TESTING &
MAINTENANCE OF
TRANSFORMER
PRESENTED BY:
SMRITI KESHARWANI
ASST PROF.
DEPARTMENT OF ELECTRICAL ENGINEERING
DR C V RAMAN UNIVERSITY, KOTA C.G.
TESTING OF TRANSFORMER
• TESTING IS CARRIED OUT AS PER IS-2026.
• ROUTINE , TYPE TESTS & SPECIAL TESTS
• ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB)
• 1.Measurement of winding resistance
• 2.Measurement of insulation resistance
• 3.Seperate source voltage withstand test (High Voltage tests on HV & LV)
• 4.Induced Over voltage Withstand test (DVDF test)
• 5.Measurement of voltage ratio
• 6.Measurement of NO LOAD LOSS & current.
• 7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY &
REGULATION)
• 8.Vector Group Verification
• 9.Oil BDV test.
• 10.Tests on OLTC (if Attached)
THESE TESTS ARE CARRIED OUT ONLY ON
ONE TRANSFORMER OF THE LOT.
 All routine tests
 Type tests
1. Lightening Impulse test.
2. Temperature rise test
 Additional Impulse test
 Short circuit test
 Measurement of zero Phase sequence Impedance test.
 Measurement of acoustic noise level.
 Measurement of harmonics of the no load current.
 Magnetic balance test.
1.MEASUREMENT OF WINDING RESISTANCE
This test measures the resistance of the HV & LV
winding. The values of resistance should be balance
for all three phases and should match the designed
values.
Equipment used : Digital resistance meter.
2.MEASUREMENT OF INSULATION RESISTANCE
Measures the insulation resistance of HV & LV
windings with respect to earth (body) and between LV
& HV winding.
INSULATION TESTER OR MEGGER IS USED.
Recommended Values are
2000Mohms for HV & 500 Mohms for LV.
3.SEPERATE SOURCE VOLTAGE WITHSTAND TEST (High
Voltage tests on HV & LV)-
This test checks the insulation property between Primary to earth,
Secondary to earth and between Primary & Secondary.
HV high voltage test : LV winding connected together and earthed.
HV winding connected together and given 28 KV ( for 11KV
transformer) for 1 minute.
LV high Voltage test : HV winding connected together and earthed. LV
winding connected together and given 3 KV for 1 minute.
Equipment used : High Voltage tester ( 100KV & 3KV)
4.INDUCED OVER VOLTAGE WITHSTAND TEST
(DVDF TEST)- This test checks the inter turn
insulation.
For a 11KV/433V transformer,866 Volts are applied
at the 433V winding with the help of a Generator for
1 minute. This induces 22KV on 11KV side. The
frequency of the 866V supply is also increased to
100HZ.
Equipment used : MOTOR GENERATOR SET
5.MEASUREMENT OF VOLTAGE RATIO
This test measures the voltage ratio as per the
customer’s requirement.
V1/V2 = N1/N2
The voltage ratio is equal to the turns ratio in a
transformer. Using this principle, the turns ratio is
measured with the help of a turns ratio meter. If it is
correct , then the voltage ratio is assumed to be
correct.
Equipment used : Turns Ratiometer
6.MEASUREMENT OF NO LOAD LOSS & CURRENT-
The iron losses and no load current are measured in
this test. The 433V winding is charged at 433V
supply & the 11KV winding is left open .The power
consumed by the transformer at no load is the no load
loss in the transformer.
Effect of actual frequency must be taken into account.
Equipment used : Watt meters or power analyzer.
7.MEASUREMENT OF LOAD LOSS &
IMPEDENCE.(EFFICIENCY & REGULATION)
This test measures the power consumed by the
transformer when the 433V winding is short circuited
and The rated current is passed through the 11KV
winding.
Equipment used : Wattmeters or power analyzer.
8.VECTOR GROUP VERIFICATION TEST
This test verifies the Dyn-11 vector group of a
distribution transformer.
Equipment used : voltmeter.
 Oil BDV TEST.
Oil breakdown voltage is checked as per IS-335.
100 mm L X 70 mm B X 80 mm Ht. glass pot.
500ml Oil sample.
Spherical electrodes with gap of 2.5 mm
Recommended value : 60KV
Equipment used : OIL BDV TEST SET.
