SlideShare ist ein Scribd-Unternehmen logo
1 von 16
Downloaden Sie, um offline zu lesen
THE REPUBLIC OF TURKEY 
1 
Review and Remedies Procedures in Turkey 
7th IPA Regional Public Procurement Conference 
9 – 10 September 2014 Vlora, Albania 
ERKAN OZDEMIR Public Procurement Specialist 
Regulation Department Public Procurement Authority 
erkanozdemir@kik.gov.tr
Who Can File a Complaint? 
The Turkish legislative framework on remedies is provided for by PPL No.4734 and its complementary secondary legislation. The PPL contains detailed rules for review and complaint procedures. 
Who can file a complaint? 
The PPL limited locus standi to actual or potential tenderers and candidates who claim that they have suffered a loss of right or damage or are likely to suffer a loss of right or damage due to unlawful procedures or actions within the process of the tender. (In order to become a potential tenderer, tender or pre-qualification documents must be purchased) 
2
Stages of Complaint Review System in Turkey 
The PPL establishes a three-tier system for reviewing complaints lodged by disgruntled economic operators. 
3 
Complaint application to the Contracting Authority 
In the first stage a complaint must be submitted to the contracting authority itself within 10 days (5 days in the case of emergency contracts) running from the date when the decision being challenged was sent or published or in any event ten days running from the notification of the contracting authority’s decision. 
Appeal application to the Public Procurement Authority 
A complainant who is dissatisfied with the decision of the contracting authority may, as a second step, appeal this decision to the PPA within 10 days. 
Appeal to the Administrative Courts 
The final decision on the appeal made by the PPA is then subject to the jurisdiction of the administrative courts within a period of 60 days.
Standstill Period and Automatic Suspensison 
4 
In December 2008 an extensive amendment to the PPL was adopted, notably to strengthen the review procedure. 
Two important steps have been taken in order to ensure that the Turkish review system meets the requirements of EU law. 1- The minumum standstill period between notification of the award decision and conclusion of the contract and, 2- Automatic suspension of the possibility to conclude the contract upon complaint, were introduced to the PPL through this amendment.
Standstill Period and Automatic Suspension 
5 
 Pursuant to Art.41 of the PPL the contract may not be signed, 
Unless ten days have passed in general, 
and unless five days have passed in the case of emergency contracts specified in article 21(b) and (c) of the PPL. following the notification of all the tenderers about the tender result.
Standstill Period and Automatic Suspensison 
6 
Furthermore, where an economic operator challenges the tender result before the contracting authority within the designated period (10 or 5 days), the suspension of the conclusion of the contract will continue till the notification date of the authority’s decision and where sequential appeal is made to the PPA within ten days following the decision by the contracting authority, suspension will continue till the decision on appeal has been taken by the PPA.
7 
Ineffectiveness 
With regard to the concept of ineffectiveness, there is no explicit provision in the PPL. 
However, Art.56 of the PPL provides that conclusion of the contract without complying with the standstill periods and procedures set out in the PPL does not constitute an obstacle for the PPA to review the application and take one of the decisions stated in Art.54 of the PPL. (i.e. setting aside, corrective action and rejection of the application).
8 
Ineffectiveness 
It is established practice that if the failure to apply the standstill period is combined with an infringement of the substantive rules, the PPA can set aside the award decision which ultimately results in the termination of the concluded contract by the contracting authority itself, as the legal basis of the contract has been removed. 
Turkish system on ineffectiveness is partially in line with the Art.2d of the Remedies Directive, which states that under certain cases specified therein a signed contract must be considered ineffective by a review body or its ineffectiveness must be the result of the decision of such a review body.
9 
Alternative Penealties 
Although the sanction of ineffectiveness implicitly exists in the Turkish remedies system, unfortunately the PPL does not provide any provisions on alternative penalties which review bodies (PPA or administrative courts) may impose on contracting authorities such as the shortening of the duration of the contract and/or the payment of a fine. 
In this respect Turkish remedies system seems to conflict with the Remedies Directive and so further legaslative initiatives are required to meet the requirements of the Art 2e of the Remedies Directive.
Specific Remedies 
10 
Upon application the PPA shall take the final decision 
within 20 days in general, 
within 10 working days for the appeals against tenders conducted in urgent cases and against actions taken by the contracting authority to cancel the tender upon a complaint or appeal.
Specific Remedies 
11 
The PPL provides two specific remedies to be made available to disappointed economic operators in actions against contracting authorities, as follows: 
i.the corrective action ii.the annulment of the procurement proceedings 
Therefore the PPL gives one of the powers to the PPA specified in Art.2(1) (b) of the Remedies Directive. (i.e. setting aside of contracting decisions) 
in cases where the infringement may be remedied through correction and where it is not necessary to interrupt the procurement process 
where the infringement would constitute an obstacle for the continuation of the tender proceeding and which cannot be remedied by taking corrective measures
Specific Remedies 
12 
However, there is no provision for interim measures and compensation for damages in the PPL. 
As indicated above, in cases of the initiation of review proceedings against any contracting decisions, the contract cannot be concluded until the PPA has taken its decision. 
Since contracting authorities cannot conclude the contract before the PPA has made a decision on the merits of the case, this automatic suspension of the possibility to conclude the contract seems to obviate the existence of interim measures with regard to procurement process within the Turkish review system.
Damages 
13 
There is no provision in the PPL regarding the award of damages; the PPA is not given the power to grant compensation for damages. 
Nonetheless damages can always be claimed before the administrative courts pursuant to Art.125 of the Turkish Constitution and Art.2 of the Procedure of Administrative Justice Law. 
Since the Remedies Directive allows the Member States latitude to assign different tasks concerning the remedy procedure to separate bodies responsible for different aspects of the review procedure, the fact that under the Turkish review system the award of damages to persons harmed by an infringement is a matter for the administrative courts should not be seen to
Main Figures on Complaint applications to PPA in 2013 
14 
Procurement type 
No.of complaints 
No.of Procurements* 
Share in Total 
Goods 
854 
45.781 
1,87 
Services 
3.034 
25.227 
4,78 
Works 
1.205 
45.921 
6,66 
Total 
5093 
116.929 
4,36 
*Exceptions are not included.
Further Developments 
15 
Turkey, as an EU candidate country, needs to bring its national review system on public procurement to full compliance with EU legislation before accession. In the last decade, Turkey has taken some important steps towards this objective. 
Although these developments have enhanced its compliance with the Remedies Directive, there are still some steps that need to be taken to ensure that the Turkish review system meets the requirements of EU law. For this purpose, further legislative initiatives will be introduced before accession.
16 
THANK YOU FOR YOUR ATTENTION

