SlideShare ist ein Scribd-Unternehmen logo
1 von 30
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Green Standards
&
data center design
and operations
John Peterson
PE, PMP, CEM, LEED AP BD+C
HP Critical Facilities Services
Agenda
• Data Center Green Standards
• Government Efforts
– Energy Star, Dept of Energy
• Building Rating Systems
– LEED
• Industry
– ASHRAE, ISO
• Hallmarks of a “Green” data center
2
Data Center Green Standards
EPA ENERGY STAR
Ratings/Certifications
LEED for Data
Centers
Rating/Certification
Federal Energy
Management
Program
EO 13514-2009
Industry Consortium Industrial technologies
Program e.g.,
Energy Base-lining
DCEP program
EU Code of Conduct
for Data Centres
15+ codes, programs
and directives
3
90.1-2010-Appendix G
2011 Environmental classes
90.4 Established
Singapore Standard
for green data centres-energy
and environmental monitoring
systems
© 2013 Hewlett-Packard Development Company, L.P.
The information contained herein is subject to change without notice.
Key attributes of EO 13514
Leadership in Environmental, Energy, and Economic Performance
4
Builds upon past policy & regulatory framework:
Energy Independence & Security Act, EO 13423, and
Energy Policy Act 2005
Defined Green House Gas (GHG) Emissions (e):
•Scope 1 – direct GHG-e from sources owned or
controlled by a Federal agency.
•Scope 2 – direct GHG-e resulting from generation of
electricity, heat, or steam purchased by a Federal
agency.
•Scope 3 – GHG-e from sources not owned or directly
controlled by a Federal agency but related to agency
activities such as vendor supply chains, delivery
services, employee travel and commuting.
Enterprise Greenhouse Gas Programs
Carbon Disclosure Project
(CDP)
The Climate Registry
(TCR)
Climate Action Reserve
(CAR)
Global reporting Initiative
(GRI)
EPA Climate Leaders
VOLUNTAR
Y
Regional Greenhouse
Gas Initiative (RGGI)
Reduce GHG by 10% from
power sector by 2018
EPA Mandatory Reporting
GHG Rule (2010)
Facilities > 25000 MT GHG
submit annual report
REGULATOR
Y
2010 California AB-32
Reduce GHG by 2020
to 1990 levels
EU Emission Trading
Scheme (EU ETS)
UK Carbon reduction
Commitment (UK CRC)
Reduce GHG by 80% in 2050
Vs 1990
National Greenhouse and
Energy Reporting
Streamlining protocol
International Regulatory & Policy Gaining Momentum
• Based on actual as-billed energy data
• Serves as a whole building indicator
• Peer group comparison of data center’s energy
performance
• Mix of fuels
• ENERGY STAR label to data centers with a
rating of 75 or higher (scale of 0-100)
• 39 data centers certified to date (June 2013)
ENERGY STAR certification for data
centers
6
ENERGY STAR - Portfolio Manager
7
• New version
coming out
July 10,
2013
8 HP Confidential
ENERGY STAR rating/certification
Data Submission
for Potential certification
Step-4
Initiation
4 weeks
Step-1
Rating Initiation:
• Send proposal to client
• Decision to apply for Energy
Star rating.
• Define Energy Star rating
objectives
• Define Energy Star rating scope
• Determine key client
information: name, site, location
• Determine key technical
information: building area, data
center area, other spaces area
• Client approval
• Select certification team
• Notify the team to perform the
facility survey and data
collection
Rating Preparation:
• Verify eligibility
• Read service data sheet and
service delivery guide
• Define Survey date and
duration.
• Request facility Electrical &
Mechanical documents
• Utility bills –current/past 12
months or next 12 months
• Conduct preliminary data
analysis
• Understand preliminary elect. &
mechanical subsystems
• Understand metering
requirements
Execution:
• Site Visit and kick-off
meeting/presentation
• Educate the client about the
process & interview
• Conduct initial walk-through &
ensure as-built condition
• Define building total energy
• Define data center total IT
loads/UPS output
• Determine mechanical loads
power panels or if any is on UPS
• Determine/Verify energy
metering for total building and
data center
• Install energy meters in
designated locations if
necessary
Data submission:
• Create an account in portfolio
manager
• Submit all required monthly
energy data for the building and
the data center
• If rating is >75%; apply for
Energy Star
• Generate energy use statement
• Populate all data in the report
template
• Certify, Stamp and Finalize and
submit to Energy Star
• Handover portfolio manager
account after training to client for
future management
• If rating is <75%; implement
ECMs and re-apply.
Preparation
Step-2
Execution
Step-3
6 WEEKS-1 year +
DoE On-line Profiling Tool: Data Center Pro
9
INPUTS
• Description
• Utility bill data
• System information
• IT
• Cooling
• Power
• On-site gen
OUTPUTS
•Overall picture of
energy use and
efficiency
•End-use breakout
•Potential areas for
energy efficiency
improvement
•Overall energy use
reduction potential
DC Profiler Tool
To download the DC Profiler tool:
http://ecenter.ee.doe.gov/EM/tools/Documents/DCPro_Downloadable_InstallInstructions.pd
f10
DoE- Air Management Energy Assessment Tool
• Air management recommendations (actions)
• Potential for reducing the supply airflow rate
• Potential for increasing the supply air
temperature
• Estimates of the % energy reduction for
supply fans and chillers
The AM-Tool is a free Excel tool
for assessing the data center air-
management status and
providing actions and energy
savings.
11
To download tool and documentation
http://www1.eere.energy.gov/industry/saveenergynow/dc_pro.html
Unit Program Step
AHU Airflow cfm Step 1 AHU
AHU Supply Air Temperature °F Step 1 AHU
AHU Return Air Temperature °F Step 1 AHU
Equipment Temperature Rise °F Step 2 Equip
Equipment Airflow cfm Step 2 Equip
Number of Equipment Units - Step 2 Equip
Equipment Power W Step 2 Equip
IT-Equipment Intake Temperature °F Step 3 RCI
Typical Max IT-Equipment Intake
Temperature
°F Step 4 Main Input
Typical Min IT-Equipment Intake
Temperature
°F Step 4 Main Input
Recommended IT-Equipment Intake
Temperature Range
°F Step 4 Main Input
Allowable IT-Equipment Intake
Temperature Range
°F Step 4 Main Input
OUTPUTS
• Provide air-
management
recommendations
• Estimate the
potential for reducing
supply airflow rate
and increasing
supply air
temperature
• Estimate the
percentage of energy
reduction for fans
and chillers
DoE AM Tool-Required Inputs
12
INPUTS
• Air-handler unit data for
calculating Return
Temperature Index
(RTI) (energy metric)
• IT-equipment data for
calculating the RTI
metric
• IT-equipment intake
temperatures for
calculating Rack Cooling
Index (RCI) (equipment
cooling metric)
• Main input with
questions for
determining energy
savings and
recommendations
DoE Electrical Assessment Tool
To download the tool and user manual
http://www1.eere.energy.gov/industry/datacenters/docs/dcpro_eat.xls
Designed to help assess the potential savings from efficiency actions in the
electrical power chain of a data center
INPUTS
• Basic configuration and
efficiency information on
electrical system
components such as
transformers, generators,
uninterruptible power supply
(UPS), power distribution
unit (PDU) devices, and
lighting
• Energy use of electrical
systems
OUTPUTS
• Estimate potential
savings
for various electrical
system efficiency actions.
• UPS efficiency
comparison /
benchmarking
• Energy efficiency metrics
13
DoE Assessment Process
14
Process Step Current Tools/Resources
1. Use DC Pro Profiling tool for preliminary assessment. Complete on-line survey of profiling
tool.
Profiling Tool
2. Hold kickoff conference call to review goals and scope; Identify needed information and
documents
Use report from Profiling tool
as a discussion prompter
3. Compile existing information from drawings, trend logs, etc. Enter available information into
tools/worksheets
Assessment Tools or
Worksheets
4. On-site meeting with all stakeholders: Site tour (if needed) / Overview presentation (if
needed) / Review, confirm and document efficiency actions to be studied, metrics to be
analyzed, and measurement plan (assign roles and responsibilities)
Assessment Tools or
Worksheets
5. Conduct on-site measurements as needed to complete inputs for assessment tools.
Assessment Tools or
Worksheets
6. Estimate savings for actions in each assessment area: Electrical power chain / IT
equipment and software / Air Management / HVAC / On-site generation (Can be done off-site)
Assessment Tools
7. Estimate costs for each action in conjunction with site personnel (can be done off-site)
8. Compile assessment report and present to site Report Template
9. Provide report to DOE (sanitized if necessary, and if site approves) and provide feedback
on overall assessment process
1wk2wk1wk3wk
14
DoE Master List of Actions
To download the master list of actions “energy conservation measures”
http://www1.eere.energy.gov/manufacturing/datacenters/pdfs/data_center_actions_list.pdf
15
Building Rating Systems
Susta ina ble Building Ra ting System s Development Ba sis
BREEAM (Building Research Establishment’s Environmental
Assessment
Method)
Original
BREEAM Canada BREEAM
BREEAM Green Leaf BREEAM, Green Leaf™
Calabasas LEED LEED®
CASBEE (Comprehensive Assessment System for Building
Environmental
Efficiency)
Original
CEPAS (Comprehensive Environmental Performance Assessment
Scheme)
LEED®, BREEAM, HK-BEAM, IBI
Earth Advantage Commercial Buildings (Oregon) Undisclosed
EkoProfile (Norway) Undisclosed
ESCALE Undisclosed
GBTool Original
EPC for Data Centers (developed by California Energy
Commission and LBNL)*
GEM (Global Environmental Method) For Existing Buildings
(Green Globes) –
LEED®
UK Green Globes Canada
GOBAS (Green Olympic Building Assessment System) CASBEE, LEED®
Green Building Rating System – Korea BREEAM, LEED®, BEPAC
Green Globes Canada BREEAM Green Leaf
Green Globes™ US Green Globes Canada
Green Leaf Eco-Rating Program Original
Green Star Australia BREEAM, LEED®
HK BEAM (Hong Kong Building Environmental Assessment
Method)
BREEAM
HQE (High Environmental Quality) Undisclosed
iDP(Integrated Design Process) Original
Labs21 Original
LEED® (Leadership in Energy and Environmental Design) Original
LEED Canada LEED®
LEED India LEED®
LEED Mexico LEED®
MSBG (The State of Minnesota Sustainable Building Guidelines)
'98, and BREEAM
LEED®, Green Building Challenge
NABERS (National Australian Built Environment Rating System) Undisclosed
PromisE Undisclosed
Protocol ITACA GBTool
SBAT (Sustainable Buildings Assessment Tool) Original
Scottsdale's Green Building Program Undisclosed
SPiRiT (Sustainable Project Rating Tool) LEED®
TERI Green Rating for Integrated Habitat Assessment Original
TQ Building Assessment System (Total Quality Building
Assessment
System)
Original
* The only rating system specifically developed for data center projects
Most common rating systems
are LEED, BREEAM and
Green Globes
16
U.S. GBC LEED Introduction
17
• Leadership in Energy and Environmental Design (LEED) - recognized
as the most prominent third-party green building certification system in
the US and derivations are widely used abroad.
• LEED basics:
• concise framework for measurable green building performance, including:
energy savings, water efficiency, construction methods, building
materials, and more.
• can be applied to any building type, from residential homes to office
buildings to hospitals to data centers.
• 4 levels of certification: Certified, Silver, Gold and Platinum.
• The latest release, Version 3, was released on April 27, 2009.
• Future versions are consensus based, transparent, ongoing development
cycle.
• LEED certification leads to:
• Lower operating costs Increased asset value Reduce landfill waste
• Conserve energy and water Healthier and safer environments for occupants
• Reduce harmful greenhouse gas emissions
• Qualify for tax rebates, zoning allowances and other incentives in hundreds of cities.
• Demonstrates a commitment by the owner toward a more efficient, environmentally-
friendly future.
LEED Adaptations for Data Centers
New Construction Energy and Atmosphere
•EA prerequisite 1: Fundamental Commissioning of Building Energy Systems (NC)
•EA prerequisite 2: Minimum Energy Performance (NC)
•EA credit 1: Optimize Energy Performance (NC)
•EA credit 3: Enhanced Commissioning (NC)
•EA credit 5: Measurement and Verification (NC)
Existing Buildings Energy and Atmosphere
•EA prerequisite 1: Energy Efficiency Best Management Practices – Planning, Documentation and Opportunity Assessment (EB)
•EA credit 2.1: Existing Building Commissioning – Investigation and Analysis (EB)
•EA credit 3.1: Performance Measurement – Building Automation System (EB)
 
