DEHRADUN MUSSOORIE ROPEWAY
PROJECT
DISTRICT DEHRADUN
UTTARAKHAND
An Uttarakhand Tourism Development Board Initiative
Government of Uttarakhand
Dehradun
April 2018
INDEX
1. Objective
2. Project
3. Alignment
4. Technology
5. Annual Traffic
6. Purkulgaon
7. Mussoorie
8. Project Area
9. Estimated Project Cost
10. Ropeways – Infrastructure Status
11. Proposed PPP Structure
12. Proposed Eligibility Criteria
13. EOI Application
2
3
Ropeways / Cable Cars
- An Integrated & Sustainable Transport Solution
for twin cities of Dehradun & Mussoorie
OBJECTIVE
• Would reduce vehicular traffic on
Mussoorie road, thereby reducing
pollution / congestion.
• Reduce travel time in peak season - 2 /3
hours to about 20 min.
• Resolve Parking issues
• Best suited for eco-sensitive zone such
as Doon Valley
• An added attraction for the city
 Aerial Passenger Ropeway
between Dehradun
(Purkulgaon / Mussoorie
Road) and Mussoorie
(Library taxi stand)
 Multi-level Parking & other
commercial developments
at Terminal Points.
PROJECT
ALIGNMENT
5
30°24'47.00"N
78°4'2.00“E
30°27'35.50"N
78°3'58.50"E
6
Items Description
Length of the Ropeway
(approx.)
5.58 kms
Vertical rise 1,006 m
Proposed Technology Mono-cable
Detachable Gondola
(MDG)
Design Capacity 2000 PPHPD
Line Speed (avg.) 4.5 m / sec
Travel Time (approx) 18 - 20 min.
Towers 30-35
Cabins (both directions) 75
Seating capacity 10
Terminal Stations 2
Construction Period 2 years
Standards CEN / IS
TECHNOLOGY
MUSSOORIE ANNUAL TRAFFIC (in lakhs)
7
Source: Tourism Department, Government of Uttarakhand
Decadal cumulative annual growth rate is 2.9%
PURKULGAON
(PROPOSED LOWER TERMINAL POINT)
8
LAND AVAILABILITY
Khasra No. Area in Ha.
236 GHA 2.265
242 1.424
237 1.947
Total 5.636
Tourism land as per govt. records
Sn Items Details Remarks
1 Total Area 22,650 sqm Khasra 236 GHA considered
2 Ground Coverage 15,000 sqm 66.6%
3 Max. Height 12.0 mtrs. Considering 9-12 mt. wide
approach road
4 Max. no. of Floors 4 (all above ground)
5 Max. Built-up area 45,000 sqm FAR of 3.0
6 Total no. of car parking 1400 – 1500 units Considering ECS of 32 sqm
As per the Uttarakhand Building Construction and Development Bye Laws / Regulations, 2011
(Amendment 2017) – DRAFT
Multi-level Parking
10
MUSSOORIE
(PROPOSED UPPER TERMINAL POINT)
11
12
NORTHExisting Site
Total Area
(4.25 acres)
MDDA
Parking
Mussoorie Mall road
13
Existing
house
Existing MDDA
Parking
Vegetation and Existing Structures on Site
Slope Condition
The site has high slopes.
More than 85% of the site
has slope more than 32°. As
per the construction standards
for hilly areas, the buildable
slopes should be either less
than or equal to 15°. The
buildable area of the site lies
along the existing MDDA
Parking.
14
There are two options to be proposed to
the site:
• Extension of the existing MDDA
Parking.
• Multi-level car parking at feasible
slope with commercial at the terrace
level.
15
Site Plan
T
2
1
3
T Ropeway Terminal
1. MLP Block 1
2. MLP Block 2
3. MLP Block 3
16
17
18
19
20
MLP Block 2
MLP Block 1
21
MLP Block 3
22
23
Pedestrian
connections at
topmost level
Passenger
Elevators
• Proposed as an extension of the existing MDDA parking vertically as well horizontally
along the road.
• 4th floor above the ground has been proposed as commercial development.
• Connected to the mall road through pedestrian connections at the two corners of the
edge facing the mall road.
Multi- Level
Car Parking
Block 1
Total Built Area:
8,220 sqm
Floor: 6 (3 above
ground and 3 below)
Capacity: 260 cars
(43-44 cars per
floor)
MLP 1
MLP 2
24
Pedestrian
connections at
topmost level
Passenger
Elevators
• Proposed over the existing buildings below the existing MDDA Parking.
• Block 1 and Block 2 are interconnected with same ramps and entry-exit points from the
Mussoorie Dehradun road.
Multi- Level
Car Parking
Block 2
Total Built Area:
9,160 sqm
Floor: 7 (all below
ground)
Capacity: 240 cars
(35 cars per floor)
MLP 1
MLP 2
25
Pedestrian
connections at
topmost level
Passenger
Elevators
• This block is a new construction on the site.
• The 3 floors of the building down the basement have been designated for the
