Light Rail Efficiency Project
Mountain View Double Track Project
Mountain View Local Projects Open
House
2
2017 Service Plan
3
Mountain View Double Track Project
Phase I: Adds a second main line LRT track (approximately 1,400) feet
between Mountain View Transit Center and State Route 85
Caltrain Realignment: Shifts existing Caltrain track to create space for
second light rail track
Phase II: Extends second main line LRT track over a distance of
approximately 3,000 feet from State Route 85 to Whisman LRT Station
4
Why Are We Doing the Project?
Double Track will allow VTA to:
• Introduce new service from Mountain View to Alum Rock
• Increase connectivity with Caltrain and the future Milpitas BART station
• Serve growing residential and commercial development
• Respond to demand at Levi’s Stadium
• Improve system-wide on-time performance, reduce train bunching
5
Mountain View Double Track – Phase I
Phase I: Construction will occur between mid 2014 to mid
2015. No major impacts to service will occur during this
period.
6
Caltrain Realignment
Caltrain Realignment: Existing Caltrain Tracks will need to be
realigned between Evelyn Station and Highway 237.
Construction will occur between mid 2014 to late 2014.
7
Mountain View Double Track – Phase II
Phase I: Construction will occur between early 2015 to late
2015. Will require Closure of Evelyn Station.
8
Evelyn Station Closure
Evelyn is located where
second light rail track will
be constructed
Discontinuation of service will
begin January 2015
Average Daily Weekday Boardings:
66 (2nd lowest of 59 stations)
EL CAMINO REAL BUS RAPID TRANSIT
Would upgrade the current 522 Rapid Bus to BRT status by making
changes to El Camino Real and The Alameda that make transit
FAST, FREQUENT AND RELIABLE and make WALKING and
BICYCLING along the corridor SAFER.
Making Stops Faster
BRT stations would function like light rail stations, allowing
passengers to purchase fares or tap Clipper Cards at stations and
board through all three doors.
Increasing Transit Travel Speeds
In some parts of the corridor, a general use lane could be converted
into a bus-only lane, allowing the BRT to bypass traffic.
Transit signal priority would allow an approaching BRT bus to hold a
green light.
EL CAMINO REAL BUS RAPID TRANSIT
Making Bicycling and Walking Safer
El Camino Real is designed for cars and can be a scary and
dangerous place to bicycle or walk. Many bicycle and pedestrian
collisions occur each year and some are fatal.
In parts of the corridor with bus-only lanes, bicycle lanes could be
installed (if the city approves).
Crossing distances would be shortened and new intersections,
signals and crosswalks can be added to make El Camino Real
less of a barrier between neighborhoods.
Median BRT stations would act as pedestrian refuges.
EL CAMINO REAL BUS RAPID TRANSIT
How Bus-Only Lanes Work
In some parts of the corridor, the bus-only lane would be in the center
of the street, adjacent to the median. BRT stations would be in the
middle of the street. The eastbound and westbound stations would
be on opposite sides of the intersection .
Bus-Only Lanes
WB BRT Station
EL CAMINO REAL BUS RAPID TRANSIT
How Bulbout Stations Work
In parts of the corridor with bulbout stations, the curb would be
extended out to the travel lane. The BRT would stop in the travel
lane while passengers board—approximately a 20-second
duration.
BRT stops in lane
Bulbout BRT Station
EL CAMINO REAL BUS RAPID TRANSIT
Project Alternatives and Environmental Analysis
Seven project alternatives—ranging from doing nothing to building
14 miles of bus-only lanes—are currently being studied by VTA.