Weitere ähnliche Inhalte

Was ist angesagt?

Service Tax Proposals in Budget 2016
Service Tax Proposals in Budget 2016Service Tax Proposals in Budget 2016
Service Tax Proposals in Budget 2016Ashish Gupta
 
Excise and custom duty
Excise and custom dutyExcise and custom duty
Excise and custom dutyZohaib Ahmed
 
Motor Accident Claim Petitions (MACP) Reference Manual Updated upto March 2014
Motor Accident Claim Petitions (MACP) Reference Manual Updated upto March 2014 Motor Accident Claim Petitions (MACP) Reference Manual Updated upto March 2014
Motor Accident Claim Petitions (MACP) Reference Manual Updated upto March 2014 Legal
 
Service tax negative list based regime
Service tax negative list based regimeService tax negative list based regime
Service tax negative list based regimeAnirudhha Bhide
 
Input Tax Credit (itc) Under GST Provision
Input Tax Credit (itc) Under GST ProvisionInput Tax Credit (itc) Under GST Provision
Input Tax Credit (itc) Under GST ProvisionShital Thadeshwar
 
Review Action No. 3 of 2012 (1) (1)
Review Action No. 3 of 2012 (1) (1)Review Action No. 3 of 2012 (1) (1)
Review Action No. 3 of 2012 (1) (1)Chandrasiri kotigala
 
Service tax rules (sushil aggarwal)
Service tax rules (sushil aggarwal)Service tax rules (sushil aggarwal)
Service tax rules (sushil aggarwal)Sushil Aggarwal
 
Letter of demand to sabc signed 23 10-2020
Letter of demand to sabc signed 23 10-2020Letter of demand to sabc signed 23 10-2020
Letter of demand to sabc signed 23 10-2020SABC News
 
