SlideShare ist ein Scribd-Unternehmen logo
1 von 41
Downloaden Sie, um offline zu lesen
Major Rail Projects in Finland
Kari Ruohonen
Director General Projects
www.fta.fi• Projects
Finnish Transport Agency organization from 1 July 2013
2
Director General
Operations
Management
Projects Infrastructure
Management
Traffic and
Information
Project
Management
Project
Implementation
Maintenance
Infrastructure
and the
Environment
Traffic
Management
Centres
Information
Traffic Services
• Communications
• Strategy
Planning
Finance and
Performance
Management
Legal Services
and
Procurement
HR and
Administration
• Internal Audit
• Regional Steering
29.4.2014 KR
www.fta.fi• Projects3KR
The FTA is responsible for transport infrastructure assets
worth billions
• The Finnish Transport Agency annually purchases infrastructure management,
planning, surveying and other services for about 1.7 billion euros, which represents
about one-third of Finland’s infrastructure field.
• The Finnish Transport Agency is responsible for transport infrastructure assets
amounting to almost 19.2 billion euros.t Agency is responsible for transport
infrastructure assets amounting to nearly 19.2 billion euros
• The annual budget (gross) is about 1.8 billion euros, of which:
• 1,020 million euros for basic transport infrastructure management
• 610 million euros for development
• 81 million euros for shipping
• 100 million euros for the procurement and development of public transport,
as well as for archipelago traffic24 million euros in subsidies for the
building of the West Metro
• The Finnish Transport Agency's own budget is approx. 87 million euros and 650 civil
servants
29.4.2014
www.fta.fi• ProjectsKR 4
The length of the
Finnish railway
network is
kilometres
5,900
level crossings and
tunnels on the main
lines
3,359
43
Every year
million journeys are
made by train
70
Every year around
million tonnes of
freight are carried by
rail
40
Railway statistics
29.4.2014
www.fta.fi• Projects
Mission
The Finnish Transport Agency enables
smooth, efficient and safe travel and transport
Vision 2025
Smart routes and intelligent traffic - for you.
Strategy of the Finnish Transport
Agency
529.4.2014 KR
www.fta.fi• Projects
Sratecig Goals
1. Well-functioning transport routes
enhance competitiveness
2. Smooth and safe travel
3. We act in a responsible, effective and
innovative way
4. The Finnish Transport Agency - an
excellent workplace for professionals
29.4.2014 KR 6
www.fta.fi• Projects
EU:n TEN-T
Core Network
29.4.2014 7
www.fta.fi• Projects
Core Network Corridors in Finland
29.4.2014 8
www.fta.fi• Projects
Helsinki Metropol
29.4.2014 9
www.fta.fi• Projects
Ring Rail Line in brief
10
● length of railway line is 18 kilometres, 8
kilometres of which in tunnel
• 5 new stations (Vehkala, Kivistö, Aviapolis,
Airport and Leinelä)
• 3 station reservations (Petas, Viinikkala and
Ruskeasanta)
• 45 bridges will be built
• park-and-ride facilities in the initial phase: 1000
cars and 840 bicycles
• Construction schedule is 2009-2015
• Estimated total costs are 738,5 million euros
• Finnish Transport Agency 474 M€
• City of Vantaa 234,5 M€
• Finavia 30 M€
• (TENT-T funding from the EU 44,8 M€)
29.4.2014
www.fta.fi• Projects
The Ring Rail Line connects the traffic in the
metropolitan area
● The Ring Rail Line
 provides an option to take the train to new areas and
connections. Daytime trains will run at 10-minute
intervals in both directions
 reduces motor vehicle traffic along with environmental
impact
• The starting point of the station arrangements is easy
mobility, smooth feeder traffic and short changing times.
 park-and-ride facilities in the immediate vicinity of the
stations
 bus terminals at the stations in Vantaankoski and Kivistö
● The Ring Rail Line provides a direct railway connection to
the airport
 urban railway line to the international airport, the travel
time to the airport is 30 minutes from the centre of
Helsinki
1129.4.2014
www.fta.fi• Projects
The Ring Rail Line creates something new
● The Ring Rail Line is an urban railway line
creating opportunities for new residential and
job areas.
 The Ring Rail creates opportunities for new
residential areas in its area of influence. In the
initial phase 5 new stations will be built along
the railway.
 It also creates thousands of new job
opportunities. At present about 850 persons are
working on the Ring Rail Line project.
 The first underground railway stations in Finland
are built on the Ring Rail Line and its 8-
kilometre twin tunnel for passenger traffic is
unique.
1229.4.2014
www.fta.fi• Projects
Aviapolis
1329.4.2014
www.fta.fi• Projects14
29.4.2014
MICROBE POPULATION IN RING RAIL LINE
AIRPORT TUNNEL
● A microbe population was found during
tunnelling under the eastern runway at
Helsinki-Vantaa Airport in summer
2010.
● The population consists of normal soil
bacteria whose growth has been
stimulated by glycol and other
substances that have seeped into the
ground from the runway. Glycol is used
to de-ice aircraft.
● Work was stopped from 30 September
to 12 October 2010.
www.fta.fi• Projects
● - In February 2011 VTT Technical Research Centre of Finland completed a study
concerning the effects of glycol seepage on concrete and steel structures. The study
showed that seepage will reduce the service life of tunnel structures.
● - When glycol breaks down, it forms acidic by-products and carbon dioxide, which
have a corrosive effect on the tunnel and its walls as well as structures extending into
the bedrock.
● - When bacteria nourished by glycol seep into the tunnel and come in contact with
oxygen, it speeds up the growth of bacteria. The resulting glycol breakdown products
form a harmful chemical environment for steel and concrete materials.
● - Research indicates that in the case of the Ring Rail Line tunnel the chemical
environment would cause steel and concrete materials to deteriorate. Deterioration
would be rapid, and an acceptable service life (50-100 years) could not be achieved
with ordinary solutions.
● - The Finnish Transport Agency received seven solutions, presented on 10 May 2011,
to prevent deterioration.
● The solution is double structure; first larger rock tunnel and inside concrete tunnel.
Between them is airproof and underinflated space where the water is collected
● Extra costs are about 50 M€:s, State and Fianavia Ltd
15
29.4.2014
www.fta.fi• Projects
Lentoasema glycol solution
1629.4.2014
Metro west extensions 1 & 2
Under construction Ruoholahti – Matinkylä
Ready to start construction Matinkylä - Kivenlahti
www.fta.fi• Projects
Metro line – now and in future
1829.4.2014
www.fta.fi• Projects19
Metro Routing and Profile
Line length 14 km (2 tunnels), 8 new stations, cost estimate 985 milj. €
29.4.2014
www.fta.fi• Projects
Tunnel profile
29.4.2014 20
www.fta.fi• Projects
Otaniemi
29.4.2014 21
Otaniemi
www.fta.fi• Projects
New Centrum
29.4.2014 22
www.fta.fi• Projects
TRIPLA of YIT was the Winner of the Pasila One
competition
29.4.2014 23
www.fta.fi• Projects
Pasila western additional track
Objectives
● To increase capacity in the