A Draft Environmental Impact Report (DEIR), which analyzes the
impact that the project will have across 17 categories will be
released in late Summer, 2014.
VTA’s Board of Directors will choose a locally preferred alternative
after the public comment period for the DEIR.
EL CAMINO REAL BUS RAPID TRANSIT
Public Outreach and City Coordination
2010 to presentMonthly meetings with city staff
Summer, 2011 City Council, committee presentations
Fall, 2011 Open House community meetings
Spring , 2012 City Council, committee presentations
Fall, 2012 VTA Board of Directors workshop, mtg.
February, 2013 Environmental Scoping meetings
EL CAMINO REAL BUS RAPID TRANSIT
Silicon Valley Express Lanes
City of Mountain View
Open House Council Meeting
April 9, 2014
What are Express Lanes?
• Express Lanes are converted carpool lanes that offer
solo drivers the opportunity to use carpool lanes for
a fee.
17
Why are Express Lanes being
developed?
• To provide congestion relief through more effective
use of existing roadways (e.g., use of existing carpool
lanes)
• To provide commuters with a new mobility option
• To provide a new source of funding for
transportation improvements including public transit
18
Who can use Express Lanes?
• SOLO DRIVERS can use Express Lanes for a fee.
• CARPOOL USERS Eligible vehicles with two or more
people per car (in addition to transit and
motorcycles) travel in Express Lanes FREE of charge.
19
Why drivers use Express Lanes
• Drivers choose to use Express Lanes for a variety
of reasons at different times, but the most
reported reasons are:
• Time Savings
• Ease of Commute
• Convenience
20
FasTrak
21
NO TOLL BOOTHS
FEES
AUTOMATICALLY
DEDUCTED FROM
ACCOUNT
FASTRAK
TRANSPONDER
ATTACHES TO
WINDSHIELD
How Much Do Solo Drivers Pay?
• Range of cost on SR 237 has been
between $0.30 and $4.75, with
an average toll less than $2.00
• Pricing changes as the number of
drivers increases and decreases
to ensure a free flow of traffic
• When more cars are on the
roadway, the price to enter
express lanes is higher. When
there are fewer cars driving, the
cost is lower
22
Digital Signage and Pricing
23
How Do I Pay?
• Step 1: Visit bayareafastrak.org to learn about
FasTrak
• Step 2: Purchase a toll tag through FasTrak or at
retail locations
• Step 3: Register your new toll tag immediately to
a new or existing FasTrak account online
or by phone at (877) 229-8655.
• Step 4: After you have completed the registration
process, mount toll tag in your vehicle and
begin enjoying the benefits of FasTrak.
24
How Are Toll Revenues Used?
• Operations, maintenance and
enforcement
• Revenue to stay within corridor
• Any remaining revenues to be used
for transportation improvements
including transit
25
Where /When Can I Use Express
Lanes?
• SR 237 Express Lanes
• Phase 1 (in operation March 2012)
• Phase 2 (2016 pending funding)
• SR 85 Express Lanes - 2017 pending funding
• US 101 Express Lanes - 2017 pending funding
26
27
SR 237 Express Lanes Data
• Up to 10,000 solo drivers use the SR 237 Express
Lanes each week
• Solo drivers have saved up to 20 minutes
• Drivers in the general purpose lanes are saving up to
seven (7) minutes
28
SR 237 Express Lanes – Phase 2
• Project Description
• 1-lane Express Lane (convert 1-lane HOV lane from
existing Phase 1 terminus to approximately Mathilda
Ave.)
• Project length: 4 miles
• Environmental Clearance
• Summer 2014
• Project Opening
• Targeting 2016, funding dependent
29
30
31
SR 85 Express Lanes
• Project Description
• 1-lane Express Lanes (convert 1-lane HOV lane from
US 101 interchange in San Jose to US 101
interchange in Mountain View)
