2. Meeting
2-4/jul/2014
WP8 – Summary
• A) Overall guidelines to awareness, networking and dissemination activities.
• B) Social networking (illustrating how to contribute to them).
• C) Dissemination plan (including template to collect feedback from partners).
• D) Calendar of workshops (tentative) with feedback from the partners.
• E) How to implement and monitor linkage activities with ICT PSP joint working group,
with other local and EU projects.
WP8: Openness with other activities, dissemination and exploitation of results
Meeting
2-4/jul/2014
3. Meeting
2-4/jul/2014
WP8
A) Overall guidelines to awareness, networking and dissemination activities.
WEBSITE The project partners’ home pages will be linked to the website to draw attention to
this project and its aims.
Send interesting pictures related to the project to be used with dissemination
purposes
Upload documents on Intranet.
SOCIAL MEDIA Participate on groups or pages.
Cooperate, give feedback, promote the project within each one’s contacts.
Send messages, tweets mentioning project’s profiles, etc.
PRESS RELEASES Translate press release in local language.
Send to local general and specialized media.
DISSEMINATION ARTICLE Translate article in local language (optional)
Send to local specialized media.
PROJECT BROCHURE Use them at events, trade fairs related to the project.
Show them in a visible place in your headquarter.
NEWSLETTER Send to main professional interesting contacts.
Participate with articles, pictures.
REPORTING Follow instructions given to complete the spreadsheet.
Meeting
2-4/jul/2014
4. Meeting
2-4/jul/2014
WP8
A) Overall guidelines to awareness, networking and dissemination activities.
Meeting
2-4/jul/2014
Please, notice that the FP7 logo has been discontinued
from 1 January 2014. In accordance with the
Commission's guidelines on visual identity, all EU
programmes must be identified exclusively by the EU
emblem and the mention of the programme name as
detailed:
“This project has received funding from the European
Union’s Seventh Framework Programme for research,
technological development and demonstration under
grant agreement no 604129”.
5. Meeting
2-4/jul/2014
WP8
B) Social networking (illustrating how to contribute to them)
Follow the slideshare account.
Share the presentations with your colleagues.
Embed interesting presentations in your websites
Participate in debates, open new discussions.
Recommend debates, updates, news, etc.
Invite your contacts to join SLOPE Group
Retweet messages with your company’s profile or
your own profile.
Make tweets with news related to the project.
Mention @slopeproject in your messages
Click “I like” with your profile to all project’s updates.
Share updates and page of the project.
Reccomend the Slope Page to your contacts
Click “I like” to the project’s videos.
Follow the channels.
Share with your contacts and invite to follow the
SLOPEs channel.
Meeting
2-4/jul/2014
http://www.slideshare.net/Slope_Project
https://www.facebook.com/pages/SLOPE-
project/351131505025437?fref=ts
http://www.linkedin.com/groups/SLOPE-
Project-7450879
http://twitter.com/SLOPEProject
https://www.youtube.com/channel/UC
XrOkeDXU4iugg7jlqlz7Jw Pending
7. Meeting
2-4/jul/2014
WP8
C) Dissemination plan
A general document with all the planned dissemination activities and the material to
achieve a large diffusion of project results will be prepared.
Deliverables: Month 6, 18, 30.
In advance, a timetable has initially being planned:
Meeting
2-4/jul/2014
2 0 1 4 2 0 1 5 2 0 1 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DISSEMINATION STRATEGY (3 rep.)
BROCHURE
PROJECT WEBSITE
WEB 2.0
NEWSLETTERS (6)
POSTER
TRADE FAIRS, DEMOS
TECHNICAL WORKSHOPS (4)
FINAL CONFERENCE (1)
RELATED PROJECTS FORUMS (5)
SCIENTIFIC PUBLICATIONS (4)
PRESS RELEASES (4)
DELAYS
8. Meeting
2-4/jul/2014
WP8
Task 8.1 - Dissemination planning and publications of results
Task leader: ITENE; Participants: GRAPHITECH, CNR, BOKU, ITENE; Involvement: ALL PARTNERS
DISSEMINATION STRATEGY
DRAFT IN DROPBOX
Document with all the
planned dissemination activities and
the material to achieve a large
diffusion of project results.