Service tax negative list
Service tax negative listService tax negative list
Service tax negative listJayesh Alwani
 
Service Tax Issues
Service Tax IssuesService Tax Issues
Service Tax IssuesBandS
 
Booomark Version of MACP Reference Manual Updated upto March 2016 with bookmark
Booomark Version of MACP Reference Manual Updated upto March 2016 with bookmarkBooomark Version of MACP Reference Manual Updated upto March 2016 with bookmark
Booomark Version of MACP Reference Manual Updated upto March 2016 with bookmarkLegal
 

Was ist angesagt? (17)

Service Tax Proposals in Budget 2016
Service Tax Proposals in Budget 2016Service Tax Proposals in Budget 2016
Service Tax Proposals in Budget 2016
 
Excise duty assessment
Excise duty assessmentExcise duty assessment
Excise duty assessment
 
Title II Part B
Title II   Part BTitle II   Part B
Title II Part B
 
Service tax
Service taxService tax
Service tax
 
Excise and custom duty
Excise and custom dutyExcise and custom duty
Excise and custom duty
 
Motor Accident Claim Petitions (MACP) Reference Manual Updated upto March 2014
Motor Accident Claim Petitions (MACP) Reference Manual Updated upto March 2014 Motor Accident Claim Petitions (MACP) Reference Manual Updated upto March 2014
Motor Accident Claim Petitions (MACP) Reference Manual Updated upto March 2014
 
Service tax negative list based regime
Service tax negative list based regimeService tax negative list based regime
Service tax negative list based regime
 
Input Tax Credit (itc) Under GST Provision
Input Tax Credit (itc) Under GST ProvisionInput Tax Credit (itc) Under GST Provision
Input Tax Credit (itc) Under GST Provision
 
Review Action No. 3 of 2012 (1) (1)
Review Action No. 3 of 2012 (1) (1)Review Action No. 3 of 2012 (1) (1)
Review Action No. 3 of 2012 (1) (1)
 
Service tax rules (sushil aggarwal)
Service tax rules (sushil aggarwal)Service tax rules (sushil aggarwal)
Service tax rules (sushil aggarwal)
 
Letter of demand to sabc signed 23 10-2020
Letter of demand to sabc signed 23 10-2020Letter of demand to sabc signed 23 10-2020
Letter of demand to sabc signed 23 10-2020
 
Negative List of Services and Exempted Services
Negative List of Services and Exempted ServicesNegative List of Services and Exempted Services
Negative List of Services and Exempted Services
 
Service tax training jan 2015
Service tax training  jan 2015Service tax training  jan 2015
Service tax training jan 2015
 
Service tax negative list
Service tax negative listService tax negative list
Service tax negative list
 
Service Tax Issues
Service Tax IssuesService Tax Issues
Service Tax Issues
 
Booomark Version of MACP Reference Manual Updated upto March 2016 with bookmark
Booomark Version of MACP Reference Manual Updated upto March 2016 with bookmarkBooomark Version of MACP Reference Manual Updated upto March 2016 with bookmark
Booomark Version of MACP Reference Manual Updated upto March 2016 with bookmark
 
35310finalsupp8
35310finalsupp835310finalsupp8
35310finalsupp8
 

Ähnlich wie Turkey Presentation, Erkan Ozdemir, PPA, Review and remedies procedures in practice, 7th Regional Public Procurement Conference, Vlora, 9-10 Sept 2014_English

Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012Kai Yun Pang
 
Article: Instructions issued in the enforcement of public procurement contracts
Article: Instructions issued in the enforcement of public procurement contractsArticle: Instructions issued in the enforcement of public procurement contracts
Article: Instructions issued in the enforcement of public procurement contractsȚuca Zbârcea & Asociații
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & AssociatesCerasela Angelescu
 
Automatic stay and confirmation of reorganization plan by Court
Automatic stay and confirmation of reorganization plan by CourtAutomatic stay and confirmation of reorganization plan by Court
Automatic stay and confirmation of reorganization plan by CourtSandulli&Associati Law Firm
 
Time Bars and their enforceability in English law EPC contracts
Time Bars and their enforceability in English law EPC contractsTime Bars and their enforceability in English law EPC contracts
Time Bars and their enforceability in English law EPC contractsEversheds Sutherland
 