• 2-lane Express Lanes (add another lane between the
SR87 and I-280 interchanges)
• Project length: 24 miles
• Environmental Clearance
• Circulation December 2013
• Approval Fall 2014
• Project Opening
• Targeting 2017, funding dependent
32
33
US 101 Express Lanes
• Project Description
• 1-lane Express Lanes (convert 1-lane HOV lane from
Cochrane Rd. in Morgan Hill to SR85 interchange in
Mountain View)
• 2-lane Express Lanes (add a new lane between Dunne
Ave. and SR85 interchange in San Jose, between Blossom
Hill Road and Mathilda Dr. in Sunnyvale; and convert 2-
lane HOV lanes from SR85 interchange in Mtn View to
the county line in Palo Alto)
• Project length: 36 miles
• Environmental Clearance - Fall 2014
• Project Opening - Targeting 2017, funding dependent
34
35
NORTH CENTRAL COUNTY BUS IMPROVEMENT
PLAN
PURPOSE
The planned Bus Rapid Transit (BRT) services on El Camino Real and Stevens Creek
may change travel demand on local bus routes that cross these corridors.
Additionally, the cities in this area (Mountain View, Sunnyvale, Santa Clara and
Cupertino) are intensifying land uses in areas that are not easily accessible by BRT so
it may be necessary to make changes to local bus service to meet a changing rider
demand. The Plan will make recommendations that will flow into VTA’s scheduled
service adjustment process.
GOALS
Improve connectivity of local routes with the BRT routes
Explore whether new service types or new routes are needed
Improve overall transit service in the study area while being cost effective
Collect input from the communities in the study area
NORTH CENTRAL COUNTY BUS IMPROVEMENT
PLANSTUDY AREA
NORTH CENTRAL COUNTY BUS IMPROVEMENT
PLAN
SCHEDULE
2014
April Existing Conditions Analysis
May Development of Draft Recommendations
June Review Draft Recommendations with City Staff
July Community and City Council Meetings
August Final Recommendations released
2015
VTA’s Biennial Service Changes
2018
Service Changes relating to opening of BRT routes
Rider Surveys
New Bus Stop Designs
Easy To Work With
TRANSIT
PASSENGER
ENVIRONMENT
PLAN
Prioritizing Improvements
Stop Percentiles
RidershipPercentages
Most of VTA’s bus riders come from a small
percentage of stops. 21% of bus riders come
from the top 1% of bus stops. 50% of bus riders
come from 5% of bus stops.
That tells us we need to prioritize improvements
to high-ridership stops to ensure the maximum
rider benefit per dollar spent.
Prioritizing Improvements
New Bus Stop Designs
Easy To Work With
TRANSIT
PASSENGER
ENVIRONMENT
PLAN
Rider Surveys
In the past, decisions about how to improve bus
stops were made with good intentions, but not
with data regarding which bus stop amenities
riders value most.
VTA surveyed riders in the summer of 2013 and
found that transit information is the most desired
amenity, followed by shelter and seating. This
information will inform which types of
improvements are installed.
Prioritizing Improvements
Easy To Work With
TRANSIT
PASSENGER
ENVIRONMENT
PLAN
Rider Surveys
New Bus Stop Designs
Many of VTA’s boxy, blue shelters are
approaching the end of their 20-year lifetime.
They will need to be replaced in the coming
decade so we’re looking at new, more functional,
more aesthetically pleasing shelter designs.
Prioritizing Improvements
TRANSIT
PASSENGER
ENVIRONMENT
PLAN
Rider Surveys
New Bus Stop Designs
Easy To Work With
In the past, VTA’s thinking about bus stop design
has been somewhat rigid and it hasn’t been easy
for cities, developers and the public to know how
to work with VTA. The Transit Passenger
Environment Plan explains all of VTA’s policies
about bus stops and makes it easy to work with
us.

