SlideShare ist ein Scribd-Unternehmen logo
1 von 26
Downloaden Sie, um offline zu lesen
THE GRADE
MAKING
Hollywood, Florida
February 28 – March 2, 2016
2
FORWARD-LOOKING STATEMENTS
This presentation contains forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and
assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You
are hence cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include words or expressions such
as “projected”, “initial”, “targeted”, “expected”, “anticipated”, “estimates”, “potential”, “priority”, “objective”, “aim”, “continuing”, “planned”,
“designed to”, “in order to”, “achieve”, “envisaged”, ‘will”, “committed”, “evolve”, “become”, “pursuing”, “growth”, “opportunities” and other
similar words or expressions. Factors that could cause future results or events to differ materially from current expectations expressed or
implied by the forward-looking statements include the ability to complete the Natougou feasibility study early in the second quarter of 2016
within the $12.5 million budget, the ability to achieve the mid-range of our 2015 production guidance of between 245,000 and 275,000
ounces, the ability to achieve our 2015 total cash cost guidance of between $485 and $505 per ounce and our all-in sustaining cost guidance
of between $630 and $650 per ounce, include the ability to meet the annual average production targets at Natougou within the anticipated
total cash costs and all-in sustaining costs, the ability to achieve the projected LOM, the ability to meet the targeted permitting process, initial
capital expenditures, construction start-up, expected first gold pour and full year of production, the ability to bring Natougou into production with
the combination of our current cash position, anticipated cash flow from production and the amended Macquarie Facility, the ability to close the
Macquarie amended Facility and to meet the various conditions precedent to drawdown, the ability to expand Natougou resources at depth
within the footwall zone of the Boungou Shear Zone, the ability to carry out our 2016 exploration program at Natougou and obtain results within
anticipated schedules, the ability to execute an agreement relating to the mining of Natougou, the ability to meet the various objectives in terms
of tonnes of ore to the milling facility, head-grade and tonnes per day processed at the Natougou plant, LOM overall strip ratio and operational
strip ratio, the ability to operate a power plant facility with an installed capacity of 15.4 MW using HFO/LFO generators, the ability to generate
an after-tax internal rate of return (IRR) of 48% with a payback period of 1.5 years and to generate an after-tax NPV of $262 million, the
accuracy of our assumptions, the ability to execute on our strategic focus, fluctuation in the price of currencies, gold or operating costs, mining
industry risks, uncertainty as to calculation of mineral reserves and resources, delays, political and social stability in Africa (including our ability
to maintain or renew licenses and permits) and other risks described in SEMAFO’s documents filed with Canadian securities regulatory
authorities. You can find further information with respect to these and other risks in SEMAFO’s 2014 Annual MD&A, as updated in SEMAFO’s
2015 First Quarter MD&A, Second Quarter MD&A and Third Quarter MD&A and other filings made with Canadian securities regulatory
authorities and available at www.sedar.com. These documents are also available on our website at www.semafo.com. SEMAFO disclaims any
obligation to update or revise these forward-looking statements, except as required by applicable law.
We also advise you that the terms “Inferred Resources” and “Indicated Resources”, although recognized and required by the Canadian
Securities Administrators, are not recognized by the US Securities and Exchange Commission. There is no certainty that Inferred
Resources or Indicated Resources will be economically mineable.