It includes:
- Detailed target audience.
- Concrete Objectives.
- Press releases and Publications /
Interviews in business and general
media.
Meeting
2-4/jul/2014
9. Meeting
2-4/jul/2014
WP8
Task 8.1 - Dissemination planning and publications of results
Meeting
2-4/jul/2014
BROCHURE
Available in electronic format
NEWSLETTERS
Date: Every 6 months
Available to download in the website
POSTER
Date: Month 6. Units to print: 10
Use:Workshops, conferences, trade
fairs, and other events.
PRESS RELEASES
4 press releases during project’s
lifetime
10. Meeting
2-4/jul/2014
WP8
Task 8.1 - Dissemination planning and publications of results
WEBSITE
GRAPHITECH will be in charge for the
deployment and maintenance of the
project web-site and web 2.0
communication channels
Date: Month 2.
PUBLIC SITE
Download section.
News section and an e-newsletter.
Easy-friendly interactive area.
INTRANET SITE
Only accessible for the projet’s members
WEB 2.0
The project will also promote the use of web
2.0 social networks as LinkedIn, Twitter,
Facebook, YouTube, in order to reach a huge
number of target group members that are
followers of topics addressed by the SLOPE
project.
The dissemination manager, who will update
the information on a regular basis, will ensure
permanent information in the online media.
Meeting
2-4/jul/2014
14. Meeting
2-4/jul/2014
Tasks and Results
T.8.1 – Dissemination planning and publications results.
3) SOCIAL MEDIA.
Channels in social media available, implemented by GRAPHITEC
http://www.slideshare.net/Slope_Project
https://www.facebook.com/pages/SLOPE-
project/351131505025437?fref=ts
http://www.linkedin.com/groups/SLOPE-
Project-7450879
http://twitter.com/SLOPEProject
https://www.youtube.com/channel/UC
XrOkeDXU4iugg7jlqlz7Jw Pending
15. Meeting
2-4/jul/2014
Tasks and Results
T.8.1 – Dissemination planning and publications results.
4) NEWSLETTER
A newsletter will be published at each six months to
provide brief information on the project status and
progress and it will be available for download from the
website.
It will be released to all targeted publics, and also a
possibility to subscribe to this service will be available
from the website.
FIRST RELEASE: July 2014
5) POSTER
SLOPE poster will be used at exhibitions and public
meetings. It will be available from our website.
Ready and printed in July 2014
17. Meeting
2-4/jul/2014
Tasks and Results
T.8.1 – Dissemination planning and publications results.
7) PRESS RELEASES
First Press release
completed and sent to
internacional media.
Translated into different
partners’ languages.
Please send to
amonsalve@itene.com the
collected publications and
the translation of this
document in your
language.
21. Meeting
2-4/jul/2014
Tasks and Results
T.8.1 – Dissemination planning and publications results.
Fondazione GraphiTech @ Fraunhofer HHI & Hasso-Plattner Institute in Germany
Published: Tuesday, 27 May 2014 07:29 GraphiTech research team went to visit
Fraunhofer Heinrich Hertz Institute in Berlin (Germany) on 27 May 2014, and the
Hasso-Plattner-Institute in Potsdam (Germany) the day after.
The Fraunhofer Heinrich Hertz Institute is a leading research institute for mobile and
fixed communications networks and for future key applications. During the visit,
GraphiTech research team has presented the SLOPE project and the activities
undertaken so far.
One of the main objectives of Fondazione GraphiTech is to organize and promote
activities that foster the implementation and industrialization of ideas. Visiting the
Fraunhofer Heinrich Hertz Institute and Hasso-Plattner-Institute, and exchanging
new ideas will surely contribute to the future implementation of the project
activities.