New Construction Water Efficiency (NEW CREDIT)
•EA credit #: Cooling Tower Water Management (NC)
18
Final Modified / Added Credits
Certified: 40 – 49 pts
Silver: 50 – 59 pts
Gold: 60 – 79 pts
Platinum: 80+ pts
Total Possible Points=110
LEED Changes – 2013
23 credits have
substantive
changes upcoming
19
Version 4
LEED Changes – 2013
Energy performance:
Determine PUE
5% improvement in design; 2% of
the 5% is to be from infrastructure
ASHRAE 90.1-2010
20
Version 4
PUE Usage and public reporting guidelines
Guidance on topics:
•Data Collection and Metrics Calculations
•Reporting Result Timescale and Data Collection Details
•Reporting Results to The Green Grid
•Common Issues with Reporting or Interpreting PUE
• Infrastructure vs. IT
• Power vs. Energy
• “Better-than-Perfect” PUE Measurements
• Comparing Results Calculated over Different Timeframes at Different Granularity Levels
• Comparing PUE Results Between Data Centers
21
22
Plus CUE, WUE, ERE, ERF….and Data Center Maturity Model “DCMM”
PUE (Power Usage Effectiveness)
Emergency
generator
Utility
transformer
PUE Total data center energy from all fuels (kWh)
Total IT energy (kWh)
Total data
center energy
House
energy
=
Data
center
Main
service
PP-Gen
service
Lighting
panel
Generator
block
Heaters &
lighting
Lighting,
Exit
lights,
BMS,
EPMS &
security
House
panels
UPS
STS
PDUs
RPPs
Mech. Swgear
Data center
CRAC units,
AHUs,
Chillers & Dry
coolers
Fuel
Misc. support Mech. supportPower
ToIT
IT-critical
load
District
chilled water
District steam
Natural gas
CO2
NOx
Total Direct Water
Consumption
Fuel
ER
F
ER
E
Total data
center
energy
Total data
center
energy
CUE
WUE
23
ENERGY STAR Rating Vs. PUE
≤ 1.5
Monitoring/Measurement
Requirements
• 1–49: Low cost operational changes + improving IT
efficiency + lowering the heat load +reductions to the
cooling load
• 50–74: Simple, low-cost changes + equipment upgrades
• 75–100: ENERGY STAR certification
• 100,000 square foot, tier 4
data center
• 10 MW IT load
• LEED Silver
• Detailed energy modeling
• Base case and proposed
energy end uses (demand and
annual)
LEED Example: Global Bank – New Data Center
25
LEED Example: Global Bank continued
Page 6
Performance Rat ing Table
Baseline Building Energy Summary by End Use
Energy Peak Energy Peak Energy
KWHx000,000 kW x000 10
6
Btu 10
6
Btuh 10
6
Btu 10
6
Btuh %
Interior Lighting Electricity 0.78 1.38 2662.14 4.71 2% 4163.86 8.16 2% 36.07%
Interior Lighting (Process) Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Exterior Lighting Electricity 0.08 0.04 273.04 0.14 0% 477.82 0.00 0% 42.86%
Space Heating (fuel 1) Natural Gas 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Space Heating (fuel 2) Electricity 2.13 1.55 7269.69 5.29 2% 6757.74 5.87 2% -7.58%
Space Cooling Electricity 10.26 13.73 35017.38 46.85 20% 102253.48 203.01 60% 65.75%
Pumps Electricity 8.36 37.67 28532.68 128.53 55% 443.69 0.00 0% -6330.77%
Heat Rejection Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Fans - Interior Electricity 7.82 10.96 26689.66 37.40 16% 79147.47 108.50 32% 66.28%
Fans - Parking Garage Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Service Water Heating (fuel 1) Natural Gas 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Service Water Heating (fuel 2) Electricity 2.37 3.25 8088.81 11.09 5% 8088.81 11.06 3% 0.00%
Receptacle Equipment Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Refrigeration (food, etc.) Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Cooking (commercial, fuel 1) Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Cooking (commercial, fuel 2) Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
Elevators and Escalators Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00%
31.8 68.58 108533.4 233.99496 100% 201332.87 336.59006 100% 46.09%
Note: Energy Consumption is listed in units ofsite energy
10
6
Btu = kWh x 3.413 x 1000 10
3
Btu = therms / 100
Performance Rat ing Met hod Compliance Report
Total Building Consumption
Baseline BuildingProposed Building
Energy Type
Process
End Use
• 46% reduction in annual energy use for infrastructure systems (as compared
to ashrae energy standard 90.1)
• 41% annual water savings (as compared to the Energy Policy Act of 1992 )
• Improved ventilation rates by 32% (compared to ASHRAE Std. 62.1)
ASHRAE Standard 90.1: Compliance options
Energy code compliance
options
• Prescriptive option
• Trade-off option
• Energy cost budget
Most compliant options are Trade-off option
Select approved addenda
• Demand control ventilation requirements
• Fan power limitations
• Alternative compliance path for water-cooled chillers
with VFD/efficient part load performance
28 addenda identified as energy-related
Mandatory Provisions
• Minimum HVAC equipment efficiency
• Load calculations
• Controls
• Construction & insulation
Overall impact: higher efficiencies, thermal
performance, and documentation
30% Energy progress
• 6 prototypes in 17 climate zones, based on 2004
• More prototypes to be examined
• Envelope R-values increase
Results are preliminary
26 HP Confidential
ASHRAE Standard 90.1: Appendix G Impacts
Clarifying existing items
• Ventilation cfm of proposed = baseline
• Exception – EQc2 increased ventilation doesn’t
change baseline
• Purchased CHW now covered
Summary: Eliminating confusion for calcs
Data Center economizer exceptions
• 3 MMBtuh with or without central plant
• 0.6 MMBtuh or less being added to existing building
• 0.6 MMBtuh or less with central plant
• Local authority prohibits cooling towers
Summary: Only small data centers meet
exemption criteria
Water-side items
• VFD required on pump motors >10 HP
• Maximum flows per pipe sizes
• Heat exchanger test procedure
• Pump head calcs required
Summary: More stringent requirements to
increase efficiency
Air-side items
• Exhaust air energy recover exception: flammable
• Two new baseline systems 10 & 11
• Supply resets
• Demand control ventilation
Summary: Greater efficiency on most air
systems
27
28 HP Confidential
TC 9.09 recommendations at computer equipment air intakes
ASHRAE: Indoor Temperature and Moisture Levels
MAXIMUM
80°F dry-bulb
67°F wet-bulb
60°F dew point
MAXIMUM
80°F dry-bulb
67°F wet-bulb
60°F dew point
MINIMUM
65°F dry-bulb
53°F wet-bulb
43°F dew point
MINIMUM
65°F dry-bulb
53°F wet-bulb
43°F dew point
Alternate Description Dry Bulb (°F)
Relative
Humidity (%)
W et Bulb (°F) Dew Point (°F)
Chilled W ater
Supply Temp
Condenser
W ater
Supply Temp
(for W SE)
Maximum
Outdoor W et
Bulb Temp (for
W SE)
70F SA Conditions - Low Humidity 70.0 37.6 54.9 43.0
70F SA Conditions - High Humidity 70.0 58.9 60.6 55.0
72F SA Conditions - Low Humidity 72.0 35.1 55.7 43.0
72F SA Conditions - High Humidity 72.0 61.4 63.0 58.0
75F SA Conditions - Low Humidity 75.0 31.8 56.9 43.0
75F SA Conditions - High Humidity 75.0 59.6 65.1 60.0
80F SA Conditions - Low Humidity 80.0 26.9 58.8 43.0
80F SA Conditions - High Humidity 80.0 50.5 66.7 60.0
#1
#2
#3
#4
58.0
60.0
63.0
68.0
56.0
58.0
61.0
66.0
42.0
44.0
47.0
52.0
50001 – Energy Management System
• Designed to be used independently, yet can be aligned or integrated
with other management systems (e.g., ISO 9001) and environmental
(ISO 14001). Applicable to all organizations.
• Requires an organization to establish, implement, maintain, and
improve an energy management system, enabling systematic
achievement of continual improvement in energy performance, energy
efficiency, and energy conservation.
• Imposes requirements on energy supply and consumption:
− Measurement
− Documentation and reporting
− Design and procurement practices for
energy-using equipment and systems
− Processes and personnel
• Applies to all factors that can be monitored and influenced by the
organization to affect energy use.
• Does not prescribe specific performance criteria with respect to energy.
International Organization for Standardization ISO
29 HP Confidential
Hallmarks of a “Green” data center
• Standards/Metrics for whole building performance
• Demand for high temperature server operation will continue, changing the way
data centers are designed
• Advances in using outdoor air for cooling will dramatically reduce energy use
• Based on industry design criteria and best practices, Climate and geography
leveraged to minimize GHG emissions
• Facility responds to site constraints and advantages
• Designed using rigorous whole-building energy modeling
• Optimization of energy and water use
• Life cycle approach used in decision making
• Thorough and transparent reporting of energy use – Energy &
Sustainability Management (ESM)
30