All mineral resources are exclusive of mineral reserves.
In this presentation, all amounts are in US dollars unless otherwise indicated.
3
SEMAFO HAS….
 STRONG IN-HOUSE
TECHNICAL TEAM
 TRACK RECORD OF
OPERATING SUCCESS
IN WEST AFRICA
 HIGH-GRADE OPEN-PIT
DEPOSITS
 FINANCIAL STRENGTH
 LARGE EXPLORATION
PACKAGE
 RESPECTED CSR
PROGRAMS
 DISCIPLINED GROWTH
STRATEGY
4
6,605km2
in Burkina Faso
over three prospective belts
MANAMine
in Burkina Faso
20years
Commissioned
3 mines in West Africa
over
LONG STANDING PRESENCE IN WEST AFRICA
NATOUGOUFeasibility Study Completed
Targeted Production H2 2018
BurkinaFaso
Mana
BANFORA GOLD BELT
PERMITS
Ouagadougou
(Capital)
Inata
Essakane
Bissa
Taparko
Youga
SEMAFO property
Other mines
Electric line
Korhogo
Natougou
Nabanga
Bantou
55
172,7
158,6
234,3
255,9
750
777
649
495
550
1 221 1 242
805
648
740
0
200
400
600
800
1000
1200
1400
0
50
100
150
200
250
300
2012 2013 2014 2015 Guidance 2016
Production '000 ounces Total Cash Cost ($/oz) All-in Sustaining Cost ($/oz)
OPERATING SUCCESS
Met its production guidance for
the eighth consecutive year
0
1
2
3
Dec. 31, 2007 Dec. 31, 2014
Mana reserves after
production of 1.4M oz
Reserves in Moz Au
245
225
‘000oz
 Built and expanded Mana on time
and on budget
 Reserves at Mana more than
doubled since inauguration of
the mine in 2008
 One of the lowest cost gold
producers
 Generates free cash flow
66
MANA STRONG PRODUCTION AND LOW COST PROFILE
6
GUIDANCE
2016
2015³ 2014
Ore processed (t) 2,500,000 2,399,100 2,754,000
Head grade (g/t) 3.25 3.63 2.90
Recovery (%) 91 91 91
Total gold ounces produced (K) 225-245 256 234
Total cash cost/ounce sold1($) 535-565 495 649
All-in sustaining cost/ounce2 ($) 720-760 648 805
1 Total cash cost is a non-IFRS financial performance measure with no standard definition under IFRS and represents the mining operation expenses and
government royalties per ounce sold.
2 All-in sustaining cost is a non-IFRS financial performance measure with no standard definition under IFRS and represents the total cash cost, plus sustainable
capital expenditures and stripping costs per ounce.
³ 2015 numbers are preliminary and are subject to final adjustment.
77
$0
$200
$400
$600
$800
$1 000
$1 200
$1 400
PRU GSC TMM TGZ ASR AR HL MND AUY ACA AGI NEM SSRI KGC OGC CG ELD ABX EDV CDE BTO DGC P AEM GG SMF
AISC TCC
LOW ALL-IN SUSTAINING COST RELATIVE TO INDUSTRY PEERS: 2016
Source: BMO Capital Markets as at February 8, 2016
$/oz
AISC - All-In-Sustaining-Cost: Cash costs plus corporate costs plus sustaining capital
Total Cash Costs (Co-Product): The Gold Institute definition of Total Cash Costs is cash operating costs plus royalties and production taxes.
For averages, total cash costs are weighted to the number of ounces produced in each respective year.
SMF
8
MANA’S RESERVES (AS AT DECEMBER 31, 2014)
Wona-Kona:
13,275,500 Mt @ 2.27 g/t
Au
970,100 oz
Fofina:
2,443,200 Mt @ 2.62 g/t
Au
205,700 oz
Siou:
6,972,200 Mt @ 4.37 g/t
Au
980,000 oz
Mana
Processing Plant
9
TARGETED EXPLORATION WITHIN TRUCKING DISTANCE OF MANA - 2016
25 km
from the mine
 $4.5 million exploration budget
established for Mana project in
2016
 Exploration will concentrate on
areas within trucking distance of
the mine
 ~27,000-meter RC drill program,
mainly on 3 sectors south of Mana
 27,000-meter auger drill program
Mana Mine
Wona
Siou
Fofina
FobiriYaho
YAMA
RC drilling
4,600 m
RC drilling
6,900 m
RC drilling
12,500 m
10
YAMA DRILLING INTERSECTION HIGHLIGHTS
NATOUGOU: OUR NEW QUALITY ASSET
12
POSITIVE FEASIBILITY STUDY HIGHLIGHTS
During the first three years,
• Average annual production of more than 226,000 ounces
• Average total cash cost of $283/oz and AISC of $374/oz
• Average head grade 5.72 g/t at a gold recovery rate of 93.8%
Projected LOM total cash cost of $408/oz and all-in sustaining
cost of $518/oz
Maiden open pit mineral reserves of 9.6 million tonnes at a
grade of 4.15 g/t Au for 1,276,000 ounces of gold
Initial CAPEX: $219 million
First gold pour
H2 2018
