www.globalmarinesystems.com
Global Marine installs the most northerly fibre optic
cable system in the world
Telecoms
CASE STUDY
Vessel: Cable Innovator
Length: 500km
Location: Arctic Ocean
Subsea Equipment: Hi-Plough
Vessel: Cable Innovator
Services ProvidedGlobal Marine System Limited completed
the installation of the most northerly
subsea cable system in the world, which
will service the research community of
Ny-Ålesund in Svalbard, Norway. The
installation was completed in October 2014.
The research station supports earth and life scientists
and is part of an international research community.
Global Marine had previously been involved with the
installation from Svalbard archipelago to the Norwegian
mainland now extending the system further into the
Arctic Circle. The scope this time was to connect a
research facility in Ny-Ålesund to the main town of
Longyearbyen via two cables providing redundancy to
the network if required.
Global Marine used multi-role DPS-2 Cable Innovator to
install the system and the Hi-Plough to complete subsea
operations.
Global Marine provided an end-to-end solution to the
customer from initial surveys through to the installation
of the fibre optic cable system, which included:
•		 Desk survey
•		 Route engineering
•		 Pre-lay grapnel run and route clearance
•		 Shore end installation
•		 Deep water operations
•		 Post project reporting
www.globalmarinesystems.com
For further information on Global Marine please visit
our website www.globalmarinesystems.com or
contact our sales team.
UK: +44 1245 702200
Asia: +65 65131300
The ChallengeAssets
Cable Innovator successfully completed the installation
despite the difficult environmental conditions using its
Hi-Plough burial capability, installing shore ends at both
Ny-Ålesund and Longyearbyen.
Cable Innovator, the purpose built DPS-2 cable ship
was used to install the system, she has a track record
of working in subsea engineering projects around the
globe with experience of both transatlantic installations
as well as operations providing platform to platform fibre
connectivity for the oil & gas market in the North Sea.
Global Marine’s range of Hi-Ploughs meet the demand
for deeper burial, and represent the latest in deep-
water plough technology, operating to a depth of 2,000
metres. Each Hi-Plough has 500kW of jetting power to
reduce the active tow tensions and can be fitted with
either a 2 metre plough share or a 3.25 metre injector
share.
Global Marine installed the subsea cable in some of
the most challenging weather conditions experienced
during an installation; the team were faced with freezing
winds, driving snow and ice bergs not to mention drops
in temperatures to -10°c during the project.
The location of the project presented numerous
hurdles. Lack of satellite coverage due the high latitude
made communications more difficult, limited means
of transport meant logistics of getting people and
equipment to and from the island and between the
landing sites needed to be very well planned, and of
course the impact of the ever changing extreme arctic
climate.
The picture above shows the shore end installation at
Ny-Ålesund.
It has been a pleasure to work with Global Marine
during this project. The installation period on board
Cable Innovator clearly demonstrated to us that we
were working with a very professional, flexible crew on
all levels. I would also like to mention the beach team
who assisted in getting the cables through the HDD
ducts safely.
Helge Stranden
Project Manager, Uninett

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (12)

MAPA CONCEPTUAL GERENCIA DE PROYECTOS
MAPA CONCEPTUAL GERENCIA DE PROYECTOSMAPA CONCEPTUAL GERENCIA DE PROYECTOS
MAPA CONCEPTUAL GERENCIA DE PROYECTOS
 
5 fuerzas de porter
5 fuerzas de porter5 fuerzas de porter
5 fuerzas de porter
 
Improving Profitability Through Business-Led Sector Partnerships
Improving Profitability Through Business-Led Sector PartnershipsImproving Profitability Through Business-Led Sector Partnerships
Improving Profitability Through Business-Led Sector Partnerships
 
Resume
ResumeResume
Resume
 
Annual Report 2015
Annual Report 2015Annual Report 2015
Annual Report 2015
 
Makhya's glasses
Makhya's glassesMakhya's glasses
Makhya's glasses
 
Cartaz de cinedetetive
Cartaz de cinedetetiveCartaz de cinedetetive
Cartaz de cinedetetive
 
24546418
2454641824546418
24546418
 
November 2016: Outreach Newsletter
November 2016: Outreach NewsletterNovember 2016: Outreach Newsletter
November 2016: Outreach Newsletter
 
Actividad 1_Tecnológico de Monterrey
Actividad 1_Tecnológico de MonterreyActividad 1_Tecnológico de Monterrey
Actividad 1_Tecnológico de Monterrey
 
Direccion estrategica
Direccion estrategicaDireccion estrategica
Direccion estrategica
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTR
 

Ähnlich wie GM-casestudy-uninett

MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...DEGIMA SA
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Javier Cantera
 
Case study_WoDS_rev1
Case study_WoDS_rev1Case study_WoDS_rev1
Case study_WoDS_rev1Rune Kaltoft
 
Presentataion Oil&Gas Telecommunications Conference - Radio LInk Project
Presentataion  Oil&Gas Telecommunications Conference - Radio LInk Project Presentataion  Oil&Gas Telecommunications Conference - Radio LInk Project
Presentataion Oil&Gas Telecommunications Conference - Radio LInk Project Andrea Vallavanti
 
