ISO 30401:2018
The Management System Standard for KM
and what it might do for you
Nick Milton
SIKM
15 Oct 2019
15 October 2019Copyright Knoco Ltd 2
Before ISO 30401; the update to ISO 9001
7. Support
7.1 Resources
7.1.6 Organizational Knowledge Requirements:
•Determine the knowledge necessary for the operation of processes and to achieve conformity of
products and services.
•Maintain this knowledge and make it available to the extent necessary.
•Consider current knowledge and determine how to acquire or access the necessary additional
knowledge (when addressing changing needs and trends).
•NOTE 1: Organizational knowledge can include information such as intellectual property and lessons
learned.
•NOTE 2: To obtain the knowledge required, consider: a) Internal Sources (e.g., learning from failures and
successful projects, capturing undocumented knowledge and experience of topical experts within the
organization); b) External Sources (e.g., standards, academia, conferences, gathering knowledge with
customers or providers).
•Changes: This clause on organizational knowledge is a new requirement. It should be an input to clause 7.2
on Competence.
•“Knowledge” is defined in the terms section as the available collection of information being a justified belief
and having a high certainty to be true
15 October 2019Copyright Knoco Ltd 3
Why ISO 30401?
In January 2014 ISO received a proposal from the Standards Institute of Israel (SII) to develop a
management system standard for Knowledge Management.
The justifications provided by the SII for this proposal for new work included:
ISO
SII BSI ANSI DIN etc
• An increasing recognition of the need for, and
importance of, Knowledge Management;
• Ambiguity in the understanding of what KM is;
• Multiple and common failures of KM projects and
initiatives due to an incomplete approach.
15 October 2019Copyright Knoco Ltd 4
For example -
“I think that KM is to date a theoretical, 'pie in the sky' type of field. not understood by business. This is
one of those fields or subject areas that has failed, failed us the practitioners, organisations and the
society at large.
What we are taught at varsities as KM is totally different from what we are expected to do when we get
employed.
There still is no one common definition, a practical one of KM as yet.
For example, when a person tells you they are doing communications, you know what they mean, you
already know the kinds of activities they undertake, same with ICT, law and etc.
I am regretful I followed this line of work. There simply is not hope at all especially within the SA
Government”.
15 October 2019Copyright Knoco Ltd 5
ISO alone cannot approve the creation of standards
ISO sent the proposal to the various member bodies, who convened feedback from a
number of experts in the field of KM, some of whom, including myself, had been
suggested in the SII proposal.
We sent our views to BSI, and BSI collated our responses (which were in favour of the
proposal) and sent them on to ISO.
• By the end of March 2014, 36 countries had replied,
• the majority were in favour of accepting the proposal for development of a MSS for
knowledge, and
• 12 countries agreed to be involved in the work, including the UK.
15 October 2019Copyright Knoco Ltd 6
The drafting process
From first
proposal to
final
publication,
developing a
standard
usually takes
about 3 years
Done by working groups of experts drawn from the member countries,
Working under the umbrella of a technical committee responsible for a specific
subject area.
Various levels of draft are cycled through working teams in the member countries
called “mirror committees” for edit, review and input at national level.
Mirror committee membership is open to all.
Working group is open to all members of mirror committees.
Work is through the principle of consensus, which is why the work is done face to
face.
A period of public consultation on draft 4.0
15 October 2019Copyright Knoco Ltd 7
Standards creation stages
Stage code Stage Associated document name
00 Preliminary Preliminary work item
10 Proposal New work item proposal
20 Preparatory Working draft or drafts
30 Committee Committee draft or drafts
40 Enquiry Enquiry draft
50 Approval Final draft
60 Publication International Standard
90 Review
London 2017
15 October 2019Copyright Knoco Ltd 8
Management Systems Standards
Type A
• The one which
provides requirements (e.g.
ISO 9001)
Type B
• The one which
provide guidelines (e.g. ISO
9004)
ANNEX SL
The new high level structure for all
management system standards of the
future
The same high level structure,
identical core text, as well as common
terms and definitions.
Whilst the high level structure cannot
be changed, sub-clauses and
discipline-specific text can be added.
15 October 2019Copyright Knoco Ltd 9
Standard format for ISO management
systems standards
1 • Scope
1 • Normative references
3 • Definitions
4 • Context of the organisation
5 • Leadership
6 • Planning
7 • Support
8 • Organisation
9 • Performance evaluation
10 • Improvement
A management system standard
provides a model to follow when
setting up and operating a
management system.
Some of the top level benefits of
a successful management
system standard are:
• Enhanced use of resources
• Improved risk management
• Increased customer
satisfaction
https://www.bsigroup.com/LocalFiles/nl-
nl/iso-9001/BSI-Annex-SL-Whitepaper.pdf
15 October 2019Copyright Knoco Ltd 10
Clause 4: Context of the organization
4.1 Understanding the organization and its context
4.2 Understanding the needs and expectations of interested parties
4.3 Determining the scope of the managements system
4.4 The management system
4.4.1 – Knowledge development/lifecycle
4.4.2 – Transitions
4.4.3 – “Enablers” (roles, processes, technologies, governance, culture)
As the flagstone of a management system, clause 4 determines why the system is needed. As
part of the answer to this question, the organization needs to identify internal and external
issues that can impact on its intended outcomes, as well as all interested parties and their