Project economics at $1,100/oz:
• After-tax NPV 5%: $262 million
• After-tax IRR: 48%
• Payback period: 1.5 years
Production of some 1.2 million ounces over a
projected LOM in excess of 7 years
13
13
ROBUST PROJECT ECONOMICS
GOLD PRICE SENSITIVITY ANALYSIS
Base Case
Gold Price ($/oz) $1,000 $1,100 $1,200
After-tax NPV 5% ($M) $199 $262 $334
After-tax IRR (%) 38 48 58
Payback period (years) 1.7 1.5 1.3
14
NATOUGOU INITIAL CAPITAL EXPENDITURES
Initial Capital Expenditures In millions of $
Indirect construction 13.6
Processing plant 42.3
Reagents and plant services 13.7
Infrastructure 41.8
Owner costs 15.8
EPCM costs 15.9
Resettlement action plan 8.0
Initial supplies inventory 7.2
Plant & infrastructures subtotal 158.3
Pre-stripping 42.4
Contingency 18.7
Grand Total 219.4
2016 - $10.0M
2017 - $46.0M
2018 - $163.4M
15
2016
2017
2018
NATOUGOU TIMETABLE
Permitting process & Detailed engineering
2026
Construction & Pre-stripping
17
Commissioning, ramp-up,
first gold pour and production
15
16
NATOUGOU– INITIAL PRODUCTION
YEAR 1 YEAR 2 YEAR 3
Feed ore (t) 1,256,000 1,343,200 1,343,200
Grade (g/t) 5.93 5.59 5.65
Gold recovery (%) 93.9 93.7 93.7
Ounces (oz) 224,918 226,100 228,502
TCC ($/oz) 319 304 227
AISC ($/oz) 380 406 337
STRONG FREE CASH FLOW
17
PROJECT FUNDING
Facility increased from $90 to $120 million
- Incremental $60 million to be drawn down by
June 30, 2017 ($30 million repayment due March 3, 2016)
- LIBOR + 4.75% per annum
- Quarterly repayments of $15 million, from first quarter of 2019 to
fourth quarter of 2020
- Closing of the amended Facility is anticipated on or about
March 31, 2016
Anticipated Cash Flow
from Ongoing Operations
Credit Facility
Cash Position
Sufficient Financial
Resources to Bring
Natougou into
Production
Generating cash flow
$167M in cash as of December 31, 2015
18
NATOUGOU: AN UNDEREXPLORED PROPERTY
Prior to the acquisition, Natougou had seen little near-pit
or regional exploration
Focus on in-fill drilling for the feasibility study in 2015
Regional and proximal exploration only commenced a few
months ago
773 km2 of exploration ground
Objective is to expand
reserves and resources
to further improve economics
19
EXPLORATION POTENTIAL - OPEN IN ALL DIRECTIONS
Grade x thickness
plan view
20
EXPLORATION POTENTIAL- FOOTWALL ZONE
21
PROXIMAL AND REGIONAL EXPLORATION PROGRAM : $6M IN 2016
 Airborne geophysical surveying - 2015
 20,000 meters of RC drilling
 6,000 meters of core drilling –
continuity of footwall & sector west
 60,000 meters of auger drilling
2016
2222
NABANGA: A THIRD HIGH-GRADE DEPOSIT
Nabanga –Inferred Mineral Resource
(1)
Cut-off Grade Tonnes Grade Ounces
5.0 g/t Au 1.84 Mt 10.0 g/t Au 590,000 oz
(1) Inferred Mineral Resource figures at a 5.0 g/t Au cut-off grade. NI 43-101 report, June 2015
.
23
PROSPECTIVE PROPERTIES ON THE SOUTH HOUNDÉ BELT
24
Côte d’Ivoire
Highly mineralised greenstone belts
Korhogo Project
Along strike from Tongon Mine - priority targets
EXPLORATION UPSIDE: ACQUIRED PERMITS IN CÔTE D’IVOIRE
Korhogo Permit /Application
Korhogo East Application
Korhogo West Permit
Target Corridor
Fapoha South (Randgold)
Fapoha North (Randgold)
Gold Mine
Gold Deposits
Target Corridor
THE GRADE
MAKING
25
2016 PRIORITIES
NATOUGOU
 Completing detailed engineering in Q4
 Completing the permitting process and
starting construction by year-end
 Exploration with the aim of increasing
reserves and resources to further
improve economics
MANA
 Delivering our production and cost
guidance for a ninth consecutive year
 Exploration within trucking distance of
the Mine
26
National Workforce Development Program -
Training of promising national employees for
management or trainer posts
SEMAFO Foundation -
Six years of activities bolster our ability to
establish strong relations with communities
Training – 10,000 hours of training
were dispensed in 2014, of which 75%
benefited our Burkinabe employees
Strong Safety Record -
Accident frequency rate of 1.88 per 200,000
hours worked as of December 31, 2015

