Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
1. 1. Current Position: Assistant Director (Tech.), BPS-17, PPP Unit,
Finance Department GoS.
2. Name: Mohammad Sajjad Hussain Gilal.
3. Father’s Name: Capt.(R) Dr. Bashir Ahmed Gilal.
4. Date of Birth: 10th
October 1978.
5. Nationality: Pakistani.
6. Personal Address: Flat No. 201, 2nd
Floor, Plot Nos. 29-C, Lane
Nos. 8, Bara Bukhari Commercial DHA Ph.-6,
Karachi.
7. Marital Status: Married.
8. Relatives in Canada: No.
9. Wife Qualification: B.Sc (With no Experience).
8. Cell No.: 0321-9285576, 0300-9285576.
Tel. No. (Res.): 021-35156168.
9. E-mail Address: sajjad_gilal@yahoo.com
10. Education: B.E. (Civil) & M.B.A (Marketing).
11. Computer Skills: MS-Office (Word, Excel & Power Point),
Good Command on Internet.
12. Language & Degree of Proficiency: English: Read (Excellent) Write (Good) Speak (Good)
Sindhi: Read (Excellent) Write (Excellent) Speak (Excellent)
Urdu: Read (Excellent) Write (Excellent) Speak (Excellent)
13. Membership in Professional Society: Pakistan Engineering Council (Civil / 21561).
14. Countries of Work Experience: Pakistan (16 Years).
15. Academic Qualification:
Examination (Passed) Grade/Division Year
MBA (Mkt.) “2nd
Position” 2003
From PIMSAT Hyderabad
B.E. (Civil) “1st
Division” 2001
From NED UET Karachi
H.S.C “A-1 Grade” 1996
From B.I.S.E Hyderabad
S.S.C “A Grade” 1994
From B.I.S.E Hyderabad
Engr. Muhammad Sajjad Hussain Gilal Page 1 – 7
2. 16. Employment Record:
From 6th May 2015 till to Date :
Employer: Finance Department, GoS.
Posted in: Public Private Partnership (PPP) Unit.
Position Held and
Description of Work: Assistant Director (Tech.), BPS-17, SCUG
Services.
Working as an Assistant Director (Tech.),
BPS-17, SCUG Services at Projects of Sindh
Government initiated / executed under Public
Private Partnership Mode. Projects under PPP
Mode are as follows:
Construction of Dual Carriageway under
PPP Mode from Hyderabad to Mirpurkhas
(HMDC).
First Project of Pakistan under PPP
Mode of Procurement.
Total Cost of the Project = 6.20 (B).
Total Length of the Project = 60 KM.
Concessionaire Agreement Period of
25 years.
Current Status = Operational.
Construction of Jhirk Mulakatiyar Bridge
Project under PPP Mode (JMK).
First Project of Pakistan having Longest
Bridge of 1800 M of Length in River
Indus Bed.
Total Cost of the Project = 3.68 (B).
Total Length of the Project = 17.2 KM.
Concessionaire Agreement Period of 25
Years.
Current Status = 68% Completed.
Construction of Karachi Thatta Dual
Carriageway under PPP Mode (KTDC).
Total Cost of the Project = 8.8
(B).
Total Length of the Project = 49
KM.
Concessionaire Agreement Period of 25
Years.
Engr. Muhammad Sajjad Hussain Gilal Page 2 – 7
3. Current Status = Relocation of Utilities
in Progress.
Construction of Ghotki Kandhkot Bridge
Project under PPP Mode (GKBP).
Total Length of the Project = 30.25
KM.
Current Status = Transaction Advisory
Services (under feasibility) in Progress.
Construction of Hyderabad Tando
Mohammad Khan Dual Carriageway under
PPP Mode (HTMK).
Total Length of the Project = 30.6
KM.
Current Status = Project would be
Launched soon for Investor Solicitation.
_____________________________________
From 5th August 2013 to 5th
May 2015:
Employer: Sindh Local Government Board
(Government of Sindh).
Posted in: Karachi Metropolitan Corporation.
(Engineering Branch).
Position Held and
Description of Work: A.E.E (Civil), BPS-17, SCUG Services.
Working as an A.E.E (Civil), BS-17, SCUG
Services at Project of Manghopir Road Ph. II
from Sarjani Moar to Hamdard University
District West K.M.C.