requirements. It also needs to document its scope and set the boundaries of the management
system – all in line with the business objectives.
15 October 2019Copyright Knoco Ltd 11
Clause 5: Leadership
5.1 Leadership and commitment
5.2 KM Policy
5.3 Organisational roles, responsibilities and authorities
The new high level structure places particular emphasis on leadership, not just management as
set out in previous standards. This means top management now has greater accountability and
involvement in the organization’s management system. They need to integrate the requirements
of the management system into the organization’s core business process, ensure the
management system achieves its intended outcomes and allocate the necessary resources. Top
management is also responsible for communicating the importance of the management system
and heighten employee awareness and involvement
15 October 2019Copyright Knoco Ltd 12
Clause 6: Planning
6.1 Actions to address risks and opportunities
6.2 Knowledge objectives and planning to achieve them
Clause 6 brings risk-based thinking to the front. The planning phase looks at what, who,
how and when risks and opportunities must be addressed. This proactive approach
replaces preventative action and reduces the need for corrective actions later on.
Particular focus is also placed on the objectives of the management system. These
should be measurable, monitored, communicated, aligned to the policy of the
management system and updated when needed.
15 October 2019Copyright Knoco Ltd 13
Clause 7: Support
7.1 Resources
7.2 Competence
7.3 Awareness
7.4 Communication
7.5 Documented information (about the KM system)
Organizations will have to look at the support needed to meet their goals and objectives.
This includes resources, targeted internal and external communications, as well as
documented information that replaces previously used terms such as documents,
documentation and records.
15 October 2019Copyright Knoco Ltd 14
Clause 8: Operations
8.1 Operational planning and control
The process elements of the management system are covered by this clause.
Clause 8 addresses both in-house and outsourced processes, while the overall process
management includes adequate criteria to control these processes, as well as ways to
manage planned and unintended change.
15 October 2019Copyright Knoco Ltd 15
Clause 9: Performance Evaluation
9.1 Monitoring, measurement, analysis and evaluation
9.2 Internal audit
9.3 Management review
Here organizations need to determine what, how and when things are to be monitored,
measured, analysed and evaluated.
An internal audit is also part of this process to ensure the management system conforms to the
requirements of the organization as well as the standard, and is successfully implemented and
maintained.
The final step, management review, looks at whether the management system is suitable,
adequate and effective.
15 October 2019Copyright Knoco Ltd 16
Clause10: Improvement
10.1 Non-conformity and corrective action
10.2 Continual improvement
Clause 10 looks at ways to address non-conformities and corrective action, as well as
strategies for improvement on a continual basis.
21 May 2019Copyright Knoco Ltd 17
Annexes
A. The knowledge spectrum
B. Boundaries between KM and adjacent disciplines
A. Information management
B. Data management
C. Business intelligence
D. CRM
E. Human Resource Management
F. Training/L&D
G. Organisational learning
H. Innovation management
I. Other management systems
C. KM culture
Implementation of the Standard
Now we have this standard, what do we
do with it?
• Use it as a guide?
• Seek to comply with it?
• Seek to audit against it?
• Seek to be certified against it?
Copyright © 2016 BSI. All rights reserved.
Image from Boris Dzingharov on Flickr
15 October 2019Copyright Knoco Ltd 19
Standards myths busted
• The standard is deliberately generic
• You define what you do and how you do it, within a framework.
It doesn’t define how
you do KM
• A framework for every kind of organisation.
• For small businesses, to put in solid foundations from the start.
It’s not only for big
business
• Shouldn’t be a burden
• An opportunity to stand back and ask “could we do better?”
It won’t take months
to implement
• No mandatory requirements for external audit.
• You can implement a standard and claim to be compliant
You don’t need to
certify
Text from www.british-assessment.co.uk
15 October 2019Copyright Knoco Ltd 20
The 54 “Shall”s
“The organization shall determine external and internal issues
that are relevant to its purpose and that affect its ability to
achieve the intended outcome(s) of its knowledge management
system”.
Using the standard as a guide
Suitable for those starting in KM
Tells you what’s different about KM
Tells you some of the principles
Tells you where to begin
Tells you what you need to consider
Tells you what you should put in place
Helps you avoid the common pitfalls
Image from wikimedia commons
Audit against the standard
Suitable for those with mature KM
Internal or external auditors
Interviewing, and reviewing documents
Looking for evidence against the 54 “shall”
requirements
Documentation of compliance
Identification of areas of non-compliance
Image from bluediamond galleryl
Why seek to show compliance?
Who is interested?
Your team – what more do we need to do?
Your management – what more do they need to
do?
Your organisation – show KM is a “real
discipline”
Your clients – to show you handle knowledge
responsibly
Your potential clients, e.g. in bids - to show you
handle knowledge responsibly
Image from maxpixel
Certification against the standard by an accredited body
Not possible (yet?)
Requires audit by trained auditors working for a
certification body
Certification body should be accredited (e.g. by
UKAS or UAF, IAS, IOAS)
Major certification bodies do most of their work
against 4 to 8 of the 60+ MSSs. KM is not yet a
major area of focus
UKAS accredits certification bodies against 16
standards. KM is not (yet?) one of them
Image from wikimedia commons
21 May 2019Copyright Knoco Ltd 25
Questions?

