Becky Webb, PE
Senior Engineer
ComEd Transmission Planning
Planning for the Future:
The Changing World of the
Electric Transmission System
2013 SWE Conference
1
Exelon
ComEd Overview
• ComEd and its nearly 6,000 employees are responsible for maintaining more than
70,000 miles of power lines that make up the electric transmission and distribution
systems in northern Illinois.
• ComEd provides customer operations for more than 3.8 million customers across the
region, or 70 percent of the state’s population, which includes the third largest city in the
United States. The service territory covers 11,400 mi2 (29,500 km2) in Northern Illinois.
• ComEd is committed to improving electric service reliability for its customers. Since
2001, ComEd has invested approximately $9 billion to expand, upgrade, and maintain
the reliability of its transmission and delivery systems.
2
Objectives
• Understand the role of the transmission planning engineer for the electric
power system
• Highlight recent trends, policies, and regulations that impact the electric
power system
• Identify challenges of planning the transmission system
3
Electric Power System
1. Electricity is generated at one of the many different power plants.
2. Electricity travels from the power plant over high-voltage transmission lines to
substation.
3. At a substation, the electricity voltage is lowered so that it can travel over the
distribution system.
4. Transformers reduce the electricity voltage even further to an acceptable level
for the home or business.
5. Service lines carry electricity to the home or business.
4
Source: www.comed.com/education/understanding-energy/Pages/how-the-system-works.aspx
Electric Power System
1. Electricity is generated at one of the many different power plants.
2. Electricity travels from the power plant over high-voltage transmission lines to
substation.
3. At a substation, the electricity voltage is lowered so that it can travel over the
distribution system.
4. Transformers reduce the electricity voltage even further to an acceptable level
for the home or business.
5. Service lines carry electricity to the home or business.
5
Source: www.comed.com/education/understanding-energy/Pages/how-the-system-works.aspx
Transmission Planner’s Focus
Electric Transmission System
• Regulated by the Federal Energy Regulatory Commission (FERC) and the
North American Electric Reliability Corporation (NERC)
6
Source: NERC, www.nerc.com
• NERC - established as the
Electric Reliability Organization
with oversight by FERC
• Develops and enforces reliability
standards
• Annually assesses seasonal and
long-term reliability
• Monitors the bulk power system
through system awareness
• Certifies industry personnel
Regional Transmission Organizations
Source: The ISO/RTO Council, www.isorto.org
• Regional Transmission Organizations (RTO) and Independent System
Operators (ISO) manage the electric grid on a regional basis
• Work with local utility to ensure reliability
7
ComEd Transmission System
8 Source: PJM 2012 Regional Transmission Expansion Report, www.pjm.com
8
Lake Michigan
The Role of the Transmission Planner
• Transmission Planning is all about evaluating snapshots of the electric
transmission system in time.
9
• The Transmission Planner is responsible for
studying the reliability of the transmission
system
• Use computer-based models to
represent the electrical parameters of
the elements on the transmission system
• Analyze different types of contingencies
for
• Near-term (1 to 5 years in future)
• Longer-term (6-10 years or more
in future)
• Determine appropriate reinforcement
projects to enhance system reliability
and security
Example Transmission Model
10
Tie Line to
Neighboring
Utility
Transmission
Station
Transmission
Station
Transmission
Station
Tie Line to Neighboring
Utility Transmission Station
Distribution
System
Distribution
System
Distribution
System
Transmission
Station
Transmission
Station
Generating
Station
Generating
Station
Generating
Station
Generating
Station
Sample Contingency Analysis
11
Tie Line to
Neighboring
Utility
Transmission
Station
Transmission
Station
Transmission
Station
Tie Line to Neighboring
Utility Transmission Station
Distribution
System
Distribution
System
Distribution
System
Transmission
Station
Transmission
Station
Is power flow
acceptable?
Generating
Station
Generating
Station
Generating
Station
Generating
Station
Challenges Impacting Transmission Planning
Future