Weitere ähnliche Inhalte

Was ist angesagt?

Corporate update John Tumazos Very Independent Research March 31, 2014
Corporate update    John Tumazos Very Independent Research March 31, 2014Corporate update    John Tumazos Very Independent Research March 31, 2014
Corporate update John Tumazos Very Independent Research March 31, 2014
Agnico Eagle Mines
 
European Gold Forum 2014
European Gold Forum 2014European Gold Forum 2014
European Gold Forum 2014
Teranga Gold
 
BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25
SemafoCorporate
 

Was ist angesagt? (20)

2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing
 
CFA Society April 9 2014
CFA Society April 9 2014CFA Society April 9 2014
CFA Society April 9 2014
 
Denver Gold Forum
Denver Gold ForumDenver Gold Forum
Denver Gold Forum
 
033016 tasiast expansion studies
033016 tasiast expansion studies033016 tasiast expansion studies
033016 tasiast expansion studies
 
2017 dgf final2
2017 dgf final22017 dgf final2
2017 dgf final2
 
2016 q1results.21apr2016
2016 q1results.21apr20162016 q1results.21apr2016
2016 q1results.21apr2016
 
Corporate update John Tumazos Very Independent Research March 31, 2014
Corporate update    John Tumazos Very Independent Research March 31, 2014Corporate update    John Tumazos Very Independent Research March 31, 2014
Corporate update John Tumazos Very Independent Research March 31, 2014
 
European Gold Forum 2014
European Gold Forum 2014European Gold Forum 2014
European Gold Forum 2014
 
Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017
 
Baml presentation.goldberg.may2016 final
Baml presentation.goldberg.may2016 finalBaml presentation.goldberg.may2016 final
Baml presentation.goldberg.may2016 final
 
2018 pdac presentation
2018 pdac presentation2018 pdac presentation
2018 pdac presentation
 
Kinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast PresentationKinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast Presentation
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentation
 
Investor Presentation - January 2017
Investor Presentation - January 2017Investor Presentation - January 2017
Investor Presentation - January 2017
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - final
 
PTNNT sale presentation June2016
PTNNT sale presentation June2016PTNNT sale presentation June2016
PTNNT sale presentation June2016
 
Full Year and Q4 2016 Earnings
Full Year and Q4 2016 EarningsFull Year and Q4 2016 Earnings
Full Year and Q4 2016 Earnings
 
110316 q3 webcast website
110316 q3 webcast website110316 q3 webcast website
110316 q3 webcast website
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25
 

Andere mochten auch

Cover Letter Kingsley Aguh 1
Cover Letter Kingsley Aguh 1Cover Letter Kingsley Aguh 1
Cover Letter Kingsley Aguh 1
Kingsley Aguh
 
ADMA Technology White Paper FA
ADMA Technology White Paper FAADMA Technology White Paper FA
ADMA Technology White Paper FA
Kym Boyle
 
02 ALeblanc P Match mai juin 1968
02 ALeblanc P Match mai juin 196802 ALeblanc P Match mai juin 1968
02 ALeblanc P Match mai juin 1968
Audrey Leblanc
 
Las TICS aprendendizaje colaborativo y cooperativo A8 A
Las TICS aprendendizaje colaborativo y cooperativo A8 ALas TICS aprendendizaje colaborativo y cooperativo A8 A
Las TICS aprendendizaje colaborativo y cooperativo A8 A
Anayda Ochoa
 

Andere mochten auch (16)

Inbound marketing
Inbound marketingInbound marketing
Inbound marketing
 
Cover Letter Kingsley Aguh 1
Cover Letter Kingsley Aguh 1Cover Letter Kingsley Aguh 1
Cover Letter Kingsley Aguh 1
 
Playas malaga
Playas malagaPlayas malaga
Playas malaga
 
Resume
ResumeResume
Resume
 
ADMA Technology White Paper FA
ADMA Technology White Paper FAADMA Technology White Paper FA
ADMA Technology White Paper FA
 
Smart big data ook voor fysieke winkels
Smart big data ook voor fysieke winkelsSmart big data ook voor fysieke winkels
Smart big data ook voor fysieke winkels
 
02 ALeblanc P Match mai juin 1968
02 ALeblanc P Match mai juin 196802 ALeblanc P Match mai juin 1968
02 ALeblanc P Match mai juin 1968
 
10th certificate
10th certificate10th certificate
10th certificate
 
ПОБУДОВА АУДІО- ТА ВІДЕОРЯДУ. ДОДАВАННЯ ДО ВІДЕОКЛІПУ ВІДЕОЕФЕКТІВ ТА НАЛАШТУ...
ПОБУДОВА АУДІО- ТА ВІДЕОРЯДУ. ДОДАВАННЯ ДО ВІДЕОКЛІПУ ВІДЕОЕФЕКТІВ ТА НАЛАШТУ...ПОБУДОВА АУДІО- ТА ВІДЕОРЯДУ. ДОДАВАННЯ ДО ВІДЕОКЛІПУ ВІДЕОЕФЕКТІВ ТА НАЛАШТУ...
ПОБУДОВА АУДІО- ТА ВІДЕОРЯДУ. ДОДАВАННЯ ДО ВІДЕОКЛІПУ ВІДЕОЕФЕКТІВ ТА НАЛАШТУ...
 