Weitere ähnliche Inhalte

Was ist angesagt?

The crossroads of Information Architecture and Knowledge Management
The crossroads of Information Architecture and Knowledge ManagementThe crossroads of Information Architecture and Knowledge Management
The crossroads of Information Architecture and Knowledge ManagementSIKM
 
ISO14001 Requirements & Implementation
ISO14001 Requirements & ImplementationISO14001 Requirements & Implementation
ISO14001 Requirements & ImplementationNukool Thanuanram
 
Connecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkConnecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkLife Cycle Engineering
 
Free ECBA V3 questions
Free ECBA V3 questionsFree ECBA V3 questions
Free ECBA V3 questionsLN Mishra CBAP
 
Requirement iso 140012015[1] (4) training
Requirement iso 140012015[1] (4) trainingRequirement iso 140012015[1] (4) training
Requirement iso 140012015[1] (4) trainingair1249
 
Deploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive WeaponDeploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive WeaponGrant Crow
 
Operational excellence through lean & six sigma
Operational excellence through lean & six sigmaOperational excellence through lean & six sigma
Operational excellence through lean & six sigmaHarsh Upadhyay
 
On business capabilities, functions and application features
On business capabilities, functions and application featuresOn business capabilities, functions and application features
On business capabilities, functions and application featuresJörgen Dahlberg
 
It Service Management Implementation Overview
It Service Management Implementation OverviewIt Service Management Implementation Overview
It Service Management Implementation OverviewAlan McSweeney
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Romains Bos, PMP, MBA
 
AI and Big Data in KM
AI and Big Data in KMAI and Big Data in KM
AI and Big Data in KMSIKM
 
ISO 9001, 14001, 45001 (IMS) basics training material
ISO 9001, 14001, 45001 (IMS) basics training materialISO 9001, 14001, 45001 (IMS) basics training material
ISO 9001, 14001, 45001 (IMS) basics training materialRanganathanR9
 
What is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFWhat is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFxavblai
 
Knowledge Management Overview
Knowledge Management OverviewKnowledge Management Overview
Knowledge Management OverviewRahul Sudame
 

Was ist angesagt? (20)

The crossroads of Information Architecture and Knowledge Management
The crossroads of Information Architecture and Knowledge ManagementThe crossroads of Information Architecture and Knowledge Management
The crossroads of Information Architecture and Knowledge Management
 
ISO14001 Requirements & Implementation
ISO14001 Requirements & ImplementationISO14001 Requirements & Implementation
ISO14001 Requirements & Implementation
 
Connecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkConnecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 Framework
 
Free ECBA V3 questions
Free ECBA V3 questionsFree ECBA V3 questions
Free ECBA V3 questions
 
Lean Transformation
Lean TransformationLean Transformation
Lean Transformation
 
Requirement iso 140012015[1] (4) training
Requirement iso 140012015[1] (4) trainingRequirement iso 140012015[1] (4) training
Requirement iso 140012015[1] (4) training
 
EA maturity models
EA maturity modelsEA maturity models
EA maturity models
 
Sesi 10 km tools
Sesi 10 km toolsSesi 10 km tools
Sesi 10 km tools
 
PDCA Problem Solving Technique & Tools
PDCA Problem Solving Technique & ToolsPDCA Problem Solving Technique & Tools
PDCA Problem Solving Technique & Tools
 
Deploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive WeaponDeploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive Weapon
 
Operational excellence through lean & six sigma
Operational excellence through lean & six sigmaOperational excellence through lean & six sigma
Operational excellence through lean & six sigma
 
On business capabilities, functions and application features
On business capabilities, functions and application featuresOn business capabilities, functions and application features
On business capabilities, functions and application features
 
It Service Management Implementation Overview
It Service Management Implementation OverviewIt Service Management Implementation Overview
It Service Management Implementation Overview
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)
 
AI and Big Data in KM
AI and Big Data in KMAI and Big Data in KM
AI and Big Data in KM
 
ISO 9001, 14001, 45001 (IMS) basics training material
ISO 9001, 14001, 45001 (IMS) basics training materialISO 9001, 14001, 45001 (IMS) basics training material
ISO 9001, 14001, 45001 (IMS) basics training material
 
What is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFWhat is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAF
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
 
Iatf 16949 training
Iatf 16949 trainingIatf 16949 training
Iatf 16949 training
 
Knowledge Management Overview
Knowledge Management OverviewKnowledge Management Overview
Knowledge Management Overview
 

Ähnlich wie ISO 30401 - The KM Management Systems Standard

Are You Ready? Implementing COSO's Updated Internal Controls Framework
Are You Ready? Implementing COSO's Updated Internal Controls FrameworkAre You Ready? Implementing COSO's Updated Internal Controls Framework
Are You Ready? Implementing COSO's Updated Internal Controls FrameworkBlackLine
 
G20/OECD Principles of Corporate Governance
G20/OECD Principles of Corporate GovernanceG20/OECD Principles of Corporate Governance
G20/OECD Principles of Corporate Governancesurrenderyourthrone
 