Weitere ähnliche Inhalte

Was ist angesagt?

Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...Schneider Electric
 
How Data Center Infrastructure Management Software Improves Planning and Cuts...
How Data Center Infrastructure Management Software Improves Planning and Cuts...How Data Center Infrastructure Management Software Improves Planning and Cuts...
How Data Center Infrastructure Management Software Improves Planning and Cuts...Schneider Electric
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT ConvergenceSchneider Electric
 
Transforming data into sustained energy performance
Transforming data into sustained energy performanceTransforming data into sustained energy performance
Transforming data into sustained energy performanceSchneider Electric
 
Types of Prefabricated Modular Data Centers
Types of Prefabricated Modular Data CentersTypes of Prefabricated Modular Data Centers
Types of Prefabricated Modular Data CentersSchneider Electric
 
Distributech 2015 - Mobile Work management
Distributech 2015 - Mobile Work managementDistributech 2015 - Mobile Work management
Distributech 2015 - Mobile Work managementSchneider Electric
 
Practical Considerations for Implementing Prefabricated Data Centers
Practical Considerations for Implementing Prefabricated Data CentersPractical Considerations for Implementing Prefabricated Data Centers
Practical Considerations for Implementing Prefabricated Data CentersSchneider Electric
 
Improving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data centerImproving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data centerSchneider Electric
 
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...Schneider Electric
 
Containerized Power and Cooling Modules for Data Cen...
Containerized Power and Cooling Modules for Data Cen...Containerized Power and Cooling Modules for Data Cen...
Containerized Power and Cooling Modules for Data Cen...Schneider Electric
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerSchneider Electric
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best directionSchneider Electric
 
Effect on Substation Engineering Costs of IEC61850 & System Configuration Tools
Effect on Substation Engineering Costs of IEC61850 & System Configuration ToolsEffect on Substation Engineering Costs of IEC61850 & System Configuration Tools
Effect on Substation Engineering Costs of IEC61850 & System Configuration ToolsSchneider Electric
 
Essential elements of data center operations
Essential elements of data center operationsEssential elements of data center operations
Essential elements of data center operationsSchneider Electric
 
The Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data CentersThe Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data CentersSchneider Electric
 
Fundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersFundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersSchneider Electric
 

Was ist angesagt? (20)

Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
 
How Data Center Infrastructure Management Software Improves Planning and Cuts...
How Data Center Infrastructure Management Software Improves Planning and Cuts...How Data Center Infrastructure Management Software Improves Planning and Cuts...
How Data Center Infrastructure Management Software Improves Planning and Cuts...
 
