1. RESUME
RUDRAYYA C YARAGAMBALIMATH
Contact:+91-7411418211
E-mail: rudrayyay@gmail.com
CAREER OBJECTIVE :
To serve the organization as a hard worker in this competitive environment discharging all my
professional skills and to give my best in my professional career for overall benefit and growth
of the organization.
Professional Experience :
Company: Desapex Engineering consultants LLP
Designation: HVAC Design Intern (REVIT)
Location: Bangalore
Duration: 6 Months
Company: M/s MivenMachine Tools Ltd (CNC Turning Machine Manufacturer)
Designation: Graduate Engineering Trainee
Location: Hubli
Duration: November 2014 to November 2015
EDUCATIONALPROFILE :
Course College
Board/University Year Of
Passing
Percentage
BE
(MECHANICAL)
KLE INSTITUTE OF
TECHNOLOGY HUBLI
VTU
BELGAUM 2014 65%
PUC
D G SHETTY COLLEGE,
DHARWAD
Department Of Pre-
University Education,
Karnataka
2010 56%
S.S.L.C
JANATHA ENGLISH
SCHOOL,KALAGHATAGI
DHARWAD
Karnataka Secondary
Education
Examination Board
2008 82.24%
2. SOFTWARE SKILLS :
Software Version
Autodesk Revit 2014
AutoCAD 2014
McQuay duct size & pipe size 6.4
MS Word, MS Excel & MS PowerPoint 2010
PROJECTACCOMPLISHED:
• Commercial building HVAC design and MEP modeling using Autodesk Revit.
PROJECTDETAILS ( HVAC design with Revit MEP)
Type: Office Building
Location: BANGALORE
Cooling Load: 352TR
Occupancy: 3,584 People
Total Floor Area: 3,00,000 sq ft.
ARCHITECTURE/STRUCTURAL MODEL:
Developed the architecture model as per the input given in AutoCAD file.
Created walls, structural columns and beams in model.
Placed windows, doors and curtain walls.
Placed plumbing fixtures in the architecture model.
HEAT LOAD CALCULATIONS:
Created spaces in the model.
Considered envelope load, occupancy load, lighting load, electrical load and fresh air load
for heat load calculations.
Calculated the heat load.
EQUIPMENT SELECTION:
Water cooled screw chiller (175 + 175 TR)
Cross flow induced draft cooling tower
Floor mounted top discharge AHU
AIR DISTRIBUTION DESIGN :
Placed supply air diffusers exhaust grills and return air grills.
By considering CFM and velocity of air duct sizing was done.
Placed fire dampers and volume control dampers in the ducting system.
3. FIRE PROTECTION SYSTEM:
Placed sprinklers in the model.
Piping network was done for all sprinklers.
ELECTRICAL FIXTURES:
Placed the lighting fixture as per the inputs of electrical consultant.
PIPING SYSTEMS:
Created piping system for all plumbing fixtures.
CLASH DETECTION:
Found the clashes between the two systems of different elements.
Resolved all the clashes by revit software and made it as zero clash model.
BOQ’s:
Prepared BILL OF QUANTITIES for different materials like ducts, air terminals, duct fittings,
duct accessory, flexible duct schedules, pipes and lighting fixtures.
HOBBIES:
• Web browsing
• Listening music
• Playing & Watching cricket
• Reading news papers
PERSONELDETAILS:
Date of Birth : 07/01/1993
Sex : Male
Father’sName : Channayya
Nationality : Indian
Languages known : English,Hindi and kannada (Read,Write andSpeak)
DECLARATION:
I hereby declare that the above mentioned information is correct up to my knowledge and I
bear the responsibility for the correctness of the above mentioned particulars.
Yours’ faithfully
Place : Bangalore
Date : (Rudrayya C. Y)