Transmission
System
Uncertainty
Generator
Deactivations
Renewable
Portfolio
Standards
FERC Order
1000
12
Generator Deactivations
• Generator deactivations impact power flows on transmission system
May potentially cause reliability issues due to lack of source in particular
locations on transmission system
• Existing generators facing increased risk to economic viability in today’s
market
Changes to environmental regulations largely impact coal- and oil-fired
generators
Increased supply of
Slowed growth in demand for electricity
• Generator required to notify transmission system operator of generator
deactivation
Generator deactivation must be analyzed to ensure system reliability
Reinforcement projects must be identified if reliability issues exist
Transmission projects typically require long lead time to design and
construct
13
Generator Retirement
• NERC projected approximately 71 GW of fossil-fired generation to retire by
2022
90% of the 71 GW projected to retire by 2017
44GW of fossil-fired generation was confirmed to retire at time of study
14
Source: 2012 NERC Summer Long-Term Reliability Assessment, www.nerc.com
Generator Retirement
15
Source: PJM Generator Deactivations, www.pjm.com, posted October 4, 2013
• Within PJM’s footprint:
Approximately 7.5 GW of capacity has retired since 2012
1.37 GW of capacity retired in the ComEd footprint in 2012
An additional 12.7 GW will be deactivated by the end of 2015
Approximately 90% of future capacity deactivations required upgrades
Challenges Impacting Transmission Planning
Future
Transmission
System
Uncertainty
Generator
Deactivations
Renewable
Portfolio
Standards
FERC Order
1000
16
Renewable Resources
• Renewable Portfolio Standards (RPS) – regulatory mandate to
increase production of energy from renewable sources
Typically states mandate a certain percentage of electricity generated from a
particular technology (wind, solar, biomass)
States can choose to apply the RPS requirements to all utilities or only
investor-owned utilities
• Approximately 29 states have implemented Renewable Portfolio
Standard (RPS) requirements to drive the development of renewable
energy and focus on greenhouse gas emission regulation
• Impacts to transmission system include
Location and siting of renewable projects
Changes in power flow due to variability of large-scale renewable generation
• Status of renewable energy production tax credit may threaten
economic viability of potential renewable projects
17
National Renewable Energy Laboratory (NREL)
Renewable Resources
18
Source: Database of State Incentives for Renewables and Efficiency: http://www.dsireusa.org
Renewable Portfolio Standard Policies..
www.dsireusa.org / March 2013.
29 states,+
Washington DC and 2
territories,have
Renewable Portfolio
Standards
(8 states and 2 territories have
renewable portfolio goals).
Challenges Impacting Transmission Planning
Future
Transmission
System
Uncertainty
Generator
Deactivations
Renewable
Portfolio
Standards
FERC Order
1000
19
Federal Energy Regulatory Commission (FERC)
Order 1000
• FERC issued Order 1000 in 2011 to support investment in
transmission to account for policy changes and introduction of new
regulations
Requires transmission providers to improve coordination between
neighboring transmission planning regions – participate in a regional
transmission planning process
Requires public utility transmission provider to consider public policy
requirements in planning process
Promotes competition in regional transmission planning
processes
o Removes incumbent utility’s right of first refusal (ROFR) for specific
new transmission facilities selected as part of a regional
transmission plan
o May require changes to transmission planning processes to prepare
for open process
Devise cost allocation principles to recover cost of regional
transmission projects
20
The Federal Energy Regulatory Commission (FERC) website, www.ferc.gov
Conclusion
• Uncertainties exist when planning for the
future
• Increased challenges in considering new
policies and economic climate
• Transmission organizations changing
traditional planning processes to account
for new challenges
• Transmission Planners tasked to identify
necessary transmission projects to invest
in the reliability of the system
• Increased focus on transmission yields
exciting opportunities for transmission
planning engineers!
21
Questions?
22
• Please feel free to contact me at:
Becky.Webb@ComEd.com