Ensuring your plant is secure
Ensuring your plant is secureEnsuring your plant is secure
Ensuring your plant is secure
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence
 
Data centers on the Edge
Data centers on the EdgeData centers on the Edge
Data centers on the Edge
 
Transforming data into sustained energy performance
Transforming data into sustained energy performanceTransforming data into sustained energy performance
Transforming data into sustained energy performance
 
Scada expert Clear Scada
Scada expert Clear ScadaScada expert Clear Scada
Scada expert Clear Scada
 
Types of Prefabricated Modular Data Centers
Types of Prefabricated Modular Data CentersTypes of Prefabricated Modular Data Centers
Types of Prefabricated Modular Data Centers
 
Distributech 2015 - Mobile Work management
Distributech 2015 - Mobile Work managementDistributech 2015 - Mobile Work management
Distributech 2015 - Mobile Work management
 
Practical Considerations for Implementing Prefabricated Data Centers
Practical Considerations for Implementing Prefabricated Data CentersPractical Considerations for Implementing Prefabricated Data Centers
Practical Considerations for Implementing Prefabricated Data Centers
 
Improving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data centerImproving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data center
 
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
 
Containerized Power and Cooling Modules for Data Cen...
Containerized Power and Cooling Modules for Data Cen...Containerized Power and Cooling Modules for Data Cen...
Containerized Power and Cooling Modules for Data Cen...
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & power
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best direction
 
Effect on Substation Engineering Costs of IEC61850 & System Configuration Tools
Effect on Substation Engineering Costs of IEC61850 & System Configuration ToolsEffect on Substation Engineering Costs of IEC61850 & System Configuration Tools
Effect on Substation Engineering Costs of IEC61850 & System Configuration Tools
 
Essential elements of data center operations
Essential elements of data center operationsEssential elements of data center operations
Essential elements of data center operations
 
The Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data CentersThe Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data Centers
 
SCADA of the Future
SCADA of the FutureSCADA of the Future
SCADA of the Future
 
Fundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersFundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for Owners
 

Ähnlich wie How green standards are changing data center design and operations

How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operationsSchneider Electric
 
Data center energy practitioner (dcep) certification training 2020
Data center energy practitioner (dcep) certification training 2020Data center energy practitioner (dcep) certification training 2020
Data center energy practitioner (dcep) certification training 2020Julius Neudorfer, DCEP
 
Data center energy practitioner (dcep) dc pro-tools
Data center energy practitioner (dcep) dc pro-toolsData center energy practitioner (dcep) dc pro-tools
Data center energy practitioner (dcep) dc pro-toolsJulius Neudorfer, DCEP
 
Energy Star® Portfolio Manager – Assessing Your Portfolio of Public Buildings
Energy Star® Portfolio Manager – Assessing Your Portfolio of Public BuildingsEnergy Star® Portfolio Manager – Assessing Your Portfolio of Public Buildings
Energy Star® Portfolio Manager – Assessing Your Portfolio of Public BuildingsTNenergy
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.LongBun1
 
What to consider when integrating energy into Facilities Management
What to consider when integrating energy into Facilities ManagementWhat to consider when integrating energy into Facilities Management
What to consider when integrating energy into Facilities ManagementeSightEnergy
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Lucia Shen
 
Benchmarking Building Energy Performance: A View from EPA’s ENERGY STAR Program
Benchmarking Building Energy Performance: A View from EPA’s ENERGY STAR ProgramBenchmarking Building Energy Performance: A View from EPA’s ENERGY STAR Program
Benchmarking Building Energy Performance: A View from EPA’s ENERGY STAR ProgramEnergyCAP, Inc.
 
Power Usage Effectiveness (PUE): Status & Directions. By K. Winkler
Power  Usage Effectiveness (PUE): Status & Directions. By K. WinklerPower  Usage Effectiveness (PUE): Status & Directions. By K. Winkler
Power Usage Effectiveness (PUE): Status & Directions. By K. WinklerDCC Mission Critical
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2ZAINI ABDUL WAHAB
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...All4 Inc.
 
European Data Centre Standards
European Data Centre StandardsEuropean Data Centre Standards
European Data Centre StandardsICT FOOTPRINT .eu
 
0436_CEEDA_General Overview_A4_Landscape_v2
0436_CEEDA_General Overview_A4_Landscape_v20436_CEEDA_General Overview_A4_Landscape_v2
0436_CEEDA_General Overview_A4_Landscape_v2David Carter
 
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleUnlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleJason Burt
 
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Upsite Technologies
 
apidays LIVE Paris - Sopra Steria: path to the industrialization of sustaina...
 apidays LIVE Paris - Sopra Steria: path to the industrialization of sustaina... apidays LIVE Paris - Sopra Steria: path to the industrialization of sustaina...
apidays LIVE Paris - Sopra Steria: path to the industrialization of sustaina...apidays
 
Energy Data Analysis Techniques
Energy Data Analysis TechniquesEnergy Data Analysis Techniques
Energy Data Analysis TechniquesStuart Turvey
 
PG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryPG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryThomas Russell, PE
 

Ähnlich wie How green standards are changing data center design and operations (20)

How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
Data center energy practitioner (dcep) certification training 2020
Data center energy practitioner (dcep) certification training 2020Data center energy practitioner (dcep) certification training 2020
Data center energy practitioner (dcep) certification training 2020
 
Data center energy practitioner (dcep) dc pro-tools
Data center energy practitioner (dcep) dc pro-toolsData center energy practitioner (dcep) dc pro-tools
Data center energy practitioner (dcep) dc pro-tools
 
Energy Star® Portfolio Manager – Assessing Your Portfolio of Public Buildings
Energy Star® Portfolio Manager – Assessing Your Portfolio of Public BuildingsEnergy Star® Portfolio Manager – Assessing Your Portfolio of Public Buildings
Energy Star® Portfolio Manager – Assessing Your Portfolio of Public Buildings
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.
 
What to consider when integrating energy into Facilities Management
What to consider when integrating energy into Facilities ManagementWhat to consider when integrating energy into Facilities Management
What to consider when integrating energy into Facilities Management
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015
 
Benchmarking Building Energy Performance: A View from EPA’s ENERGY STAR Program
Benchmarking Building Energy Performance: A View from EPA’s ENERGY STAR ProgramBenchmarking Building Energy Performance: A View from EPA’s ENERGY STAR Program
Benchmarking Building Energy Performance: A View from EPA’s ENERGY STAR Program
 
Power Usage Effectiveness (PUE): Status & Directions. By K. Winkler
Power  Usage Effectiveness (PUE): Status & Directions. By K. WinklerPower  Usage Effectiveness (PUE): Status & Directions. By K. Winkler
Power Usage Effectiveness (PUE): Status & Directions. By K. Winkler
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2
 
Tds.Data Center Eval
Tds.Data Center EvalTds.Data Center Eval
Tds.Data Center Eval
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
 
European Data Centre Standards
European Data Centre StandardsEuropean Data Centre Standards
European Data Centre Standards
 
0436_CEEDA_General Overview_A4_Landscape_v2
0436_CEEDA_General Overview_A4_Landscape_v20436_CEEDA_General Overview_A4_Landscape_v2
0436_CEEDA_General Overview_A4_Landscape_v2
 
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleUnlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
 
apidays LIVE Paris - Sopra Steria: path to the industrialization of sustaina...
 apidays LIVE Paris - Sopra Steria: path to the industrialization of sustaina... apidays LIVE Paris - Sopra Steria: path to the industrialization of sustaina...
apidays LIVE Paris - Sopra Steria: path to the industrialization of sustaina...
 