rehabilitation and relocation purposes from the existing structures where the other two
parking blocks have been proposed.
Multi- Level
Car Parking
Block 3
Total Built Area:
12,080 sqm
Floor: 8 (5 above
and 3 below ground)
Capacity: 360 cars
(45 cars per floor)
26
Terminal Station
Pedestrian
connections at
topmost level
Passenger
Elevators
• Lower 3 floors are proposed for ropeway equipment and associated facilities.
• Upper 2 floors have been proposed with commercial shops like banks, offices, retail.
• The station is connected to the parking blocks at the topmost level through pedestrian
walkway and hence the mall road through the MLP block 1.
Terminal
Station
Total Built Area:
1,800 sqm
Floor: 5 (2 above
ground and 3 below)
27
Area Chart
Components
No of
Units
Site Area
Acres
(sqm)
Actual Built
up area (sqm)
Actual
Ground
Coverage
(sqm)
No. of
Floors
4.25 Acres (Buildable/ Developable Area = 1.5 Acres [35.7%])
Multi Level Car Parking Block 1 260
1.51 6125
8220 1370 6
Multi Level Car Parking Block 2 240 9160 1145 7
Multi Level Car Parking Block 3 360 12080 1564 8
Commercial Area 1370
at terrace level of MLP
Block 1
Rehabilitation 2700
at lower 3 basements of
MLP Block 3
Pedestrian Connections 3 Total area = 158 sqm
Terminal Station 1800 360 5
Total area 6125 4439
Project Area
28
Description Area Ownership Components
Lower Terminal
Station
(Purkulgaon)
2.5 hectares Tourism Dept. • Boarding & De-boarding point,
DG Room, Administrative
Block, Gondola Parking space,
Clock room, Toilets & Drinking
water facilities , etc.
• Multi-level Parking
• Commercial Components
Upper Terminal
Station
(Mussoorie)
1.7 hectares Nagar Pallika
Mussoorie
(Notified Private
Forest)
Ropeway Corridor
(10m wide)
ROW for 5.5
hectares
Private land,
Reserved
Forest
Tower structures & rope
Estimated Project Cost
29
Project Cost (Rs./crores)
Survey & Investigations
5.0
Ropeway Equipment (Imported) + Civil works
200.0
Multi-level Parking at Purkulgaon (phase -1)
45.0
Multi-level Parking at Mussoorie (phase -1)
40.0
Preliminary & pre-operative expenses
60.0
Interest during construction
50.0
Total
400.0
The project has been proposed to Ministry of Tourism, Government of
India for 20% grant under its new Viability Gap Funding (VGF) Scheme.
Ropeways - Infrastructure
Ropeways got included in the Harmonised Master List of Infrastructure sub-sectors
for infrastructure lending notified by Ministry of Finance, Government of India.
30
Proposed PPP Structure
UTDB is a statutory board constituted by the
Government of Uttarakhand to develop
tourism projects and formulate tourism
policies in the state. It is chaired by the
Tourism Minister and Chief Secretary of
Uttarakhand as it's vice chairman. The
Principal Secretary/ Secretary tourism acts as
Chief Executive Officer.
UTDB
Selected
Bidder
SPV
 Format : Design, Build, Finance, Operate & Transfer (DBFOT)
 Concession Period : 60 years including Construction Period
 Construction period : 3 years
 Ropeway Tariff: No ceiling
 On expiry, project shall be transferred back to the Authority at Re 1/-.
31
Proposed Eligibility Criteria
Sn Parameters Details
1 Evaluation Criteria
Technical Experience 2 times project
Financial Experience (Net-worth) 25% of the project cost
O&M Experience 50% of the project cost
2 Bid Parameter Highest Concession Fee / Revenue
Share / Combination
3 Bid Security 1% of the est. project cost
4 Construction Period Performance
Security
5% of the est. project cost
The Bidding Documents shall generally be based on the Model Concession
Agreement (draft) proposed by NITI Aayog for development of Ropeway
Projects on PPP
EOI Application
1. Company Profile, management, financials, etc.
2. Experience in Infrastructure Sector esp. ropeways
3. Experience in implementing projects in hilly regions esp.
Uttarakhand
4. Availability of required technical know-how / personnel
5. Financial Resources such as net-worth, turnover, profits, etc. in
last 5 years
6. Suggestions on ropeway alignment, project profile, associated
costs, etc.
7. Assistance required from Government of Uttarakhand.
33
THANK YOU
Request you to kindly send the EOI Application with all required
details by 9th May 2018.
34

