2. Network, Topology & LRS Tools in FME
Many tools in FME for Topology, Networks and LRS
workflows
Validating & Cleaning Networks
Build Topology
Network Analysis
LRS operations - Measures
Transformer Categories
Network
Linear Referencing
Geometry Operations
3. Building a Clean FME Network
Challenge
FME needs clean, fully
segmented networks
Complex edges
must be split
Segments must
touch
4. Building a Clean Network
Not Clean – Snapper
Not Intersected – Intersector
or TopologyBuilder
Still not intersected:–
PointOnLineOverlayer
has a tolerance
5. Validate a Network Topology
NetworkTopologyCalculator
Finds the connected
lines that belong to
the same network
graph.
Example
6. Network Analysis
Challenge
Find the valves on pipes near a
work site
Start with a clean network
Split the network into
sub-networks between values
Find the sub-network by the
work location
Find the values connected to
the sub-network Example
7. Using Linear Referencing Data
Assigning Mile Markers to Asset Data
Source Data:
Road Network (LRS)
Lighting Asset Data (Points)
NUMBER LONGITUDE LATITUDE CONDITION TYPE TYPE_OF_LUMINARE VOLTAGE WATTS CONTROLCENTER
1 82 59 26.098235061 - 41 30 43.068175401 + Good NAV RED INCANDESCENT 120/12 9.24 61
2 82 59 26.563977418 - 41 30 43.362121522 + Good NAV GRN INCANDESCENT 120/12 9.24 61
3 82 59 27.002814710 - 41 30 43.641866642 + Good NAV RED INCANDESCENT 120/12 9.24 61
4 82 59 27.463651489 - 41 30 43.939960952 + Good NAV GRN INCANDESCENT 120/12 9.24 61
5 82 59 27.905565366 - 41 30 44.219406077 + Good NAV RED INCANDESCENT 120/12 9.24 61
6 82 59 28.380990900 - 41 30 44.520466955 + Good NAV GRN INCANDESCENT 120/12 9.24 61
7 82 59 28.820540125 - 41 30 44.791771643 + Good NAV RED INCANDESCENT 120/12 9.24 61