Energy Data Analysis Techniques
Energy Data Analysis TechniquesEnergy Data Analysis Techniques
Energy Data Analysis Techniques
 
PG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryPG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_Summary
 

Mehr von Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design ConsiderationsSchneider Electric
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsSchneider Electric
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing Schneider Electric
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsSchneider Electric
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service ProvidersSchneider Electric
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingSchneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSchneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingSchneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingSchneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesSchneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTSchneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingSchneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingSchneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingSchneider Electric
 

Mehr von Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Kürzlich hochgeladen

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 

Kürzlich hochgeladen (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 

How green standards are changing data center design and operations

  • 1. © Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. Green Standards & data center design and operations John Peterson PE, PMP, CEM, LEED AP BD+C HP Critical Facilities Services
  • 2. Agenda • Data Center Green Standards • Government Efforts – Energy Star, Dept of Energy • Building Rating Systems – LEED • Industry – ASHRAE, ISO • Hallmarks of a “Green” data center 2
  • 3. Data Center Green Standards EPA ENERGY STAR Ratings/Certifications LEED for Data Centers Rating/Certification Federal Energy Management Program EO 13514-2009 Industry Consortium Industrial technologies Program e.g., Energy Base-lining DCEP program EU Code of Conduct for Data Centres 15+ codes, programs and directives 3 90.1-2010-Appendix G 2011 Environmental classes 90.4 Established Singapore Standard for green data centres-energy and environmental monitoring systems © 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
  • 4. Key attributes of EO 13514 Leadership in Environmental, Energy, and Economic Performance 4 Builds upon past policy & regulatory framework: Energy Independence & Security Act, EO 13423, and Energy Policy Act 2005 Defined Green House Gas (GHG) Emissions (e): •Scope 1 – direct GHG-e from sources owned or controlled by a Federal agency. •Scope 2 – direct GHG-e resulting from generation of electricity, heat, or steam purchased by a Federal agency. •Scope 3 – GHG-e from sources not owned or directly controlled by a Federal agency but related to agency activities such as vendor supply chains, delivery services, employee travel and commuting.
  • 5. Enterprise Greenhouse Gas Programs Carbon Disclosure Project (CDP) The Climate Registry (TCR) Climate Action Reserve (CAR) Global reporting Initiative (GRI) EPA Climate Leaders VOLUNTAR Y Regional Greenhouse Gas Initiative (RGGI) Reduce GHG by 10% from power sector by 2018 EPA Mandatory Reporting GHG Rule (2010) Facilities > 25000 MT GHG submit annual report REGULATOR Y 2010 California AB-32 Reduce GHG by 2020 to 1990 levels EU Emission Trading Scheme (EU ETS) UK Carbon reduction Commitment (UK CRC) Reduce GHG by 80% in 2050 Vs 1990 National Greenhouse and Energy Reporting Streamlining protocol International Regulatory & Policy Gaining Momentum
  • 6. • Based on actual as-billed energy data • Serves as a whole building indicator • Peer group comparison of data center’s energy performance • Mix of fuels • ENERGY STAR label to data centers with a rating of 75 or higher (scale of 0-100) • 39 data centers certified to date (June 2013) ENERGY STAR certification for data centers 6
  • 7. ENERGY STAR - Portfolio Manager 7 • New version coming out July 10, 2013
  • 8. 8 HP Confidential ENERGY STAR rating/certification Data Submission for Potential certification Step-4 Initiation 4 weeks Step-1 Rating Initiation: • Send proposal to client • Decision to apply for Energy Star rating. • Define Energy Star rating objectives • Define Energy Star rating scope • Determine key client information: name, site, location • Determine key technical information: building area, data center area, other spaces area • Client approval • Select certification team • Notify the team to perform the facility survey and data collection Rating Preparation: • Verify eligibility • Read service data sheet and service delivery guide • Define Survey date and duration. • Request facility Electrical & Mechanical documents • Utility bills –current/past 12 months or next 12 months • Conduct preliminary data analysis • Understand preliminary elect. & mechanical subsystems • Understand metering requirements Execution: • Site Visit and kick-off meeting/presentation • Educate the client about the process & interview • Conduct initial walk-through & ensure as-built condition • Define building total energy • Define data center total IT loads/UPS output • Determine mechanical loads power panels or if any is on UPS • Determine/Verify energy metering for total building and data center • Install energy meters in designated locations if necessary Data submission: • Create an account in portfolio manager • Submit all required monthly energy data for the building and the data center • If rating is >75%; apply for Energy Star • Generate energy use statement • Populate all data in the report template • Certify, Stamp and Finalize and submit to Energy Star • Handover portfolio manager account after training to client for future management • If rating is <75%; implement ECMs and re-apply. Preparation Step-2 Execution Step-3 6 WEEKS-1 year +
  • 9. DoE On-line Profiling Tool: Data Center Pro 9 INPUTS • Description • Utility bill data • System information • IT • Cooling • Power • On-site gen OUTPUTS •Overall picture of energy use and efficiency •End-use breakout •Potential areas for energy efficiency improvement •Overall energy use reduction potential
  • 10. DC Profiler Tool To download the DC Profiler tool: http://ecenter.ee.doe.gov/EM/tools/Documents/DCPro_Downloadable_InstallInstructions.pd f10
  • 11. DoE- Air Management Energy Assessment Tool • Air management recommendations (actions) • Potential for reducing the supply airflow rate • Potential for increasing the supply air temperature • Estimates of the % energy reduction for supply fans and chillers The AM-Tool is a free Excel tool for assessing the data center air- management status and providing actions and energy savings. 11
  • 12. To download tool and documentation http://www1.eere.energy.gov/industry/saveenergynow/dc_pro.html Unit Program Step AHU Airflow cfm Step 1 AHU AHU Supply Air Temperature °F Step 1 AHU AHU Return Air Temperature °F Step 1 AHU Equipment Temperature Rise °F Step 2 Equip Equipment Airflow cfm Step 2 Equip Number of Equipment Units - Step 2 Equip Equipment Power W Step 2 Equip IT-Equipment Intake Temperature °F Step 3 RCI Typical Max IT-Equipment Intake Temperature °F Step 4 Main Input Typical Min IT-Equipment Intake Temperature °F Step 4 Main Input Recommended IT-Equipment Intake Temperature Range °F Step 4 Main Input Allowable IT-Equipment Intake Temperature Range °F Step 4 Main Input OUTPUTS • Provide air- management recommendations • Estimate the potential for reducing supply airflow rate and increasing supply air temperature • Estimate the percentage of energy reduction for fans and chillers DoE AM Tool-Required Inputs 12 INPUTS • Air-handler unit data for calculating Return Temperature Index (RTI) (energy metric) • IT-equipment data for calculating the RTI metric • IT-equipment intake temperatures for calculating Rack Cooling Index (RCI) (equipment cooling metric) • Main input with questions for determining energy savings and recommendations