Corporate-Governance-Principles-ENG.pdf
Corporate-Governance-Principles-ENG.pdfCorporate-Governance-Principles-ENG.pdf
Corporate-Governance-Principles-ENG.pdfJasonCama1
 
Cobit 2019 framework by ISACA
Cobit 2019 framework by ISACACobit 2019 framework by ISACA
Cobit 2019 framework by ISACAMDFazlaRabbiAbir
 
Implementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkImplementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkIJCSIS Research Publications
 
Introduction to COBIT 2019 and IT management
Introduction to COBIT 2019 and IT managementIntroduction to COBIT 2019 and IT management
Introduction to COBIT 2019 and IT managementChristian F. Nissen
 
Charlotte FENG - What you need to know in 2014!
Charlotte FENG - What you need to know in 2014!Charlotte FENG - What you need to know in 2014!
Charlotte FENG - What you need to know in 2014!Ken Witt
 
The President Of A Company
The President Of A CompanyThe President Of A Company
The President Of A CompanyNavy Savchenko
 
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-001-100.pdf
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-001-100.pdfProject_Management_Institute_A_Guide_to_the_Project_Management_Body-001-100.pdf
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-001-100.pdfsandipanpaul16
 
Prepare for the 2013 COSO Internal Control Framework—Start Now
Prepare for the 2013 COSO Internal Control Framework—Start NowPrepare for the 2013 COSO Internal Control Framework—Start Now
Prepare for the 2013 COSO Internal Control Framework—Start NowBrown Smith Wallace
 
Lab insight into retail investors use of digital for corporate reporting
Lab insight into retail investors use of digital for corporate reportingLab insight into retail investors use of digital for corporate reporting
Lab insight into retail investors use of digital for corporate reportingThomas Toomse-Smith
 
Blog 2016 07 -Target Operating Model and Role of Statutory Auditor
Blog 2016 07 -Target Operating Model and Role of Statutory AuditorBlog 2016 07 -Target Operating Model and Role of Statutory Auditor
Blog 2016 07 -Target Operating Model and Role of Statutory AuditorSandip Mukherjee CFA, FRM
 
COBIT 2019 webinar Use Cases: Tailoring Governance of Your Enterprise IT
COBIT 2019 webinar Use Cases: Tailoring Governance of Your Enterprise ITCOBIT 2019 webinar Use Cases: Tailoring Governance of Your Enterprise IT
COBIT 2019 webinar Use Cases: Tailoring Governance of Your Enterprise ITMark Constable
 
Effects Of Internal Audit Practices On Financial...
Effects Of Internal Audit Practices On Financial...Effects Of Internal Audit Practices On Financial...
Effects Of Internal Audit Practices On Financial...Alison Reed
 
Sustainability role of accountants
Sustainability role of accountantsSustainability role of accountants
Sustainability role of accountantsStephen Ndiboi
 
An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019Gregor Polančič
 
sodexo-case-studyfeb2014%20(00000004)
sodexo-case-studyfeb2014%20(00000004)sodexo-case-studyfeb2014%20(00000004)
sodexo-case-studyfeb2014%20(00000004)June Lancaster CMgr
 

Ähnlich wie ISO 30401 - The KM Management Systems Standard (20)

Are You Ready? Implementing COSO's Updated Internal Controls Framework
Are You Ready? Implementing COSO's Updated Internal Controls FrameworkAre You Ready? Implementing COSO's Updated Internal Controls Framework
Are You Ready? Implementing COSO's Updated Internal Controls Framework
 
G20/OECD Principles of Corporate Governance
G20/OECD Principles of Corporate GovernanceG20/OECD Principles of Corporate Governance
G20/OECD Principles of Corporate Governance
 
Corporate-Governance-Principles-ENG.pdf
Corporate-Governance-Principles-ENG.pdfCorporate-Governance-Principles-ENG.pdf
Corporate-Governance-Principles-ENG.pdf
 
Cobit 2019 framework by ISACA
Cobit 2019 framework by ISACACobit 2019 framework by ISACA
Cobit 2019 framework by ISACA
 
Implementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkImplementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance Framework
 
Introduction to COBIT 2019 and IT management
Introduction to COBIT 2019 and IT managementIntroduction to COBIT 2019 and IT management
Introduction to COBIT 2019 and IT management
 
Nick Milton - APM Knowledge SIG Conference 2018
Nick Milton - APM Knowledge SIG Conference 2018 Nick Milton - APM Knowledge SIG Conference 2018
Nick Milton - APM Knowledge SIG Conference 2018
 
Charlotte FENG - What you need to know in 2014!
Charlotte FENG - What you need to know in 2014!Charlotte FENG - What you need to know in 2014!
Charlotte FENG - What you need to know in 2014!
 