Estrategias de inversión 2014
Estrategias de inversión 2014Estrategias de inversión 2014
Estrategias de inversión 2014
 
memoria descriptiva proyecto de electrificacion
memoria descriptiva proyecto de electrificacionmemoria descriptiva proyecto de electrificacion
memoria descriptiva proyecto de electrificacion
 
Las TICS aprendendizaje colaborativo y cooperativo A8 A
Las TICS aprendendizaje colaborativo y cooperativo A8 ALas TICS aprendendizaje colaborativo y cooperativo A8 A
Las TICS aprendendizaje colaborativo y cooperativo A8 A
 
Carlos reyes 15% higiene
Carlos reyes 15% higieneCarlos reyes 15% higiene
Carlos reyes 15% higiene
 
Entrepreneurial spirit among indian youth
Entrepreneurial spirit among indian youthEntrepreneurial spirit among indian youth
Entrepreneurial spirit among indian youth
 
Subham Internship
Subham InternshipSubham Internship
Subham Internship
 
Rotterdam
RotterdamRotterdam
Rotterdam
 

Ähnlich wie Bmo finale web low res

Corporate Update march 17 - 2014
Corporate Update   march 17 - 2014Corporate Update   march 17 - 2014
Corporate Update march 17 - 2014
Agnico Eagle Mines
 

Ähnlich wie Bmo finale web low res (20)

National bank qc june 2016 lr
National bank qc june 2016 lrNational bank qc june 2016 lr
National bank qc june 2016 lr
 
Scotiabank conference dec 2016 lr final
Scotiabank conference dec 2016 lr finalScotiabank conference dec 2016 lr final
Scotiabank conference dec 2016 lr final
 
Denver gold-2016-final
Denver gold-2016-finalDenver gold-2016-final
Denver gold-2016-final
 
Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017
 
07 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final207 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final2
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek final
 
Denver gold-forum-final web-lr
Denver gold-forum-final web-lrDenver gold-forum-final web-lr
Denver gold-forum-final web-lr
 
Td securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-finalTd securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-final
 
Corporate Update march 17 - 2014
Corporate Update   march 17 - 2014Corporate Update   march 17 - 2014
Corporate Update march 17 - 2014
 
121 london teranga presentation - 1x1
121 london   teranga presentation - 1x1121 london   teranga presentation - 1x1
121 london teranga presentation - 1x1
 
121 singapore teranga presentation - 1x1
121 singapore   teranga presentation - 1x1121 singapore   teranga presentation - 1x1
121 singapore teranga presentation - 1x1
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 16 04_07 - laurentian 1x1 presentation
Dgc 16 04_07 - laurentian 1x1 presentationDgc 16 04_07 - laurentian 1x1 presentation
Dgc 16 04_07 - laurentian 1x1 presentation
 
Pdac march-2018-final-print-lr
Pdac march-2018-final-print-lrPdac march-2018-final-print-lr
Pdac march-2018-final-print-lr
 
PDAC - Investor Presentation
PDAC - Investor PresentationPDAC - Investor Presentation
PDAC - Investor Presentation
 
Llg corporate presentation march 2018
Llg   corporate presentation march 2018Llg   corporate presentation march 2018
Llg corporate presentation march 2018
 
Llg corporate presentation march 2018
Llg   corporate presentation march 2018Llg   corporate presentation march 2018
Llg corporate presentation march 2018
 
Great panther silver_limited_corporate_presentation_february_21_2017
Great panther silver_limited_corporate_presentation_february_21_2017Great panther silver_limited_corporate_presentation_february_21_2017
Great panther silver_limited_corporate_presentation_february_21_2017
 
Great panther silver_limited_corporate_presentation_january_24_2017
Great panther silver_limited_corporate_presentation_january_24_2017Great panther silver_limited_corporate_presentation_january_24_2017
Great panther silver_limited_corporate_presentation_january_24_2017
 
Dgc 16 02_28 - bmo 1x1 presentation
Dgc 16 02_28 - bmo 1x1 presentationDgc 16 02_28 - bmo 1x1 presentation
Dgc 16 02_28 - bmo 1x1 presentation
 

Mehr von SemafoCorporate

Mehr von SemafoCorporate (12)

Presentation - Investor Day June 2019
Presentation - Investor Day June 2019Presentation - Investor Day June 2019
Presentation - Investor Day June 2019
 
Presentation - Investor Day June 2019
Presentation - Investor Day June 2019Presentation - Investor Day June 2019
Presentation - Investor Day June 2019
 
Corporate Presentation August 2018
Corporate Presentation August 2018Corporate Presentation August 2018
Corporate Presentation August 2018
 
Corporate presentation-february-2018-final-web
Corporate presentation-february-2018-final-webCorporate presentation-february-2018-final-web
Corporate presentation-february-2018-final-web
 