  • 13. DoE Electrical Assessment Tool To download the tool and user manual http://www1.eere.energy.gov/industry/datacenters/docs/dcpro_eat.xls Designed to help assess the potential savings from efficiency actions in the electrical power chain of a data center INPUTS • Basic configuration and efficiency information on electrical system components such as transformers, generators, uninterruptible power supply (UPS), power distribution unit (PDU) devices, and lighting • Energy use of electrical systems OUTPUTS • Estimate potential savings for various electrical system efficiency actions. • UPS efficiency comparison / benchmarking • Energy efficiency metrics 13
  • 14. DoE Assessment Process 14 Process Step Current Tools/Resources 1. Use DC Pro Profiling tool for preliminary assessment. Complete on-line survey of profiling tool. Profiling Tool 2. Hold kickoff conference call to review goals and scope; Identify needed information and documents Use report from Profiling tool as a discussion prompter 3. Compile existing information from drawings, trend logs, etc. Enter available information into tools/worksheets Assessment Tools or Worksheets 4. On-site meeting with all stakeholders: Site tour (if needed) / Overview presentation (if needed) / Review, confirm and document efficiency actions to be studied, metrics to be analyzed, and measurement plan (assign roles and responsibilities) Assessment Tools or Worksheets 5. Conduct on-site measurements as needed to complete inputs for assessment tools. Assessment Tools or Worksheets 6. Estimate savings for actions in each assessment area: Electrical power chain / IT equipment and software / Air Management / HVAC / On-site generation (Can be done off-site) Assessment Tools 7. Estimate costs for each action in conjunction with site personnel (can be done off-site) 8. Compile assessment report and present to site Report Template 9. Provide report to DOE (sanitized if necessary, and if site approves) and provide feedback on overall assessment process 1wk2wk1wk3wk 14
  • 15. DoE Master List of Actions To download the master list of actions “energy conservation measures” http://www1.eere.energy.gov/manufacturing/datacenters/pdfs/data_center_actions_list.pdf 15
  • 16. Building Rating Systems Susta ina ble Building Ra ting System s Development Ba sis BREEAM (Building Research Establishment’s Environmental Assessment Method) Original BREEAM Canada BREEAM BREEAM Green Leaf BREEAM, Green Leaf™ Calabasas LEED LEED® CASBEE (Comprehensive Assessment System for Building Environmental Efficiency) Original CEPAS (Comprehensive Environmental Performance Assessment Scheme) LEED®, BREEAM, HK-BEAM, IBI Earth Advantage Commercial Buildings (Oregon) Undisclosed EkoProfile (Norway) Undisclosed ESCALE Undisclosed GBTool Original EPC for Data Centers (developed by California Energy Commission and LBNL)* GEM (Global Environmental Method) For Existing Buildings (Green Globes) – LEED® UK Green Globes Canada GOBAS (Green Olympic Building Assessment System) CASBEE, LEED® Green Building Rating System – Korea BREEAM, LEED®, BEPAC Green Globes Canada BREEAM Green Leaf Green Globes™ US Green Globes Canada Green Leaf Eco-Rating Program Original Green Star Australia BREEAM, LEED® HK BEAM (Hong Kong Building Environmental Assessment Method) BREEAM HQE (High Environmental Quality) Undisclosed iDP(Integrated Design Process) Original Labs21 Original LEED® (Leadership in Energy and Environmental Design) Original LEED Canada LEED® LEED India LEED® LEED Mexico LEED® MSBG (The State of Minnesota Sustainable Building Guidelines) '98, and BREEAM LEED®, Green Building Challenge NABERS (National Australian Built Environment Rating System) Undisclosed PromisE Undisclosed Protocol ITACA GBTool SBAT (Sustainable Buildings Assessment Tool) Original Scottsdale's Green Building Program Undisclosed SPiRiT (Sustainable Project Rating Tool) LEED® TERI Green Rating for Integrated Habitat Assessment Original TQ Building Assessment System (Total Quality Building Assessment System) Original * The only rating system specifically developed for data center projects Most common rating systems are LEED, BREEAM and Green Globes 16
  • 17. U.S. GBC LEED Introduction 17 • Leadership in Energy and Environmental Design (LEED) - recognized as the most prominent third-party green building certification system in the US and derivations are widely used abroad. • LEED basics: • concise framework for measurable green building performance, including: energy savings, water efficiency, construction methods, building materials, and more. • can be applied to any building type, from residential homes to office buildings to hospitals to data centers. • 4 levels of certification: Certified, Silver, Gold and Platinum. • The latest release, Version 3, was released on April 27, 2009. • Future versions are consensus based, transparent, ongoing development cycle. • LEED certification leads to: • Lower operating costs Increased asset value Reduce landfill waste • Conserve energy and water Healthier and safer environments for occupants • Reduce harmful greenhouse gas emissions • Qualify for tax rebates, zoning allowances and other incentives in hundreds of cities. • Demonstrates a commitment by the owner toward a more efficient, environmentally- friendly future.
  • 18. LEED Adaptations for Data Centers New Construction Energy and Atmosphere •EA prerequisite 1: Fundamental Commissioning of Building Energy Systems (NC) •EA prerequisite 2: Minimum Energy Performance (NC) •EA credit 1: Optimize Energy Performance (NC) •EA credit 3: Enhanced Commissioning (NC) •EA credit 5: Measurement and Verification (NC) Existing Buildings Energy and Atmosphere •EA prerequisite 1: Energy Efficiency Best Management Practices – Planning, Documentation and Opportunity Assessment (EB) •EA credit 2.1: Existing Building Commissioning – Investigation and Analysis (EB) •EA credit 3.1: Performance Measurement – Building Automation System (EB)   New Construction Water Efficiency (NEW CREDIT) •EA credit #: Cooling Tower Water Management (NC) 18 Final Modified / Added Credits Certified: 40 – 49 pts Silver: 50 – 59 pts Gold: 60 – 79 pts Platinum: 80+ pts Total Possible Points=110
  • 19. LEED Changes – 2013 23 credits have substantive changes upcoming 19 Version 4
  • 20. LEED Changes – 2013 Energy performance: Determine PUE 5% improvement in design; 2% of the 5% is to be from infrastructure ASHRAE 90.1-2010 20 Version 4
  • 21. PUE Usage and public reporting guidelines Guidance on topics: •Data Collection and Metrics Calculations •Reporting Result Timescale and Data Collection Details •Reporting Results to The Green Grid •Common Issues with Reporting or Interpreting PUE • Infrastructure vs. IT • Power vs. Energy • “Better-than-Perfect” PUE Measurements • Comparing Results Calculated over Different Timeframes at Different Granularity Levels • Comparing PUE Results Between Data Centers 21
