• Details of project
• Introduction of structure
• Foundation details
• Design criteria
• Vibration control system
• Safety measures
DETAILS OF PROJECT
• Project name – Tokyo Sky Tree
• Location – Sumida, Tokyo
• Height of project – 634m (G+32)
• Purpose – Broadcasting tower, Restaurant
• Project duration – 4 years
• Project cost – $800 million
• Contractor – Obayashi Corp.
FOUNDATION DETAILS
• Type of soil at site is silt.
• Hence RC wall pile type foundation
is adopted to counter the earthquake
effects.
• Spikes like protuberances rise from
walls to hold soil firmly.
• This technique is called Knuckle
Walls.
• Piles are driven 35m into the ground.
• Pile of length 2.3m and diameter of 10cm were
adopted.
• SRC pile system is adopted to have the continuity
of steel member.
• Maximum load was 40,000kN during
pull-out test
• Aspect ratio is about 9.0.
• Top displacement is too large if foundation has
poor vertical rigidity
DESIGN CRITERIA
• Tower was designed to resist up to the earthquake magnitude of 7.3
• The wind speeds at height of 600m were measured using balloons.
• Winds are measured using ultrasonic wind gauge for two years.
VIBRATION CONTROL
SYSTEM
• Two methods are used – Tuned Mass Damper(TMD)
Core Column System
• To suppress the wind at top of tower 2 TMDs are
installed in the means of weights, springs, dampers
• TMD weighing 40 tons are installed at 620m height
and TMD weighing 20 tons are installed at 625m
height
• A core column was provided in the
center of structure.
• It is a cylindrical shaped column of
reinforced concrete.
• Diameter is 8 m and height of
column is 375 m
• Above this height oil dampers are
provided to suppress the motions.
SAFETY MEASURES
• Providing waterproof canvas to workers to protect from wind and
dizzying.
• 2 safety lines are implemented instead of one to all the workers.
• 100 m steel protective panels are setup over the railway just beneath
the tower.
• Building huge steel scaffolding in ground and placing in required
position using cranes.
Tokyo Sky Tree

Weitere ähnliche Inhalte

Was ist angesagt?

Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Dimple Poddar
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)Prince Pathania
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.Shabarinath R
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structuresAkash Matthew
 
The Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case StudyThe Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case StudyDinesh Kumar
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5Sandhya Singh
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures rohan joshi
 
Bundled Tube Structural System
 Bundled Tube Structural System Bundled Tube Structural System
Bundled Tube Structural SystemUmer Farooq
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structuresKrishnagnr
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studiesSoumitra Smart
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Towermisschand
 
Vector active systems
Vector active systemsVector active systems
Vector active systemsDanishPathan7
 
Building construction-2 project-2
Building construction-2 project-2Building construction-2 project-2
Building construction-2 project-2kerneng
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatravaParul Sharma
 
Beijing National Stadium
Beijing National StadiumBeijing National Stadium
Beijing National Stadiumluisaam
 

Was ist angesagt? (20)

Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
 
The Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case StudyThe Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case Study
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures
 
Bundled Tube Structural System
 Bundled Tube Structural System Bundled Tube Structural System
Bundled Tube Structural System
 
Surface active systems
Surface active systems Surface active systems
Surface active systems
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
Long span structure
Long span structureLong span structure
Long span structure
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Vector active systems
Vector active systemsVector active systems
Vector active systems
 
Building construction-2 project-2
Building construction-2 project-2Building construction-2 project-2
Building construction-2 project-2
 
Sears tower
Sears tower Sears tower
Sears tower
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatrava
 
Beijing National Stadium
Beijing National StadiumBeijing National Stadium
Beijing National Stadium
 

Ähnlich wie Tokyo Sky Tree

PLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxPLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxJawaharM18
 
PLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxPLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxRajeshKumar25548
 
Modeling procedure and Case study of ‘Gocheok Sky Dome’
Modeling procedure and Case study of  ‘Gocheok Sky Dome’Modeling procedure and Case study of  ‘Gocheok Sky Dome’
Modeling procedure and Case study of ‘Gocheok Sky Dome’chandrashekhar lakavath
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxAnshuBarmase
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhiRajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE  CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE AIT Solutions
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down methodDarshan Parakhiya
 