Helsinki-Riihimäki direction
● To increase the capacity of
Pasila railway yard
● Less vulnerability to traffic
disturbances in local and long-
distance traffic
● Better punctuality
29.4.2014 KR 24
Planning area situated directly north of the Helsinki railway yard, at the Pasila
railway yard, where there are now 9 platform lines and 2 yard tracks.
● An additional track will be built on the western edge of the Pasila railway yard.
The length of the track is 1.5 km and the section includes several bridges.
● The new track runs through the present station building.
● The turnouts and the functionality of the railway yard will be altered so that the
number of tracks in the Helsinki-Turku direction will remain the same (4). The
tracks in the Helsinki-Riihimäki direction will increase by one, amounting to a
total of 6 tracks and 2 yard tracks.
+ 1 platform line
+ 1 main line
Riihimäki
Kerava
www.fta.fi• Projects
Improving the efficiency of the Helsinki railway yard, HELRA
● Preliminary report on the transport and track schematic model presented:
● The best out of four alternative schematic models chosen for further development,
on the basis of traffic and disturbance simulations
● HELRA measures
● Efficiency of the tracks at the Helsinki railway yard will be improved by adding more
turnouts and groups of scissor crossings
● Signalling stages are added to the urban railway line between Helsinki and Pasila
● By reducing the speed limit 80 km/h60 km/h more capacity would be added to Pasila
● Cost 56 M€
● Replacement of the signal box later (after 10-15 years), 86 M€ (Year 2018)
29.4.2014 KR 25
Objectives
• To increase rail capacity
• Reduce vulnerability to
traffic disturbances
www.fta.fi• Projects
Improving the efficiency of the Helsinki railway yard, HELRA
● Planning continues
● Improvement planning in 2014
● Impact of simulated speeds of 60-70-80 km/h on safety and functionality studied
through risk management
● Detailed planning of track geometry
● Detailed planning of safety devices for later procurement
● Construction planning in 2015-2016
● Implementation in stages in 2016-2019
● Project completed approximately in 2020, as HELRA measures and Pasila
additional track have been implemented
29.4.2014 KR 26
www.fta.fi• Projects
Railway from Helsinki to North
Added capacity between Helsinki and Riihimäki
29.4.2014 KR 27
www.fta.fi• Projects
Added capacity between Helsinki and Riihimäki
● Project schedule and costs
● Railway plan for the first phase to be completed in April 2014;
construction planning and construction will commence in 2015
● Cost estimate 150 million €
● General plan for the second phase will commence in June 2014
● Cost estimate 200 million €
● Project impact
● Number of commuter trains can be increased between Helsinki and
Riihimäki
● Reduced risk of traffic disturbances and improved punctuality
● Smoother operation of long-distance trains
● Separation of slow freight traffic from fast passenger traffic increases
track capacity and enables less strict freight traffic scheduling
● On the section north of Pasila the project increases the capacity required
in order to draw benefits from the City Rail Loop project.
29.4.2014 KR 28
www.fta.fi• Projects
Added capacity between Helsinki and Riihimäki
● The project has been divided into two phases
● First implementation phase:
● Turnout and track alterations at Tikkurila
● Additional track for freight traffic at Kerava to the Vuosaari and Sköldvik
track.
● Additional track between Kyrölä and Purola
● Turnout arrangements at Hyvinkää
● Track, turnout and platform alterations at the Riihimäki passenger yard
Second implementation phase:
● Additional tracks from Kytömaa to Kyrölä and from Purola to Jokela
● Connecting of Kerava freight traffic to the Lahti direct line
● After the second implementation phase there will be four tracks to Jokela
● Track for freight traffic from Hyvinkää to Riihimäki
29.4.2014 KR 29
www.fta.fi• Projects
Espoo urban railway line westward from Helsinki
Objectives
● Increased capacity
● Less vulnerability to traffic disturbances
in local and long-distance traffic
● Better punctuality
● Better public transport connections
● Lower motorization level and less congestion
The planning area Leppävaara – Kauklahti
is located at the Helsinki–Turku main line in the cities of Espoo and Kauniainen
● Railway section about 15 km
● Current double track altered into 2+2 tracks
 slower urban traffic and faster long-distance traffic on separate tracks
● 7 traffic operating points (Kilo, Kera, Kauniainen, Koivuhovi, Tuomarila, Espoo,
Kauklahti)
● 26 bridges
● A high-quality underpass for bicycle traffic is also planned in connection with
the railway plan29.4.2014 30KR
www.fta.fi• Projects
Espoo urban railway line
● Cost estimate 300 M€
(Year 2018)
● Railway plan circulated for comment in autumn 2014
● The town plan for the power supply station delays completion
● Approval of the railway plan in 2015
29.4.2014 31KR
www.fta.fi• Projects
The City Rail Loop Helsinki
The City Rail Loop would
● enable an increased volume of
passenger rail traffic
● enhance public transport
● improve passenger convenience
● reduce train delays
Töölö
Station
Hakaniemi
Station
City Centre Station
www.fta.fi• Projects
Project status
- General plan approved 2012
- Railway plan completed end of 2014
- Detailed planning 2015-2016 (-2017)
- Planning cost estimated 40 M€ (including geological
surveys)
- Decision of the construction works, Finnish parliament
- Project costs 750 M€ (year 2018 price level)
- City Rail Loop
- Under the city center of Helsinki
- 8 km (6 km in tunnels), 2 tracks
- 3 underground stations, 250 m platforms
- Local trains every 5 (3) minutes (both directions)
www.fta.fi• Projects
City Rail Loop in figures
Underground stations Töölö, Keskusta, Hakaniemi
Material to be excavated and transported 1 304 000 cu.m
Length of railway line 8 km
Length of section in tunnel 6 km
Bridges to be built 3
Longest concrete tunnel (Stadium) 200 m
Maximum depth of excavation from surface 63 m
Construction costs (estimate) EUR 740 million (ex VAT)
Design stage duration 4 years
Design cost estimate EUR 40 million
29.4.2014 34
www.fta.fi• Projects
Helsinki centrum, tracks today
29.4.2014 35
www.fta.fi• Projects
City Rail Loop, tracks
29.4.2014 36
www.fta.fi• Projects
Passengers in
stations, year 2035
Pasila
27 000 rush hour
180 000 per day
Töölö
2 100 per rush hour
16 100 per day
Keskusta
5 300 per rush hour
42 700 per day
Hakaniemi
10 700 per rush hour
79 100 per day
29.4.2014 37
www.fta.fi• Projects
City Centre station
● Large numbers of passengers distributed more evenly in the city centre
● Most extensive network of access points and underground walkways
● Access to adjoining commercial premises
www.fta.fi• Projects
City Centre station
www.fta.fi• Projects
Hakaniemi station
● The highest-volume station on the City Rail Loop
● Good interchange facility between metro and rail
● Largest potential number of passengers changing between metro and rail
www.fta.fi• Projects
Thank You
29.4.2014 41