The President Of A Company
The President Of A CompanyThe President Of A Company
The President Of A Company
 
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-001-100.pdf
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-001-100.pdfProject_Management_Institute_A_Guide_to_the_Project_Management_Body-001-100.pdf
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-001-100.pdf
 
Prepare for the 2013 COSO Internal Control Framework—Start Now
Prepare for the 2013 COSO Internal Control Framework—Start NowPrepare for the 2013 COSO Internal Control Framework—Start Now
Prepare for the 2013 COSO Internal Control Framework—Start Now
 
Lab insight into retail investors use of digital for corporate reporting
Lab insight into retail investors use of digital for corporate reportingLab insight into retail investors use of digital for corporate reporting
Lab insight into retail investors use of digital for corporate reporting
 
PMBOK7_Guide_2021.pdf
PMBOK7_Guide_2021.pdfPMBOK7_Guide_2021.pdf
PMBOK7_Guide_2021.pdf
 
Blog 2016 07 -Target Operating Model and Role of Statutory Auditor
Blog 2016 07 -Target Operating Model and Role of Statutory AuditorBlog 2016 07 -Target Operating Model and Role of Statutory Auditor
Blog 2016 07 -Target Operating Model and Role of Statutory Auditor
 
PMI Indonesia Chapter Profile
PMI Indonesia Chapter ProfilePMI Indonesia Chapter Profile
PMI Indonesia Chapter Profile
 
COBIT 2019 webinar Use Cases: Tailoring Governance of Your Enterprise IT
COBIT 2019 webinar Use Cases: Tailoring Governance of Your Enterprise ITCOBIT 2019 webinar Use Cases: Tailoring Governance of Your Enterprise IT
COBIT 2019 webinar Use Cases: Tailoring Governance of Your Enterprise IT
 
Effects Of Internal Audit Practices On Financial...
Effects Of Internal Audit Practices On Financial...Effects Of Internal Audit Practices On Financial...
Effects Of Internal Audit Practices On Financial...
 
Sustainability role of accountants
Sustainability role of accountantsSustainability role of accountants
Sustainability role of accountants
 
An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019
 
sodexo-case-studyfeb2014%20(00000004)
sodexo-case-studyfeb2014%20(00000004)sodexo-case-studyfeb2014%20(00000004)
sodexo-case-studyfeb2014%20(00000004)
 

Mehr von SIKM

Knowledge Retention Framework and Maturity Model
Knowledge Retention Framework and Maturity ModelKnowledge Retention Framework and Maturity Model
Knowledge Retention Framework and Maturity ModelSIKM
 
Accelerating Knowledge at Scale
Accelerating Knowledge at ScaleAccelerating Knowledge at Scale
Accelerating Knowledge at ScaleSIKM
 
A system-thinking approach to a learning organization transformation
A system-thinking approach to a learning organization transformationA system-thinking approach to a learning organization transformation
A system-thinking approach to a learning organization transformationSIKM
 
Resilience and KM
Resilience and KMResilience and KM
Resilience and KMSIKM
 
Expert Knowledge Transfer - Reflections and Panel Discussion
Expert Knowledge Transfer - Reflections and Panel DiscussionExpert Knowledge Transfer - Reflections and Panel Discussion
Expert Knowledge Transfer - Reflections and Panel DiscussionSIKM
 
The Value of Knowledge
The Value of KnowledgeThe Value of Knowledge
The Value of KnowledgeSIKM
 
Communities of Practice - Challenges, Curiosity and Dragons
Communities of Practice - Challenges, Curiosity and Dragons Communities of Practice - Challenges, Curiosity and Dragons
Communities of Practice - Challenges, Curiosity and Dragons SIKM
 
Data Curation - Data probity in a time of COVID
Data Curation - Data probity in a time of COVIDData Curation - Data probity in a time of COVID
Data Curation - Data probity in a time of COVIDSIKM
 
Tips & Tricks for Your Lessons Learned Program
Tips & Tricks for Your Lessons Learned ProgramTips & Tricks for Your Lessons Learned Program
Tips & Tricks for Your Lessons Learned ProgramSIKM
 
Integration of Knowledge and Innovation Standards
Integration of Knowledge and Innovation StandardsIntegration of Knowledge and Innovation Standards
Integration of Knowledge and Innovation StandardsSIKM
 
Behavioral DNA of Collaborative Leadership
Behavioral DNA of Collaborative LeadershipBehavioral DNA of Collaborative Leadership
Behavioral DNA of Collaborative LeadershipSIKM
 
More Than a Feeling: Emotions and Knowledge Management
More Than a Feeling: Emotions and Knowledge ManagementMore Than a Feeling: Emotions and Knowledge Management
More Than a Feeling: Emotions and Knowledge ManagementSIKM
 
Applied Knowledge Services: A New Approach for Management and Leadership in t...
Applied Knowledge Services: A New Approach for Management and Leadership in t...Applied Knowledge Services: A New Approach for Management and Leadership in t...
Applied Knowledge Services: A New Approach for Management and Leadership in t...SIKM
 
Could a Rural Island Inspire KM Approaches?
Could a Rural Island Inspire KM Approaches?Could a Rural Island Inspire KM Approaches?
Could a Rural Island Inspire KM Approaches?SIKM
 
Tom Barfield - Navigating Knowledge to the User
Tom Barfield - Navigating Knowledge to the UserTom Barfield - Navigating Knowledge to the User
Tom Barfield - Navigating Knowledge to the UserSIKM
 
The Impact of Data Analytics in Digital Transformation Programs
The Impact of Data Analytics in Digital Transformation ProgramsThe Impact of Data Analytics in Digital Transformation Programs
The Impact of Data Analytics in Digital Transformation ProgramsSIKM
 