LIGHTENING IMPULSE TEST
 All the dielectric tests check the insulation level of the job.
 Impulse generator is used to produce the specified voltage
impulse wave of 1.2/50 micro seconds wave
 One impulse of a reduced voltage between 50 to 75% of the
full test voltage and subsequent three impulses at full voltage.
 For a three phase transformer, impulse is carried out on all
three phases in succession.
 The voltage is applied on each of the line terminal in
succession, keeping the other terminals earthed.
 The current and voltage wave shapes are recorded on the
oscilloscope and any distortion in the wave shape is the criteria
for failure.
SHORT CIRCUIT WITHSTAND ABILITY TEST-
 This tests measures the ability of the transformer to withstand
the mechanical and thermal stresses caused by the external
short circuit.
 HV terminals are connected to the supply bus of the testing
plant. The LV is short circuited. The testing plant parameters
are such adjusted to give the rated short circuit current.
 Supply is made on and closed after specified duration of short
circuit. The record of current wave form is noted.
 There should not be any mechanical distortion, fire to the
transformer during this test. Similarly no wave form
distortion. The transformer should also withstand the routine
tests after the short circuit test.
 The reactance of the winding measured before and after the
S.C. test should not vary beyond the limits stated in the
IS2026.
 Transformer is the heart of any power system.
Hence preventive maintenance is always cost
effective and time saving. Any failure to the
transformer can extremely affect the whole
functioning of the organization.
 OIL :
1. Oil level checking. Leakages to be attended.
2. Oil BDV & acidity checking at regular intervals.
If acidity is between 0.5 to 1mg KOH, oil should
be kept under observation.
3. BDV, Color and smell of oil are indicative.
1. Sludge, dust, dirt ,moisture can be removed by
filtration.
2. Oil when topped up shall be of the same make. It
may lead to sludge formation and acidic contents.
 Insulation resistance of the transformer should be
checked once in 6 months.
 Megger values along with oil values indicate the
condition of transformer.
 Periodic Dissolved Gas Analysis can be carried out.
 BUSHINGS
Bushings should be cleaned and inspected for any cracks.
Dust & dirt deposition, Salt or chemical deposition,
cement or acid fumes depositions should be carefully
noted and rectified.
 Periodic checking of any loose connections of the
terminations of HV & LV side.
 Breather examination. Dehydration of Silica gel if
necessary.
 Explosion vent diaphragm examination.
 Conservator to be cleaned from inside after every
three years.
 Regular inspection of OIL & WINDING
TEMPERATURE METER readings.
 Cleanliness in the Substation yard with all nets, vines,
shrubs removed.
 The best way of protecting a transformer is to have
good preventive maintenance schedule.
 Oil Temperature Indicators.
 Winding Temperature indicators.
 Buchholz Relay.
 Magnetic Oil level Gauge.
 Explosion Vent.
 HT fuse & D.O. fuse.
 LT circuit breaker.
 HT Circuit breaker with Over load, Earth Fault relay
tripping.
 Oil Surge Relay for OLTC.
 PRV for OLTC.
 HORN GAPS & Lightening Arrestor.
 Breather.
 Insufficient Oil level.
 Seepage of water in oil.
 Prolonged Over loading.
 Single Phase loading.
 Unbalanced loading.
 Faulty Termination (Improper sized lugs etc)
 Power Theft.
 Prolonged Short Circuit.
 Faulty operation of tap changer switch.
 Lack of installation checks.
 Faulty design
 Bad Quality of raw material.
 Transit damaged transformers.
 After failure , transformer is removed and replaced
with new/repaired one without removing the cause of
failure which results in immediate or short time failure.
Testing of transformer