Weitere ähnliche Inhalte

Was ist angesagt?

PLANNING PRINCIPLES OF LE CORBUSIER – A CASE STUDY OF CHANDIGARH CITY”
PLANNING PRINCIPLES OF LE CORBUSIER – A CASE STUDY OF CHANDIGARH CITY”PLANNING PRINCIPLES OF LE CORBUSIER – A CASE STUDY OF CHANDIGARH CITY”
PLANNING PRINCIPLES OF LE CORBUSIER – A CASE STUDY OF CHANDIGARH CITY”
Yash Shah
 
Cultural and sacred places in pakistan
Cultural and sacred places in pakistanCultural and sacred places in pakistan
Cultural and sacred places in pakistan
Rehana Qureshi
 

Was ist angesagt? (20)

Lake preservation and protection in Hyderabad: a watershed systems approach
Lake preservation and protection in Hyderabad: a watershed systems approachLake preservation and protection in Hyderabad: a watershed systems approach
Lake preservation and protection in Hyderabad: a watershed systems approach
 
Puri
PuriPuri
Puri
 
Akshardham Temple in Delhi
Akshardham Temple in DelhiAkshardham Temple in Delhi
Akshardham Temple in Delhi
 
CITY PROFILE OF VARANASI -CASE STUDY by Savitri kumari
CITY PROFILE OF VARANASI -CASE STUDY by Savitri kumariCITY PROFILE OF VARANASI -CASE STUDY by Savitri kumari
CITY PROFILE OF VARANASI -CASE STUDY by Savitri kumari
 
Ghat ki guni jaipur
Ghat ki guni  jaipurGhat ki guni  jaipur
Ghat ki guni jaipur
 
Monuments of bangladesh
Monuments of bangladeshMonuments of bangladesh
Monuments of bangladesh
 
Akshardham temple, delhi
Akshardham temple, delhiAkshardham temple, delhi
Akshardham temple, delhi
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach
 
Development study of aurangabad
Development study of aurangabadDevelopment study of aurangabad
Development study of aurangabad
 
Punjab- Amritsar
Punjab- AmritsarPunjab- Amritsar
Punjab- Amritsar
 
Dwarka -Developing Projects
Dwarka -Developing ProjectsDwarka -Developing Projects
Dwarka -Developing Projects
 
Welcome To Bhubaneswar
Welcome To BhubaneswarWelcome To Bhubaneswar
Welcome To Bhubaneswar
 
Dravidian Architecture
Dravidian ArchitectureDravidian Architecture
Dravidian Architecture
 
World heritage site Bodhgaya
World heritage site Bodhgaya World heritage site Bodhgaya
World heritage site Bodhgaya
 
Minor project report on temple architectur
Minor project report on temple architecturMinor project report on temple architectur
Minor project report on temple architectur
 