7) COOPERATION / OTHER PROJECTS
22. Meeting
2-4/jul/2014
WP8
Task 8.1 - Dissemination planning and publications of results
EVENTS: CONFERENCES,TRADE
FAIRS, etc.
In order to have the widest
dissemination and largest involvement
of industrial stakeholders, SLOPE project
and results will be presented at the most
relevant fairs and demos, mainly
organized in the participating countries.
FINAL CONFERENCE (end of the project)
A large-scale conference will be
organized by CNR as final event of the
project
Meeting
2-4/jul/2014
23. Meeting
2-4/jul/2014
Trade Fairs
Meeting
2-4/jul/2014
NAME TYPE PLACE STARTING DATE PERIOD CWL COASTWAY MHG SYSTEMS BOKU GREIFENBERG
SAM Trade Fair Grenoble, France 23/04/2014 23-24/4/2014 X
Worldbioenergy 2014 Trade Fair Jönköping, Sweden 03/05/2014 3-5/6/2014 X
GEO Bussines Show Trade Fair London, England 28/05/2014 28-29/5/2014 X
Boster nord- est Trade Fair
Piana del Cansiglio,
Italy 06/06/2014 6-8/6/2014 X
Euroforest Trade Fair
Saint Bonnet de Joux,
France 19/06/2014 19-21/6/2014 X
Interforst Trade Fair Munich, Alemania 16/07/2014 16-20/7/2014 x X
FinnMETKO Trade Fair Jämsä, Finlandia 28/08/2014 28-30/8/2014 X
Internationale Holzmesse Trade Fair Klagenfurt, Austria 04/09/2014 4-7/9/2014 x
Metsä Trade Fair Helsinki, Finlandia 07/09/2014 07/09/2014 X
Boster nord-ovest Trade Fair Alta Val Susa, Italy 26/09/2014 26-28/9/2014 X
EIMA Trade Fair Bolonia, Italia 12/11/2014 12-16/11/2014 X
Interalpin Trade Fair Innsbruck, Austria 15/04/2015 15-17/4/2015 X
GEO Bussines Show Trade Fair London, England 27/05/2015 27-28/5/2015 X
Asturforesta Trade Fair
Tineo (Asturias),
España 01/06/2015 ¿junio? 2015 X
Forlener Trade Fair Caresanablot, Italy 01/09/2015 sep-15 X
Austrofoma Trade Fair Hochficht, Austria 06/10/2015 6-8/10/2015 X
Expocorma 2015 Trade Fair Concepción, Chile 18/11/2015 18-20/11/2015
Agri Verona Trade Fair Verona, Italy 01/02/2016 feb-16 X
SAM Trade Fair Grenoble, France 23/04/2016 23-24/4/2016
Events with the participation of the partners (Included in the dissemination Plan):
24. Meeting
2-4/jul/2014
Trade Fairs
Meeting
2-4/jul/2014
Nature Expo Trade Fair Riga, Letonia 24/04/2014 24-26/4/2014
GIS Solution Expo Trade Fair
San Diego (California),
EEUU 15/07/2014 15-17/7/2014
Agricultural and Forest Fair of
Libramont Trade Fair Libramont, Bélgica 25/07/2014 25-29/7/2014
APF 2014 Trade Fair Alcester, Inglaterra 18/08/2014 18-19-20/9/2014
Forest - LES Trade Fair Nitra, Eslovaquia 21/08/2014 21-24/8/2014
MellanskogsElmia Trade Fair Sala, Suecia 22/08/2014 22-23/8/2014
Forestry Management & Wood
Processing Industry Of Siberia Trade Fair Irkutsk, Rusia 16/09/2014 16-19/9/2014
Lisderevmash Trade Fair Kiev, Ucrania 23/09/2014 23-26/9/2014
Lorisa - Fair of Forestry Trade Fair Novi Sad, Serbia 01/10/2014 1-5/10/2014
Solution Circle Trade Fair Kaunas, Lituania 02/10/2014 2-4/10/2014
Pap-For Trade Fair San Petesburgo, Rusia 28/10/2014 28-31/10/2014
WoodMac 2015 Trade Fair Shanghai, Brasil 04/03/2015 4-7/3/2015