Weitere ähnliche Inhalte

Was ist angesagt?

K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
ascemiami-dade
 
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Andrew Gelston
 
Powering sydneys future workshop
Powering sydneys future workshopPowering sydneys future workshop
Powering sydneys future workshop
TransGrid AU
 
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
Tuong Do
 
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
Tuong Do
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
sanjeev jain
 
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
Tuong Do
 

Was ist angesagt? (20)

Affordable 24x7 Power To All @2019 - Key Strategies (Improve and Enhance Dist...
Affordable 24x7 Power To All @2019 - Key Strategies (Improve and Enhance Dist...Affordable 24x7 Power To All @2019 - Key Strategies (Improve and Enhance Dist...
Affordable 24x7 Power To All @2019 - Key Strategies (Improve and Enhance Dist...
 
Environmental show of the south 2014 new entrants in electricity generation
Environmental show of the south 2014 new entrants in electricity generationEnvironmental show of the south 2014 new entrants in electricity generation
Environmental show of the south 2014 new entrants in electricity generation
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
 
Tracy Babbidge – RCSD 2019
Tracy Babbidge – RCSD 2019Tracy Babbidge – RCSD 2019
Tracy Babbidge – RCSD 2019
 
Oliver Spink
Oliver SpinkOliver Spink
Oliver Spink
 
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
 
Powering sydneys future workshop
Powering sydneys future workshopPowering sydneys future workshop
Powering sydneys future workshop
 
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
 
Choosing Green: Status and Challenges of RE based Open Access
Choosing Green: Status and Challenges of RE based Open AccessChoosing Green: Status and Challenges of RE based Open Access
Choosing Green: Status and Challenges of RE based Open Access
 
Presentation steel
 Presentation steel  Presentation steel
Presentation steel
 
IRJET- A Review on Load Frequency Control Strategy
IRJET- A Review on Load Frequency Control StrategyIRJET- A Review on Load Frequency Control Strategy
IRJET- A Review on Load Frequency Control Strategy
 
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
2013 Smart Grid Potential in Thailand & Vietnam, Anand Menon (EN)
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for difference
 
Acquisition of gulf coast natural gas assets final
Acquisition of gulf coast natural gas assets   finalAcquisition of gulf coast natural gas assets   final
Acquisition of gulf coast natural gas assets final
 
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
 
Eskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationEskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentation
 
Vehicle-to-Everything (V2X) Energy Services
Vehicle-to-Everything (V2X) Energy ServicesVehicle-to-Everything (V2X) Energy Services
Vehicle-to-Everything (V2X) Energy Services
 
Second E-rate MOdernizzation Order Review
Second E-rate MOdernizzation Order ReviewSecond E-rate MOdernizzation Order Review
Second E-rate MOdernizzation Order Review
 

Andere mochten auch

Business development plan
Business development planBusiness development plan
Business development plan
Ramesh Raut
 
Project mgmt. & entrepenuership[1]
Project mgmt. & entrepenuership[1]Project mgmt. & entrepenuership[1]
Project mgmt. & entrepenuership[1]
07Deeps
 
Seia Nrelrampingpaper2008
Seia Nrelrampingpaper2008Seia Nrelrampingpaper2008
Seia Nrelrampingpaper2008
Carolyn Elefant
 

Andere mochten auch (19)

Business development plan
Business development planBusiness development plan
Business development plan
 
Project mgmt. & entrepenuership[1]
Project mgmt. & entrepenuership[1]Project mgmt. & entrepenuership[1]
Project mgmt. & entrepenuership[1]
 
Mycv Tb
Mycv TbMycv Tb
Mycv Tb
 
Seia Nrelrampingpaper2008
Seia Nrelrampingpaper2008Seia Nrelrampingpaper2008
Seia Nrelrampingpaper2008
 
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
 
FERC Order Issuing Certificate for DTI's Leidy South Project
FERC Order Issuing Certificate for DTI's Leidy South ProjectFERC Order Issuing Certificate for DTI's Leidy South Project
FERC Order Issuing Certificate for DTI's Leidy South Project
 
FERC 101, continued - Robert Deibel - USDA Forest Service and Matt Rice, Amer...
FERC 101, continued - Robert Deibel - USDA Forest Service and Matt Rice, Amer...FERC 101, continued - Robert Deibel - USDA Forest Service and Matt Rice, Amer...
FERC 101, continued - Robert Deibel - USDA Forest Service and Matt Rice, Amer...
 