Weitere ähnliche Inhalte

Was ist angesagt?

Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationCrosstown TO
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014SCVTA
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Adina Levin
 
Mountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationMountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationSCVTA
 
Metra Presentation - A Vision for the Fulton Market Area
Metra Presentation - A Vision for the Fulton Market AreaMetra Presentation - A Vision for the Fulton Market Area
Metra Presentation - A Vision for the Fulton Market AreaWest Central Association
 
Why can't we just?
Why can't we just?Why can't we just?
Why can't we just?JumpingJaq
 
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...Hossam Shafiq I
 

Was ist angesagt? (20)

Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
 
05.ENTRIPS
05.ENTRIPS05.ENTRIPS
05.ENTRIPS
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 
Metra Station - Fulton Market/Kinzie
Metra Station - Fulton Market/KinzieMetra Station - Fulton Market/Kinzie
Metra Station - Fulton Market/Kinzie
 
Mountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationMountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 Presentation
 
AICPA GPAC presentation
AICPA GPAC presentationAICPA GPAC presentation
AICPA GPAC presentation
 
Metra Presentation - A Vision for the Fulton Market Area
Metra Presentation - A Vision for the Fulton Market AreaMetra Presentation - A Vision for the Fulton Market Area
Metra Presentation - A Vision for the Fulton Market Area
 
Urban streets
Urban streetsUrban streets
Urban streets
 
First-Last Mile Presentation
First-Last Mile PresentationFirst-Last Mile Presentation
First-Last Mile Presentation
 
Why can't we just?
Why can't we just?Why can't we just?
Why can't we just?
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
February-March Consultation Report
February-March Consultation ReportFebruary-March Consultation Report
February-March Consultation Report
 
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
 

Andere mochten auch

Unit 1a - Organisation of Departments
Unit 1a - Organisation of DepartmentsUnit 1a - Organisation of Departments
Unit 1a - Organisation of DepartmentsRobbieA
 
Company - Hierarchy
Company - HierarchyCompany - Hierarchy
Company - Hierarchybeatriz0889
 
Basic Business Skills
Basic Business SkillsBasic Business Skills
Basic Business SkillsHugo Soto
 
Ptcl managment overview
Ptcl managment overviewPtcl managment overview
Ptcl managment overviewIsma Nizam
 
Company Hierarchy
Company HierarchyCompany Hierarchy
Company Hierarchyjsoftspl
 
Organizational structure ppt
Organizational structure pptOrganizational structure ppt
Organizational structure pptvibhugorintla
 
10 Ways Your Boss Kills Employee Motivation
10 Ways Your Boss Kills Employee Motivation10 Ways Your Boss Kills Employee Motivation
10 Ways Your Boss Kills Employee MotivationOfficevibe
 

Andere mochten auch (10)

BASIC BUSINESS FUNCTIONS & FIRM HIERARCHY
BASIC BUSINESS FUNCTIONS & FIRM HIERARCHY BASIC BUSINESS FUNCTIONS & FIRM HIERARCHY
BASIC BUSINESS FUNCTIONS & FIRM HIERARCHY
 
Unit 1a - Organisation of Departments
Unit 1a - Organisation of DepartmentsUnit 1a - Organisation of Departments
Unit 1a - Organisation of Departments
 
Company - Hierarchy
Company - HierarchyCompany - Hierarchy
Company - Hierarchy
 
Basic Business Skills
Basic Business SkillsBasic Business Skills
Basic Business Skills
 
Railways State Report - January 2017
Railways State Report - January 2017Railways State Report - January 2017
Railways State Report - January 2017
 
Ptcl managment overview
Ptcl managment overviewPtcl managment overview
Ptcl managment overview
 
Company Hierarchy
Company HierarchyCompany Hierarchy
Company Hierarchy
 
Organizational structure ppt
Organizational structure pptOrganizational structure ppt
Organizational structure ppt
 
Models for hierarchical data
Models for hierarchical dataModels for hierarchical data
Models for hierarchical data
 
10 Ways Your Boss Kills Employee Motivation
10 Ways Your Boss Kills Employee Motivation10 Ways Your Boss Kills Employee Motivation
10 Ways Your Boss Kills Employee Motivation
 

Ähnlich wie Mountain View Double Track Project Open House

April 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boardsApril 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boardsSCVTA
 
January Service Change Public Comment Meeting
January Service Change Public Comment MeetingJanuary Service Change Public Comment Meeting
January Service Change Public Comment MeetingCOTA BUS
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation Sandra Idio
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber finalRobertsBankRailCorridor
 