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_vaPresentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_vaAndrea Vallavanti
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
Aberdeen Harbour Siklu CCTV Case Study
Aberdeen Harbour Siklu CCTV Case StudyAberdeen Harbour Siklu CCTV Case Study
Aberdeen Harbour Siklu CCTV Case StudyPurdicom
 
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...Purdicom
 
Case study_Walney_rev1
Case study_Walney_rev1Case study_Walney_rev1
Case study_Walney_rev1Rune Kaltoft
 
Case study_GYM_rev1
Case study_GYM_rev1Case study_GYM_rev1
Case study_GYM_rev1Rune Kaltoft
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webNora Kohlhase
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webPaul Heinrich
 

Ähnlich wie GM-casestudy-uninett (20)

Prysmian group-2014-sum-t
Prysmian group-2014-sum-tPrysmian group-2014-sum-t
Prysmian group-2014-sum-t
 
Oresund
OresundOresund
Oresund
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
 
Case study_WoDS_rev1
Case study_WoDS_rev1Case study_WoDS_rev1
Case study_WoDS_rev1
 
Presentataion Oil&Gas Telecommunications Conference - Radio LInk Project
Presentataion  Oil&Gas Telecommunications Conference - Radio LInk Project Presentataion  Oil&Gas Telecommunications Conference - Radio LInk Project
Presentataion Oil&Gas Telecommunications Conference - Radio LInk Project
 
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_vaPresentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Aberdeen Harbour Siklu CCTV Case Study
Aberdeen Harbour Siklu CCTV Case StudyAberdeen Harbour Siklu CCTV Case Study
Aberdeen Harbour Siklu CCTV Case Study
 
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
 
Case study_Walney_rev1
Case study_Walney_rev1Case study_Walney_rev1
Case study_Walney_rev1
 
brochuredeepoffshore_1_0
brochuredeepoffshore_1_0brochuredeepoffshore_1_0
brochuredeepoffshore_1_0
 
Submarine cable
Submarine cableSubmarine cable
Submarine cable
 
Deep Energy Description
Deep Energy DescriptionDeep Energy Description
Deep Energy Description
 
Case study_GYM_rev1
Case study_GYM_rev1Case study_GYM_rev1
Case study_GYM_rev1
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Nexans LV-HV Wind Farm Cables Catalogue
Nexans LV-HV Wind Farm Cables CatalogueNexans LV-HV Wind Farm Cables Catalogue
Nexans LV-HV Wind Farm Cables Catalogue
 
Sakhalin II OPF Project
Sakhalin II OPF ProjectSakhalin II OPF Project
Sakhalin II OPF Project
 

GM-casestudy-uninett

  • 1. www.globalmarinesystems.com Global Marine installs the most northerly fibre optic cable system in the world Telecoms CASE STUDY Vessel: Cable Innovator Length: 500km Location: Arctic Ocean Subsea Equipment: Hi-Plough Vessel: Cable Innovator Services ProvidedGlobal Marine System Limited completed the installation of the most northerly subsea cable system in the world, which will service the research community of Ny-Ålesund in Svalbard, Norway. The installation was completed in October 2014. The research station supports earth and life scientists and is part of an international research community. Global Marine had previously been involved with the installation from Svalbard archipelago to the Norwegian mainland now extending the system further into the Arctic Circle. The scope this time was to connect a research facility in Ny-Ålesund to the main town of Longyearbyen via two cables providing redundancy to the network if required. Global Marine used multi-role DPS-2 Cable Innovator to install the system and the Hi-Plough to complete subsea operations. Global Marine provided an end-to-end solution to the customer from initial surveys through to the installation of the fibre optic cable system, which included: • Desk survey • Route engineering • Pre-lay grapnel run and route clearance • Shore end installation • Deep water operations • Post project reporting
  • 2. www.globalmarinesystems.com For further information on Global Marine please visit our website www.globalmarinesystems.com or contact our sales team. UK: +44 1245 702200 Asia: +65 65131300 The ChallengeAssets Cable Innovator successfully completed the installation despite the difficult environmental conditions using its Hi-Plough burial capability, installing shore ends at both Ny-Ålesund and Longyearbyen. Cable Innovator, the purpose built DPS-2 cable ship was used to install the system, she has a track record of working in subsea engineering projects around the globe with experience of both transatlantic installations as well as operations providing platform to platform fibre connectivity for the oil & gas market in the North Sea. Global Marine’s range of Hi-Ploughs meet the demand for deeper burial, and represent the latest in deep- water plough technology, operating to a depth of 2,000 metres. Each Hi-Plough has 500kW of jetting power to reduce the active tow tensions and can be fitted with either a 2 metre plough share or a 3.25 metre injector share. Global Marine installed the subsea cable in some of the most challenging weather conditions experienced during an installation; the team were faced with freezing winds, driving snow and ice bergs not to mention drops in temperatures to -10°c during the project. The location of the project presented numerous hurdles. Lack of satellite coverage due the high latitude made communications more difficult, limited means of transport meant logistics of getting people and equipment to and from the island and between the landing sites needed to be very well planned, and of course the impact of the ever changing extreme arctic climate. The picture above shows the shore end installation at Ny-Ålesund. It has been a pleasure to work with Global Marine during this project. The installation period on board Cable Innovator clearly demonstrated to us that we were working with a very professional, flexible crew on all levels. I would also like to mention the beach team who assisted in getting the cables through the HDD ducts safely. Helge Stranden Project Manager, Uninett