I Don't Think We're in Kansas Anymore: Life for a Professional Returning to G...
I Don't Think We're in Kansas Anymore: Life for a Professional Returning to G...I Don't Think We're in Kansas Anymore: Life for a Professional Returning to G...
I Don't Think We're in Kansas Anymore: Life for a Professional Returning to G...
 
Tips for Hosting a Successful Evening with Industry Event
Tips for Hosting a Successful Evening with Industry EventTips for Hosting a Successful Evening with Industry Event
Tips for Hosting a Successful Evening with Industry Event
 
Harnessing Light – How Light is Enabling the Future
Harnessing Light – How Light is Enabling the FutureHarnessing Light – How Light is Enabling the Future
Harnessing Light – How Light is Enabling the Future
 
Fundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity PricingFundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity Pricing
 
Fundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity PricingFundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity Pricing
 
45 Minutes, 45 Girls ... What Do I Do???
45 Minutes, 45 Girls ... What Do I Do???45 Minutes, 45 Girls ... What Do I Do???
45 Minutes, 45 Girls ... What Do I Do???
 
It’s Not Personal. It’s Just Business.
It’s Not Personal. It’s Just Business.It’s Not Personal. It’s Just Business.
It’s Not Personal. It’s Just Business.
 
Continual Compliance Monitoring– PCI DSS, HIPAA, FERC/NERC, EI3PA, ISO 27001 ...
Continual Compliance Monitoring– PCI DSS, HIPAA, FERC/NERC, EI3PA, ISO 27001 ...Continual Compliance Monitoring– PCI DSS, HIPAA, FERC/NERC, EI3PA, ISO 27001 ...
Continual Compliance Monitoring– PCI DSS, HIPAA, FERC/NERC, EI3PA, ISO 27001 ...
 
Regions of the United States
Regions of the United StatesRegions of the United States
Regions of the United States
 
Ferc 1000
Ferc 1000Ferc 1000
Ferc 1000
 
WE16 - There is no Crying in Baseball
WE16 - There is no Crying in BaseballWE16 - There is no Crying in Baseball
WE16 - There is no Crying in Baseball
 
WE16 - Shine Theory
WE16 - Shine TheoryWE16 - Shine Theory
WE16 - Shine Theory
 

Ähnlich wie Planning for the Future: The Changing World of the Electric Transmission System

Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of RE
ANUECI
 
20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides
Jennifer Szaro
 
WindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptWindFarmFeasibility (1).ppt
WindFarmFeasibility (1).ppt
ssuserfdb06f
 
New jersey's clean energy program opportunities for chp
New jersey's clean energy program   opportunities for chpNew jersey's clean energy program   opportunities for chp
New jersey's clean energy program opportunities for chp
TNenergy
 

Ähnlich wie Planning for the Future: The Changing World of the Electric Transmission System (20)

Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...
 
