SlideShare ist ein Scribd-Unternehmen logo
1 von 4
R.Davison Comprehensive Steel Construction
Relative Work History
August 1997 to date
Time Frame :- July2014 – January2015
Employer:- PipetechProjects
Duties:- Site supervisor/AP/rigger/pipefitter
Supervisingseveralthree manteamsworkingthroughouttworefineriesonboththeir shutdown
phase as well astheiroperational phase ,carryingoutthe fittingof majorvessel,pipe andassociated
equiptment bothtonewstructuresas well ascomplex pipe runsinextremelychallenginglocations
withinthe existingbuildingsfabrictoa verystringentsafetyregime.
Liasingwiththe customer’smanagementteamona dailybasisonworksprogressandproblem
solvingasthe projectdevelops.Alsoliasingwithmanagementonall liftingrequirements,planning
all major lifts,writingbothcrane plansandcomplex liftplansandcarryingthemoutand managing
all craneage whilstonsite forus.
Time Frame :- March 2014 – July2014
Employer:- Vogal Group
Duties:- Site supervisor/Crane Supervisor/Rigger
Supervisingseveralthree manteamsworkingthroughoutarefineryonitsshutdownphase,carrying
out ripout, re-fitandremedial workstoaverystringentsafetyregime. Liasingwiththe customer’s
managementteamona dailybasisonworksprogressand problemsolvingasthe projectdevelops.
Alsoliasingwithmanagementonall liftingrequirements,planningall majorlifts,writingcomplexlift
plansand carryingthemout andmanagingany craneage neededonsite.
Time Frame :- October2011 – March 2014
Employer:- D.B.WrightPipework
Duties:- Erectionmanger/AP/Site Supervisor
I startedwiththe companyas a site supervisor/welder/erectorandcarriedoutseveral large
contracts for GalemainengineeringforD.B.Wrightsuchas the rebuildof the beethopperatBritish
Sugar Bury St Edmundsandreplacementof the culletvesselatArdaghGlassDoncaster.This was
alongwithmanysmallerlocal works includingthe installationof variousnew conveyor/feedlinesin
all three britishsugarfactories, butthe companyran outof workso I got intouch witha colleague
froma local steel buildingcontractorandsecuredanongoingerectioncontractandthencreateda
steel erectionside tothe company.
Time Frame :- May 2009 – October2011
Employer:- DGT Structures
Duties:- Site Foreman
Supervisingandrunningteamsof three, carryingoutsteel erectioncontractsthroughoutthe
country,manyhighprofile contractssuchas the rebuildof the Marlowe theatre inCanterbury, Baths
Hall leisure complex Scunthorpeand DorsetCouncil new officesDorchestertoname buta few.
Alwaysworkingtotightprogramsinoftenchallengingcircumstances.
Time Frame :- June 2007 – May 2009
Employer:- HighCross ForecourtCanopies
Duties:- Surveyor/SiteForeman
Carryingout surveyscountrywideondamagedPFCcanopiesforcustomerssuchasBP, Sainsburys,
Total andTesco,reportingback tothe office onworkrequiredandthencarryingoutrepairsas
required.
AlsoerectingnewPFCcanopiesanddevelopingthe new plugandplayPFCshop fabrication
constructionand installationconcept.
Time Frame :- April 2005 – May 2009
Employer:- A J WatersLimited
Duties:- ErectionForeman
Site foremanforseveral gangsof three,erectingbuildings countrywideforsteel firmssuchas
S.C.W.S.DGT, Youngs,Wall engineering,Greensstructural and NorthBayStructures
Time Frame :- May 2004 – April 2005
Employer:- R.DavisonSteel SolutionsLTD
Duties:- Owner
Ownerof a twogang, six manerectionfirmthatcarriedout several successful contracts
countrywide, the majorone beingthe erectionof the managementsuite tothe BeethamHilton
Hotel Manchester(tallestbuildingoutside Londonatthe time).
Sadly,due toa majorcustomerchangingtheirpaymentregime withoutnotice Ihadtoclose the
companyas the cashflowsituationbecame suchthatthe businesswas untenable.
Time Frame January2003 – May 2004
Employer:- Rural Engineering
Duties:- ErectionForeman
Site Foremanfora gang of three, successfullycarryingoutmulti millionpounderectioncontractsfor
customerssuchas Tesco,Sainsburys,B&Qcountrywide.
Time Frame :- May 2002 - December2002
Employer:- Paul Cox Steel Erections
Duties:- ErectionForeman
Site foremanforseveral gangsof three,erectingsteel structuresandbuildingscountrywide forWall
engineering,FourbaystructuresandPickeringSteel.
Time frame :- February2001 – May 2002
Employer:- DGT Steel andCladding
Duties:- Steel Erector/Snagger/SiteForeman
Startedwiththe companyas a leaderectorbutwas soonmade up to site foreman/snaggerrunning
varioussteel jobs countrywide asagang of three andcarryingout site/remedialworkstoexisting
structures.
Time Frame :- May 1998 – February2002
Employer:- Paul Cox Steel Erections
Duties:- Steel Erector/Snagger
Travellingthe countryerectingvarioussteel structuresfromsimpleportal framesto12,000 ton
shoppingcomplex’sforsteel firmssuchasWall engineering,FourbayStructuresetc.
Time frame :- August1997 – May 1998
Employer:- HubbardArchitectural Metalwork
Duties:- Fab welder/Erector
Fabricationanderectionof variousstructuresbothinthe company’syardand on site.
comprehensive work history