Alchemy of Data Elements - Top Down Meets Bottom Up
Alchemy of Data Elements - Top Down Meets Bottom UpAlchemy of Data Elements - Top Down Meets Bottom Up
Alchemy of Data Elements - Top Down Meets Bottom UpSIKM
 
Bridging Islands of Knowledge
Bridging Islands of KnowledgeBridging Islands of Knowledge
Bridging Islands of KnowledgeSIKM
 
Digital Workplace Experience: Building a Collaborative Culture at GE
Digital Workplace Experience: Building a Collaborative Culture at GEDigital Workplace Experience: Building a Collaborative Culture at GE
Digital Workplace Experience: Building a Collaborative Culture at GESIKM
 
Sharing Deep Smarts - Experience-based Knowledge (Downloadable version)
Sharing Deep Smarts - Experience-based Knowledge (Downloadable version)Sharing Deep Smarts - Experience-based Knowledge (Downloadable version)
Sharing Deep Smarts - Experience-based Knowledge (Downloadable version)SIKM
 

Mehr von SIKM (20)

Knowledge Retention Framework and Maturity Model
Knowledge Retention Framework and Maturity ModelKnowledge Retention Framework and Maturity Model
Knowledge Retention Framework and Maturity Model
 
Accelerating Knowledge at Scale
Accelerating Knowledge at ScaleAccelerating Knowledge at Scale
Accelerating Knowledge at Scale
 
A system-thinking approach to a learning organization transformation
A system-thinking approach to a learning organization transformationA system-thinking approach to a learning organization transformation
A system-thinking approach to a learning organization transformation
 
Resilience and KM
Resilience and KMResilience and KM
Resilience and KM
 
Expert Knowledge Transfer - Reflections and Panel Discussion
Expert Knowledge Transfer - Reflections and Panel DiscussionExpert Knowledge Transfer - Reflections and Panel Discussion
Expert Knowledge Transfer - Reflections and Panel Discussion
 
The Value of Knowledge
The Value of KnowledgeThe Value of Knowledge
The Value of Knowledge
 
Communities of Practice - Challenges, Curiosity and Dragons
Communities of Practice - Challenges, Curiosity and Dragons Communities of Practice - Challenges, Curiosity and Dragons
Communities of Practice - Challenges, Curiosity and Dragons
 
Data Curation - Data probity in a time of COVID
Data Curation - Data probity in a time of COVIDData Curation - Data probity in a time of COVID
Data Curation - Data probity in a time of COVID
 
Tips & Tricks for Your Lessons Learned Program
Tips & Tricks for Your Lessons Learned ProgramTips & Tricks for Your Lessons Learned Program
Tips & Tricks for Your Lessons Learned Program
 
Integration of Knowledge and Innovation Standards
Integration of Knowledge and Innovation StandardsIntegration of Knowledge and Innovation Standards
Integration of Knowledge and Innovation Standards
 
Behavioral DNA of Collaborative Leadership
Behavioral DNA of Collaborative LeadershipBehavioral DNA of Collaborative Leadership
Behavioral DNA of Collaborative Leadership
 
More Than a Feeling: Emotions and Knowledge Management
More Than a Feeling: Emotions and Knowledge ManagementMore Than a Feeling: Emotions and Knowledge Management
More Than a Feeling: Emotions and Knowledge Management
 
Applied Knowledge Services: A New Approach for Management and Leadership in t...
Applied Knowledge Services: A New Approach for Management and Leadership in t...Applied Knowledge Services: A New Approach for Management and Leadership in t...
Applied Knowledge Services: A New Approach for Management and Leadership in t...
 
Could a Rural Island Inspire KM Approaches?
Could a Rural Island Inspire KM Approaches?Could a Rural Island Inspire KM Approaches?
Could a Rural Island Inspire KM Approaches?
 
Tom Barfield - Navigating Knowledge to the User
Tom Barfield - Navigating Knowledge to the UserTom Barfield - Navigating Knowledge to the User
Tom Barfield - Navigating Knowledge to the User
 
The Impact of Data Analytics in Digital Transformation Programs
The Impact of Data Analytics in Digital Transformation ProgramsThe Impact of Data Analytics in Digital Transformation Programs
The Impact of Data Analytics in Digital Transformation Programs
 
Alchemy of Data Elements - Top Down Meets Bottom Up
Alchemy of Data Elements - Top Down Meets Bottom UpAlchemy of Data Elements - Top Down Meets Bottom Up
Alchemy of Data Elements - Top Down Meets Bottom Up
 
Bridging Islands of Knowledge
Bridging Islands of KnowledgeBridging Islands of Knowledge
Bridging Islands of Knowledge
 
Digital Workplace Experience: Building a Collaborative Culture at GE
Digital Workplace Experience: Building a Collaborative Culture at GEDigital Workplace Experience: Building a Collaborative Culture at GE
Digital Workplace Experience: Building a Collaborative Culture at GE
 
Sharing Deep Smarts - Experience-based Knowledge (Downloadable version)
Sharing Deep Smarts - Experience-based Knowledge (Downloadable version)Sharing Deep Smarts - Experience-based Knowledge (Downloadable version)
Sharing Deep Smarts - Experience-based Knowledge (Downloadable version)
 