November boungou-visit final-low
November boungou-visit final-lowNovember boungou-visit final-low
November boungou-visit final-low
 
Agm 2016 final lR
Agm 2016 final lRAgm 2016 final lR
Agm 2016 final lR
 
Présentation corporative – avril 2016
Présentation corporative – avril 2016Présentation corporative – avril 2016
Présentation corporative – avril 2016
 
Assemblee generale annuelle des actionnaires
Assemblee generale annuelle des actionnairesAssemblee generale annuelle des actionnaires
Assemblee generale annuelle des actionnaires
 
Denver Gold Forum 2015
Denver Gold Forum 2015Denver Gold Forum 2015
Denver Gold Forum 2015
 
Annual General Meeting (in French) - May 14, 2015
Annual General Meeting (in French) - May 14, 2015Annual General Meeting (in French) - May 14, 2015
Annual General Meeting (in French) - May 14, 2015
 
BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 

Kürzlich hochgeladen

Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
MollyBrown86
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
Probe Gold
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
dharasingh5698
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
MollyBrown86
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Sheetaleventcompany
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
mriyagarg453
 

Kürzlich hochgeladen (20)

Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 

Bmo finale web low res

  • 2. 2 FORWARD-LOOKING STATEMENTS This presentation contains forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You are hence cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include words or expressions such as “projected”, “initial”, “targeted”, “expected”, “anticipated”, “estimates”, “potential”, “priority”, “objective”, “aim”, “continuing”, “planned”, “designed to”, “in order to”, “achieve”, “envisaged”, ‘will”, “committed”, “evolve”, “become”, “pursuing”, “growth”, “opportunities” and other similar words or expressions. Factors that could cause future results or events to differ materially from current expectations expressed or implied by the forward-looking statements include the ability to complete the Natougou feasibility study early in the second quarter of 2016 within the $12.5 million budget, the ability to achieve the mid-range of our 2015 production guidance of between 245,000 and 275,000 ounces, the ability to achieve our 2015 total cash cost guidance of between $485 and $505 per ounce and our all-in sustaining cost guidance of between $630 and $650 per ounce, include the ability to meet the annual average production targets at Natougou within the anticipated total cash costs and all-in sustaining costs, the ability to achieve the projected LOM, the ability to meet the targeted permitting process, initial capital expenditures, construction start-up, expected first gold pour and full year of production, the ability to bring Natougou into production with the combination of our current cash position, anticipated cash flow from production and the amended Macquarie Facility, the ability to close the Macquarie amended Facility and to meet the various conditions precedent to drawdown, the ability to expand Natougou resources at depth within the footwall zone of the Boungou Shear Zone, the ability to carry out our 2016 exploration program at Natougou and obtain results within anticipated schedules, the ability to execute an agreement relating to the mining of Natougou, the ability to meet the various objectives in terms of tonnes of ore to the milling facility, head-grade and tonnes per day processed at the Natougou plant, LOM overall strip ratio and operational strip ratio, the ability to operate a power plant facility with an installed capacity of 15.4 MW using HFO/LFO generators, the ability to generate an after-tax internal rate of return (IRR) of 48% with a payback period of 1.5 years and to generate an after-tax NPV of $262 million, the accuracy of our assumptions, the ability to execute on our strategic focus, fluctuation in the price of currencies, gold or operating costs, mining industry risks, uncertainty as to calculation of mineral reserves and resources, delays, political and social stability in Africa (including our ability to maintain or renew licenses and permits) and other risks described in SEMAFO’s documents filed with Canadian securities regulatory authorities. You can find further information with