Weitere ähnliche Inhalte

Was ist angesagt?

N287066157 Stephen Geissmann-CV
N287066157 Stephen Geissmann-CVN287066157 Stephen Geissmann-CV
N287066157 Stephen Geissmann-CVStephen Geissmann
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1Kenny Hagan
 
Chris Lee CV doc.
Chris Lee CV  doc.Chris Lee CV  doc.
Chris Lee CV doc.Chris Lee
 
Solcrete- DHS Affordable Housing feature in Annual Construction Review Magazine
Solcrete- DHS Affordable Housing feature in Annual Construction Review MagazineSolcrete- DHS Affordable Housing feature in Annual Construction Review Magazine
Solcrete- DHS Affordable Housing feature in Annual Construction Review MagazineSolcrete
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 
Troy Ens Resume
Troy Ens ResumeTroy Ens Resume
Troy Ens ResumeTroy Ens
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)Simon Barkley
 
Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Frans Van Zyl
 
TERRY LUMLEY C.V. 2015.
TERRY LUMLEY C.V. 2015.TERRY LUMLEY C.V. 2015.
TERRY LUMLEY C.V. 2015.terry lumley
 
Jim styles CV May 2015
Jim styles CV  May 2015Jim styles CV  May 2015
Jim styles CV May 2015james styles
 
Tony Woodfine 2016 resume
Tony Woodfine 2016 resumeTony Woodfine 2016 resume
Tony Woodfine 2016 resumeTony Woodfine
 
McKajj Services Presentation (Long)
McKajj Services Presentation (Long)McKajj Services Presentation (Long)
McKajj Services Presentation (Long)Michael Haugh
 
Ben Mullins Resume
Ben Mullins ResumeBen Mullins Resume
Ben Mullins ResumeBen Mullins
 
CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)Ram Atta
 
Geo-Keller Project History
Geo-Keller Project HistoryGeo-Keller Project History
Geo-Keller Project HistoryChad Smith
 

Was ist angesagt? (20)

N287066157 Stephen Geissmann-CV
N287066157 Stephen Geissmann-CVN287066157 Stephen Geissmann-CV
N287066157 Stephen Geissmann-CV
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
 
Chris Lee CV doc.
Chris Lee CV  doc.Chris Lee CV  doc.
Chris Lee CV doc.
 
Solcrete- DHS Affordable Housing feature in Annual Construction Review Magazine
Solcrete- DHS Affordable Housing feature in Annual Construction Review MagazineSolcrete- DHS Affordable Housing feature in Annual Construction Review Magazine
Solcrete- DHS Affordable Housing feature in Annual Construction Review Magazine
 
JEarle_2016
JEarle_2016JEarle_2016
JEarle_2016
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
Troy Ens Resume
Troy Ens ResumeTroy Ens Resume
Troy Ens Resume
 
Resume with System 3
Resume with System 3Resume with System 3
Resume with System 3
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
ray resume (1)
ray resume (1)ray resume (1)
ray resume (1)
 
Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015
 
TERRY LUMLEY C.V. 2015.
TERRY LUMLEY C.V. 2015.TERRY LUMLEY C.V. 2015.
TERRY LUMLEY C.V. 2015.
 