Beijing National Stadium (China)
Beijing National Stadium (China)Beijing National Stadium (China)
Beijing National Stadium (China)sultanimulk796
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towersaman shukla
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard buildingBirukYared3
 
High level cancer institute,
High level cancer institute,High level cancer institute,
High level cancer institute,Krishan Kumar
 
Microwave Tower Presentation.ppt
Microwave Tower Presentation.pptMicrowave Tower Presentation.ppt
Microwave Tower Presentation.pptRuturajJadhav25
 

Ähnlich wie Tokyo Sky Tree (20)

PLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxPLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptx
 
PLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxPLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptx
 
Modeling procedure and Case study of ‘Gocheok Sky Dome’
Modeling procedure and Case study of  ‘Gocheok Sky Dome’Modeling procedure and Case study of  ‘Gocheok Sky Dome’
Modeling procedure and Case study of ‘Gocheok Sky Dome’
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
CHEk LAP KOK AIRPORT
CHEk LAP KOK AIRPORTCHEk LAP KOK AIRPORT
CHEk LAP KOK AIRPORT
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptx
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE  CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down method
 
Beijing National Stadium (China)
Beijing National Stadium (China)Beijing National Stadium (China)
Beijing National Stadium (China)
 
the millau viaduct
the millau viaductthe millau viaduct
the millau viaduct
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towers
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
High level cancer institute,
High level cancer institute,High level cancer institute,
High level cancer institute,
 
Microwave Tower Presentation.ppt
Microwave Tower Presentation.pptMicrowave Tower Presentation.ppt
Microwave Tower Presentation.ppt
 

Kürzlich hochgeladen

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 

Kürzlich hochgeladen (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 

Tokyo Sky Tree

  • 1. CASE STUDY ON TOKYO SKY TREE Presented By J. Sai Akhil (13131A0140)
  • 2. POINTS TO BE COVERED • Details of project • Introduction of structure • Foundation details • Design criteria • Vibration control system • Safety measures
  • 3. DETAILS OF PROJECT • Project name – Tokyo Sky Tree • Location – Sumida, Tokyo • Height of project – 634m (G+32) • Purpose – Broadcasting tower, Restaurant • Project duration – 4 years • Project cost – $800 million • Contractor – Obayashi Corp.
  • 4.
  • 5.
  • 6. FOUNDATION DETAILS • Type of soil at site is silt. • Hence RC wall pile type foundation is adopted to counter the earthquake effects. • Spikes like protuberances rise from walls to hold soil firmly. • This technique is called Knuckle Walls. • Piles are driven 35m into the ground.
  • 7. • Pile of length 2.3m and diameter of 10cm were adopted. • SRC pile system is adopted to have the continuity of steel member. • Maximum load was 40,000kN during pull-out test • Aspect ratio is about 9.0. • Top displacement is too large if foundation has poor vertical rigidity
  • 8. DESIGN CRITERIA • Tower was designed to resist up to the earthquake magnitude of 7.3 • The wind speeds at height of 600m were measured using balloons. • Winds are measured using ultrasonic wind gauge for two years.
  • 9. VIBRATION CONTROL SYSTEM • Two methods are used – Tuned Mass Damper(TMD) Core Column System • To suppress the wind at top of tower 2 TMDs are installed in the means of weights, springs, dampers • TMD weighing 40 tons are installed at 620m height and TMD weighing 20 tons are installed at 625m height
  • 10. • A core column was provided in the center of structure. • It is a cylindrical shaped column of reinforced concrete. • Diameter is 8 m and height of column is 375 m • Above this height oil dampers are provided to suppress the motions.
  • 11. SAFETY MEASURES • Providing waterproof canvas to workers to protect from wind and dizzying. • 2 safety lines are implemented instead of one to all the workers. • 100 m steel protective panels are setup over the railway just beneath the tower. • Building huge steel scaffolding in ground and placing in required position using cranes.