A SEMINAR PRESENTATION ON
SURATGARH SUPER THERMAL POWER
PLANT
By: RAHUL DABI
MECHANICAL
FINIAL YEAR
2015-2016
SURATGARH THERMAL POWER PLANT
.
INTRODUCTION
1. Suratgarh thermal power station is the first super
thermal power Station of Rajasthan with total
installed capacity of 1500 MW and 93% PLF.
2. Suratgarh super thermal power station is located
27 km away from Suratgarh town in shri
Ganganagar Dist.
3.This station is operated and maintained by ‘Rajasthan
vidyut Utpadan Nigam Limited’.
S.S.T.P.S. is designed in six stages
•STAGE I - 1x250 MW
•STAGE II - 1X250 MW
•STAGE III - 1X250 MW
•STAGE IV - 1X250 MW
•STAGE V 1X250 MW
•STAGE VI - 1X250 MW
•STAGE VII- 1X660MW(Under construction)
•STAGE VIII- 1X660MW(Under construction)
Total Power Generation - 1500 MW
YEAR ACHIVEMENTS
1999-2000 : Meritorious production &
3.74 lacs money
2000-2005 : Gold shield awarded by Ex
President of India Late
Mr. A.P.J. Abdul Kalam.
2005-2006 : Bronze shield awarded by
Ex P.M. of India
Dr. Manmohan Singh.
BLOCK DIAGRAM OF POWER PLANT
Raw coal from bharat
coal ltd. Dhanbad &
bilaspur(MP)
To SSTPS from gudla
via a single railway
track
Wagon
tippler
hoppersCrusher housebunkers
Raw coal
feeders
Coal mills
(pulverization)
Boiler furnace ( tangential firing
of pulverized coal)
STEAM BOILER
The boiler installed in S.T.P.S. are single drum, water tube
naturally circulated over hanged, pulverizing coal firing
with a max.
Continuous steam output of 37 tons/hour at 138 kg/cm2
pressure and 5400C temperature.
Heat transfer section in boiler :
Furnace : Furnace is the primary element part of the boiler
where the thermal energy is obtained by combustion.
BOILER:
Flue gases
Boiler water tubes
& various stages
Boiler
furnace
Pulverized
coal
Air from
environment
via draft fans
Ash
handling
plant
DM water
Super
heated
steam
stack
BOILER AUXILLARIES
SUPER HEATER: Superheats are meant to raise the
tem. of steam by absorbing heat from flue gases steam.
Reheater: Reheater are used to raise the temp. of steam
from which point the energy had been extracted in H.P.
turbine .
Reheating is continuing till temp. of steam is reaches to
5400C.
Superheaters and reheaters tubes are made of 50 to 75
mm outside diameter.
Economizer :
The function of an economizer in a steam-generating
unit is to absorb heat from the flue gases and add this as
sensible heat to fed water. It acts like feed water heater.
The size of economiser tubes are 45 to70mm in outside
diameter .
Air Preheater: Air preheater is a heat exchanger in which
preheating of air done by transferring heat from the flue
gas before supplying to the combustion chamber. For
better combustion the air temp. 250 to 350 is always
desired.
The preheating of air results:
1.Improved combustion
2.Saving in fuel consumption
3.Thermal efficiency.
Flow of steam
Boiler
tubes
Boiler
drum
Super
heaters &
reheater
economiser
condenser
FWP
turbine
DM water plant
STEAM TURBINE
Turbine is a prime mover in which a shaft is rotate by impact or reaction
of stream upon blades of a wheel.
It converts the potential or kinetic energy of the steam into mechanical
power.
When the working substance is steam it is called the steam turbine.
IMPULSE TURBINE: The passage of steam through moving part of turbine in such a
manner that the pressure at the outlet side of the blade is equal to that at the inlet inside.
Such a turbine is broadly termed as impulse turbine.
IMPULSE REACTION TURBINE: Pressure of the steam
at outlet from the moving blade may be less than that at the inlet side of the blades; the
drop in pressure suffered by the steam during its flow through the moving causes a
further generation of kinetic energy within the blades and adds to the propelling force
which is applied to the turbine rotor. Such a turbine is broadly termed as ‘impulse
reaction turbine’.
STEAM TURBINE
MOVING BLADES
FIXED BLADES
ROTOR LAYOUT
HIGH PRESSURE TURBINE: The HP turbine consists of 25
reaction stages. The moving and stationary blades are
inserted into appropriately shapes into inner casing and the
shaft.
INTERMEDIATE PRESSURE TURBINE: The steam from HP
turbine after reheating enters the inner casing from above
and below through two inlet nozzles.
The IP turbine consists of 20 reaction stages per flow. The
moving and stationary blades are inserted in appropriately
shaped grooves in shaft and inner casing.
LOW PRESSURE TURBINE: Steam admitted to LP turbine
from IP turbine flows into the inner casing from both sides
through steam inlet nozzles.
 TWO POLE TYPE; WITH CYLINDRICAL
ROTOR
 BASIC PRINCIPLE :FARADAY’s LOW OF
MAGNETIC INDUCTION
 COOLING:
 STATOR WINDING-DIRECT WATER COOLING
 ROTOR WINDING – HYDROGEN COOLING
GENERATOR:
MECHANICAL
ENERGY
ELECTRICAL
ENERGY
THERMAL POWER GENERATION