Ian C. Shannon
Ian C. ShannonIan C. Shannon
Ian C. Shannon
 
Jim styles CV May 2015
Jim styles CV  May 2015Jim styles CV  May 2015
Jim styles CV May 2015
 
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 
Tony Woodfine 2016 resume
Tony Woodfine 2016 resumeTony Woodfine 2016 resume
Tony Woodfine 2016 resume
 
McKajj Services Presentation (Long)
McKajj Services Presentation (Long)McKajj Services Presentation (Long)
McKajj Services Presentation (Long)
 
Ben Mullins Resume
Ben Mullins ResumeBen Mullins Resume
Ben Mullins Resume
 
CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)
 
Geo-Keller Project History
Geo-Keller Project HistoryGeo-Keller Project History
Geo-Keller Project History
 

Ähnlich wie comprehensive work history

Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell currentAndrew Mitchell
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3Kevin Hill
 
stevenfrench_coordinator
stevenfrench_coordinatorstevenfrench_coordinator
stevenfrench_coordinatorsteven french
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian Rowell
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016John Brennan
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)kevin breiter
 
Resume ofwaynecohen vp-cellular_03.07.2016
Resume ofwaynecohen vp-cellular_03.07.2016Resume ofwaynecohen vp-cellular_03.07.2016
Resume ofwaynecohen vp-cellular_03.07.2016Wayne Cohen
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016Liam Henry
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017Steven Miller
 

Ähnlich wie comprehensive work history (20)

Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 
Resume 1
Resume 1 Resume 1
Resume 1
 
Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell current
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Amey CV 2015
Amey CV 2015Amey CV 2015
Amey CV 2015
 
Ashley cv most recent2016 7
Ashley cv most recent2016 7Ashley cv most recent2016 7
Ashley cv most recent2016 7
 
Ashley cv most recent2016 7
Ashley cv most recent2016 7Ashley cv most recent2016 7
Ashley cv most recent2016 7
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
 
stevenfrench_coordinator
stevenfrench_coordinatorstevenfrench_coordinator
stevenfrench_coordinator
 
jason cv 2017
jason cv 2017jason cv 2017
jason cv 2017
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)
 
Resume ofwaynecohen vp-cellular_03.07.2016
Resume ofwaynecohen vp-cellular_03.07.2016Resume ofwaynecohen vp-cellular_03.07.2016
Resume ofwaynecohen vp-cellular_03.07.2016
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
CV 2015 Christo Van Jaarsveld
CV 2015 Christo Van JaarsveldCV 2015 Christo Van Jaarsveld
CV 2015 Christo Van Jaarsveld
 