67/2010 Issuing Service Price Control Regulation
67/2010 Issuing Service Price Control Regulation67/2010 Issuing Service Price Control Regulation
67/2010 Issuing Service Price Control Regulationtraoman
 
SECURITIES AND EXCHANGE COMMISSION vs ACCOUNTANT (SC enbanc).pptx
SECURITIES AND EXCHANGE COMMISSION  vs ACCOUNTANT (SC enbanc).pptxSECURITIES AND EXCHANGE COMMISSION  vs ACCOUNTANT (SC enbanc).pptx
SECURITIES AND EXCHANGE COMMISSION vs ACCOUNTANT (SC enbanc).pptxAttyJimPeru
 
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...Dr. Oliver Massmann
 
Vietnam - The World Bank is asking Duane Morris about Doing Business and Gove...
Vietnam - The World Bank is asking Duane Morris about Doing Business and Gove...Vietnam - The World Bank is asking Duane Morris about Doing Business and Gove...
Vietnam - The World Bank is asking Duane Morris about Doing Business and Gove...Dr. Oliver Massmann
 
time bar clauses
time bar clausestime bar clauses
time bar clausesAMILA GAYAN
 
CIPAA presentation
CIPAA presentationCIPAA presentation
CIPAA presentationDoreen Yeo
 
Eo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industryEo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industryjbonvier
 

Ähnlich wie Turkey Presentation, Erkan Ozdemir, PPA, Review and remedies procedures in practice, 7th Regional Public Procurement Conference, Vlora, 9-10 Sept 2014_English (20)

Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
PPT, L Kojnok, EC, Third ENP East public procurement conference, Tbilisi, 6 N...
PPT, L Kojnok, EC, Third ENP East public procurement conference, Tbilisi, 6 N...PPT, L Kojnok, EC, Third ENP East public procurement conference, Tbilisi, 6 N...
PPT, L Kojnok, EC, Third ENP East public procurement conference, Tbilisi, 6 N...
 
Article: Instructions issued in the enforcement of public procurement contracts
Article: Instructions issued in the enforcement of public procurement contractsArticle: Instructions issued in the enforcement of public procurement contracts
Article: Instructions issued in the enforcement of public procurement contracts
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & Associates
 
Automatic stay and confirmation of reorganization plan by Court
Automatic stay and confirmation of reorganization plan by CourtAutomatic stay and confirmation of reorganization plan by Court
Automatic stay and confirmation of reorganization plan by Court
 
IBC_in_Covid-19_25.04.20_Adv. CA Puneet Agrawal
IBC_in_Covid-19_25.04.20_Adv. CA Puneet AgrawalIBC_in_Covid-19_25.04.20_Adv. CA Puneet Agrawal
IBC_in_Covid-19_25.04.20_Adv. CA Puneet Agrawal
 
CIPAA Conference - 21 August 2021
CIPAA Conference - 21 August 2021CIPAA Conference - 21 August 2021
CIPAA Conference - 21 August 2021
 
Time Bars and their enforceability in English law EPC contracts
Time Bars and their enforceability in English law EPC contractsTime Bars and their enforceability in English law EPC contracts
Time Bars and their enforceability in English law EPC contracts
 
UJBL - AM
UJBL - AMUJBL - AM
UJBL - AM
 
Restraints of Trade and Dominance in Cyprus
Restraints of Trade and Dominance in CyprusRestraints of Trade and Dominance in Cyprus
Restraints of Trade and Dominance in Cyprus
 
Matrta Laszuk, SIGMA Public procurement review bodies conference, Ohrid 9-10 ...
Matrta Laszuk, SIGMA Public procurement review bodies conference, Ohrid 9-10 ...Matrta Laszuk, SIGMA Public procurement review bodies conference, Ohrid 9-10 ...
Matrta Laszuk, SIGMA Public procurement review bodies conference, Ohrid 9-10 ...
 
67/2010 Issuing Service Price Control Regulation
67/2010 Issuing Service Price Control Regulation67/2010 Issuing Service Price Control Regulation
67/2010 Issuing Service Price Control Regulation
 
Presentation by Aleksandra Melesko, public procurement reality and challenges...
Presentation by Aleksandra Melesko, public procurement reality and challenges...Presentation by Aleksandra Melesko, public procurement reality and challenges...
Presentation by Aleksandra Melesko, public procurement reality and challenges...
 