THE GREEN TRANSPORT final
THE GREEN TRANSPORT finalTHE GREEN TRANSPORT final
THE GREEN TRANSPORT finalDeepanshu Garg
 
Louisa Sorrentino
Louisa SorrentinoLouisa Sorrentino
Louisa SorrentinoJumpingJaq
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Toronto Public Consultation Unit
 
Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21jgabateman
 
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsFairfax County
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015Norma Nun
 
Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019Steven Simms
 
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott HamweyMAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott HamweyMetropolitan Area Planning Council
 
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...South Fraser Blog
 
Surrey Bus Rapid Transit Proposal
Surrey Bus Rapid Transit ProposalSurrey Bus Rapid Transit Proposal
Surrey Bus Rapid Transit Proposalparadigm4
 

Ähnlich wie Mountain View Double Track Project Open House (20)

April 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boardsApril 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boards
 
January Service Change Public Comment Meeting
January Service Change Public Comment MeetingJanuary Service Change Public Comment Meeting
January Service Change Public Comment Meeting
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber final
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
THE GREEN TRANSPORT final
THE GREEN TRANSPORT finalTHE GREEN TRANSPORT final
THE GREEN TRANSPORT final
 
Louisa Sorrentino
Louisa SorrentinoLouisa Sorrentino
Louisa Sorrentino
 
Miami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentationMiami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentation
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016
 
Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21
 
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
5 route network rs final
5 route network rs final5 route network rs final
5 route network rs final
 
Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019
 
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott HamweyMAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
 
Project Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes StudyProject Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes Study
 
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
 
Surrey Bus Rapid Transit Proposal
Surrey Bus Rapid Transit ProposalSurrey Bus Rapid Transit Proposal
Surrey Bus Rapid Transit Proposal
 

Mehr von SCVTA

VTA Strategic Plan 2016
VTA Strategic Plan 2016VTA Strategic Plan 2016
VTA Strategic Plan 2016SCVTA
 
2016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 20182016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 2018SCVTA
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasSCVTA
 
2016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 20162016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 2016SCVTA
 
VTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineVTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineSCVTA
 
VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual ReportSCVTA
 
VTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentationVTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentationSCVTA
 
VTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanVTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanSCVTA
 
VTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesVTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesSCVTA
 
Envision Outreach Report February 2016
Envision Outreach Report February 2016Envision Outreach Report February 2016
Envision Outreach Report February 2016SCVTA
 
VTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project EvaluationVTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project EvaluationSCVTA
 
VTA Envision Silicon Valley Program Presentation
VTA Envision Silicon Valley Program PresentationVTA Envision Silicon Valley Program Presentation
VTA Envision Silicon Valley Program PresentationSCVTA
 
Funding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara CountyFunding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara CountySCVTA
 
Hack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationHack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationSCVTA
 
VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015SCVTA
 
Current Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation SystemCurrent Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation SystemSCVTA
 
Santa Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSanta Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSCVTA
 
Annual report 2014
Annual report 2014Annual report 2014
Annual report 2014SCVTA
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentationSCVTA
 
VTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksVTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksSCVTA
 

Mehr von SCVTA (20)

VTA Strategic Plan 2016
VTA Strategic Plan 2016VTA Strategic Plan 2016
VTA Strategic Plan 2016
 
2016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 20182016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 2018
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program Areas
 
2016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 20162016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 2016
 
VTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineVTA Draft Strategic Plan Outline
VTA Draft Strategic Plan Outline
 
VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual Report
 
VTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentationVTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentation
 
VTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanVTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement Plan
 
VTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesVTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit Choices
 
Envision Outreach Report February 2016
Envision Outreach Report February 2016Envision Outreach Report February 2016
Envision Outreach Report February 2016
 
VTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project EvaluationVTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project Evaluation
 