Weitere ähnliche Inhalte

Was ist angesagt?

CPDLC - Data Link Services in Brazil
CPDLC -   Data Link Services in BrazilCPDLC -   Data Link Services in Brazil
CPDLC - Data Link Services in BrazilCarlos Pera
 
ERTMS Solutions Success Stories 2019
ERTMS Solutions Success Stories 2019ERTMS Solutions Success Stories 2019
ERTMS Solutions Success Stories 2019ERTMS Solutions
 
Presenter rail & Pway survey
Presenter rail & Pway surveyPresenter rail & Pway survey
Presenter rail & Pway surveyNick Blenkarn
 
A2 p alty k delcourte_d bardelli_f serdot omer_luigi brucculeri
A2  p alty k delcourte_d bardelli_f serdot omer_luigi brucculeriA2  p alty k delcourte_d bardelli_f serdot omer_luigi brucculeri
A2 p alty k delcourte_d bardelli_f serdot omer_luigi brucculeriSESAR Joint Undertaking
 
Reefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical AdvantageReefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical AdvantageORBCOMM Inc.
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finNathan Baker
 
Arqiva 2008 Ops Conference - TWM Update by GHarris
Arqiva 2008 Ops Conference - TWM Update by GHarrisArqiva 2008 Ops Conference - TWM Update by GHarris
Arqiva 2008 Ops Conference - TWM Update by GHarrisGavin Harris
 
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...mfrancis
 
Olivier Casabianca
Olivier CasabiancaOlivier Casabianca
Olivier CasabiancaJoost Boers
 
Ultra high-throughput vlsi architecture of h.265-hevc cabac encoder for uhdtv...
Ultra high-throughput vlsi architecture of h.265-hevc cabac encoder for uhdtv...Ultra high-throughput vlsi architecture of h.265-hevc cabac encoder for uhdtv...
Ultra high-throughput vlsi architecture of h.265-hevc cabac encoder for uhdtv...I3E Technologies
 
Galileo Search & Rescue workshop_European Space Solutions 2016_HELIOS - Alain...
Galileo Search & Rescue workshop_European Space Solutions 2016_HELIOS - Alain...Galileo Search & Rescue workshop_European Space Solutions 2016_HELIOS - Alain...
Galileo Search & Rescue workshop_European Space Solutions 2016_HELIOS - Alain...The European GNSS Agency (GSA)
 
Adding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette InternationalAdding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette InternationalMRS Logística
 

Was ist angesagt? (20)

CPDLC - Data Link Services in Brazil
CPDLC -   Data Link Services in BrazilCPDLC -   Data Link Services in Brazil
CPDLC - Data Link Services in Brazil
 
ERTMS Solutions Success Stories 2019
ERTMS Solutions Success Stories 2019ERTMS Solutions Success Stories 2019
ERTMS Solutions Success Stories 2019
 
Presenter rail & Pway survey
Presenter rail & Pway surveyPresenter rail & Pway survey
Presenter rail & Pway survey
 