SECURITIES AND EXCHANGE COMMISSION vs ACCOUNTANT (SC enbanc).pptx
SECURITIES AND EXCHANGE COMMISSION  vs ACCOUNTANT (SC enbanc).pptxSECURITIES AND EXCHANGE COMMISSION  vs ACCOUNTANT (SC enbanc).pptx
SECURITIES AND EXCHANGE COMMISSION vs ACCOUNTANT (SC enbanc).pptx
 
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
 
Merger Control in Cyprus: Overview
Merger Control in Cyprus: OverviewMerger Control in Cyprus: Overview
Merger Control in Cyprus: Overview
 
Vietnam - The World Bank is asking Duane Morris about Doing Business and Gove...
Vietnam - The World Bank is asking Duane Morris about Doing Business and Gove...Vietnam - The World Bank is asking Duane Morris about Doing Business and Gove...
Vietnam - The World Bank is asking Duane Morris about Doing Business and Gove...
 
time bar clauses
time bar clausestime bar clauses
time bar clauses
 
CIPAA presentation
CIPAA presentationCIPAA presentation
CIPAA presentation
 
Eo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industryEo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industry
 

Mehr von Support for Improvement in Governance and Management SIGMA

Mehr von Support for Improvement in Governance and Management SIGMA (20)

PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
 
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdfPPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
 
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdfPhoto gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdfPPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2 and 3.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2  and 3.pdfPPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2  and 3.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2 and 3.pdf
 
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdfAcademies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdfPPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
 
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
 
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
 

Kürzlich hochgeladen

EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...tanu pandey
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Dipal Arora
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...tanu pandey
 

Kürzlich hochgeladen (20)

EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 

Turkey Presentation, Erkan Ozdemir, PPA, Review and remedies procedures in practice, 7th Regional Public Procurement Conference, Vlora, 9-10 Sept 2014_English