VTA Envision Silicon Valley Program Presentation
VTA Envision Silicon Valley Program PresentationVTA Envision Silicon Valley Program Presentation
VTA Envision Silicon Valley Program Presentation
 
Funding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara CountyFunding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara County
 
Hack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationHack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon Presentation
 
VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015
 
Current Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation SystemCurrent Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation System
 
Santa Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSanta Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax Measures
 
Annual report 2014
Annual report 2014Annual report 2014
Annual report 2014
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentation
 
VTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksVTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning Talks
 

Kürzlich hochgeladen

PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 

Kürzlich hochgeladen (20)

PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 

Mountain View Double Track Project Open House

  • 1. Light Rail Efficiency Project Mountain View Double Track Project Mountain View Local Projects Open House
  • 3. 3 Mountain View Double Track Project Phase I: Adds a second main line LRT track (approximately 1,400) feet between Mountain View Transit Center and State Route 85 Caltrain Realignment: Shifts existing Caltrain track to create space for second light rail track Phase II: Extends second main line LRT track over a distance of approximately 3,000 feet from State Route 85 to Whisman LRT Station
  • 4. 4 Why Are We Doing the Project? Double Track will allow VTA to: • Introduce new service from Mountain View to Alum Rock • Increase connectivity with Caltrain and the future Milpitas BART station • Serve growing residential and commercial development • Respond to demand at Levi’s Stadium • Improve system-wide on-time performance, reduce train bunching
  • 5. 5 Mountain View Double Track – Phase I Phase I: Construction will occur between mid 2014 to mid 2015. No major impacts to service will occur during this period.
  • 6. 6 Caltrain Realignment Caltrain Realignment: Existing Caltrain Tracks will need to be realigned between Evelyn Station and Highway 237. Construction will occur between mid 2014 to late 2014.
  • 7. 7 Mountain View Double Track – Phase II Phase I: Construction will occur between early 2015 to late 2015. Will require Closure of Evelyn Station.
  • 8. 8 Evelyn Station Closure Evelyn is located where second light rail track will be constructed Discontinuation of service will begin January 2015 Average Daily Weekday Boardings: 66 (2nd lowest of 59 stations)
  • 9. EL CAMINO REAL BUS RAPID TRANSIT Would upgrade the current 522 Rapid Bus to BRT status by making changes to El Camino Real and The Alameda that make transit FAST, FREQUENT AND RELIABLE and make WALKING and BICYCLING along the corridor SAFER.
  • 10. Making Stops Faster BRT stations would function like light rail stations, allowing passengers to purchase fares or tap Clipper Cards at stations and board through all three doors. Increasing Transit Travel Speeds In some parts of the corridor, a general use lane could be converted into a bus-only lane, allowing the BRT to bypass traffic. Transit signal priority would allow an approaching BRT bus to hold a green light. EL CAMINO REAL BUS RAPID TRANSIT
  • 11. Making Bicycling and Walking Safer El Camino Real is designed for cars and can be a scary and dangerous place to bicycle or walk. Many bicycle and pedestrian collisions occur each year and some are fatal. In parts of the corridor with bus-only lanes, bicycle lanes could be installed (if the city approves). Crossing distances would be shortened and new intersections, signals and crosswalks can be added to make El Camino Real less of a barrier between neighborhoods. Median BRT stations would act as pedestrian refuges. EL CAMINO REAL BUS RAPID TRANSIT