A2 p alty k delcourte_d bardelli_f serdot omer_luigi brucculeri
A2  p alty k delcourte_d bardelli_f serdot omer_luigi brucculeriA2  p alty k delcourte_d bardelli_f serdot omer_luigi brucculeri
A2 p alty k delcourte_d bardelli_f serdot omer_luigi brucculeri
 
Reefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical AdvantageReefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical Advantage
 
News on Satnav for GA
News on Satnav for GANews on Satnav for GA
News on Satnav for GA
 
Status of Galileo
Status of Galileo Status of Galileo
Status of Galileo
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
 
Galileo differentiators for mass market
Galileo differentiators for mass marketGalileo differentiators for mass market
Galileo differentiators for mass market
 
Arqiva 2008 Ops Conference - TWM Update by GHarris
Arqiva 2008 Ops Conference - TWM Update by GHarrisArqiva 2008 Ops Conference - TWM Update by GHarris
Arqiva 2008 Ops Conference - TWM Update by GHarris
 
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
 
Olivier Casabianca
Olivier CasabiancaOlivier Casabianca
Olivier Casabianca
 
Ultra high-throughput vlsi architecture of h.265-hevc cabac encoder for uhdtv...
Ultra high-throughput vlsi architecture of h.265-hevc cabac encoder for uhdtv...Ultra high-throughput vlsi architecture of h.265-hevc cabac encoder for uhdtv...
Ultra high-throughput vlsi architecture of h.265-hevc cabac encoder for uhdtv...
 
Aopa UK presentation by Martin Robinson
Aopa UK presentation by Martin RobinsonAopa UK presentation by Martin Robinson
Aopa UK presentation by Martin Robinson
 
Crossrail - Integrated Assurance, 17 May 2016,
Crossrail - Integrated Assurance, 17 May 2016, Crossrail - Integrated Assurance, 17 May 2016,
Crossrail - Integrated Assurance, 17 May 2016,
 
GSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for AviationGSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for Aviation
 
Galileo Search & Rescue workshop_European Space Solutions 2016_HELIOS - Alain...
Galileo Search & Rescue workshop_European Space Solutions 2016_HELIOS - Alain...Galileo Search & Rescue workshop_European Space Solutions 2016_HELIOS - Alain...
Galileo Search & Rescue workshop_European Space Solutions 2016_HELIOS - Alain...
 
Overview of JRC Capabilities - Sbardellati
Overview of JRC Capabilities - SbardellatiOverview of JRC Capabilities - Sbardellati
Overview of JRC Capabilities - Sbardellati
 
Adding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette InternationalAdding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette International
 
H2020-Galileo-2015-1 Call
H2020-Galileo-2015-1 CallH2020-Galileo-2015-1 Call
H2020-Galileo-2015-1 Call
 

Andere mochten auch

Airport security 2013 philipp kriegbaum
Airport security 2013   philipp kriegbaumAirport security 2013   philipp kriegbaum
Airport security 2013 philipp kriegbaumRussell Publishing
 
MaaS-workshop yhteenveto
MaaS-workshop yhteenvetoMaaS-workshop yhteenveto
MaaS-workshop yhteenvetoSito_Group
 
Infrastructures for innovation(2)
Infrastructures for innovation(2)Infrastructures for innovation(2)
Infrastructures for innovation(2)rigarquia
 
Käyttäjälähtöisellä kehittämisellä vaikuttavammat palvelut vantaan varhaiskas...
Käyttäjälähtöisellä kehittämisellä vaikuttavammat palvelut vantaan varhaiskas...Käyttäjälähtöisellä kehittämisellä vaikuttavammat palvelut vantaan varhaiskas...
Käyttäjälähtöisellä kehittämisellä vaikuttavammat palvelut vantaan varhaiskas...vantaansivistystoimi
 
Kumppanuusfoorumi Vantaa 7.11.2012
Kumppanuusfoorumi Vantaa 7.11.2012Kumppanuusfoorumi Vantaa 7.11.2012
Kumppanuusfoorumi Vantaa 7.11.2012BM Design Oy
 
Pollinator_Portfolio_kevät_2017
Pollinator_Portfolio_kevät_2017Pollinator_Portfolio_kevät_2017
Pollinator_Portfolio_kevät_2017Sanni Aromaa
 
Mari Peltomaki - Session 1: Commercial Development and Airport Real-Estate
Mari Peltomaki - Session 1: Commercial Development and Airport Real-EstateMari Peltomaki - Session 1: Commercial Development and Airport Real-Estate
Mari Peltomaki - Session 1: Commercial Development and Airport Real-EstateGlobal Airport Cities
 

Andere mochten auch (15)

Gunther koller
Gunther kollerGunther koller
Gunther koller
 
Elisabeth sinclair
Elisabeth sinclairElisabeth sinclair
Elisabeth sinclair
 
Elisabeth sinclair
Elisabeth sinclairElisabeth sinclair
Elisabeth sinclair
 
Denis castanet
Denis castanetDenis castanet
Denis castanet
 
Airport security 2013 philipp kriegbaum
Airport security 2013   philipp kriegbaumAirport security 2013   philipp kriegbaum
Airport security 2013 philipp kriegbaum
 
David thomasson
David thomassonDavid thomasson
David thomasson
 
Johnny sorenson
Johnny sorensonJohnny sorenson
Johnny sorenson
 
Flamingo spa esitys levi 2012
Flamingo spa esitys levi 2012Flamingo spa esitys levi 2012
Flamingo spa esitys levi 2012
 
MaaS-workshop yhteenveto
MaaS-workshop yhteenvetoMaaS-workshop yhteenveto
MaaS-workshop yhteenveto
 
Best vantaa
Best vantaaBest vantaa
Best vantaa
 
Infrastructures for innovation(2)
Infrastructures for innovation(2)Infrastructures for innovation(2)
Infrastructures for innovation(2)
 
Käyttäjälähtöisellä kehittämisellä vaikuttavammat palvelut vantaan varhaiskas...
Käyttäjälähtöisellä kehittämisellä vaikuttavammat palvelut vantaan varhaiskas...Käyttäjälähtöisellä kehittämisellä vaikuttavammat palvelut vantaan varhaiskas...
Käyttäjälähtöisellä kehittämisellä vaikuttavammat palvelut vantaan varhaiskas...
 
