawings for SARU Unit
n) Cerestar Wheat & Refinery Project ( On assignment to Harlem Office) (May98 to
Dec 98): Performed as Designer: Preparation of standard drawing, layout drawing, 3D models
and Piling, concrete & structural Steel design drawings
o) Hercules Project & Tyvek (3 line) project (On assignment to Harlem Office)
Performed as Designer: Estimation of plant & non-plant buildings.
p) Delphi Automotive system Pvt. Ltd., G. Noida. India (Jun 97 to May 98):
Performed as Designer: Preparation of standard drawing, layout drawings concrete &
structural Steel design drawings
q) Godavari Power Project (A.P.) India: (Jun 96 to Jun 97 ):Performed as Designer:
Preparation of standard drawing, layout drawings concrete & structural Steel design drawings
r) Jindal Vijay nagar Steel Ltd. Vijay Nagar India: Performed as Designer: Preparation of
standard drawing, layout drawings concrete & structural Steel design drawings
s) Kalyanpur cement works, Hira cement works & DLF cements ltd, Binani cements &
Nagarjuna constn. co. ltd. India (Apr 92 to Jun 96): Performed as Designer: Preparation of
October 2009 3
4. Shahi, Ramesh
standard drawing, layout drawings concrete & structural Steel design drawings for Cement &
Blending silo, Raw material Hopper, Truck unloading hopper etc, Wagon tippler, Limestone
crusher, Cement mill, Pre-heater tower, Cooler house, Raw mill House, Coal mill house & Kiln
Fdn., Clinker Stockpile, Conveyor Gallery, Transfer Towers, Steel Hoppers, Tunnels &
Retaining walls.
t) Likim Ro Hydro Electric Project & Shiloi Hydro Electric Project Nagaland India(Sep 89
to Apr 92): Performed as Designer: Preparation of Civil works, Contour drawing, Dam,
General Arrangement & R.C.C. detail Dwg’s for Civil works, paving & grading Drawings Man
Hole, catch basin, Site preparation, Under ground Water Conductor system, pen stock
Balancing Reservoir & Power House.
Accomplishments and/or Publications:
Received Recognitions for Leadership, Hard work & issued quality deliverables with in
schedule in CNRL Kirby North 1 Project.
Quest Award received form Suncor for High Quality Deliverable and outstanding job
performance in Steam Generation area Firebag 3.
Received achievement certificate for Jacobs leadership course
Award received from Flour Harlem for Outstanding performance.
Job well done received from Shell project for meeting schedule milestone.
Spotlight Award received from Exxon Mobile project for Value Creation.
Job well done received from Sunoco project for project completed with in schedule.
Additional Training/Technical Skills:
Jacobs Leadership Course, Calgary (June. 2008).
Training in SP3D in Intergraph Calgary Canada (Jan 2007).
Jacobs the Leading Edge Course, Calgary (Jan-Feb. 2014)
Training in Microstation & Framework Plus at Fluor Camberley, (U.K.) (07th
July.1997 - 28th
Aug.1997)
Training in Auto cad from Cadd center New Delhi India (15th
July.1992 – 15th
Oct.1992)
Employment History:
• Jacobs Canada Inc Canada 2013- 2015
1. Jacobs Engineering Mumbai India (Assignment). Mar 2015 to July 2015
2. Jacobs Engineering Mumbai India (Assignment). Mar 2013 to Sep 2013
• Jacobs Canada Inc Canada 2007- 2013
• Fluor India Pvt. Ltd. India 1997 – 2007
1. Fluor Houston USA (Assignment) 2001 and 2005
2. Fluor Harlem Netherlands (Assignment) 1998- 1999
October 2009 4
5. Shahi, Ramesh
• VAI (INDIA) Pvt. Ltd. India 1996 - 1997
• Holtec Consulting Private Limited India 1992- 1996
• Redecon (India) Pvt. Limited India 1989 - 1992
• Diwevidi & Associates (Architect) India 1986 - 1989
October 2009 5
6. Shahi, Ramesh
• VAI (INDIA) Pvt. Ltd. India 1996 - 1997
• Holtec Consulting Private Limited India 1992- 1996
• Redecon (India) Pvt. Limited India 1989 - 1992
• Diwevidi & Associates (Architect) India 1986 - 1989
October 2009 5