  • 12. How Bus-Only Lanes Work In some parts of the corridor, the bus-only lane would be in the center of the street, adjacent to the median. BRT stations would be in the middle of the street. The eastbound and westbound stations would be on opposite sides of the intersection . Bus-Only Lanes WB BRT Station EL CAMINO REAL BUS RAPID TRANSIT
  • 13. How Bulbout Stations Work In parts of the corridor with bulbout stations, the curb would be extended out to the travel lane. The BRT would stop in the travel lane while passengers board—approximately a 20-second duration. BRT stops in lane Bulbout BRT Station EL CAMINO REAL BUS RAPID TRANSIT
  • 14. Project Alternatives and Environmental Analysis Seven project alternatives—ranging from doing nothing to building 14 miles of bus-only lanes—are currently being studied by VTA. A Draft Environmental Impact Report (DEIR), which analyzes the impact that the project will have across 17 categories will be released in late Summer, 2014. VTA’s Board of Directors will choose a locally preferred alternative after the public comment period for the DEIR. EL CAMINO REAL BUS RAPID TRANSIT
  • 15. Public Outreach and City Coordination 2010 to presentMonthly meetings with city staff Summer, 2011 City Council, committee presentations Fall, 2011 Open House community meetings Spring , 2012 City Council, committee presentations Fall, 2012 VTA Board of Directors workshop, mtg. February, 2013 Environmental Scoping meetings EL CAMINO REAL BUS RAPID TRANSIT
  • 16. Silicon Valley Express Lanes City of Mountain View Open House Council Meeting April 9, 2014
  • 17. What are Express Lanes? • Express Lanes are converted carpool lanes that offer solo drivers the opportunity to use carpool lanes for a fee. 17
  • 18. Why are Express Lanes being developed? • To provide congestion relief through more effective use of existing roadways (e.g., use of existing carpool lanes) • To provide commuters with a new mobility option • To provide a new source of funding for transportation improvements including public transit 18
  • 19. Who can use Express Lanes? • SOLO DRIVERS can use Express Lanes for a fee. • CARPOOL USERS Eligible vehicles with two or more people per car (in addition to transit and motorcycles) travel in Express Lanes FREE of charge. 19
  • 20. Why drivers use Express Lanes • Drivers choose to use Express Lanes for a variety of reasons at different times, but the most reported reasons are: • Time Savings • Ease of Commute • Convenience 20
  • 21. FasTrak 21 NO TOLL BOOTHS FEES AUTOMATICALLY DEDUCTED FROM ACCOUNT FASTRAK TRANSPONDER ATTACHES TO WINDSHIELD
  • 22. How Much Do Solo Drivers Pay? • Range of cost on SR 237 has been between $0.30 and $4.75, with an average toll less than $2.00 • Pricing changes as the number of drivers increases and decreases to ensure a free flow of traffic • When more cars are on the roadway, the price to enter express lanes is higher. When there are fewer cars driving, the cost is lower 22
  • 23. Digital Signage and Pricing 23
  • 24. How Do I Pay? • Step 1: Visit bayareafastrak.org to learn about FasTrak • Step 2: Purchase a toll tag through FasTrak or at retail locations • Step 3: Register your new toll tag immediately to a new or existing FasTrak account online or by phone at (877) 229-8655. • Step 4: After you have completed the registration process, mount toll tag in your vehicle and begin enjoying the benefits of FasTrak. 24
  • 25. How Are Toll Revenues Used? • Operations, maintenance and enforcement • Revenue to stay within corridor • Any remaining revenues to be used for transportation improvements including transit 25
  • 26. Where /When Can I Use Express Lanes? • SR 237 Express Lanes • Phase 1 (in operation March 2012) • Phase 2 (2016 pending funding) • SR 85 Express Lanes - 2017 pending funding • US 101 Express Lanes - 2017 pending funding 26
  • 27. 27
  • 28. SR 237 Express Lanes Data • Up to 10,000 solo drivers use the SR 237 Express Lanes each week • Solo drivers have saved up to 20 minutes • Drivers in the general purpose lanes are saving up to seven (7) minutes 28