  • 22. 22 Plus CUE, WUE, ERE, ERF….and Data Center Maturity Model “DCMM” PUE (Power Usage Effectiveness) Emergency generator Utility transformer PUE Total data center energy from all fuels (kWh) Total IT energy (kWh) Total data center energy House energy = Data center Main service PP-Gen service Lighting panel Generator block Heaters & lighting Lighting, Exit lights, BMS, EPMS & security House panels UPS STS PDUs RPPs Mech. Swgear Data center CRAC units, AHUs, Chillers & Dry coolers Fuel Misc. support Mech. supportPower ToIT IT-critical load District chilled water District steam Natural gas CO2 NOx Total Direct Water Consumption Fuel ER F ER E Total data center energy Total data center energy CUE WUE
  • 23. 23 ENERGY STAR Rating Vs. PUE ≤ 1.5 Monitoring/Measurement Requirements • 1–49: Low cost operational changes + improving IT efficiency + lowering the heat load +reductions to the cooling load • 50–74: Simple, low-cost changes + equipment upgrades • 75–100: ENERGY STAR certification
  • 24. • 100,000 square foot, tier 4 data center • 10 MW IT load • LEED Silver • Detailed energy modeling • Base case and proposed energy end uses (demand and annual) LEED Example: Global Bank – New Data Center
  • 25. 25 LEED Example: Global Bank continued Page 6 Performance Rat ing Table Baseline Building Energy Summary by End Use Energy Peak Energy Peak Energy KWHx000,000 kW x000 10 6 Btu 10 6 Btuh 10 6 Btu 10 6 Btuh % Interior Lighting Electricity 0.78 1.38 2662.14 4.71 2% 4163.86 8.16 2% 36.07% Interior Lighting (Process) Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Exterior Lighting Electricity 0.08 0.04 273.04 0.14 0% 477.82 0.00 0% 42.86% Space Heating (fuel 1) Natural Gas 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Space Heating (fuel 2) Electricity 2.13 1.55 7269.69 5.29 2% 6757.74 5.87 2% -7.58% Space Cooling Electricity 10.26 13.73 35017.38 46.85 20% 102253.48 203.01 60% 65.75% Pumps Electricity 8.36 37.67 28532.68 128.53 55% 443.69 0.00 0% -6330.77% Heat Rejection Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Fans - Interior Electricity 7.82 10.96 26689.66 37.40 16% 79147.47 108.50 32% 66.28% Fans - Parking Garage Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Service Water Heating (fuel 1) Natural Gas 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Service Water Heating (fuel 2) Electricity 2.37 3.25 8088.81 11.09 5% 8088.81 11.06 3% 0.00% Receptacle Equipment Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Refrigeration (food, etc.) Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Cooking (commercial, fuel 1) Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Cooking (commercial, fuel 2) Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% Elevators and Escalators Electricity 0 0 0.00 0.00 0% 0.00 0.00 0% 0.00% 31.8 68.58 108533.4 233.99496 100% 201332.87 336.59006 100% 46.09% Note: Energy Consumption is listed in units ofsite energy 10 6 Btu = kWh x 3.413 x 1000 10 3 Btu = therms / 100 Performance Rat ing Met hod Compliance Report Total Building Consumption Baseline BuildingProposed Building Energy Type Process End Use • 46% reduction in annual energy use for infrastructure systems (as compared to ashrae energy standard 90.1) • 41% annual water savings (as compared to the Energy Policy Act of 1992 ) • Improved ventilation rates by 32% (compared to ASHRAE Std. 62.1)
  • 26. ASHRAE Standard 90.1: Compliance options Energy code compliance options • Prescriptive option • Trade-off option • Energy cost budget Most compliant options are Trade-off option Select approved addenda • Demand control ventilation requirements • Fan power limitations • Alternative compliance path for water-cooled chillers with VFD/efficient part load performance 28 addenda identified as energy-related Mandatory Provisions • Minimum HVAC equipment efficiency • Load calculations • Controls • Construction & insulation Overall impact: higher efficiencies, thermal performance, and documentation 30% Energy progress • 6 prototypes in 17 climate zones, based on 2004 • More prototypes to be examined • Envelope R-values increase Results are preliminary 26 HP Confidential
  • 27. ASHRAE Standard 90.1: Appendix G Impacts Clarifying existing items • Ventilation cfm of proposed = baseline • Exception – EQc2 increased ventilation doesn’t change baseline • Purchased CHW now covered Summary: Eliminating confusion for calcs Data Center economizer exceptions • 3 MMBtuh with or without central plant • 0.6 MMBtuh or less being added to existing building • 0.6 MMBtuh or less with central plant • Local authority prohibits cooling towers Summary: Only small data centers meet exemption criteria Water-side items • VFD required on pump motors >10 HP • Maximum flows per pipe sizes • Heat exchanger test procedure • Pump head calcs required Summary: More stringent requirements to increase efficiency Air-side items • Exhaust air energy recover exception: flammable • Two new baseline systems 10 & 11 • Supply resets • Demand control ventilation Summary: Greater efficiency on most air systems 27
  • 28. 28 HP Confidential TC 9.09 recommendations at computer equipment air intakes ASHRAE: Indoor Temperature and Moisture Levels MAXIMUM 80°F dry-bulb 67°F wet-bulb 60°F dew point MAXIMUM 80°F dry-bulb 67°F wet-bulb 60°F dew point MINIMUM 65°F dry-bulb 53°F wet-bulb 43°F dew point MINIMUM 65°F dry-bulb 53°F wet-bulb 43°F dew point Alternate Description Dry Bulb (°F) Relative Humidity (%) W et Bulb (°F) Dew Point (°F) Chilled W ater Supply Temp Condenser W ater Supply Temp (for W SE) Maximum Outdoor W et Bulb Temp (for W SE) 70F SA Conditions - Low Humidity 70.0 37.6 54.9 43.0 70F SA Conditions - High Humidity 70.0 58.9 60.6 55.0 72F SA Conditions - Low Humidity 72.0 35.1 55.7 43.0 72F SA Conditions - High Humidity 72.0 61.4 63.0 58.0 75F SA Conditions - Low Humidity 75.0 31.8 56.9 43.0 75F SA Conditions - High Humidity 75.0 59.6 65.1 60.0 80F SA Conditions - Low Humidity 80.0 26.9 58.8 43.0 80F SA Conditions - High Humidity 80.0 50.5 66.7 60.0 #1 #2 #3 #4 58.0 60.0 63.0 68.0 56.0 58.0 61.0 66.0 42.0 44.0 47.0 52.0
  • 29. 50001 – Energy Management System • Designed to be used independently, yet can be aligned or integrated with other management systems (e.g., ISO 9001) and environmental (ISO 14001). Applicable to all organizations. • Requires an organization to establish, implement, maintain, and improve an energy management system, enabling systematic achievement of continual improvement in energy performance, energy efficiency, and energy conservation. • Imposes requirements on energy supply and consumption: − Measurement − Documentation and reporting − Design and procurement practices for energy-using equipment and systems − Processes and personnel • Applies to all factors that can be monitored and influenced by the organization to affect energy use. • Does not prescribe specific performance criteria with respect to energy. International Organization for Standardization ISO 29 HP Confidential
  • 30. Hallmarks of a “Green” data center • Standards/Metrics for whole building performance • Demand for high temperature server operation will continue, changing the way data centers are designed • Advances in using outdoor air for cooling will dramatically reduce energy use • Based on industry design criteria and best practices, Climate and geography leveraged to minimize GHG emissions • Facility responds to site constraints and advantages • Designed using rigorous whole-building energy modeling • Optimization of energy and water use • Life cycle approach used in decision making • Thorough and transparent reporting of energy use – Energy & Sustainability Management (ESM) 30