Weitere ähnliche Inhalte

Was ist angesagt?

Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
Binit Das
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
Md Irshad Ahmad
 

Was ist angesagt? (20)

Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protection
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Transformer ppt.
Transformer ppt.Transformer ppt.
Transformer ppt.
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 
Soft starters
Soft startersSoft starters
Soft starters
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV Switchgear
 
Motor starter
Motor starterMotor starter
Motor starter
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Transformer
TransformerTransformer
Transformer
 
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv JimitPRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
 
Vacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakersVacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakers
 
Transformer Oil Testing.pptx
Transformer Oil Testing.pptxTransformer Oil Testing.pptx
Transformer Oil Testing.pptx
 
Transformer Parts and functions
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functions
 
Ppt of current transformer
Ppt of current transformerPpt of current transformer
Ppt of current transformer
 

Andere mochten auch

Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and Testing
GPTraining
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1
Vijay Raskar
 
Electrical maintenance fundamentals
Electrical maintenance fundamentalsElectrical maintenance fundamentals
Electrical maintenance fundamentals
James Shearer
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
Suresh Patil
 
Maitenance of transformer
Maitenance of transformerMaitenance of transformer
Maitenance of transformer
Rohit Dave
 

Andere mochten auch (20)

Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and Testing
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1
 
Electrical maintenance fundamentals
Electrical maintenance fundamentalsElectrical maintenance fundamentals
Electrical maintenance fundamentals
 
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
Troubleshooting, Maintenance and Protection of AC Electrical Motors and DrivesTroubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
 
open circuit and short circuit test on transformer
open circuit and short circuit test on transformeropen circuit and short circuit test on transformer
open circuit and short circuit test on transformer
 
Transformer construction,types and working
Transformer construction,types and workingTransformer construction,types and working
Transformer construction,types and working
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
 
Sc and oc test on transformer
Sc and oc test on transformerSc and oc test on transformer
Sc and oc test on transformer
 
Transformer
TransformerTransformer
Transformer
 
Maitenance of transformer
Maitenance of transformerMaitenance of transformer
Maitenance of transformer
 
FMEA - Electrical Motor
FMEA - Electrical MotorFMEA - Electrical Motor
FMEA - Electrical Motor
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
 
151706423 maintenance-and-troubleshooting-of-electric-motors
151706423 maintenance-and-troubleshooting-of-electric-motors151706423 maintenance-and-troubleshooting-of-electric-motors
151706423 maintenance-and-troubleshooting-of-electric-motors
 
transformer
transformertransformer
transformer
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
Transformer 2
Transformer 2Transformer 2
Transformer 2
 
Armature & field coil inspection
Armature & field coil inspectionArmature & field coil inspection
Armature & field coil inspection
 
Why dehydration of transformer oil is important?
Why dehydration of transformer oil is important?Why dehydration of transformer oil is important?
Why dehydration of transformer oil is important?
 
Transformer oil
Transformer oilTransformer oil
Transformer oil
 

Ähnlich wie Testing of transformer

REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
RAJPRASAD RS
 
Introduction of transfromer
Introduction of transfromerIntroduction of transfromer
Introduction of transfromer
pretty gurna
 

Ähnlich wie Testing of transformer (20)

TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
Testing of transformer.pptx
Testing of transformer.pptxTesting of transformer.pptx
Testing of transformer.pptx
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjar
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
PROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptPROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.ppt
 
Transformers pptxx.ppt
Transformers pptxx.pptTransformers pptxx.ppt
Transformers pptxx.ppt
 
transformers.ppt
transformers.ppttransformers.ppt
transformers.ppt
 
220kv grid wapda town lahore
220kv grid wapda town lahore220kv grid wapda town lahore
220kv grid wapda town lahore
 
MSC SOW
MSC SOWMSC SOW
MSC SOW
 
Transformer cont
Transformer contTransformer cont
Transformer cont
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Introduction of transfromer
Introduction of transfromerIntroduction of transfromer
Introduction of transfromer
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
SD.pptx
SD.pptxSD.pptx
SD.pptx
 