LAS-EXPO Trade Fair Kielce, Polonia 27/03/2015 27-29/3/2015
LIGNA Trade Fair Hannover, Alemania 11/05/2015 11-15/5/2015
SkogsElmia Trade Fair Joenkoeping, Suecia 04/06/2015 4-6/6/2015
Forstmesse Trade Fair Lucerna, Suiza 20/08/2015 20-23/8/2015
Forestal y Biomassa 2015 Trade Fair Lages, Brasil 23/09/2015 23-25/9/2015
Other interesting related trade fairs:
25. Meeting
2-4/jul/2014
Conferences & Symposiums
Meeting
2-4/jul/2014
NAME TYPE PLACE
STARTING
DATE PERIOD GRAPHITEC MHG SYSTEMS BOKU FLYBY
Aebiom Bioenergy
Conference Conference Brussels, Belgium 12/05/2014 12-14/5/2014 X
SENTINEL-2 for Science
Workshop Conference Frascati (Rome) Italy 20/05/2014 20-22/05/2014
x
OSCAR 2014 Conference Uppsala, Sweden 25/06/2014 25-27/06/2014
x
EUROMICRO DSD/SEAA
2014 Conference Verona, Itay 27/08/2014 27-29/08/2014 x
REbuild 2014 Conference Riva del Garda, Italy 25/09/2014 25-26/09/2014 x
UIFRO Conference
Salt Lake City (Utah),
EEUU 05/10/2014 5-11/10/2014 x
Small Log Conference,
Forest Business
Network Conference
Coeur d’Alene,
Idaho, USA 24/03/2015 24-26/3/2015 X
COFE 2014 Symposium Moline, Illinois, USA 22/06/2014 22-25/06/2014
x
FORMEC Symposium Gerardmer, Francia 23/09/2014 23-26/9/2014 X
FORMEC 2015 Symposium Linz, Austria 04/10/2015 4-8/10/2015
x
Forest and Sustainable
Development Symposium Brasov, Romania 24/10/2015 24-25/10/2015
x
Events with the participation of the partners (Included in the dissemination Plan):
26. Meeting
2-4/jul/2014
Conferences & Symposiums
Meeting
2-4/jul/2014
Other related Conferences & Symposiums
NAME TYPE PLACE STARTING DATE DATE
ICSAEF 2014 Conference París, Francia 28/08/2014 28-29/8/2014
EFI Conference Bilbao 10/09/2014 10-12/9/2014
St.Petersburg International Forestry Forum Conference San Petesburgo, Rusia 20/09/2014 30/9-2/10/2014
Asita 2014 Conference Florence, Italy 14/10/2014 14-16/10/2014
FORESTTECH 2014 Conference Melbourne, Australia 25/11/2014 25-26/11/2014
ICMLC Conference Florencia, Italia 19/03/2015 19-20/3/2015
Forest Machine Technology Conference Conference Montreal, Canada 21/04/2015 21-23/04/2015
icsaef 2015 Conference Londres, Inglaterra 28/06/2015 28-29/6/2015
HCI International 2015 Conference Los Angeles, CA, USA 02/08/2015 2-7/08/2015
WFC World Forestal Congress Conference Durbán, Sudáfrica 07/09/2015 7-11/9/2015
Interact 2015 Conference Bamberg, Germany 14/09/2015 14-18/09/2015
ICHCI 2015 : International Conference on
Human Computer Interaction Conference Madrid, Spain 09/11/2015 9-10/11/2015
AUSTimber Conference Latrobe City, Australia 11/04/2016 11-16/04/2016
EU Forest-based Sector Technology Platform Presentations All over the world 2014 All the year
Pacific Logging Congress Symposium Molalla, Oregon, USA 25/09/2014 25-27/09/2014
ACM Symposium on User Interface Softwa
re and Technology
Symposium Hawaii, EEUU 05/10/2014 5-8/10/2014
27. Meeting
2-4/jul/2014
Tasks and Results
T.8.1 – Dissemination planning and publications results.