comprehensive work history

  • 1. R.Davison Comprehensive Steel Construction Relative Work History August 1997 to date Time Frame :- July2014 – January2015 Employer:- PipetechProjects Duties:- Site supervisor/AP/rigger/pipefitter Supervisingseveralthree manteamsworkingthroughouttworefineriesonboththeir shutdown phase as well astheiroperational phase ,carryingoutthe fittingof majorvessel,pipe andassociated equiptment bothtonewstructuresas well ascomplex pipe runsinextremelychallenginglocations withinthe existingbuildingsfabrictoa verystringentsafetyregime. Liasingwiththe customer’smanagementteamona dailybasisonworksprogressandproblem solvingasthe projectdevelops.Alsoliasingwithmanagementonall liftingrequirements,planning all major lifts,writingbothcrane plansandcomplex liftplansandcarryingthemoutand managing all craneage whilstonsite forus. Time Frame :- March 2014 – July2014 Employer:- Vogal Group Duties:- Site supervisor/Crane Supervisor/Rigger Supervisingseveralthree manteamsworkingthroughoutarefineryonitsshutdownphase,carrying out ripout, re-fitandremedial workstoaverystringentsafetyregime. Liasingwiththe customer’s managementteamona dailybasisonworksprogressand problemsolvingasthe projectdevelops. Alsoliasingwithmanagementonall liftingrequirements,planningall majorlifts,writingcomplexlift plansand carryingthemout andmanagingany craneage neededonsite. Time Frame :- October2011 – March 2014 Employer:- D.B.WrightPipework Duties:- Erectionmanger/AP/Site Supervisor I startedwiththe companyas a site supervisor/welder/erectorandcarriedoutseveral large contracts for GalemainengineeringforD.B.Wrightsuchas the rebuildof the beethopperatBritish Sugar Bury St Edmundsandreplacementof the culletvesselatArdaghGlassDoncaster.This was alongwithmanysmallerlocal works includingthe installationof variousnew conveyor/feedlinesin all three britishsugarfactories, butthe companyran outof workso I got intouch witha colleague froma local steel buildingcontractorandsecuredanongoingerectioncontractandthencreateda steel erectionside tothe company.
  • 2. Time Frame :- May 2009 – October2011 Employer:- DGT Structures Duties:- Site Foreman Supervisingandrunningteamsof three, carryingoutsteel erectioncontractsthroughoutthe country,manyhighprofile contractssuchas the rebuildof the Marlowe theatre inCanterbury, Baths Hall leisure complex Scunthorpeand DorsetCouncil new officesDorchestertoname buta few. Alwaysworkingtotightprogramsinoftenchallengingcircumstances. Time Frame :- June 2007 – May 2009 Employer:- HighCross ForecourtCanopies Duties:- Surveyor/SiteForeman Carryingout surveyscountrywideondamagedPFCcanopiesforcustomerssuchasBP, Sainsburys, Total andTesco,reportingback tothe office onworkrequiredandthencarryingoutrepairsas required. AlsoerectingnewPFCcanopiesanddevelopingthe new plugandplayPFCshop fabrication constructionand installationconcept. Time Frame :- April 2005 – May 2009 Employer:- A J WatersLimited Duties:- ErectionForeman Site foremanforseveral gangsof three,erectingbuildings countrywideforsteel firmssuchas S.C.W.S.DGT, Youngs,Wall engineering,Greensstructural and NorthBayStructures Time Frame :- May 2004 – April 2005 Employer:- R.DavisonSteel SolutionsLTD Duties:- Owner Ownerof a twogang, six manerectionfirmthatcarriedout several successful contracts countrywide, the majorone beingthe erectionof the managementsuite tothe BeethamHilton Hotel Manchester(tallestbuildingoutside Londonatthe time). Sadly,due toa majorcustomerchangingtheirpaymentregime withoutnotice Ihadtoclose the companyas the cashflowsituationbecame suchthatthe businesswas untenable.
  • 3. Time Frame January2003 – May 2004 Employer:- Rural Engineering Duties:- ErectionForeman Site Foremanfora gang of three, successfullycarryingoutmulti millionpounderectioncontractsfor customerssuchas Tesco,Sainsburys,B&Qcountrywide. Time Frame :- May 2002 - December2002 Employer:- Paul Cox Steel Erections Duties:- ErectionForeman Site foremanforseveral gangsof three,erectingsteel structuresandbuildingscountrywide forWall engineering,FourbaystructuresandPickeringSteel. Time frame :- February2001 – May 2002 Employer:- DGT Steel andCladding Duties:- Steel Erector/Snagger/SiteForeman Startedwiththe companyas a leaderectorbutwas soonmade up to site foreman/snaggerrunning varioussteel jobs countrywide asagang of three andcarryingout site/remedialworkstoexisting structures. Time Frame :- May 1998 – February2002 Employer:- Paul Cox Steel Erections Duties:- Steel Erector/Snagger Travellingthe countryerectingvarioussteel structuresfromsimpleportal framesto12,000 ton shoppingcomplex’sforsteel firmssuchasWall engineering,FourbayStructuresetc. Time frame :- August1997 – May 1998 Employer:- HubbardArchitectural Metalwork Duties:- Fab welder/Erector Fabricationanderectionof variousstructuresbothinthe company’syardand on site.