Grid code
Grid codeGrid code
Grid code
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of RE
 
Power system Planning - Basic Techniques
Power system Planning - Basic TechniquesPower system Planning - Basic Techniques
Power system Planning - Basic Techniques
 
Capital Partners Solar Project FAQ
Capital Partners Solar Project FAQCapital Partners Solar Project FAQ
Capital Partners Solar Project FAQ
 
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTURE
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTUREREDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTURE
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTURE
 
20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides
 
AECT Electricity 101
AECT Electricity 101AECT Electricity 101
AECT Electricity 101
 
WindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptWindFarmFeasibility (1).ppt
WindFarmFeasibility (1).ppt
 
Poster Board_v8
Poster Board_v8Poster Board_v8
Poster Board_v8
 
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
 
IEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.pptIEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.ppt
 
Power sytem improvement techniques
Power sytem improvement techniquesPower sytem improvement techniques
Power sytem improvement techniques
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)
 
Update on ERCOT Activities
Update on ERCOT ActivitiesUpdate on ERCOT Activities
Update on ERCOT Activities
 
The merits of integrating renewables with smarter grid carimet
The merits of integrating renewables with smarter grid   carimetThe merits of integrating renewables with smarter grid   carimet
The merits of integrating renewables with smarter grid carimet
 
L1-Generation and distribution of electric power-latest.pptx
L1-Generation and distribution of electric power-latest.pptxL1-Generation and distribution of electric power-latest.pptx
L1-Generation and distribution of electric power-latest.pptx
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
 
Sgcp14jones1
Sgcp14jones1Sgcp14jones1
Sgcp14jones1
 
New jersey's clean energy program opportunities for chp
New jersey's clean energy program   opportunities for chpNew jersey's clean energy program   opportunities for chp
New jersey's clean energy program opportunities for chp
 

Mehr von Society of Women Engineers

Mehr von Society of Women Engineers (20)

Schneider electric overview laurie addisonlavelle_2
Schneider electric overview laurie addisonlavelle_2Schneider electric overview laurie addisonlavelle_2
Schneider electric overview laurie addisonlavelle_2
 
Opening keynote
Opening keynoteOpening keynote
Opening keynote
 
Moonshot rodriguez slides
Moonshot rodriguez slidesMoonshot rodriguez slides
Moonshot rodriguez slides
 
Moonshot fetch slides
Moonshot fetch slidesMoonshot fetch slides
Moonshot fetch slides
 
H ivs ai_wehr_slides
H ivs ai_wehr_slidesH ivs ai_wehr_slides
H ivs ai_wehr_slides
 
H ivs ai_faust_slides
H ivs ai_faust_slidesH ivs ai_faust_slides
H ivs ai_faust_slides
 
H ivs ai_bestelmeyer_slides
H ivs ai_bestelmeyer_slidesH ivs ai_bestelmeyer_slides
H ivs ai_bestelmeyer_slides
 
Closing keynote
Closing keynoteClosing keynote
Closing keynote
 
Ball d 8
Ball d 8Ball d 8
Ball d 8
 
Ball d 7
Ball d 7Ball d 7
Ball d 7
 
Ball d 6
Ball d 6Ball d 6
Ball d 6
 
Ball d 4
Ball d 4Ball d 4
Ball d 4
 
How to Develop Your Section's Corporate Relations
How to Develop Your Section's Corporate Relations How to Develop Your Section's Corporate Relations
How to Develop Your Section's Corporate Relations
 
How to Find Your Section's Next Officer Team
How to Find Your Section's Next Officer Team How to Find Your Section's Next Officer Team
How to Find Your Section's Next Officer Team
 
Using SWE to Complement your Career
Using SWE to Complement your Career Using SWE to Complement your Career
Using SWE to Complement your Career
 
How to Have a Difficult Conversation with an Underperforming SWE Leader
How to Have a Difficult Conversation with an Underperforming SWE LeaderHow to Have a Difficult Conversation with an Underperforming SWE Leader
How to Have a Difficult Conversation with an Underperforming SWE Leader
 
18 cd 32
18 cd 3218 cd 32
18 cd 32
 
How to Get the Most out of your LCC Coach!
How to Get the Most out of your LCC Coach!How to Get the Most out of your LCC Coach!
How to Get the Most out of your LCC Coach!
 