6) EVENTS
Poster presentations:
CNR IVALSA:
Sentinel-2 for Science Workshop, 2014 May 20 -
22, ESA-ESRIN Frascati
M.Morelli, A.Masini, “Sentinel-2 Imagery for the
Development of Innovative Decision Support Systems
Dedicated to Sustainable Forest Management”.
28. Meeting
2-4/jul/2014
Publications / Scientific Articles
Meeting
2-4/jul/2014
SCIENTIFIC ARTICLES
In selected journals and targeted publications at
highly visible and relevant industrial and research
conferences . At least 4 in 2015 & 2016
Scientific Publication Silva Fennica
Scientific Publication Scandinavian Journal of Forest Research
Scientific Publication Croatian Journal of Forest Engineering
Scientific Publication European Journal of Forest Engineering
Possibility of publishing by BOKU
Scientific Publication European Journal of Forest Research
Scientific Publication Canadian Journal of Forest Research
Scientific Publication Forest Ecology and Management
Scientific Publication Annals of Forest Science
Scientific Publication International Forestry Review
Scientific Publication Wood Science & Technology
Scientific Publication Bioresource technology
Scientific Publication Biomass and Bioenergy
Scientific Publication Bioenergy
Scientific Publication Energy & Environmental Science
Scientific Publication Vibrational Spectroscopy
Scientific Publication International Journal of Logistics
Scientific Publication International Transport Journal
Scientific Publication Journal of Computer Integrated Manufacturing
Other Publications to check and review possibilities
Magazine Geoconnexion
Magazine GeoInformatics
Magazine European Forum Innovation
Magazine Biomass Canada
Magazine Canadian Biomass Magazine
Magazine Biomass Power & Thermal
Magazine Canadian Forest Industries
Magazine Bioenergy International.
Magazine The Parliament Magazine
Magazine European Voice
Magazine Europolitics
MAGAZINES
Publications in which the SLOPE project information
could be published:
30. Meeting
2-4/jul/2014
Technical workshops
Four technical workshops are planned as far as
results are available for dissemination
BOKU is responsible for
Selecting potential stakeholders
Making invitations
Setting up the program
Communication
Secretariat and logistics
D) Calendar of workshops (tentative) with feedback from the partners.
31. Meeting
2-4/jul/2014
Technical workshops –
Open questions
Participants
Interested persons from industry, SME, forestry and
agricultural sector
All partners within the SLOPE consortium
Structure
Presentations, demonstrations, field trip
Location
Austria, Italy, Norway, Ireland
D) Calendar of workshops (tentative) with feedback from the partners.
32. Meeting
2-4/jul/2014
Technical workshops –
Possible dates
Date Location In conjunction with
M18 June 2015 Firenze (IT) Project meeting
M19 July 2015 (AT, IT) Demonstration activities
M22 October 2015 Linz (AT) FORMEC symposium
M24 December 2015 Cork (IE) Project meeting
M30 June 2016 Vienna (AT) Project meeting
M31 July 2016 (AT, IT, NO) Demonstration activities
M29 October 2016 ? FORMEC symposium
D) Calendar of workshops (tentative) with feedback from the partners.
33. Meeting
2-4/jul/2014
WP8
E) How to implement and monitor linkage activities with ICT PSP joint working group,
with other local and EU projects.
RELATED PROJECTS
all partners have been asked to
collaborate in identifying projects
related to SLOPE, regional, European
and extra-European (e.g. Canadian).
ITENE will be in charge of establishing
relationships with most of these
projects to ensure synergy and
exchange of results.