PLANNING PRINCIPLES OF LE CORBUSIER – A CASE STUDY OF CHANDIGARH CITY”
PLANNING PRINCIPLES OF LE CORBUSIER – A CASE STUDY OF CHANDIGARH CITY”PLANNING PRINCIPLES OF LE CORBUSIER – A CASE STUDY OF CHANDIGARH CITY”
PLANNING PRINCIPLES OF LE CORBUSIER – A CASE STUDY OF CHANDIGARH CITY”
 
Cultural and sacred places in pakistan
Cultural and sacred places in pakistanCultural and sacred places in pakistan
Cultural and sacred places in pakistan
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINES
 
Taxlian architecture
Taxlian architectureTaxlian architecture
Taxlian architecture
 
Pune city
Pune cityPune city
Pune city
 

Ähnlich wie Proposed cable car project, Uttarakhnad, India.

Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15
Sahil Singh Kapoor
 
2013-03-15_BalanceMHub&Parking_final
2013-03-15_BalanceMHub&Parking_final2013-03-15_BalanceMHub&Parking_final
2013-03-15_BalanceMHub&Parking_final
Joshua Engel-Yan
 

Ähnlich wie Proposed cable car project, Uttarakhnad, India. (20)

TOD and its Inclusion in the Master Plan - Mringanka Saxena, UTTIPEC
TOD and its Inclusion in the Master Plan  - Mringanka Saxena, UTTIPECTOD and its Inclusion in the Master Plan  - Mringanka Saxena, UTTIPEC
TOD and its Inclusion in the Master Plan - Mringanka Saxena, UTTIPEC
 
Smart City Project Jakarta Indonesia
Smart City Project Jakarta IndonesiaSmart City Project Jakarta Indonesia
Smart City Project Jakarta Indonesia
 
Land development daan mogot
Land development daan mogot  Land development daan mogot
Land development daan mogot
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
 
Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15
 
Nehru place placemaking project uttipec-sdmc_shakti
Nehru place  placemaking project uttipec-sdmc_shaktiNehru place  placemaking project uttipec-sdmc_shakti
Nehru place placemaking project uttipec-sdmc_shakti
 
Report of parking problem
Report of parking problemReport of parking problem
Report of parking problem
 
Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2
 
Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) car
 
2013-03-15_BalanceMHub&Parking_final
2013-03-15_BalanceMHub&Parking_final2013-03-15_BalanceMHub&Parking_final
2013-03-15_BalanceMHub&Parking_final
 
Construction Projects Feasibility studies
Construction Projects Feasibility studiesConstruction Projects Feasibility studies
Construction Projects Feasibility studies
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
 
923 2 wheeler_public privat partnerships
923 2 wheeler_public privat partnerships923 2 wheeler_public privat partnerships
923 2 wheeler_public privat partnerships
 
Rejeet Matthews: Building Complete Communities—Transit-oriented Development i...
Rejeet Matthews: Building Complete Communities—Transit-oriented Development i...Rejeet Matthews: Building Complete Communities—Transit-oriented Development i...
Rejeet Matthews: Building Complete Communities—Transit-oriented Development i...
 
ToR
ToRToR
ToR
 
Analysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking AreaAnalysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking Area
 
Smart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev couseraSmart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev cousera
 

Kürzlich hochgeladen

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Kürzlich hochgeladen (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 

Proposed cable car project, Uttarakhnad, India.