  • 29. SR 237 Express Lanes – Phase 2 • Project Description • 1-lane Express Lane (convert 1-lane HOV lane from existing Phase 1 terminus to approximately Mathilda Ave.) • Project length: 4 miles • Environmental Clearance • Summer 2014 • Project Opening • Targeting 2016, funding dependent 29
  • 30. 30
  • 31. 31
  • 32. SR 85 Express Lanes • Project Description • 1-lane Express Lanes (convert 1-lane HOV lane from US 101 interchange in San Jose to US 101 interchange in Mountain View) • 2-lane Express Lanes (add another lane between the SR87 and I-280 interchanges) • Project length: 24 miles • Environmental Clearance • Circulation December 2013 • Approval Fall 2014 • Project Opening • Targeting 2017, funding dependent 32
  • 33. 33
  • 34. US 101 Express Lanes • Project Description • 1-lane Express Lanes (convert 1-lane HOV lane from Cochrane Rd. in Morgan Hill to SR85 interchange in Mountain View) • 2-lane Express Lanes (add a new lane between Dunne Ave. and SR85 interchange in San Jose, between Blossom Hill Road and Mathilda Dr. in Sunnyvale; and convert 2- lane HOV lanes from SR85 interchange in Mtn View to the county line in Palo Alto) • Project length: 36 miles • Environmental Clearance - Fall 2014 • Project Opening - Targeting 2017, funding dependent 34
  • 35. 35
  • 36. NORTH CENTRAL COUNTY BUS IMPROVEMENT PLAN PURPOSE The planned Bus Rapid Transit (BRT) services on El Camino Real and Stevens Creek may change travel demand on local bus routes that cross these corridors. Additionally, the cities in this area (Mountain View, Sunnyvale, Santa Clara and Cupertino) are intensifying land uses in areas that are not easily accessible by BRT so it may be necessary to make changes to local bus service to meet a changing rider demand. The Plan will make recommendations that will flow into VTA’s scheduled service adjustment process. GOALS Improve connectivity of local routes with the BRT routes Explore whether new service types or new routes are needed Improve overall transit service in the study area while being cost effective Collect input from the communities in the study area
  • 37. NORTH CENTRAL COUNTY BUS IMPROVEMENT PLANSTUDY AREA
  • 38. NORTH CENTRAL COUNTY BUS IMPROVEMENT PLAN SCHEDULE 2014 April Existing Conditions Analysis May Development of Draft Recommendations June Review Draft Recommendations with City Staff July Community and City Council Meetings August Final Recommendations released 2015 VTA’s Biennial Service Changes 2018 Service Changes relating to opening of BRT routes
  • 39. Rider Surveys New Bus Stop Designs Easy To Work With TRANSIT PASSENGER ENVIRONMENT PLAN Prioritizing Improvements Stop Percentiles RidershipPercentages Most of VTA’s bus riders come from a small percentage of stops. 21% of bus riders come from the top 1% of bus stops. 50% of bus riders come from 5% of bus stops. That tells us we need to prioritize improvements to high-ridership stops to ensure the maximum rider benefit per dollar spent.
  • 40. Prioritizing Improvements New Bus Stop Designs Easy To Work With TRANSIT PASSENGER ENVIRONMENT PLAN Rider Surveys In the past, decisions about how to improve bus stops were made with good intentions, but not with data regarding which bus stop amenities riders value most. VTA surveyed riders in the summer of 2013 and found that transit information is the most desired amenity, followed by shelter and seating. This information will inform which types of improvements are installed.
  • 41. Prioritizing Improvements Easy To Work With TRANSIT PASSENGER ENVIRONMENT PLAN Rider Surveys New Bus Stop Designs Many of VTA’s boxy, blue shelters are approaching the end of their 20-year lifetime. They will need to be replaced in the coming decade so we’re looking at new, more functional, more aesthetically pleasing shelter designs.
  • 42. Prioritizing Improvements TRANSIT PASSENGER ENVIRONMENT PLAN Rider Surveys New Bus Stop Designs Easy To Work With In the past, VTA’s thinking about bus stop design has been somewhat rigid and it hasn’t been easy for cities, developers and the public to know how to work with VTA. The Transit Passenger Environment Plan explains all of VTA’s policies about bus stops and makes it easy to work with us.