COST ACTION
COST Action platform will be also
used to facilitate information
exchange with the experts
community. In particular, activity of
the following COST Actions will be
monitored and exchanges promoted:
•FP1206 - European mixed forests. Integrating Scientific
Knowledge in Sustainable Forest Management.
(EuMIXFOR);
• FP1201 - Forest LAnd Ownership Changes in Europe:
Significance for Management And Policy (FACESMAP);
• FP1106 - STReESS - Studying Tree Responses to extreme
Events: a SynthesiS;
• FP1001 - Improving Data and Information on the Potential
Supply of Wood Resources: A European Approach
from Multisource National Forest Inventories (USEWOOD).
Meeting
2-4/jul/2014
34. Meeting
2-4/jul/2014
WP8
RELATED PROJECTS
GRAPHITEC
CNR-
IVALSA
CWL
COASTWAY
MHG
SYSTEMS
BOKU FLYBY
GREIFENB
ERG
TREEMETRI
CS
ITENE
FP7 KBBE “Innovative and effective technology and logistics for forest residual biomass supply in the EU”
(www.infres.eu)
X X
FP7 KBBE “Advanced multifunctional forest management in European mountain ranges”
(http://www.arange-project.eu)
X
FP7 INFRA-2011-1.1.13 “Designing Trees for the future” (http://www.trees4future.eu/) X X
FP7 STREP i-Tour “intelligent Transport system for Optimized URban trips” (as tech. manager) X
ICT-PSP BRISEIDE “BRIdging SErvices, Information and Data for Europe”,(www.briseide.eu) X
ICT-PSP i-SCOPE “interoperable Smart City services through an Open Platform for urban Ecosystems”,
(www.iscopeproject.net).
X
ICT-PSP SUNSHINE “Smart Urban services for Higher energy efficiency” X
NATO Science for Peace GEPSUS “Geographical Information Processing for Environmental Pollutionrelated
Security within Urban Scale environments“.
X
BISYPLAN - The Bioenergy System Planners Handbook, part of the - BIOENAREA/INTEREG X
BiQUEEN – Quality Biomass for Efficient Energy production; X
NNE5-2000-0395 “Forest Energy – A solution for the Future Power Needs”; X
LdV WESST “Wood Energy Supply System Training”; X
QLRT-2000-0645 “Storm damaged forests: efficient and safe harvesting and log conservation methods”; X
QLRT 99 – 0991 “Development of a protocol for ecoefficient wood harvesting on sensitive sites"; X
AIR2-CT94-1102 "Harvesting, drying and storage of energy biomass from SRF”; X
AIR2-CT94-0905 “Improvement of coppice forests in the Mediterranean region” X
LIFE94/F/A151/EU/00713 "Mountain forests: techniques for long-term multi-functional management"; X
Gatto delle funi (tracked automotive carriage) in collaboration with UNACOMA X
Freeman 1800 (programmable forestry winch), computer-controlled machine with drive and motor PID
controlling device
X
HT 30 (carriage with cable ejection system) in collaboration with Autonomous Province of Trento X
LEW (electronic winch) for the management of take-off ramps on ski jumping hills X
TG 860 (carriage cableway) first load-identification machine with transport autonomous management X
TECNO totally autonomous remote-controlled self-propelled motor carriage X
Flexwood (EU FP7) X X
IRIS ( ERA-NET) X
BESTFACT: Best Practice Factory for Freight Transport, X
CO3: Collaboration Concept for Comodality (FP7 Transport), X
MODULUSHCA: Modular Logistics Units in Shared Co-modal Networks, X
WINN: European Platform Driving KNOWledge to INNovations in Freight Logistics. X
35. Meeting
2-4/jul/2014
WP8 -TASKS
D) How to implement and monitor linkage activities with ICT PSP joint working group,
with other local and EU projects
2) Establish a meeting to discuss common issues and identify once per year:
• Tentative calendar
• STRUCTURE:
• Individual Project presentations
• Discuss in groups with other project representatives regarding selected
topics
2 0 1 4 2 0 1 5 2 0 1 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
RELATED PROJECTS FORUMS (5)
Meeting
2-4/jul/2014
36. Meeting
2-4/jul/2014
WP8 -TASKS
OTHER ACTIVITIES INTHE WP
Task 8.2 – Exploitation, business planning and IPR & licensing policies
Task leader: MHG; Participants: KESLA, COAST, BOKU, FLY, GRE, TRE
• Identification of the business scenarios
• Creation of the appropriate SLOPE business model
• Production of a business plan
• Development of a detailed exploitation strategy by each partner
• Continuous technology and market watch
• Development of an intellectual property rights (IPR) strategy.