The Mars Ice Challenge (RASC-AL)
The Mars Ice Challenge (RASC-AL)The Mars Ice Challenge (RASC-AL)
The Mars Ice Challenge (RASC-AL)
 
Beyond Disruption
Beyond Disruption Beyond Disruption
Beyond Disruption
 

Kürzlich hochgeladen

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Kürzlich hochgeladen (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 

Planning for the Future: The Changing World of the Electric Transmission System

  • 1. Becky Webb, PE Senior Engineer ComEd Transmission Planning Planning for the Future: The Changing World of the Electric Transmission System 2013 SWE Conference
  • 3. ComEd Overview • ComEd and its nearly 6,000 employees are responsible for maintaining more than 70,000 miles of power lines that make up the electric transmission and distribution systems in northern Illinois. • ComEd provides customer operations for more than 3.8 million customers across the region, or 70 percent of the state’s population, which includes the third largest city in the United States. The service territory covers 11,400 mi2 (29,500 km2) in Northern Illinois. • ComEd is committed to improving electric service reliability for its customers. Since 2001, ComEd has invested approximately $9 billion to expand, upgrade, and maintain the reliability of its transmission and delivery systems. 2
  • 4. Objectives • Understand the role of the transmission planning engineer for the electric power system • Highlight recent trends, policies, and regulations that impact the electric power system • Identify challenges of planning the transmission system 3
  • 5. Electric Power System 1. Electricity is generated at one of the many different power plants. 2. Electricity travels from the power plant over high-voltage transmission lines to substation. 3. At a substation, the electricity voltage is lowered so that it can travel over the distribution system. 4. Transformers reduce the electricity voltage even further to an acceptable level for the home or business. 5. Service lines carry electricity to the home or business. 4 Source: www.comed.com/education/understanding-energy/Pages/how-the-system-works.aspx
  • 6. Electric Power System 1. Electricity is generated at one of the many different power plants. 2. Electricity travels from the power plant over high-voltage transmission lines to substation. 3. At a substation, the electricity voltage is lowered so that it can travel over the distribution system. 4. Transformers reduce the electricity voltage even further to an acceptable level for the home or business. 5. Service lines carry electricity to the home or business. 5 Source: www.comed.com/education/understanding-energy/Pages/how-the-system-works.aspx Transmission Planner’s Focus
  • 7. Electric Transmission System • Regulated by the Federal Energy Regulatory Commission (FERC) and the North American Electric Reliability Corporation (NERC) 6 Source: NERC, www.nerc.com • NERC - established as the Electric Reliability Organization with oversight by FERC • Develops and enforces reliability standards • Annually assesses seasonal and long-term reliability • Monitors the bulk power system through system awareness • Certifies industry personnel
  • 8. Regional Transmission Organizations Source: The ISO/RTO Council, www.isorto.org • Regional Transmission Organizations (RTO) and Independent System Operators (ISO) manage the electric grid on a regional basis • Work with local utility to ensure reliability 7
  • 9. ComEd Transmission System 8 Source: PJM 2012 Regional Transmission Expansion Report, www.pjm.com 8 Lake Michigan
  • 10. The Role of the Transmission Planner • Transmission Planning is all about evaluating snapshots of the electric transmission system in time. 9 • The Transmission Planner is responsible for studying the reliability of the transmission system • Use computer-based models to represent the electrical parameters of the elements on the transmission system • Analyze different types of contingencies for • Near-term (1 to 5 years in future) • Longer-term (6-10 years or more in future) • Determine appropriate reinforcement projects to enhance system reliability and security
  • 11. Example Transmission Model 10 Tie Line to Neighboring Utility Transmission Station Transmission Station Transmission Station Tie Line to Neighboring Utility Transmission Station Distribution System Distribution System Distribution System Transmission Station Transmission Station Generating Station Generating Station Generating Station Generating Station
  • 12. Sample Contingency Analysis 11 Tie Line to Neighboring Utility Transmission Station Transmission Station Transmission Station Tie Line to Neighboring Utility Transmission Station Distribution System Distribution System Distribution System Transmission Station Transmission Station Is power flow acceptable? Generating Station Generating Station Generating Station Generating Station