respect to these and other risks in SEMAFO’s 2014 Annual MD&A, as updated in SEMAFO’s 2015 First Quarter MD&A, Second Quarter MD&A and Third Quarter MD&A and other filings made with Canadian securities regulatory authorities and available at www.sedar.com. These documents are also available on our website at www.semafo.com. SEMAFO disclaims any obligation to update or revise these forward-looking statements, except as required by applicable law. We also advise you that the terms “Inferred Resources” and “Indicated Resources”, although recognized and required by the Canadian Securities Administrators, are not recognized by the US Securities and Exchange Commission. There is no certainty that Inferred Resources or Indicated Resources will be economically mineable. All mineral resources are exclusive of mineral reserves. In this presentation, all amounts are in US dollars unless otherwise indicated.
  • 3. 3 SEMAFO HAS….  STRONG IN-HOUSE TECHNICAL TEAM  TRACK RECORD OF OPERATING SUCCESS IN WEST AFRICA  HIGH-GRADE OPEN-PIT DEPOSITS  FINANCIAL STRENGTH  LARGE EXPLORATION PACKAGE  RESPECTED CSR PROGRAMS  DISCIPLINED GROWTH STRATEGY
  • 4. 4 6,605km2 in Burkina Faso over three prospective belts MANAMine in Burkina Faso 20years Commissioned 3 mines in West Africa over LONG STANDING PRESENCE IN WEST AFRICA NATOUGOUFeasibility Study Completed Targeted Production H2 2018 BurkinaFaso Mana BANFORA GOLD BELT PERMITS Ouagadougou (Capital) Inata Essakane Bissa Taparko Youga SEMAFO property Other mines Electric line Korhogo Natougou Nabanga Bantou
  • 5. 55 172,7 158,6 234,3 255,9 750 777 649 495 550 1 221 1 242 805 648 740 0 200 400 600 800 1000 1200 1400 0 50 100 150 200 250 300 2012 2013 2014 2015 Guidance 2016 Production '000 ounces Total Cash Cost ($/oz) All-in Sustaining Cost ($/oz) OPERATING SUCCESS Met its production guidance for the eighth consecutive year 0 1 2 3 Dec. 31, 2007 Dec. 31, 2014 Mana reserves after production of 1.4M oz Reserves in Moz Au 245 225 ‘000oz  Built and expanded Mana on time and on budget  Reserves at Mana more than doubled since inauguration of the mine in 2008  One of the lowest cost gold producers  Generates free cash flow
  • 6. 66 MANA STRONG PRODUCTION AND LOW COST PROFILE 6 GUIDANCE 2016 2015³ 2014 Ore processed (t) 2,500,000 2,399,100 2,754,000 Head grade (g/t) 3.25 3.63 2.90 Recovery (%) 91 91 91 Total gold ounces produced (K) 225-245 256 234 Total cash cost/ounce sold1($) 535-565 495 649 All-in sustaining cost/ounce2 ($) 720-760 648 805 1 Total cash cost is a non-IFRS financial performance measure with no standard definition under IFRS and represents the mining operation expenses and government royalties per ounce sold. 2 All-in sustaining cost is a non-IFRS financial performance measure with no standard definition under IFRS and represents the total cash cost, plus sustainable capital expenditures and stripping costs per ounce. ³ 2015 numbers are preliminary and are subject to final adjustment.
  • 7. 77 $0 $200 $400 $600 $800 $1 000 $1 200 $1 400 PRU GSC TMM TGZ ASR AR HL MND AUY ACA AGI NEM SSRI KGC OGC CG ELD ABX EDV CDE BTO DGC P AEM GG SMF AISC TCC LOW ALL-IN SUSTAINING COST RELATIVE TO INDUSTRY PEERS: 2016 Source: BMO Capital Markets as at February 8, 2016 $/oz AISC - All-In-Sustaining-Cost: Cash costs plus corporate costs plus sustaining capital Total Cash Costs (Co-Product): The Gold Institute definition of Total Cash Costs is cash operating costs plus royalties and production taxes. For averages, total cash costs are weighted to the number of ounces produced in each respective year. SMF
  • 8. 8 MANA’S RESERVES (AS AT DECEMBER 31, 2014) Wona-Kona: 13,275,500 Mt @ 2.27 g/t Au 970,100 oz Fofina: 2,443,200 Mt @ 2.62 g/t Au 205,700 oz Siou: 6,972,200 Mt @ 4.37 g/t Au 980,000 oz Mana Processing Plant
  • 9. 9 TARGETED EXPLORATION WITHIN TRUCKING DISTANCE OF MANA - 2016 25 km from the mine  $4.5 million exploration budget established for Mana project in 2016  Exploration will concentrate on areas within trucking distance of the mine  ~27,000-meter RC drill program, mainly on 3 sectors south of Mana  27,000-meter auger drill program Mana Mine Wona Siou Fofina FobiriYaho YAMA RC drilling 4,600 m RC drilling 6,900 m RC drilling 12,500 m
  • 11. NATOUGOU: OUR NEW QUALITY ASSET