_____________________________________
From 15th November 2012 to 31st
July 2013:
Employer: Frontier Works Organization, 756 Cte. Group
494.
Client: National Highway Authority, NHA.
Position Held and
Description of Work: Deputy Manager Highway & Structures On
Lyari Expressway Karachi.
Working as a Deputy Manager Highways &
Structures on Project of Construction of Lyari
Expressway & Infrastructure Developments along
Engr. Muhammad Sajjad Hussain Gilal Page 3 – 7
4. both Banks of Lyari River i/c Construction of
Elevated Structures, Clearance of ROW in co-
operation of CDGK, Planning & Laying of
Service Utilities.
_____________________________________
From 16th
November 2011 to 15th
November 2012:
Employer: Techno-Consult. International.
(Water Division).
Client: Karachi Water & Sewerage Board.
(KW&SB).
Position Held and
Description of Work: Resident Engineer (R.E.) Reverse Osmosis
Plants In Liyari Town.
Working as a R.E. on Project of Installation of
Reverse Osmosis Plants & Construction of R.O
Plant Buildings Located in Lyari Town Karachi
(including Erection of Kirby Structure instead of
Concrete Super Structure too) on following 6 Nos.
Locations:
Installation of Reverse Osmosis Plant at
Lyari Town (Chakiwara Pumping
Station).
Installation of Reverse Osmosis Plant at
Lyari Town (Ahmed Shah Bukhari).
Installation of Reverse Osmosis Plant at
Lyari Town (Grid Station Near Maripur
Road)
Installation of Reverse Osmosis Plant at
Lyari Town (Peoples Stadium Lyari).
Installation of Reverse Osmosis Plant at
Lyari Town (Trans Layari).
Installation of Reverse Osmosis Plant at
Kemari Town (Wazir Manssion).
_________________________________
From 5th
February 2011 to 15th
November 2011:
Employer: Al – Qasmia Properties (Pvt.) Ltd.
Builders & Developers.
Consultant: Arch Vision Plus.
Position Held and
Description of Work: Project Incharge.
Engr. Muhammad Sajjad Hussain Gilal Page 4 – 7
5. Working as Project Incharge on Construction
Infrastructure Development of Hakeem Villas
located on Jinnah Avenue Malir Cantonment
Board Area Project, for Construction of following
Banglows:
120 Sq. Yds. Single Unit Banglows.
120 Sq. Yds. One Unit Banglows.
240 Sq. Yds. Single Unit Banglows.
240 Sq. Yds. One Unit Banglows.
The Total Area of the Project is 45 Acres
including Construction of following:
• 30 ft Wide Streets,
• 60 ft Wide Roads,
• 100 ft Wide Roads,
• 4 Nos. of Parks for Each Category of
Banglows,
• Lying of Dia. 90mm, 180mm & 355mm
HDPE-100 for Water Supply
Distribution Network &
• Lying of Dia 12” and 21” RCC Pipes for
Sewerage Distribution Networks.
Extra Responsibilities: Handling all Real Estate Marketing Related
matters, dealing with New and Old Clients &
Manage Clients Payment Records.
_____________________________________
From 8th
March 2006 to 2nd
February 2011:
Employer: Osmani & Company (Pvt.) Ltd.
Consulting Engineers – Architects – Planners
Client: Pakistan Defence Officers Housing Authority.
Position Held and
Description of Work: Assistant Resident Engineer (A.R.E.)
Highways & Infrastructure
Working as an A.R.E. on Project of Infrastructure
Development Works of DHA Phase VIII. For
Pakistan Defence Officers Housing Authority
Karachi on Contract (RD-01, RD-02, RD - 03 to
RD - 08, Infra – A, Infra – B), WAT 01 & 02 &
WAT-06 (Bulk Water Supply Line).
The Total Length of Projects (204 Km),
including Roads & Streets only.
Engr. Muhammad Sajjad Hussain Gilal Page 5 – 7
6. Works supervised are :-
Water Supply Distribution Network of Make :
• HDPE-100 of PN -8, PN-10 and
PN-12.5 of Dia. 3”,6” and 12”.