Kumppanuusfoorumi Vantaa 7.11.2012
Kumppanuusfoorumi Vantaa 7.11.2012Kumppanuusfoorumi Vantaa 7.11.2012
Kumppanuusfoorumi Vantaa 7.11.2012
 
Pollinator_Portfolio_kevät_2017
Pollinator_Portfolio_kevät_2017Pollinator_Portfolio_kevät_2017
Pollinator_Portfolio_kevät_2017
 
Mari Peltomaki - Session 1: Commercial Development and Airport Real-Estate
Mari Peltomaki - Session 1: Commercial Development and Airport Real-EstateMari Peltomaki - Session 1: Commercial Development and Airport Real-Estate
Mari Peltomaki - Session 1: Commercial Development and Airport Real-Estate
 

Ähnlich wie Kari rouhonen

JSC, “Lithuanian railways”
JSC, “Lithuanian railways”JSC, “Lithuanian railways”
JSC, “Lithuanian railways”Business Finland
 
Baltic adriatique corridor k. bodewig
Baltic adriatique corridor   k. bodewigBaltic adriatique corridor   k. bodewig
Baltic adriatique corridor k. bodewigEuropean Commission
 
North sea baltic corridor c. trautmann
North sea baltic corridor   c. trautmannNorth sea baltic corridor   c. trautmann
North sea baltic corridor c. trautmannEuropean Commission
 
Natural gas and bio methane as fuel for transport a. makinen
Natural gas and bio methane as fuel for transport   a. makinenNatural gas and bio methane as fuel for transport   a. makinen
Natural gas and bio methane as fuel for transport a. makinenEuropean Commission
 
ERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
ERRAC and how proposals for Horizon 2020 have been developed - Andy DohertyERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
ERRAC and how proposals for Horizon 2020 have been developed - Andy DohertyKTN
 
Curriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major ProjectsCurriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major ProjectsPapastamatis Zisis
 
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas CorridorTrans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas CorridorAlbania Energy Association
 
Rail Baltica implementation in Latvia 2016. - 2017
Rail Baltica implementation in Latvia 2016. - 2017Rail Baltica implementation in Latvia 2016. - 2017
Rail Baltica implementation in Latvia 2016. - 2017Business Finland
 
Euro rail eng_full
Euro rail eng_fullEuro rail eng_full
Euro rail eng_fullinvestinlviv
 
Rail Baltica project - Lithuanian perspective
Rail Baltica project - Lithuanian perspectiveRail Baltica project - Lithuanian perspective
Rail Baltica project - Lithuanian perspectiveBusiness Finland
 
Turku finland
Turku finlandTurku finland
Turku finlandainjai
 
Network Rail - passengers and freight
Network Rail - passengers and freightNetwork Rail - passengers and freight
Network Rail - passengers and freightBogdan Ciocoiu
 

Ähnlich wie Kari rouhonen (20)

WSP Parsons Brinckerhoff
WSP Parsons BrinckerhoffWSP Parsons Brinckerhoff
WSP Parsons Brinckerhoff
 
JSC, “Lithuanian railways”
JSC, “Lithuanian railways”JSC, “Lithuanian railways”
JSC, “Lithuanian railways”
 
Baltic adriatique corridor k. bodewig
Baltic adriatique corridor   k. bodewigBaltic adriatique corridor   k. bodewig
Baltic adriatique corridor k. bodewig
 
North sea baltic corridor c. trautmann
North sea baltic corridor   c. trautmannNorth sea baltic corridor   c. trautmann
North sea baltic corridor c. trautmann
 
Natural gas and bio methane as fuel for transport a. makinen
Natural gas and bio methane as fuel for transport   a. makinenNatural gas and bio methane as fuel for transport   a. makinen
Natural gas and bio methane as fuel for transport a. makinen
 
Coeck
CoeckCoeck
Coeck
 
Coeck
CoeckCoeck
Coeck
 
Eduardo Feio S4C Colloquium Aveiro 2016
Eduardo Feio S4C Colloquium Aveiro 2016Eduardo Feio S4C Colloquium Aveiro 2016
Eduardo Feio S4C Colloquium Aveiro 2016
 
ERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
ERRAC and how proposals for Horizon 2020 have been developed - Andy DohertyERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
ERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
 
Curriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major ProjectsCurriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major Projects
 
Pöyry
PöyryPöyry
Pöyry
 
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas CorridorTrans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
 
Rail Baltica implementation in Latvia 2016. - 2017
Rail Baltica implementation in Latvia 2016. - 2017Rail Baltica implementation in Latvia 2016. - 2017
Rail Baltica implementation in Latvia 2016. - 2017
 
Rail Baltica
Rail BalticaRail Baltica
Rail Baltica
 
Euro rail eng_full
Euro rail eng_fullEuro rail eng_full
Euro rail eng_full
 
Rail Baltica project - Lithuanian perspective
Rail Baltica project - Lithuanian perspectiveRail Baltica project - Lithuanian perspective
Rail Baltica project - Lithuanian perspective
 
Turku finland
Turku finlandTurku finland
Turku finland
 
Turku finland
Turku finlandTurku finland
Turku finland
 
Network Rail - passengers and freight
Network Rail - passengers and freightNetwork Rail - passengers and freight
Network Rail - passengers and freight
 
