Parallel Big Bowl CD 600 Slim Line Hydraulic
Centrifuges Installed onboard Ensco 107 at KFEL
Shipyard Singapore for Premier Oil Vietnam
CHALLENGES
Limited deck space on shaker
module roof.
Share of shaker module roof
with MWD / Logging
Containers
Big bowl Centrifuges had to fit
the same footprint deck space
for duel standard 518
centrifuges
Due to combined weight of
the centrifuges / MWD &
Logging containers the Shaker
module had to have additional
strengthening carried out
Centrifuge support frame
required Ensco Engineering
and ABS approval, structural
analysis to withstand towing
conditions
Due to wide load road limitations in Singapore the Centrifuge support frame was
designed as pre fabricated modular flanged sections which also reduced hot work
requirements during install with consideration for a cold work de mobilization on
completion of contract
A total of 8 sacrificial welded anchor pads were fitted and to compensate for deck
deviations the tie brackets were designed to adjust height prior to welding down the
sacrificial Anchor pad, The solids hoppers were pre fabricated and were flanged for ease
of install and de mob multiple spray bars and Teflon sheets fitted internal to ensure the
large volume of solids discharged from the big bowl centrifuges are flushed freely
overboard
Positioning and securing the Centrifuge Bowl frames to base frame
Positioning and securing the 2 pre fabricated support frames for the Centrifuge Hydraulic
Power packs which will be located on the upper level of the frame
Installation of the pre fabricated walk ways / hand rails and access ladder to the
Hydraulic power pack platform,
Centrifuge Hydraulic Power Packs positioned and secured on the upper level of support
frame, the only hot work required to get to this stage was the 8 sacrificial anchor pads,
matching flanges for the 2 solids hoppers and deck flanges for the 2 feed tube lines
everything else is flanged and bolted
Left Picture showing the hard pipe feed line tie in with certified crimped flanged jumper
hoses to the feed tubes.
Right picture showing PLC touch screens mounted on substantial support frame with
rubber vibration dampers also shown is the ABS approved removable sea fasteners that
are installed when rig is on tow to location pictures taken after commissioning
Centrifuge feed pumps positioned and secured Hard pipe suction and
discharge lines with certified crimped flanged jumper hoses on the discharges

Weitere ähnliche Inhalte

Was ist angesagt?

2.2 rig components
2.2 rig components2.2 rig components
2.2 rig componentsElsayed Amer
 
Equipos usados en perforación de pozos petroleros
Equipos usados en perforación de pozos petrolerosEquipos usados en perforación de pozos petroleros
Equipos usados en perforación de pozos petrolerosJohann Quintanar
 
Crankshaft/Piston/Xhead
Crankshaft/Piston/Xhead Crankshaft/Piston/Xhead
Crankshaft/Piston/Xhead Cyril Sudip
 
Deepwater sub sea capital equipment
Deepwater sub sea capital equipmentDeepwater sub sea capital equipment
Deepwater sub sea capital equipmentamrhaggag
 
(2) drilling rig operations & a to z rotary drilling rig components
(2) drilling rig operations & a to z rotary drilling rig components(2) drilling rig operations & a to z rotary drilling rig components
(2) drilling rig operations & a to z rotary drilling rig componentsmakrand tripathi
 
Yale c879 gdc70 vx lift truck service repair manual
Yale c879 gdc70 vx lift truck service repair manualYale c879 gdc70 vx lift truck service repair manual
Yale c879 gdc70 vx lift truck service repair manualjfjskekdhnejd
 
Yale c879 gdc60 vx lift truck service repair manual
Yale c879 gdc60 vx lift truck service repair manualYale c879 gdc60 vx lift truck service repair manual
Yale c879 gdc60 vx lift truck service repair manualfhhsjdkmem
 
Yale c879 glc70 vx lift truck service repair manual
Yale c879 glc70 vx lift truck service repair manualYale c879 glc70 vx lift truck service repair manual
Yale c879 glc70 vx lift truck service repair manualfjjskekdmmme
 
Yale c879 glc70 vx lift truck service repair manual
Yale c879 glc70 vx lift truck service repair manualYale c879 glc70 vx lift truck service repair manual
Yale c879 glc70 vx lift truck service repair manualjkmsme ekdmm
 