• M.S Pipes of Dia. 20”, &
• D.I Pipes of Dia. 300mm,
400mm and 500mm
• All a/m Pipe Networks including
(Pressure Testing and Disinfection of
Water Supply Main & Branch Lines),
Sewerage Distribution Network of Make:
• F.C Pipes of Dia. 8”, 10”, 12”,
16”, 18” and 20”,
• RCC of Dia. 21”&
• RCC Plastic lined Pipes of Dia.
21”,
• All F.C Pipes Network includes
(Leakage Drop Tests),
Irrigation Distribution Network of Make:
• UPVC Pipes of Dia. 4”, 8” and
12” including (Pressure Testing),
Storm Water R.C.C Drains with Expansion
Joints @ 30 M Interval,
Storm Water R.C.C Pipe Drains of Dia. 21”,
Utility Box Culverts Single Cell & Double
Cell,
Drain Box Culverts, &
Utility Pipe Sleeves of Make R.C.C Pipes
(With Concrete Encasing where ever required)
having Utility Pipe Sleeves Chamber on both
Sides of Roads / Streets where required as per
Design.
The Total Cost of Projects is (9136 Million).
Extra Responsibilities: Worked as a Resident Engineer for 08 Months
too.
From 5th
October 2004 to 7th
March 2006:
Employer: Sultan Mahmood & Company (SMC),
Client: National Highway Authority,
Consultant: Engineering Associates
Consulting Engineers – Architects – Planners
Position Held and
Description of Work: Deputy Project Manager (D.P.M.)
Engr. Muhammad Sajjad Hussain Gilal Page 6 – 7
7. Worked as a D.P.M. on project of Rehabilitation
Works of National Highway,
N-5, Existing Carriageway (Karachi to
Hyderabad), Contract Package 10.
The Length of Project is (48 Km),
Works supervised are:-
Construction of Pavement & Shoulders,
Installation of Road Studs,
Pavement Marking of make T.P, &
Planning for Diversions with maximum
precautionary measures
The Total Cost of Project is (620 Million).
From 27th
April 2001 to 25th
September 2004:
Employer: Sultan Mahmood & Company (SMC),
Client: Sindh Industrial & Trade Estate.
Consultant: Osmani & Company (Pvt.) Ltd.
Consulting Engineers – Architects – Planners
Position Held and
Description of Works: Site Engineer (S.E.)
Worked as a S.E. on Project of Infrastructure
Development Works at S.I.T.E. Superhighway
Phase – II, Karachi,
The Contract SITE – SHW - 006 & 001.
Works supervised are:-
Water Supply Distribution Network of Make
P.E Pipes including (Pressure Tests and
Disinfections of Water Supply Branch Lines),
Sewerage Distribution Network of Make RCC
Pipes including (Leakage Drop Tests),
Storm Water R.C.C Drains with Expansion
Joints @ 30 M Interval,
Utility Pipe Sleeves Works of Make R.C.C
Pipes having Utility Pipe Sleeves Chamber of
both Sides of Roads / Streets where required
as per Design.
The Length of Project is (73 Km), including
Roads & Streets only.
Engr. Muhammad Sajjad Hussain Gilal Page 7 – 7
8. The Cost of the Project is (250 Million).
17. References:
• Mr. Tufail Ahmed Shaikh
G.M (M-9.), N.H.A Sindh.
Cell #: 0300 – 2030694.
• Mr. Ali Sibtain Naqvi
Director General PPP Unit Finance
Department, GoS.
Cell #: 0346-2872086.
Mr. Khalil Ahmed
Managing Partner LOYA Associates
Cell #: 0300-7002559.
Brgd. Syed Basim
Commander Risalpour Engineering Center,
Cell #: 0334-3997381.
Lt. Col. (R) Ikram Ur Rahim
Manager Construction Mari Oil Field.
Cell #: 0300-2151909.
Capt. (R) Arif Kamal
Senior Resident Engineer DHA Ph. VIII.
Cell # : 0306-3187407.
• Tahir Hussain Sanghi
Deputy Commissioner Shaheed Benazir Abad
Cell #: 0300-8237086.
• Ali Nawaz Lashari.
Resident Engineer JMK Project, Engineering
Associates Intl. Pvt. Ltd. Karachi.
Cell #: 0304-3222418 & 0321-2488390.
• Col. Taimur Khan
Commanding Officer FWO 756 Cte.
Cell #: 0333-8246875.
• Khalid Mehmood Shaikh
Engr. Muhammad Sajjad Hussain Gilal Page 8 – 7