  • 1. DEHRADUN MUSSOORIE ROPEWAY PROJECT DISTRICT DEHRADUN UTTARAKHAND An Uttarakhand Tourism Development Board Initiative Government of Uttarakhand Dehradun April 2018
  • 2. INDEX 1. Objective 2. Project 3. Alignment 4. Technology 5. Annual Traffic 6. Purkulgaon 7. Mussoorie 8. Project Area 9. Estimated Project Cost 10. Ropeways – Infrastructure Status 11. Proposed PPP Structure 12. Proposed Eligibility Criteria 13. EOI Application 2
  • 3. 3 Ropeways / Cable Cars - An Integrated & Sustainable Transport Solution for twin cities of Dehradun & Mussoorie OBJECTIVE • Would reduce vehicular traffic on Mussoorie road, thereby reducing pollution / congestion. • Reduce travel time in peak season - 2 /3 hours to about 20 min. • Resolve Parking issues • Best suited for eco-sensitive zone such as Doon Valley • An added attraction for the city
  • 4.  Aerial Passenger Ropeway between Dehradun (Purkulgaon / Mussoorie Road) and Mussoorie (Library taxi stand)  Multi-level Parking & other commercial developments at Terminal Points. PROJECT
  • 6. 6 Items Description Length of the Ropeway (approx.) 5.58 kms Vertical rise 1,006 m Proposed Technology Mono-cable Detachable Gondola (MDG) Design Capacity 2000 PPHPD Line Speed (avg.) 4.5 m / sec Travel Time (approx) 18 - 20 min. Towers 30-35 Cabins (both directions) 75 Seating capacity 10 Terminal Stations 2 Construction Period 2 years Standards CEN / IS TECHNOLOGY
  • 7. MUSSOORIE ANNUAL TRAFFIC (in lakhs) 7 Source: Tourism Department, Government of Uttarakhand Decadal cumulative annual growth rate is 2.9%
  • 9. LAND AVAILABILITY Khasra No. Area in Ha. 236 GHA 2.265 242 1.424 237 1.947 Total 5.636 Tourism land as per govt. records
  • 10. Sn Items Details Remarks 1 Total Area 22,650 sqm Khasra 236 GHA considered 2 Ground Coverage 15,000 sqm 66.6% 3 Max. Height 12.0 mtrs. Considering 9-12 mt. wide approach road 4 Max. no. of Floors 4 (all above ground) 5 Max. Built-up area 45,000 sqm FAR of 3.0 6 Total no. of car parking 1400 – 1500 units Considering ECS of 32 sqm As per the Uttarakhand Building Construction and Development Bye Laws / Regulations, 2011 (Amendment 2017) – DRAFT Multi-level Parking 10
  • 12. 12 NORTHExisting Site Total Area (4.25 acres) MDDA Parking Mussoorie Mall road
  • 14. Slope Condition The site has high slopes. More than 85% of the site has slope more than 32°. As per the construction standards for hilly areas, the buildable slopes should be either less than or equal to 15°. The buildable area of the site lies along the existing MDDA Parking. 14 There are two options to be proposed to the site: • Extension of the existing MDDA Parking. • Multi-level car parking at feasible slope with commercial at the terrace level.
  • 15. 15 Site Plan T 2 1 3 T Ropeway Terminal 1. MLP Block 1 2. MLP Block 2 3. MLP Block 3
  • 16. 16
  • 17. 17
  • 18. 18
  • 19. 19
  • 22. 22
  • 23. 23 Pedestrian connections at topmost level Passenger Elevators • Proposed as an extension of the existing MDDA parking vertically as well horizontally along the road. • 4th floor above the ground has been proposed as commercial development. • Connected to the mall road through pedestrian connections at the two corners of the edge facing the mall road. Multi- Level Car Parking Block 1 Total Built Area: 8,220 sqm Floor: 6 (3 above ground and 3 below) Capacity: 260 cars (43-44 cars per floor) MLP 1 MLP 2
  • 24. 24 Pedestrian connections at topmost level Passenger Elevators • Proposed over the existing buildings below the existing MDDA Parking. • Block 1 and Block 2 are interconnected with same ramps and entry-exit points from the Mussoorie Dehradun road. Multi- Level Car Parking Block 2 Total Built Area: 9,160 sqm Floor: 7 (all below ground) Capacity: 240 cars (35 cars per floor) MLP 1 MLP 2
  • 25. 25 Pedestrian connections at topmost level Passenger Elevators • This block is a new construction on the site. • The 3 floors of the building down the basement have been designated for the rehabilitation and relocation purposes from the existing structures where the other two parking blocks have been proposed. Multi- Level Car Parking Block 3 Total Built Area: 12,080 sqm Floor: 8 (5 above and 3 below ground) Capacity: 360 cars (45 cars per floor)