Hinweis der Redaktion

  1. Since 2005, the data center market has matured significantly with respect to an overall understanding of the drivers of energy efficiency. Several private organizations in the United States and Canada (ASHRAE, Green Grid, Green Globes) and worldwide (CIBSE, Japan CASBEE, Australia Green Star) have developed robust standards and criteria aimed at making buildings and data centers more energy and water efficient. These standards and criteria work well in developing a decision-making framework in both new data center design and retrofit projects. The release of the standards and metrics is timely as we begin to see a proliferation of local, state, and federal energy-efficiency guidelines and programs. June 20, 2013 HP Confidential
  2. So many standards that apply to data centers that IT must keep up with. Good news is that they are gaining traction. Going from left to right, top row: EPA Energy Star Rating and certification has METRICS in Server performance rating &amp; Energy star label Data enter performance benchmarking Leed Certification for data centers looks at Sustainable Sites Water Efficiency Energy and Atmosphere Materials and Resources Indoor Environmental Quality Innovation in Design Federal Energy Management program showcases Best practices at Federal data centers Pilot adoption of Best-in-class guidelines at Federal data centers Adoption of to-be-developed industry standard for Best-in-class at newly constructed Federal data centers Industry Consortium Tools Metrics Training Best practice information Best-in-class guidelines IT work productivity standard As an example, Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, signed by President Obama Oct. 5, 2009, outlines a mandate for reducing energy consumption, water use, and greenhouse gas emissions in U.S. federal facilities. While it also presents requirements for reductions for items other than buildings (vehicles, electricity generation, etc.), the majority of the order is geared toward the built environment. Related to data centers specifically, and the impact that technology use has on the environment, there is a dedicated section on electronics and data processing facilities. An excerpt from this section states, “ [Agencies should] promote electronics stewardship, in particular by implementing best management practices for energy-efficient management of servers and federal data centers.” June 20, 2013 HP Confidential
  3. Since 2005, the data center market has matured significantly with respect to an overall understanding of the drivers of energy efficiency. Several private organizations in the United States and Canada (ASHRAE, Green Grid, Green Globes) and worldwide (CIBSE, Japan CASBEE, Australia Green Star) have developed robust standards and criteria aimed at making buildings and data centers more energy and water efficient. These standards and criteria work well in developing a decision-making framework in both new data center design and retrofit projects. The release of the standards and metrics is timely as we begin to see a proliferation of local, state, and federal energy-efficiency guidelines and programs. So many standards that apply to data centers that IT must keep up with. Good news is that they are gaining traction. Going from left to right, top row: Over 3,000 organizations in some 60 countries around the world now measure and disclose their greenhouse gas emissions, water management and climate change strategies through CDP, in order that they can set reduction targets and make performance improvements. This data is made available for use by a wide audience including institutional investors, corporations, policymakers and their advisors, public sector organizations, government bodies, academics and the public. June 20, 2013 HP Confidential
  4. Although the Executive Order is written specifically for U.S. federal agencies, the broader data center industry also is entering the next era of energy and resource efficiency: strongly encouraged or compulsory reductions in resource use and greenhouse gas emissions. The new U.S. Environmental Protection Agency Energy Star Data Center Energy Efficiency Initiative is an example of a program that will quickly gain momentum in the private sector by showing business value similar to the other Energy Star programs. This program is designed to raise the energy-efficiency bar as the portfolio of data centers is updated; only facilities in the top 25% can achieve an Energy Star rating. So as more facilities earn higher energy ratings, the top 25% will be reserved for only the best of the best. Background: Originally started as an international standard for energy efficient consumer products originated in the United States of America. It was first created as a United States government program during the early 1990s, but Australia, Canada, Japan, New Zealand, Taiwan and the European Union have also adopted the program. In 2006 the Energy Star standard was expanded to include an Energy Star performance Rating for buildings such as new homes, commercial and industrial buildings. In June, 2010 the Energy Star Performance for industrial buildings was expanded to include data centers as well. Covers stand-alone data centers, as well as data centers housed within office or other buildings Objectives and criteria Based on actual as-billed energy data. Serves as a whole building indicator Assesses performance at the building level to explain how a building performs, not why it performs a certain way. Captures the interactions of building systems not individual equipment efficiency. Tracks energy use accounting for weather and operational changes over time. Peer group comparison Compares a building’s energy performance to its national peer group Allows owners with multiple facilities to compare performance across a portfolio of buildings. Mix of fuels: Site Energy : Energy consumption expressed on utility bills. Includes combination of primary and secondary energy, which are not directly comparable. Some heat and electricity comes from fuels burned on-site (e.g. natural gas), while some comes from fuels burned off-site (e.g. district chilled water) Source Energy: Traces on-site consumption back to energy content of primary fuels. Accounts for the losses in conversion from primary to secondary energy (which can occur either on-site or at a utility) June 20, 2013 HP Confidential
  5. The DC Pro software tool suite, which includes: A web-based profiling tool Separate Excel-based assessment tools for Air Management, HVAC, electrical syatems, and IT-equipment These tools are not a substitute for a detailed “investment grade” audit. They provide estimates of savings for various measures, but actual savings may vary based on site-specific conditions that are not addressed in the tools. June 20, 2013 HP Confidential
  6. June 20, 2013 HP Confidential
  7. June 20, 2013 HP Confidential
  8. June 20, 2013 HP Confidential
  9. June 20, 2013 HP Confidential
  10. June 20, 2013 HP Confidential
  11. June 20, 2013 HP Confidential
  12. June 20, 2013 HP Confidential
  13. Another highly anticipated program that will help the data center design and construction industry achieve energy and water efficiency is coming from the U.S. Green Building Council. LEED Data Centers is available for second public comment through July 2011. It is based on the current LEED standards, Green Building Design and Construction and Green Building Operations and Maintenance, but has credit modifications that customize it solely for use in data center facilities. The credits in the new standard have a strong focus on energy efficiency, reducing cooling tower water use, measurement and verification of power and cooling systems, and commissioning. Once this program is released for public use, achieving LEED certification will only be possible after following a rigorous and thorough process. June 20, 2013 HP Confidential
  14. June 20, 2013 HP Confidential
  15. June 20, 2013 HP Confidential
  16. June 20, 2013 HP Confidential
  17. June 20, 2013 HP Confidential
  18. June 20, 2013 HP Confidential
  19. ASHRAE Technical Committee TC 9.9 is working on an update to standard 90.1 - minimum efficiency standards for buildings. The update states that new data centres will require water-side economisers “free cooling” (unless cooling towers are prohibited by local code). The standard may be expanded to include requirements for air-side economisers “free cooling” after 2014. By that time humidity and contamination research should provide more insight into their impact and to understand the Electro Static Discharge (ESD) issue at the minimum humidity limit. Similarly, contamination impact on IT equipment due to free cooling will also be further understood and will likely drive the extent to which free cooling using outside air can be used. http://tc99.ashraetcs.org/documents/Standard%2090_1_2010%20Applicability%20to%20Datacom.pdf See summary on page 4
  20. Design for the highest internal air temperature allowable that will not cause the computers’ internal fans to run at excessive speeds or create electrical leakage in the computers. The ASHRAE supplement to the Thermal Guidelines for Data Processing Environments (ASHRAE 2004), called 2008 ASHRAE Environmental Guidelines for Datacom Equipment - Expanding the Recommended Environmental Envelope recommends an upper dry-bulb limit of 80 F for the air used to cool the computers. If this temperature is used (and even higher temperatures in the near future), the hours for economization will be increased; when vapor compression (mechanical) cooling is used, the elevated temperatures will result in lower compressor power. However, the onboard fans in the servers will typically begin to increase speed and draw in more air to maintain the temperature of the server’s internal components at an acceptable level. Also, depending on the internal heat sink specification, electrical leakage will begin to occur at elevated temperatures, eroding away some of the energy savings. Unless the internal thermal management algorithms are modified, there will be diminishing energy returns as more power is required for the fans in the servers when the data center supply air temperature exceeds 80 F. The exception to this is if an economizer is used on the cooling system, providing cooling air beyond 80 F without any compressor power June 20, 2013 HP Confidential
  21. ISO 50001 is a newly developed international standard for an energy management system (EnMS). ISO 50001:2011 (the first and current version) provides a framework for establishing energy management best practice to help organisations to improve their energy efficiency in a logical, controlled and systematic way. ISO 50001 has been structured to align with other popular industry management system standards such as those for quality, health &amp; safety and environmental management. Organisations can thus, if appropriate, integrate an energy management system (EnMS) with their existing management system(s). June 20, 2013 HP Confidential
  22. Standards/Metrics will include whole building performance, including water use and source energy reporting “ Carbon Dioxide Equivalent” reduction strategies will reinforce dematerialization of data center facilities Demand for high temperature server operation will continue, changing the way data centers are designed Advances in using outdoor air for cooling will dramatically reduce energy use Based on industry design criteria and best practices, Climate and geography leveraged to minimize GHG emissions Facility responds to site constraints and advantages Designed using rigorous whole-building energy modeling Optimization of energy and water use Life cycle approach used in decision making Thorough and transparent reporting of energy use June 20, 2013 HP Confidential