Kürzlich hochgeladen

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 

Kürzlich hochgeladen (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 

ISO 30401 - The KM Management Systems Standard

  • 1. ISO 30401:2018 The Management System Standard for KM and what it might do for you Nick Milton SIKM 15 Oct 2019
  • 2. 15 October 2019Copyright Knoco Ltd 2 Before ISO 30401; the update to ISO 9001 7. Support 7.1 Resources 7.1.6 Organizational Knowledge Requirements: •Determine the knowledge necessary for the operation of processes and to achieve conformity of products and services. •Maintain this knowledge and make it available to the extent necessary. •Consider current knowledge and determine how to acquire or access the necessary additional knowledge (when addressing changing needs and trends). •NOTE 1: Organizational knowledge can include information such as intellectual property and lessons learned. •NOTE 2: To obtain the knowledge required, consider: a) Internal Sources (e.g., learning from failures and successful projects, capturing undocumented knowledge and experience of topical experts within the organization); b) External Sources (e.g., standards, academia, conferences, gathering knowledge with customers or providers). •Changes: This clause on organizational knowledge is a new requirement. It should be an input to clause 7.2 on Competence. •“Knowledge” is defined in the terms section as the available collection of information being a justified belief and having a high certainty to be true
  • 3. 15 October 2019Copyright Knoco Ltd 3 Why ISO 30401? In January 2014 ISO received a proposal from the Standards Institute of Israel (SII) to develop a management system standard for Knowledge Management. The justifications provided by the SII for this proposal for new work included: ISO SII BSI ANSI DIN etc • An increasing recognition of the need for, and importance of, Knowledge Management; • Ambiguity in the understanding of what KM is; • Multiple and common failures of KM projects and initiatives due to an incomplete approach.
  • 4. 15 October 2019Copyright Knoco Ltd 4 For example - “I think that KM is to date a theoretical, 'pie in the sky' type of field. not understood by business. This is one of those fields or subject areas that has failed, failed us the practitioners, organisations and the society at large. What we are taught at varsities as KM is totally different from what we are expected to do when we get employed. There still is no one common definition, a practical one of KM as yet. For example, when a person tells you they are doing communications, you know what they mean, you already know the kinds of activities they undertake, same with ICT, law and etc. I am regretful I followed this line of work. There simply is not hope at all especially within the SA Government”.
  • 5. 15 October 2019Copyright Knoco Ltd 5 ISO alone cannot approve the creation of standards ISO sent the proposal to the various member bodies, who convened feedback from a number of experts in the field of KM, some of whom, including myself, had been suggested in the SII proposal. We sent our views to BSI, and BSI collated our responses (which were in favour of the proposal) and sent them on to ISO. • By the end of March 2014, 36 countries had replied, • the majority were in favour of accepting the proposal for development of a MSS for knowledge, and • 12 countries agreed to be involved in the work, including the UK.
  • 6. 15 October 2019Copyright Knoco Ltd 6 The drafting process From first proposal to final publication, developing a standard usually takes about 3 years Done by working groups of experts drawn from the member countries, Working under the umbrella of a technical committee responsible for a specific subject area. Various levels of draft are cycled through working teams in the member countries called “mirror committees” for edit, review and input at national level. Mirror committee membership is open to all. Working group is open to all members of mirror committees. Work is through the principle of consensus, which is why the work is done face to face. A period of public consultation on draft 4.0
  • 7. 15 October 2019Copyright Knoco Ltd 7 Standards creation stages Stage code Stage Associated document name 00 Preliminary Preliminary work item 10 Proposal New work item proposal 20 Preparatory Working draft or drafts 30 Committee Committee draft or drafts 40 Enquiry Enquiry draft 50 Approval Final draft 60 Publication International Standard 90 Review London 2017
  • 8. 15 October 2019Copyright Knoco Ltd 8 Management Systems Standards Type A • The one which provides requirements (e.g. ISO 9001) Type B • The one which provide guidelines (e.g. ISO 9004) ANNEX SL The new high level structure for all management system standards of the future The same high level structure, identical core text, as well as common terms and definitions. Whilst the high level structure cannot be changed, sub-clauses and discipline-specific text can be added.
  • 9. 15 October 2019Copyright Knoco Ltd 9 Standard format for ISO management systems standards 1 • Scope 1 • Normative references 3 • Definitions 4 • Context of the organisation 5 • Leadership 6 • Planning 7 • Support 8 • Organisation 9 • Performance evaluation 10 • Improvement A management system standard provides a model to follow when setting up and operating a management system. Some of the top level benefits of a successful management system standard are: • Enhanced use of resources • Improved risk management • Increased customer satisfaction https://www.bsigroup.com/LocalFiles/nl- nl/iso-9001/BSI-Annex-SL-Whitepaper.pdf
  • 10. 15 October 2019Copyright Knoco Ltd 10 Clause 4: Context of the organization 4.1 Understanding the organization and its context 4.2 Understanding the needs and expectations of interested parties 4.3 Determining the scope of the managements system 4.4 The management system 4.4.1 – Knowledge development/lifecycle 4.4.2 – Transitions 4.4.3 – “Enablers” (roles, processes, technologies, governance, culture) As the flagstone of a management system, clause 4 determines why the system is needed. As part of the answer to this question, the organization needs to identify internal and external issues that can impact on its intended outcomes, as well as all interested parties and their requirements. It also needs to document its scope and set the boundaries of the management system – all in line with the business objectives.