Weitere ähnliche Inhalte

Was ist angesagt?

Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Navin Pathak
 

Was ist angesagt? (20)

A Report on Steam Turbine
A Report on Steam TurbineA Report on Steam Turbine
A Report on Steam Turbine
 
193411716 study-on-steam-turbines
193411716 study-on-steam-turbines193411716 study-on-steam-turbines
193411716 study-on-steam-turbines
 
Steam Turbine modelling
Steam Turbine modellingSteam Turbine modelling
Steam Turbine modelling
 
BHEL training ppt
BHEL training pptBHEL training ppt
BHEL training ppt
 
Steam turbine ntpc seepat bilaspur chhattisgarh
Steam turbine ntpc seepat bilaspur chhattisgarhSteam turbine ntpc seepat bilaspur chhattisgarh
Steam turbine ntpc seepat bilaspur chhattisgarh
 
Unit v
Unit vUnit v
Unit v
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam Turbine
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
general awareness in steam turbine manufacturing
general awareness in steam turbine manufacturinggeneral awareness in steam turbine manufacturing
general awareness in steam turbine manufacturing
 
Steam turbine and its types
Steam turbine and its typesSteam turbine and its types
Steam turbine and its types
 
Steam turbine Working
Steam turbine WorkingSteam turbine Working
Steam turbine Working
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plant
 
Turbine.
Turbine.Turbine.
Turbine.
 
STEAM AND GAS TURBINES ppt
STEAM AND GAS TURBINES pptSTEAM AND GAS TURBINES ppt
STEAM AND GAS TURBINES ppt
 
STEAM TURBINE BASIC
STEAM TURBINE BASIC STEAM TURBINE BASIC
STEAM TURBINE BASIC
 
Bhel steam turbine manufacturing
Bhel steam turbine manufacturingBhel steam turbine manufacturing
Bhel steam turbine manufacturing
 
Gaurav ppt
Gaurav pptGaurav ppt
Gaurav ppt
 
St module1 1 jan2008
St module1  1 jan2008St module1  1 jan2008
St module1 1 jan2008
 

Ähnlich wie THERMAL POWER GENERATION

Suratgarh thermal power station
Suratgarh  thermal  power  stationSuratgarh  thermal  power  station
Suratgarh thermal power station
Gaurav Gunjan
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
NaveenJarwal1
 

Ähnlich wie THERMAL POWER GENERATION (20)

thermal power plant suratgarh ppt
thermal power plant suratgarh ppt thermal power plant suratgarh ppt
thermal power plant suratgarh ppt
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power Plant
 
THERMAL
THERMALTHERMAL
THERMAL
 
suratgarh super thermal power station
suratgarh super thermal power stationsuratgarh super thermal power station
suratgarh super thermal power station
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Suratgarh thermal power station
Suratgarh  thermal  power  stationSuratgarh  thermal  power  station
Suratgarh thermal power station
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
ntpc thermal power plant.ppt
ntpc thermal power plant.pptntpc thermal power plant.ppt
ntpc thermal power plant.ppt
 
KTPS
KTPSKTPS
KTPS
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Three major inputs of ptps
Three major inputs of ptpsThree major inputs of ptps
Three major inputs of ptps
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Kürzlich hochgeladen

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 

Kürzlich hochgeladen (20)