  • 26. 26 Terminal Station Pedestrian connections at topmost level Passenger Elevators • Lower 3 floors are proposed for ropeway equipment and associated facilities. • Upper 2 floors have been proposed with commercial shops like banks, offices, retail. • The station is connected to the parking blocks at the topmost level through pedestrian walkway and hence the mall road through the MLP block 1. Terminal Station Total Built Area: 1,800 sqm Floor: 5 (2 above ground and 3 below)
  • 27. 27 Area Chart Components No of Units Site Area Acres (sqm) Actual Built up area (sqm) Actual Ground Coverage (sqm) No. of Floors 4.25 Acres (Buildable/ Developable Area = 1.5 Acres [35.7%]) Multi Level Car Parking Block 1 260 1.51 6125 8220 1370 6 Multi Level Car Parking Block 2 240 9160 1145 7 Multi Level Car Parking Block 3 360 12080 1564 8 Commercial Area 1370 at terrace level of MLP Block 1 Rehabilitation 2700 at lower 3 basements of MLP Block 3 Pedestrian Connections 3 Total area = 158 sqm Terminal Station 1800 360 5 Total area 6125 4439
  • 28. Project Area 28 Description Area Ownership Components Lower Terminal Station (Purkulgaon) 2.5 hectares Tourism Dept. • Boarding & De-boarding point, DG Room, Administrative Block, Gondola Parking space, Clock room, Toilets & Drinking water facilities , etc. • Multi-level Parking • Commercial Components Upper Terminal Station (Mussoorie) 1.7 hectares Nagar Pallika Mussoorie (Notified Private Forest) Ropeway Corridor (10m wide) ROW for 5.5 hectares Private land, Reserved Forest Tower structures & rope
  • 29. Estimated Project Cost 29 Project Cost (Rs./crores) Survey & Investigations 5.0 Ropeway Equipment (Imported) + Civil works 200.0 Multi-level Parking at Purkulgaon (phase -1) 45.0 Multi-level Parking at Mussoorie (phase -1) 40.0 Preliminary & pre-operative expenses 60.0 Interest during construction 50.0 Total 400.0 The project has been proposed to Ministry of Tourism, Government of India for 20% grant under its new Viability Gap Funding (VGF) Scheme.
  • 30. Ropeways - Infrastructure Ropeways got included in the Harmonised Master List of Infrastructure sub-sectors for infrastructure lending notified by Ministry of Finance, Government of India. 30
  • 31. Proposed PPP Structure UTDB is a statutory board constituted by the Government of Uttarakhand to develop tourism projects and formulate tourism policies in the state. It is chaired by the Tourism Minister and Chief Secretary of Uttarakhand as it's vice chairman. The Principal Secretary/ Secretary tourism acts as Chief Executive Officer. UTDB Selected Bidder SPV  Format : Design, Build, Finance, Operate & Transfer (DBFOT)  Concession Period : 60 years including Construction Period  Construction period : 3 years  Ropeway Tariff: No ceiling  On expiry, project shall be transferred back to the Authority at Re 1/-. 31
  • 32. Proposed Eligibility Criteria Sn Parameters Details 1 Evaluation Criteria Technical Experience 2 times project Financial Experience (Net-worth) 25% of the project cost O&M Experience 50% of the project cost 2 Bid Parameter Highest Concession Fee / Revenue Share / Combination 3 Bid Security 1% of the est. project cost 4 Construction Period Performance Security 5% of the est. project cost The Bidding Documents shall generally be based on the Model Concession Agreement (draft) proposed by NITI Aayog for development of Ropeway Projects on PPP
  • 33. EOI Application 1. Company Profile, management, financials, etc. 2. Experience in Infrastructure Sector esp. ropeways 3. Experience in implementing projects in hilly regions esp. Uttarakhand 4. Availability of required technical know-how / personnel 5. Financial Resources such as net-worth, turnover, profits, etc. in last 5 years 6. Suggestions on ropeway alignment, project profile, associated costs, etc. 7. Assistance required from Government of Uttarakhand. 33
  • 34. THANK YOU Request you to kindly send the EOI Application with all required details by 9th May 2018. 34