  • 11. 15 October 2019Copyright Knoco Ltd 11 Clause 5: Leadership 5.1 Leadership and commitment 5.2 KM Policy 5.3 Organisational roles, responsibilities and authorities The new high level structure places particular emphasis on leadership, not just management as set out in previous standards. This means top management now has greater accountability and involvement in the organization’s management system. They need to integrate the requirements of the management system into the organization’s core business process, ensure the management system achieves its intended outcomes and allocate the necessary resources. Top management is also responsible for communicating the importance of the management system and heighten employee awareness and involvement
  • 12. 15 October 2019Copyright Knoco Ltd 12 Clause 6: Planning 6.1 Actions to address risks and opportunities 6.2 Knowledge objectives and planning to achieve them Clause 6 brings risk-based thinking to the front. The planning phase looks at what, who, how and when risks and opportunities must be addressed. This proactive approach replaces preventative action and reduces the need for corrective actions later on. Particular focus is also placed on the objectives of the management system. These should be measurable, monitored, communicated, aligned to the policy of the management system and updated when needed.
  • 13. 15 October 2019Copyright Knoco Ltd 13 Clause 7: Support 7.1 Resources 7.2 Competence 7.3 Awareness 7.4 Communication 7.5 Documented information (about the KM system) Organizations will have to look at the support needed to meet their goals and objectives. This includes resources, targeted internal and external communications, as well as documented information that replaces previously used terms such as documents, documentation and records.
  • 14. 15 October 2019Copyright Knoco Ltd 14 Clause 8: Operations 8.1 Operational planning and control The process elements of the management system are covered by this clause. Clause 8 addresses both in-house and outsourced processes, while the overall process management includes adequate criteria to control these processes, as well as ways to manage planned and unintended change.
  • 15. 15 October 2019Copyright Knoco Ltd 15 Clause 9: Performance Evaluation 9.1 Monitoring, measurement, analysis and evaluation 9.2 Internal audit 9.3 Management review Here organizations need to determine what, how and when things are to be monitored, measured, analysed and evaluated. An internal audit is also part of this process to ensure the management system conforms to the requirements of the organization as well as the standard, and is successfully implemented and maintained. The final step, management review, looks at whether the management system is suitable, adequate and effective.
  • 16. 15 October 2019Copyright Knoco Ltd 16 Clause10: Improvement 10.1 Non-conformity and corrective action 10.2 Continual improvement Clause 10 looks at ways to address non-conformities and corrective action, as well as strategies for improvement on a continual basis.
  • 17. 21 May 2019Copyright Knoco Ltd 17 Annexes A. The knowledge spectrum B. Boundaries between KM and adjacent disciplines A. Information management B. Data management C. Business intelligence D. CRM E. Human Resource Management F. Training/L&D G. Organisational learning H. Innovation management I. Other management systems C. KM culture
  • 18. Implementation of the Standard Now we have this standard, what do we do with it? • Use it as a guide? • Seek to comply with it? • Seek to audit against it? • Seek to be certified against it? Copyright © 2016 BSI. All rights reserved. Image from Boris Dzingharov on Flickr
  • 19. 15 October 2019Copyright Knoco Ltd 19 Standards myths busted • The standard is deliberately generic • You define what you do and how you do it, within a framework. It doesn’t define how you do KM • A framework for every kind of organisation. • For small businesses, to put in solid foundations from the start. It’s not only for big business • Shouldn’t be a burden • An opportunity to stand back and ask “could we do better?” It won’t take months to implement • No mandatory requirements for external audit. • You can implement a standard and claim to be compliant You don’t need to certify Text from www.british-assessment.co.uk
  • 20. 15 October 2019Copyright Knoco Ltd 20 The 54 “Shall”s “The organization shall determine external and internal issues that are relevant to its purpose and that affect its ability to achieve the intended outcome(s) of its knowledge management system”.
  • 21. Using the standard as a guide Suitable for those starting in KM Tells you what’s different about KM Tells you some of the principles Tells you where to begin Tells you what you need to consider Tells you what you should put in place Helps you avoid the common pitfalls Image from wikimedia commons
  • 22. Audit against the standard Suitable for those with mature KM Internal or external auditors Interviewing, and reviewing documents Looking for evidence against the 54 “shall” requirements Documentation of compliance Identification of areas of non-compliance Image from bluediamond galleryl
  • 23. Why seek to show compliance? Who is interested? Your team – what more do we need to do? Your management – what more do they need to do? Your organisation – show KM is a “real discipline” Your clients – to show you handle knowledge responsibly Your potential clients, e.g. in bids - to show you handle knowledge responsibly Image from maxpixel
  • 24. Certification against the standard by an accredited body Not possible (yet?) Requires audit by trained auditors working for a certification body Certification body should be accredited (e.g. by UKAS or UAF, IAS, IOAS) Major certification bodies do most of their work against 4 to 8 of the 60+ MSSs. KM is not yet a major area of focus UKAS accredits certification bodies against 16 standards. KM is not (yet?) one of them Image from wikimedia commons
  • 25. 21 May 2019Copyright Knoco Ltd 25