  • 13. Challenges Impacting Transmission Planning Future Transmission System Uncertainty Generator Deactivations Renewable Portfolio Standards FERC Order 1000 12
  • 14. Generator Deactivations • Generator deactivations impact power flows on transmission system May potentially cause reliability issues due to lack of source in particular locations on transmission system • Existing generators facing increased risk to economic viability in today’s market Changes to environmental regulations largely impact coal- and oil-fired generators Increased supply of Slowed growth in demand for electricity • Generator required to notify transmission system operator of generator deactivation Generator deactivation must be analyzed to ensure system reliability Reinforcement projects must be identified if reliability issues exist Transmission projects typically require long lead time to design and construct 13
  • 15. Generator Retirement • NERC projected approximately 71 GW of fossil-fired generation to retire by 2022 90% of the 71 GW projected to retire by 2017 44GW of fossil-fired generation was confirmed to retire at time of study 14 Source: 2012 NERC Summer Long-Term Reliability Assessment, www.nerc.com
  • 16. Generator Retirement 15 Source: PJM Generator Deactivations, www.pjm.com, posted October 4, 2013 • Within PJM’s footprint: Approximately 7.5 GW of capacity has retired since 2012 1.37 GW of capacity retired in the ComEd footprint in 2012 An additional 12.7 GW will be deactivated by the end of 2015 Approximately 90% of future capacity deactivations required upgrades
  • 17. Challenges Impacting Transmission Planning Future Transmission System Uncertainty Generator Deactivations Renewable Portfolio Standards FERC Order 1000 16
  • 18. Renewable Resources • Renewable Portfolio Standards (RPS) – regulatory mandate to increase production of energy from renewable sources Typically states mandate a certain percentage of electricity generated from a particular technology (wind, solar, biomass) States can choose to apply the RPS requirements to all utilities or only investor-owned utilities • Approximately 29 states have implemented Renewable Portfolio Standard (RPS) requirements to drive the development of renewable energy and focus on greenhouse gas emission regulation • Impacts to transmission system include Location and siting of renewable projects Changes in power flow due to variability of large-scale renewable generation • Status of renewable energy production tax credit may threaten economic viability of potential renewable projects 17 National Renewable Energy Laboratory (NREL)
  • 19. Renewable Resources 18 Source: Database of State Incentives for Renewables and Efficiency: http://www.dsireusa.org Renewable Portfolio Standard Policies.. www.dsireusa.org / March 2013. 29 states,+ Washington DC and 2 territories,have Renewable Portfolio Standards (8 states and 2 territories have renewable portfolio goals).
  • 20. Challenges Impacting Transmission Planning Future Transmission System Uncertainty Generator Deactivations Renewable Portfolio Standards FERC Order 1000 19
  • 21. Federal Energy Regulatory Commission (FERC) Order 1000 • FERC issued Order 1000 in 2011 to support investment in transmission to account for policy changes and introduction of new regulations Requires transmission providers to improve coordination between neighboring transmission planning regions – participate in a regional transmission planning process Requires public utility transmission provider to consider public policy requirements in planning process Promotes competition in regional transmission planning processes o Removes incumbent utility’s right of first refusal (ROFR) for specific new transmission facilities selected as part of a regional transmission plan o May require changes to transmission planning processes to prepare for open process Devise cost allocation principles to recover cost of regional transmission projects 20 The Federal Energy Regulatory Commission (FERC) website, www.ferc.gov
  • 22. Conclusion • Uncertainties exist when planning for the future • Increased challenges in considering new policies and economic climate • Transmission organizations changing traditional planning processes to account for new challenges • Transmission Planners tasked to identify necessary transmission projects to invest in the reliability of the system • Increased focus on transmission yields exciting opportunities for transmission planning engineers! 21
  • 23. Questions? 22 • Please feel free to contact me at: Becky.Webb@ComEd.com