Ocean finance
Ocean financeOcean finance
Ocean finance
 

Mehr von Russell Publishing

Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Russell Publishing
 
Robin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRobin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRussell Publishing
 
Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Russell Publishing
 
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailPeter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailRussell Publishing
 
Martyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailMartyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailRussell Publishing
 
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilMarc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilRussell Publishing
 
José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)Russell Publishing
 
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)Russell Publishing
 
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicDaniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicRussell Publishing
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Russell Publishing
 
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Russell Publishing
 
Airport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionAirport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionRussell Publishing
 
Airport IT&T 2013 Michael Zaddach
Airport IT&T 2013 Michael ZaddachAirport IT&T 2013 Michael Zaddach
Airport IT&T 2013 Michael ZaddachRussell Publishing
 
Airport IT&T 2013 John McCarthy
Airport IT&T 2013 John McCarthyAirport IT&T 2013 John McCarthy
Airport IT&T 2013 John McCarthyRussell Publishing
 
Airport IT&T 2013 Antoine Rostworowski
Airport IT&T 2013 Antoine RostworowskiAirport IT&T 2013 Antoine Rostworowski
Airport IT&T 2013 Antoine RostworowskiRussell Publishing
 
Airport IT&T 2013 Massimo Gentile
Airport IT&T 2013 Massimo GentileAirport IT&T 2013 Massimo Gentile
Airport IT&T 2013 Massimo GentileRussell Publishing
 
Airport IT&T 2013 Pedro Casimiro
Airport IT&T 2013 Pedro CasimiroAirport IT&T 2013 Pedro Casimiro
Airport IT&T 2013 Pedro CasimiroRussell Publishing
 
Airport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionAirport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionRussell Publishing
 
Airport IT&T 2013 Lloyd Gozzett
Airport IT&T 2013 Lloyd GozzettAirport IT&T 2013 Lloyd Gozzett
Airport IT&T 2013 Lloyd GozzettRussell Publishing
 

Mehr von Russell Publishing (20)

Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
 
Robin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRobin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF Security
 
Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)
 
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailPeter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
 
Martyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailMartyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern Rail
 
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilMarc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
 
José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)
 
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
 
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicDaniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
 
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
 
Airport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionAirport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel Discussion
 
Airport IT&T 2013 Michael Zaddach
Airport IT&T 2013 Michael ZaddachAirport IT&T 2013 Michael Zaddach
Airport IT&T 2013 Michael Zaddach
 
Airport IT&T 2013 John McCarthy
Airport IT&T 2013 John McCarthyAirport IT&T 2013 John McCarthy
Airport IT&T 2013 John McCarthy
 
Airport IT&T 2013 Antoine Rostworowski
Airport IT&T 2013 Antoine RostworowskiAirport IT&T 2013 Antoine Rostworowski
Airport IT&T 2013 Antoine Rostworowski
 
Airport IT&T 2013 Massimo Gentile
Airport IT&T 2013 Massimo GentileAirport IT&T 2013 Massimo Gentile
Airport IT&T 2013 Massimo Gentile
 
Airport IT&T 2013 Pedro Casimiro
Airport IT&T 2013 Pedro CasimiroAirport IT&T 2013 Pedro Casimiro
Airport IT&T 2013 Pedro Casimiro
 
Airport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionAirport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel Discussion
 
Airport IT&T 2013 Lloyd Gozzett
Airport IT&T 2013 Lloyd GozzettAirport IT&T 2013 Lloyd Gozzett
Airport IT&T 2013 Lloyd Gozzett
 
Airport IT&T 2013 Jeff Ulrich
Airport IT&T 2013 Jeff UlrichAirport IT&T 2013 Jeff Ulrich
Airport IT&T 2013 Jeff Ulrich
 

Kürzlich hochgeladen

Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 

Kürzlich hochgeladen (20)

Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 

Kari rouhonen

  • 1. Major Rail Projects in Finland Kari Ruohonen Director General Projects
  • 2. www.fta.fi• Projects Finnish Transport Agency organization from 1 July 2013 2 Director General Operations Management Projects Infrastructure Management Traffic and Information Project Management Project Implementation Maintenance Infrastructure and the Environment Traffic Management Centres Information Traffic Services • Communications • Strategy Planning Finance and Performance Management Legal Services and Procurement HR and Administration • Internal Audit • Regional Steering 29.4.2014 KR
  • 3. www.fta.fi• Projects3KR The FTA is responsible for transport infrastructure assets worth billions • The Finnish Transport Agency annually purchases infrastructure management, planning, surveying and other services for about 1.7 billion euros, which represents about one-third of Finland’s infrastructure field. • The Finnish Transport Agency is responsible for transport infrastructure assets amounting to almost 19.2 billion euros.t Agency is responsible for transport infrastructure assets amounting to nearly 19.2 billion euros • The annual budget (gross) is about 1.8 billion euros, of which: • 1,020 million euros for basic transport infrastructure management • 610 million euros for development • 81 million euros for shipping • 100 million euros for the procurement and development of public transport, as well as for archipelago traffic24 million euros in subsidies for the building of the West Metro • The Finnish Transport Agency's own budget is approx. 87 million euros and 650 civil servants 29.4.2014
  • 4. www.fta.fi• ProjectsKR 4 The length of the Finnish railway network is kilometres 5,900 level crossings and tunnels on the main lines 3,359 43 Every year million journeys are made by train 70 Every year around million tonnes of freight are carried by rail 40 Railway statistics 29.4.2014
  • 5. www.fta.fi• Projects Mission The Finnish Transport Agency enables smooth, efficient and safe travel and transport Vision 2025 Smart routes and intelligent traffic - for you. Strategy of the Finnish Transport Agency 529.4.2014 KR
  • 6. www.fta.fi• Projects Sratecig Goals 1. Well-functioning transport routes enhance competitiveness 2. Smooth and safe travel 3. We act in a responsible, effective and innovative way 4. The Finnish Transport Agency - an excellent workplace for professionals 29.4.2014 KR 6
  • 8. www.fta.fi• Projects Core Network Corridors in Finland 29.4.2014 8
  • 10. www.fta.fi• Projects Ring Rail Line in brief 10 ● length of railway line is 18 kilometres, 8 kilometres of which in tunnel • 5 new stations (Vehkala, Kivistö, Aviapolis, Airport and Leinelä) • 3 station reservations (Petas, Viinikkala and Ruskeasanta) • 45 bridges will be built • park-and-ride facilities in the initial phase: 1000 cars and 840 bicycles • Construction schedule is 2009-2015 • Estimated total costs are 738,5 million euros • Finnish Transport Agency 474 M€ • City of Vantaa 234,5 M€ • Finavia 30 M€ • (TENT-T funding from the EU 44,8 M€) 29.4.2014
  • 11. www.fta.fi• Projects The Ring Rail Line connects the traffic in the metropolitan area ● The Ring Rail Line  provides an option to take the train to new areas and connections. Daytime trains will run at 10-minute intervals in both directions  reduces motor vehicle traffic along with environmental impact • The starting point of the station arrangements is easy mobility, smooth feeder traffic and short changing times.  park-and-ride facilities in the immediate vicinity of the stations  bus terminals at the stations in Vantaankoski and Kivistö ● The Ring Rail Line provides a direct railway connection to the airport  urban railway line to the international airport, the travel time to the airport is 30 minutes from the centre of Helsinki 1129.4.2014
  • 12. www.fta.fi• Projects The Ring Rail Line creates something new ● The Ring Rail Line is an urban railway line creating opportunities for new residential and job areas.  The Ring Rail creates opportunities for new residential areas in its area of influence. In the initial phase 5 new stations will be built along the railway.  It also creates thousands of new job opportunities. At present about 850 persons are working on the Ring Rail Line project.  The first underground railway stations in Finland are built on the Ring Rail Line and its 8- kilometre twin tunnel for passenger traffic is unique. 1229.4.2014
  • 14. www.fta.fi• Projects14 29.4.2014 MICROBE POPULATION IN RING RAIL LINE AIRPORT TUNNEL ● A microbe population was found during tunnelling under the eastern runway at Helsinki-Vantaa Airport in summer 2010. ● The population consists of normal soil bacteria whose growth has been stimulated by glycol and other substances that have seeped into the ground from the runway. Glycol is used to de-ice aircraft. ● Work was stopped from 30 September to 12 October 2010.
  • 15. www.fta.fi• Projects ● - In February 2011 VTT Technical Research Centre of Finland completed a study concerning the effects of glycol seepage on concrete and steel structures. The study showed that seepage will reduce the service life of tunnel structures. ● - When glycol breaks down, it forms acidic by-products and carbon dioxide, which have a corrosive effect on the tunnel and its walls as well as structures extending into the bedrock. ● - When bacteria nourished by glycol seep into the tunnel and come in contact with oxygen, it speeds up the growth of bacteria. The resulting glycol breakdown products form a harmful chemical environment for steel and concrete materials. ● - Research indicates that in the case of the Ring Rail Line tunnel the chemical environment would cause steel and concrete materials to deteriorate. Deterioration would be rapid, and an acceptable service life (50-100 years) could not be achieved with ordinary solutions. ● - The Finnish Transport Agency received seven solutions, presented on 10 May 2011, to prevent deterioration. ● The solution is double structure; first larger rock tunnel and inside concrete tunnel. Between them is airproof and underinflated space where the water is collected ● Extra costs are about 50 M€:s, State and Fianavia Ltd 15 29.4.2014
  • 17. Metro west extensions 1 & 2 Under construction Ruoholahti – Matinkylä Ready to start construction Matinkylä - Kivenlahti
  • 18. www.fta.fi• Projects Metro line – now and in future 1829.4.2014
  • 19. www.fta.fi• Projects19 Metro Routing and Profile Line length 14 km (2 tunnels), 8 new stations, cost estimate 985 milj. € 29.4.2014
  • 23. www.fta.fi• Projects TRIPLA of YIT was the Winner of the Pasila One competition 29.4.2014 23