Kürzlich hochgeladen

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Kürzlich hochgeladen (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Testing of transformer

  • 1. TESTING & MAINTENANCE OF TRANSFORMER PRESENTED BY: SMRITI KESHARWANI ASST PROF. DEPARTMENT OF ELECTRICAL ENGINEERING DR C V RAMAN UNIVERSITY, KOTA C.G.
  • 2. TESTING OF TRANSFORMER • TESTING IS CARRIED OUT AS PER IS-2026. • ROUTINE , TYPE TESTS & SPECIAL TESTS • ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB) • 1.Measurement of winding resistance • 2.Measurement of insulation resistance • 3.Seperate source voltage withstand test (High Voltage tests on HV & LV) • 4.Induced Over voltage Withstand test (DVDF test) • 5.Measurement of voltage ratio • 6.Measurement of NO LOAD LOSS & current. • 7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION) • 8.Vector Group Verification • 9.Oil BDV test. • 10.Tests on OLTC (if Attached)
  • 3. THESE TESTS ARE CARRIED OUT ONLY ON ONE TRANSFORMER OF THE LOT.  All routine tests  Type tests 1. Lightening Impulse test. 2. Temperature rise test
  • 4.  Additional Impulse test  Short circuit test  Measurement of zero Phase sequence Impedance test.  Measurement of acoustic noise level.  Measurement of harmonics of the no load current.  Magnetic balance test.
  • 5. 1.MEASUREMENT OF WINDING RESISTANCE This test measures the resistance of the HV & LV winding. The values of resistance should be balance for all three phases and should match the designed values. Equipment used : Digital resistance meter.
  • 6. 2.MEASUREMENT OF INSULATION RESISTANCE Measures the insulation resistance of HV & LV windings with respect to earth (body) and between LV & HV winding. INSULATION TESTER OR MEGGER IS USED. Recommended Values are 2000Mohms for HV & 500 Mohms for LV.
  • 7. 3.SEPERATE SOURCE VOLTAGE WITHSTAND TEST (High Voltage tests on HV & LV)- This test checks the insulation property between Primary to earth, Secondary to earth and between Primary & Secondary. HV high voltage test : LV winding connected together and earthed. HV winding connected together and given 28 KV ( for 11KV transformer) for 1 minute. LV high Voltage test : HV winding connected together and earthed. LV winding connected together and given 3 KV for 1 minute. Equipment used : High Voltage tester ( 100KV & 3KV)
  • 8.
  • 9. 4.INDUCED OVER VOLTAGE WITHSTAND TEST (DVDF TEST)- This test checks the inter turn insulation. For a 11KV/433V transformer,866 Volts are applied at the 433V winding with the help of a Generator for 1 minute. This induces 22KV on 11KV side. The frequency of the 866V supply is also increased to 100HZ. Equipment used : MOTOR GENERATOR SET
  • 10.
  • 11. 5.MEASUREMENT OF VOLTAGE RATIO This test measures the voltage ratio as per the customer’s requirement. V1/V2 = N1/N2 The voltage ratio is equal to the turns ratio in a transformer. Using this principle, the turns ratio is measured with the help of a turns ratio meter. If it is correct , then the voltage ratio is assumed to be correct. Equipment used : Turns Ratiometer
  • 12. 6.MEASUREMENT OF NO LOAD LOSS & CURRENT- The iron losses and no load current are measured in this test. The 433V winding is charged at 433V supply & the 11KV winding is left open .The power consumed by the transformer at no load is the no load loss in the transformer. Effect of actual frequency must be taken into account. Equipment used : Watt meters or power analyzer.
  • 13. 7.MEASUREMENT OF LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION) This test measures the power consumed by the transformer when the 433V winding is short circuited and The rated current is passed through the 11KV winding. Equipment used : Wattmeters or power analyzer.
  • 14.
  • 15. 8.VECTOR GROUP VERIFICATION TEST This test verifies the Dyn-11 vector group of a distribution transformer. Equipment used : voltmeter.
  • 16.