Meeting
2-4/jul/2014
37. Meeting
2-4/jul/2014
WP8 -TASKS
OTHER ACTIVITIES IN THE WP
Task 8.3 - Contribution to standardization
Task leader: CNR; Participants: ITENE
The main objective of this task is to contribute to both update existing standards and to
develop new ones in the field of sustainable forest production:
• Communication with standardization committees via the interactive section of the
SLOPE website and social networks.
• Physical meetings between SLOPE members and the StandardizationTechnical
Committee.
• The SLOPE consortium will show interest in participating in the working groups of
standard committees.
• Consensus with CEN and other standardization
Meeting
2-4/jul/2014
38. Meeting
2-4/jul/2014
WP8 -TASKS
OTHER ACTIVITIES IN THE WP
Task 8.4 - Industrial Advisory Board
Task leader: MHG; Participants: KESLA,COAST, BOKU, FLY,TRE
The main objective of this task will be to involve industrial members from the forestry,
agricultural and related logistics and machinery industry. The main activities of the
advisory board will be interchange opinions and knowledge by means of meetings and
discussions.
This information will be used as inputs for the execution of the tasks defined in SLOPE
project, and redefine them when needed. The Advisory board will be set up at an early
stage (first project meeting) of the project in order to follow all the activities starting from
the requirements analysis.
Meeting
2-4/jul/2014
40. Meeting
2-4/jul/2014
T.8.4 – Industrial Advisory board
Partners: KESLA, COAST, BOKU, FLY, TRE
Set up advisory board (1st technical meeting) in order to follow all the activities
starting from the requirements analysis.
The Advisory Board (AB) will be formed by: (i) key representatives from the
consortium; (ii) representatives from other stakeholders including those found
through the project’s openness and linking activities; (iii) key representatives
from other Ecfunded projects; (iv) and representatives from academia. The AB
will be chaired by the DEM, and will insure project openness and visibility. The
DEM will also report on AB activities to the PC. The advisory board and the
related Industrial board will be defined into the very early stage of the project.
Semiannual Meeting , Mikkeli 2-4 July, 2014
41. Meeting
2-4/jul/2014
T.8.4 – Industrial Advisory board
The Industrial Advisory Board is composed of scientific and business leaders
from university and companies in the area of utilizations of forest resources or
by-products or for surveying and modelling applications. Its aim is to define
research challenges from the industrial point of view, to recommend Short-
Medium- and Long term priorities to relevant WPs, providing
feedbacks on SLOPE research activities and suggest possible links to public and
private financing.
• Policy. How costs of participations of meetings and events are compensated
in SLOPE budget?
Semiannual Meeting , Mikkeli 2-4 July, 2014
42. Meeting
2-4/jul/2014
T.8.4 – Industrial Advisory board
• MHG´s network covers:
• Forest machinerary industry; John Deere, Ponsse etc.
• Metsäteho; Finnish R&D organization owned by forest industry
• Finnish Sawmill association
• Aebiom; European Biomass Association; industry members?
• Deassociation; Alberta based Association promoting renewables and new
technologies; industry members?
• FCBA; French players in forestry
• Contacts in Romania
Semiannual Meeting , Mikkeli 2-4 July, 2014