  • 24. www.fta.fi• Projects Pasila western additional track Objectives ● To increase capacity in the Helsinki-Riihimäki direction ● To increase the capacity of Pasila railway yard ● Less vulnerability to traffic disturbances in local and long- distance traffic ● Better punctuality 29.4.2014 KR 24 Planning area situated directly north of the Helsinki railway yard, at the Pasila railway yard, where there are now 9 platform lines and 2 yard tracks. ● An additional track will be built on the western edge of the Pasila railway yard. The length of the track is 1.5 km and the section includes several bridges. ● The new track runs through the present station building. ● The turnouts and the functionality of the railway yard will be altered so that the number of tracks in the Helsinki-Turku direction will remain the same (4). The tracks in the Helsinki-Riihimäki direction will increase by one, amounting to a total of 6 tracks and 2 yard tracks. + 1 platform line + 1 main line Riihimäki Kerava
  • 25. www.fta.fi• Projects Improving the efficiency of the Helsinki railway yard, HELRA ● Preliminary report on the transport and track schematic model presented: ● The best out of four alternative schematic models chosen for further development, on the basis of traffic and disturbance simulations ● HELRA measures ● Efficiency of the tracks at the Helsinki railway yard will be improved by adding more turnouts and groups of scissor crossings ● Signalling stages are added to the urban railway line between Helsinki and Pasila ● By reducing the speed limit 80 km/h60 km/h more capacity would be added to Pasila ● Cost 56 M€ ● Replacement of the signal box later (after 10-15 years), 86 M€ (Year 2018) 29.4.2014 KR 25 Objectives • To increase rail capacity • Reduce vulnerability to traffic disturbances
  • 26. www.fta.fi• Projects Improving the efficiency of the Helsinki railway yard, HELRA ● Planning continues ● Improvement planning in 2014 ● Impact of simulated speeds of 60-70-80 km/h on safety and functionality studied through risk management ● Detailed planning of track geometry ● Detailed planning of safety devices for later procurement ● Construction planning in 2015-2016 ● Implementation in stages in 2016-2019 ● Project completed approximately in 2020, as HELRA measures and Pasila additional track have been implemented 29.4.2014 KR 26
  • 27. www.fta.fi• Projects Railway from Helsinki to North Added capacity between Helsinki and Riihimäki 29.4.2014 KR 27
  • 28. www.fta.fi• Projects Added capacity between Helsinki and Riihimäki ● Project schedule and costs ● Railway plan for the first phase to be completed in April 2014; construction planning and construction will commence in 2015 ● Cost estimate 150 million € ● General plan for the second phase will commence in June 2014 ● Cost estimate 200 million € ● Project impact ● Number of commuter trains can be increased between Helsinki and Riihimäki ● Reduced risk of traffic disturbances and improved punctuality ● Smoother operation of long-distance trains ● Separation of slow freight traffic from fast passenger traffic increases track capacity and enables less strict freight traffic scheduling ● On the section north of Pasila the project increases the capacity required in order to draw benefits from the City Rail Loop project. 29.4.2014 KR 28
  • 29. www.fta.fi• Projects Added capacity between Helsinki and Riihimäki ● The project has been divided into two phases ● First implementation phase: ● Turnout and track alterations at Tikkurila ● Additional track for freight traffic at Kerava to the Vuosaari and Sköldvik track. ● Additional track between Kyrölä and Purola ● Turnout arrangements at Hyvinkää ● Track, turnout and platform alterations at the Riihimäki passenger yard Second implementation phase: ● Additional tracks from Kytömaa to Kyrölä and from Purola to Jokela ● Connecting of Kerava freight traffic to the Lahti direct line ● After the second implementation phase there will be four tracks to Jokela ● Track for freight traffic from Hyvinkää to Riihimäki 29.4.2014 KR 29
  • 30. www.fta.fi• Projects Espoo urban railway line westward from Helsinki Objectives ● Increased capacity ● Less vulnerability to traffic disturbances in local and long-distance traffic ● Better punctuality ● Better public transport connections ● Lower motorization level and less congestion The planning area Leppävaara – Kauklahti is located at the Helsinki–Turku main line in the cities of Espoo and Kauniainen ● Railway section about 15 km ● Current double track altered into 2+2 tracks  slower urban traffic and faster long-distance traffic on separate tracks ● 7 traffic operating points (Kilo, Kera, Kauniainen, Koivuhovi, Tuomarila, Espoo, Kauklahti) ● 26 bridges ● A high-quality underpass for bicycle traffic is also planned in connection with the railway plan29.4.2014 30KR
  • 31. www.fta.fi• Projects Espoo urban railway line ● Cost estimate 300 M€ (Year 2018) ● Railway plan circulated for comment in autumn 2014 ● The town plan for the power supply station delays completion ● Approval of the railway plan in 2015 29.4.2014 31KR
  • 32. www.fta.fi• Projects The City Rail Loop Helsinki The City Rail Loop would ● enable an increased volume of passenger rail traffic ● enhance public transport ● improve passenger convenience ● reduce train delays Töölö Station Hakaniemi Station City Centre Station
  • 33. www.fta.fi• Projects Project status - General plan approved 2012 - Railway plan completed end of 2014 - Detailed planning 2015-2016 (-2017) - Planning cost estimated 40 M€ (including geological surveys) - Decision of the construction works, Finnish parliament - Project costs 750 M€ (year 2018 price level) - City Rail Loop - Under the city center of Helsinki - 8 km (6 km in tunnels), 2 tracks - 3 underground stations, 250 m platforms - Local trains every 5 (3) minutes (both directions)
  • 34. www.fta.fi• Projects City Rail Loop in figures Underground stations Töölö, Keskusta, Hakaniemi Material to be excavated and transported 1 304 000 cu.m Length of railway line 8 km Length of section in tunnel 6 km Bridges to be built 3 Longest concrete tunnel (Stadium) 200 m Maximum depth of excavation from surface 63 m Construction costs (estimate) EUR 740 million (ex VAT) Design stage duration 4 years Design cost estimate EUR 40 million 29.4.2014 34
  • 35. www.fta.fi• Projects Helsinki centrum, tracks today 29.4.2014 35
  • 36. www.fta.fi• Projects City Rail Loop, tracks 29.4.2014 36
  • 37. www.fta.fi• Projects Passengers in stations, year 2035 Pasila 27 000 rush hour 180 000 per day Töölö 2 100 per rush hour 16 100 per day Keskusta 5 300 per rush hour 42 700 per day Hakaniemi 10 700 per rush hour 79 100 per day 29.4.2014 37
  • 38. www.fta.fi• Projects City Centre station ● Large numbers of passengers distributed more evenly in the city centre ● Most extensive network of access points and underground walkways ● Access to adjoining commercial premises
  • 40. www.fta.fi• Projects Hakaniemi station ● The highest-volume station on the City Rail Loop ● Good interchange facility between metro and rail ● Largest potential number of passengers changing between metro and rail