  • 17.  Oil BDV TEST. Oil breakdown voltage is checked as per IS-335. 100 mm L X 70 mm B X 80 mm Ht. glass pot. 500ml Oil sample. Spherical electrodes with gap of 2.5 mm Recommended value : 60KV Equipment used : OIL BDV TEST SET.
  • 18. LIGHTENING IMPULSE TEST  All the dielectric tests check the insulation level of the job.  Impulse generator is used to produce the specified voltage impulse wave of 1.2/50 micro seconds wave  One impulse of a reduced voltage between 50 to 75% of the full test voltage and subsequent three impulses at full voltage.  For a three phase transformer, impulse is carried out on all three phases in succession.  The voltage is applied on each of the line terminal in succession, keeping the other terminals earthed.  The current and voltage wave shapes are recorded on the oscilloscope and any distortion in the wave shape is the criteria for failure.
  • 19.
  • 20. SHORT CIRCUIT WITHSTAND ABILITY TEST-  This tests measures the ability of the transformer to withstand the mechanical and thermal stresses caused by the external short circuit.  HV terminals are connected to the supply bus of the testing plant. The LV is short circuited. The testing plant parameters are such adjusted to give the rated short circuit current.  Supply is made on and closed after specified duration of short circuit. The record of current wave form is noted.  There should not be any mechanical distortion, fire to the transformer during this test. Similarly no wave form distortion. The transformer should also withstand the routine tests after the short circuit test.  The reactance of the winding measured before and after the S.C. test should not vary beyond the limits stated in the IS2026.
  • 21.  Transformer is the heart of any power system. Hence preventive maintenance is always cost effective and time saving. Any failure to the transformer can extremely affect the whole functioning of the organization.
  • 22.  OIL : 1. Oil level checking. Leakages to be attended. 2. Oil BDV & acidity checking at regular intervals. If acidity is between 0.5 to 1mg KOH, oil should be kept under observation. 3. BDV, Color and smell of oil are indicative.
  • 23. 1. Sludge, dust, dirt ,moisture can be removed by filtration. 2. Oil when topped up shall be of the same make. It may lead to sludge formation and acidic contents.  Insulation resistance of the transformer should be checked once in 6 months.  Megger values along with oil values indicate the condition of transformer.  Periodic Dissolved Gas Analysis can be carried out.
  • 24.  BUSHINGS Bushings should be cleaned and inspected for any cracks. Dust & dirt deposition, Salt or chemical deposition, cement or acid fumes depositions should be carefully noted and rectified.
  • 25.  Periodic checking of any loose connections of the terminations of HV & LV side.  Breather examination. Dehydration of Silica gel if necessary.  Explosion vent diaphragm examination.  Conservator to be cleaned from inside after every three years.  Regular inspection of OIL & WINDING TEMPERATURE METER readings.  Cleanliness in the Substation yard with all nets, vines, shrubs removed.
  • 26.  The best way of protecting a transformer is to have good preventive maintenance schedule.  Oil Temperature Indicators.  Winding Temperature indicators.  Buchholz Relay.  Magnetic Oil level Gauge.  Explosion Vent.
  • 27.  HT fuse & D.O. fuse.  LT circuit breaker.  HT Circuit breaker with Over load, Earth Fault relay tripping.  Oil Surge Relay for OLTC.  PRV for OLTC.  HORN GAPS & Lightening Arrestor.  Breather.
  • 28.  Insufficient Oil level.  Seepage of water in oil.  Prolonged Over loading.  Single Phase loading.  Unbalanced loading.  Faulty Termination (Improper sized lugs etc)  Power Theft.  Prolonged Short Circuit.  Faulty operation of tap changer switch.  Lack of installation checks.
  • 29.  Faulty design  Bad Quality of raw material.  Transit damaged transformers.  After failure , transformer is removed and replaced with new/repaired one without removing the cause of failure which results in immediate or short time failure.