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 

THERMAL POWER GENERATION

  • 1. A SEMINAR PRESENTATION ON SURATGARH SUPER THERMAL POWER PLANT By: RAHUL DABI MECHANICAL FINIAL YEAR 2015-2016
  • 3. INTRODUCTION 1. Suratgarh thermal power station is the first super thermal power Station of Rajasthan with total installed capacity of 1500 MW and 93% PLF. 2. Suratgarh super thermal power station is located 27 km away from Suratgarh town in shri Ganganagar Dist. 3.This station is operated and maintained by ‘Rajasthan vidyut Utpadan Nigam Limited’.
  • 4. S.S.T.P.S. is designed in six stages •STAGE I - 1x250 MW •STAGE II - 1X250 MW •STAGE III - 1X250 MW •STAGE IV - 1X250 MW •STAGE V 1X250 MW •STAGE VI - 1X250 MW •STAGE VII- 1X660MW(Under construction) •STAGE VIII- 1X660MW(Under construction) Total Power Generation - 1500 MW
  • 5. YEAR ACHIVEMENTS 1999-2000 : Meritorious production & 3.74 lacs money 2000-2005 : Gold shield awarded by Ex President of India Late Mr. A.P.J. Abdul Kalam. 2005-2006 : Bronze shield awarded by Ex P.M. of India Dr. Manmohan Singh.
  • 6. BLOCK DIAGRAM OF POWER PLANT
  • 7. Raw coal from bharat coal ltd. Dhanbad & bilaspur(MP) To SSTPS from gudla via a single railway track Wagon tippler hoppersCrusher housebunkers Raw coal feeders Coal mills (pulverization) Boiler furnace ( tangential firing of pulverized coal)
  • 8. STEAM BOILER The boiler installed in S.T.P.S. are single drum, water tube naturally circulated over hanged, pulverizing coal firing with a max. Continuous steam output of 37 tons/hour at 138 kg/cm2 pressure and 5400C temperature. Heat transfer section in boiler : Furnace : Furnace is the primary element part of the boiler where the thermal energy is obtained by combustion.
  • 9. BOILER: Flue gases Boiler water tubes & various stages Boiler furnace Pulverized coal Air from environment via draft fans Ash handling plant DM water Super heated steam stack
  • 10. BOILER AUXILLARIES SUPER HEATER: Superheats are meant to raise the tem. of steam by absorbing heat from flue gases steam. Reheater: Reheater are used to raise the temp. of steam from which point the energy had been extracted in H.P. turbine . Reheating is continuing till temp. of steam is reaches to 5400C. Superheaters and reheaters tubes are made of 50 to 75 mm outside diameter.
  • 11. Economizer : The function of an economizer in a steam-generating unit is to absorb heat from the flue gases and add this as sensible heat to fed water. It acts like feed water heater. The size of economiser tubes are 45 to70mm in outside diameter . Air Preheater: Air preheater is a heat exchanger in which preheating of air done by transferring heat from the flue gas before supplying to the combustion chamber. For better combustion the air temp. 250 to 350 is always desired. The preheating of air results: 1.Improved combustion 2.Saving in fuel consumption 3.Thermal efficiency.
  • 12. Flow of steam Boiler tubes Boiler drum Super heaters & reheater economiser condenser FWP turbine DM water plant
  • 13. STEAM TURBINE Turbine is a prime mover in which a shaft is rotate by impact or reaction of stream upon blades of a wheel. It converts the potential or kinetic energy of the steam into mechanical power. When the working substance is steam it is called the steam turbine. IMPULSE TURBINE: The passage of steam through moving part of turbine in such a manner that the pressure at the outlet side of the blade is equal to that at the inlet inside. Such a turbine is broadly termed as impulse turbine. IMPULSE REACTION TURBINE: Pressure of the steam at outlet from the moving blade may be less than that at the inlet side of the blades; the drop in pressure suffered by the steam during its flow through the moving causes a further generation of kinetic energy within the blades and adds to the propelling force which is applied to the turbine rotor. Such a turbine is broadly termed as ‘impulse reaction turbine’.
  • 18. HIGH PRESSURE TURBINE: The HP turbine consists of 25 reaction stages. The moving and stationary blades are inserted into appropriately shapes into inner casing and the shaft. INTERMEDIATE PRESSURE TURBINE: The steam from HP turbine after reheating enters the inner casing from above and below through two inlet nozzles. The IP turbine consists of 20 reaction stages per flow. The moving and stationary blades are inserted in appropriately shaped grooves in shaft and inner casing. LOW PRESSURE TURBINE: Steam admitted to LP turbine from IP turbine flows into the inner casing from both sides through steam inlet nozzles.
  • 19.  TWO POLE TYPE; WITH CYLINDRICAL ROTOR  BASIC PRINCIPLE :FARADAY’s LOW OF MAGNETIC INDUCTION  COOLING:  STATOR WINDING-DIRECT WATER COOLING  ROTOR WINDING – HYDROGEN COOLING GENERATOR: MECHANICAL ENERGY ELECTRICAL ENERGY