  • 12. 12 POSITIVE FEASIBILITY STUDY HIGHLIGHTS During the first three years, • Average annual production of more than 226,000 ounces • Average total cash cost of $283/oz and AISC of $374/oz • Average head grade 5.72 g/t at a gold recovery rate of 93.8% Projected LOM total cash cost of $408/oz and all-in sustaining cost of $518/oz Maiden open pit mineral reserves of 9.6 million tonnes at a grade of 4.15 g/t Au for 1,276,000 ounces of gold Initial CAPEX: $219 million First gold pour H2 2018 Project economics at $1,100/oz: • After-tax NPV 5%: $262 million • After-tax IRR: 48% • Payback period: 1.5 years Production of some 1.2 million ounces over a projected LOM in excess of 7 years
  • 13. 13 13 ROBUST PROJECT ECONOMICS GOLD PRICE SENSITIVITY ANALYSIS Base Case Gold Price ($/oz) $1,000 $1,100 $1,200 After-tax NPV 5% ($M) $199 $262 $334 After-tax IRR (%) 38 48 58 Payback period (years) 1.7 1.5 1.3
  • 14. 14 NATOUGOU INITIAL CAPITAL EXPENDITURES Initial Capital Expenditures In millions of $ Indirect construction 13.6 Processing plant 42.3 Reagents and plant services 13.7 Infrastructure 41.8 Owner costs 15.8 EPCM costs 15.9 Resettlement action plan 8.0 Initial supplies inventory 7.2 Plant & infrastructures subtotal 158.3 Pre-stripping 42.4 Contingency 18.7 Grand Total 219.4 2016 - $10.0M 2017 - $46.0M 2018 - $163.4M
  • 15. 15 2016 2017 2018 NATOUGOU TIMETABLE Permitting process & Detailed engineering 2026 Construction & Pre-stripping 17 Commissioning, ramp-up, first gold pour and production 15
  • 16. 16 NATOUGOU– INITIAL PRODUCTION YEAR 1 YEAR 2 YEAR 3 Feed ore (t) 1,256,000 1,343,200 1,343,200 Grade (g/t) 5.93 5.59 5.65 Gold recovery (%) 93.9 93.7 93.7 Ounces (oz) 224,918 226,100 228,502 TCC ($/oz) 319 304 227 AISC ($/oz) 380 406 337 STRONG FREE CASH FLOW
  • 17. 17 PROJECT FUNDING Facility increased from $90 to $120 million - Incremental $60 million to be drawn down by June 30, 2017 ($30 million repayment due March 3, 2016) - LIBOR + 4.75% per annum - Quarterly repayments of $15 million, from first quarter of 2019 to fourth quarter of 2020 - Closing of the amended Facility is anticipated on or about March 31, 2016 Anticipated Cash Flow from Ongoing Operations Credit Facility Cash Position Sufficient Financial Resources to Bring Natougou into Production Generating cash flow $167M in cash as of December 31, 2015
  • 18. 18 NATOUGOU: AN UNDEREXPLORED PROPERTY Prior to the acquisition, Natougou had seen little near-pit or regional exploration Focus on in-fill drilling for the feasibility study in 2015 Regional and proximal exploration only commenced a few months ago 773 km2 of exploration ground Objective is to expand reserves and resources to further improve economics
  • 19. 19 EXPLORATION POTENTIAL - OPEN IN ALL DIRECTIONS Grade x thickness plan view
  • 21. 21 PROXIMAL AND REGIONAL EXPLORATION PROGRAM : $6M IN 2016  Airborne geophysical surveying - 2015  20,000 meters of RC drilling  6,000 meters of core drilling – continuity of footwall & sector west  60,000 meters of auger drilling 2016
  • 22. 2222 NABANGA: A THIRD HIGH-GRADE DEPOSIT Nabanga –Inferred Mineral Resource (1) Cut-off Grade Tonnes Grade Ounces 5.0 g/t Au 1.84 Mt 10.0 g/t Au 590,000 oz (1) Inferred Mineral Resource figures at a 5.0 g/t Au cut-off grade. NI 43-101 report, June 2015 .
  • 23. 23 PROSPECTIVE PROPERTIES ON THE SOUTH HOUNDÉ BELT
  • 24. 24 Côte d’Ivoire Highly mineralised greenstone belts Korhogo Project Along strike from Tongon Mine - priority targets EXPLORATION UPSIDE: ACQUIRED PERMITS IN CÔTE D’IVOIRE Korhogo Permit /Application Korhogo East Application Korhogo West Permit Target Corridor Fapoha South (Randgold) Fapoha North (Randgold) Gold Mine Gold Deposits Target Corridor
  • 25. THE GRADE MAKING 25 2016 PRIORITIES NATOUGOU  Completing detailed engineering in Q4  Completing the permitting process and starting construction by year-end  Exploration with the aim of increasing reserves and resources to further improve economics MANA  Delivering our production and cost guidance for a ninth consecutive year  Exploration within trucking distance of the Mine
  • 26. 26 National Workforce Development Program - Training of promising national employees for management or trainer posts SEMAFO Foundation - Six years of activities bolster our ability to establish strong relations with communities Training – 10,000 hours of training were dispensed in 2014, of which 75% benefited our Burkinabe employees Strong Safety Record - Accident frequency rate of 1.88 per 200,000 hours worked as of December 31, 2015