2. Building no. - 63
Plot area - 798.35 sq.m.
No. of floors -P+G+14;
multi-level mechanical parking
Status -under construction
Nehru Nagar Mhada Colony, Mumbai
3. Building no. - 34
Plot area - 1193.68 sq.m.
No. of floors -B+G+15;
multi-level mechanical parking
Status -under construction
Nehru Nagar Mhada Colony, Mumbai
4. Building no. - 58
Plot area - 810.50 sq.m.
No. of floors -B+G+15;
multi-level mechanical parking
Status -under construction
Nehru Nagar Mhada Colony, Mumbai
5. Building no. - 60
Plot area - 822.50 sq.m.
No. of floors -B+G+15;
multi-level mechanical parking
Status - At Approval Stage
Nehru Nagar Mhada Colony, Mumbai
6. Building no. - 79 TO 83
Plot area - 3573.23 sq.m.
No. of floors -B+G+15;
multi-level mechanical parking
Status - At Design Stage
Nehru Nagar Mhada Colony, Mumbai
7. Nehru Nagar Mhada Colony, Mumbai
1. Building No. 12
2. Building No. 64
3. Building No. 66
1
2 3
Status - Completed
8. Mahakaleshwar CHS (SRA) Redevelopment, Bhandup (W), Mumbai
Building Under S.R.A. Scheme
Plot area - 2556.58 sq.m.
No. of floors -G+20;
multi-level mechanical parking
Status - Under Construction
9. Shantiniketan CHS Redevelopment, Andher (W), Mumbai
Building Under T.D.R Proposal
Plot area - 916.50 sq.m.
No. of floors -G+12;
multi-level mechanical parking
Status - Under Construction
10. Padmavati Nagari Residential Layout, Igatpuri
Plot area - 10718 sq.m
Bungalows,row-houses & buildings
Status - Under Construction
11. Padmavati Nagari Residential Layout, Igatpuri
Bungalow
Avg.Plot area - 115 sq.m.
No. of Bungalows – 20 nos.
No. of floors -G+2;
No of rooms – 4 BHK.
Status - Under Construction
Avg.Plot area - 52 sq.m.
No. of Row-houses – 38 nos.
No. of floors -G+2;
No of rooms – 2 BHK.
Status - Under Construction
ROW-HOUSE
12. Padmavati Nagari Residential Layout, Igatpuri
Plot area - 2756 sq.m.
No. of Buildings – 2 nos.
No. of floors -G+2 & ST+3
Flat Type – 1 BHK.
Status - Under Construction
BUILDINGS
REAR VIEW
FRONT VIEW
17. Senior college at Gove,Kolad. Raigarh
Plot area - 132720 sq.m.
Senior College for Science, Arts
And Commerce. for
Tatkare Charitable Trust, Kolad
18. Residential Lay-out At Dahanu
Plot area - 132720 sq.m.
Bungalows with 900 sqm. Plot
Bungalows with 650 sq.m. Plot
Bungalows with 300 sq.m. Plot
Club-house and independent
cottages with swimming pool
Go- karting track
19. Residential Lay-out At Ghoti
Plot area - 132720 sq.m.
Contoured site with1m slope for every 5 m
Bungalow design as such that every bungalow has the lake view
Row-houses and single building with 1bhk flats
Club-house with swimming pool
20. Residential Lay-out At Wade-Bolai, Nagar Road, Pune
Plot area - 20438.50sq.m.
Residential buildings with flat areas up to 365 sft.
Row-houses and Club-house with swimming pool
23. Proposed Projects in Comming Future
1.Kajal Kiran CHS redevelopment at Mulund West
2.Alpa CHS redevelopment at Mulund East – planning
3.Nirmala Niwas CHS redev at Chembur –
4.14 acre mixed user layout at Pune
5.Proposed Redevelopment under cluster scheme at Thane
6.Proposed Redevelopment at Kannamwar Nagar Mhada Colony
7.Proposed mixed user development at Kurla
8. Proposed Residential Towers at Mulund (W) and Mulund (E)
Ongoing project only for liasoning in M.C.G.M.
1.Residential Tower at Byculla For Rubberwala Realtors
2.Residential Tower at Worli and Tardeo For Kumar Builders
3.Commercial Tower at B.K.C. For Orbit Developers
4.Commercial Mall at Kurla(Phoenix Mall) for Market city Developer
5.Residential Tower at Byculla for Fortune Builders.
6.Residential Complex at Saki Vihar Road for S P Associates
24. DESIGN STAGE
Taking the clients instructions and preparing the conceptual design
Modify the conceptual designs incorporating required changes and
prepare the preliminary drawings for clients approval.
After clients approval prepare all the necessary drawings required for
the approval as per the prevailing norms of the authorities .
APPROVAL STAGE
Get the project approved on behalf of client from the concerned
authorities as per the specified conditions.
After the basic approval from the concerned authorities Prepare the
elevation of the building.
Preparing all the basic architectural working drawings as per the
approved plans and elevation.
CONSTRUCTION STAGE
Prepare and issue working drawings and details for proper execution of
works during construction.
On site demarcation of proposed building (setting out)
Checking of c-line as per the c-line drawings
Guide the contractor throughout the process of construction.
Checking of each slab at the time of shuttering process.
Approve samples of various elements and materials
Keep the client informed regarding the process of construction and if
any changes has to be done as per the site condition.
Site visit at various stages of the construction.
SCOPE OF WORK