  • 1. THE REPUBLIC OF TURKEY 1 Review and Remedies Procedures in Turkey 7th IPA Regional Public Procurement Conference 9 – 10 September 2014 Vlora, Albania ERKAN OZDEMIR Public Procurement Specialist Regulation Department Public Procurement Authority erkanozdemir@kik.gov.tr
  • 2. Who Can File a Complaint? The Turkish legislative framework on remedies is provided for by PPL No.4734 and its complementary secondary legislation. The PPL contains detailed rules for review and complaint procedures. Who can file a complaint? The PPL limited locus standi to actual or potential tenderers and candidates who claim that they have suffered a loss of right or damage or are likely to suffer a loss of right or damage due to unlawful procedures or actions within the process of the tender. (In order to become a potential tenderer, tender or pre-qualification documents must be purchased) 2
  • 3. Stages of Complaint Review System in Turkey The PPL establishes a three-tier system for reviewing complaints lodged by disgruntled economic operators. 3 Complaint application to the Contracting Authority In the first stage a complaint must be submitted to the contracting authority itself within 10 days (5 days in the case of emergency contracts) running from the date when the decision being challenged was sent or published or in any event ten days running from the notification of the contracting authority’s decision. Appeal application to the Public Procurement Authority A complainant who is dissatisfied with the decision of the contracting authority may, as a second step, appeal this decision to the PPA within 10 days. Appeal to the Administrative Courts The final decision on the appeal made by the PPA is then subject to the jurisdiction of the administrative courts within a period of 60 days.
  • 4. Standstill Period and Automatic Suspensison 4 In December 2008 an extensive amendment to the PPL was adopted, notably to strengthen the review procedure. Two important steps have been taken in order to ensure that the Turkish review system meets the requirements of EU law. 1- The minumum standstill period between notification of the award decision and conclusion of the contract and, 2- Automatic suspension of the possibility to conclude the contract upon complaint, were introduced to the PPL through this amendment.
  • 5. Standstill Period and Automatic Suspension 5  Pursuant to Art.41 of the PPL the contract may not be signed, Unless ten days have passed in general, and unless five days have passed in the case of emergency contracts specified in article 21(b) and (c) of the PPL. following the notification of all the tenderers about the tender result.
  • 6. Standstill Period and Automatic Suspensison 6 Furthermore, where an economic operator challenges the tender result before the contracting authority within the designated period (10 or 5 days), the suspension of the conclusion of the contract will continue till the notification date of the authority’s decision and where sequential appeal is made to the PPA within ten days following the decision by the contracting authority, suspension will continue till the decision on appeal has been taken by the PPA.
  • 7. 7 Ineffectiveness With regard to the concept of ineffectiveness, there is no explicit provision in the PPL. However, Art.56 of the PPL provides that conclusion of the contract without complying with the standstill periods and procedures set out in the PPL does not constitute an obstacle for the PPA to review the application and take one of the decisions stated in Art.54 of the PPL. (i.e. setting aside, corrective action and rejection of the application).
  • 8. 8 Ineffectiveness It is established practice that if the failure to apply the standstill period is combined with an infringement of the substantive rules, the PPA can set aside the award decision which ultimately results in the termination of the concluded contract by the contracting authority itself, as the legal basis of the contract has been removed. Turkish system on ineffectiveness is partially in line with the Art.2d of the Remedies Directive, which states that under certain cases specified therein a signed contract must be considered ineffective by a review body or its ineffectiveness must be the result of the decision of such a review body.
  • 9. 9 Alternative Penealties Although the sanction of ineffectiveness implicitly exists in the Turkish remedies system, unfortunately the PPL does not provide any provisions on alternative penalties which review bodies (PPA or administrative courts) may impose on contracting authorities such as the shortening of the duration of the contract and/or the payment of a fine. In this respect Turkish remedies system seems to conflict with the Remedies Directive and so further legaslative initiatives are required to meet the requirements of the Art 2e of the Remedies Directive.
  • 10. Specific Remedies 10 Upon application the PPA shall take the final decision within 20 days in general, within 10 working days for the appeals against tenders conducted in urgent cases and against actions taken by the contracting authority to cancel the tender upon a complaint or appeal.
  • 11. Specific Remedies 11 The PPL provides two specific remedies to be made available to disappointed economic operators in actions against contracting authorities, as follows: i.the corrective action ii.the annulment of the procurement proceedings Therefore the PPL gives one of the powers to the PPA specified in Art.2(1) (b) of the Remedies Directive. (i.e. setting aside of contracting decisions) in cases where the infringement may be remedied through correction and where it is not necessary to interrupt the procurement process where the infringement would constitute an obstacle for the continuation of the tender proceeding and which cannot be remedied by taking corrective measures
  • 12. Specific Remedies 12 However, there is no provision for interim measures and compensation for damages in the PPL. As indicated above, in cases of the initiation of review proceedings against any contracting decisions, the contract cannot be concluded until the PPA has taken its decision. Since contracting authorities cannot conclude the contract before the PPA has made a decision on the merits of the case, this automatic suspension of the possibility to conclude the contract seems to obviate the existence of interim measures with regard to procurement process within the Turkish review system.
  • 13. Damages 13 There is no provision in the PPL regarding the award of damages; the PPA is not given the power to grant compensation for damages. Nonetheless damages can always be claimed before the administrative courts pursuant to Art.125 of the Turkish Constitution and Art.2 of the Procedure of Administrative Justice Law. Since the Remedies Directive allows the Member States latitude to assign different tasks concerning the remedy procedure to separate bodies responsible for different aspects of the review procedure, the fact that under the Turkish review system the award of damages to persons harmed by an infringement is a matter for the administrative courts should not be seen to
  • 14. Main Figures on Complaint applications to PPA in 2013 14 Procurement type No.of complaints No.of Procurements* Share in Total Goods 854 45.781 1,87 Services 3.034 25.227 4,78 Works 1.205 45.921 6,66 Total 5093 116.929 4,36 *Exceptions are not included.
  • 15. Further Developments 15 Turkey, as an EU candidate country, needs to bring its national review system on public procurement to full compliance with EU legislation before accession. In the last decade, Turkey has taken some important steps towards this objective. Although these developments have enhanced its compliance with the Remedies Directive, there are still some steps that need to be taken to ensure that the Turkish review system meets the requirements of EU law. For this purpose, further legislative initiatives will be introduced before accession.
  • 16. 16 THANK YOU FOR YOUR ATTENTION