05 drilling methods
05  drilling methods05  drilling methods
05 drilling methodsgraham101231
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technologyakpp01
 

Was ist angesagt? (19)

2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
 
Equipos usados en perforación de pozos petroleros
Equipos usados en perforación de pozos petrolerosEquipos usados en perforación de pozos petroleros
Equipos usados en perforación de pozos petroleros
 
Crankshaft/Piston/Xhead
Crankshaft/Piston/Xhead Crankshaft/Piston/Xhead
Crankshaft/Piston/Xhead
 
Mech.pdf
Mech.pdfMech.pdf
Mech.pdf
 
Agnee h series helical gearbox-bevel helical gear box
Agnee  h series helical gearbox-bevel helical gear boxAgnee  h series helical gearbox-bevel helical gear box
Agnee h series helical gearbox-bevel helical gear box
 
Deepwater sub sea capital equipment
Deepwater sub sea capital equipmentDeepwater sub sea capital equipment
Deepwater sub sea capital equipment
 
SHALLOW WELL PUMPS HJ100S
SHALLOW WELL PUMPS HJ100SSHALLOW WELL PUMPS HJ100S
SHALLOW WELL PUMPS HJ100S
 
(2) drilling rig operations & a to z rotary drilling rig components
(2) drilling rig operations & a to z rotary drilling rig components(2) drilling rig operations & a to z rotary drilling rig components
(2) drilling rig operations & a to z rotary drilling rig components
 
Yale c879 gdc70 vx lift truck service repair manual
Yale c879 gdc70 vx lift truck service repair manualYale c879 gdc70 vx lift truck service repair manual
Yale c879 gdc70 vx lift truck service repair manual
 
Yale c879 gdc60 vx lift truck service repair manual
Yale c879 gdc60 vx lift truck service repair manualYale c879 gdc60 vx lift truck service repair manual
Yale c879 gdc60 vx lift truck service repair manual
 
Yale c879 glc70 vx lift truck service repair manual
Yale c879 glc70 vx lift truck service repair manualYale c879 glc70 vx lift truck service repair manual
Yale c879 glc70 vx lift truck service repair manual
 
Yale c879 glc70 vx lift truck service repair manual
Yale c879 glc70 vx lift truck service repair manualYale c879 glc70 vx lift truck service repair manual
Yale c879 glc70 vx lift truck service repair manual
 
05 drilling methods
05  drilling methods05  drilling methods
05 drilling methods
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technology
 
5346 5350.output
5346 5350.output5346 5350.output
5346 5350.output
 
5346 5350.output
5346 5350.output5346 5350.output
5346 5350.output
 
jahangir new
jahangir newjahangir new
jahangir new
 
Z 3500 pump lpg corken
Z 3500 pump lpg corkenZ 3500 pump lpg corken
Z 3500 pump lpg corken
 
One cylnder Axial engine
One cylnder Axial engineOne cylnder Axial engine
One cylnder Axial engine
 

Andere mochten auch

Mud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKOMud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKORoy Catto
 
101 socialmediadosanddonts
101 socialmediadosanddonts101 socialmediadosanddonts
101 socialmediadosanddontsWayne Harriman
 
Combo Guide Training_FEA FDS_20140312
Combo Guide Training_FEA  FDS_20140312Combo Guide Training_FEA  FDS_20140312
Combo Guide Training_FEA FDS_20140312Whitney Lamb
 
Новые идеологические слияния в российском антидемократизме
Новые идеологические слияния в российском антидемократизмеНовые идеологические слияния в российском антидемократизме
Новые идеологические слияния в российском антидемократизмеAndreas Umland
 
UGent MIS research seminar June 2015
UGent MIS research seminar June 2015UGent MIS research seminar June 2015
UGent MIS research seminar June 2015Jan Claes
 
PhD pre-defense September 2015
PhD pre-defense September 2015PhD pre-defense September 2015
PhD pre-defense September 2015Jan Claes
 
The German Science Landscape
The German Science LandscapeThe German Science Landscape
The German Science LandscapeAndreas Umland
 
Germany's "Excellence Initiative"
Germany's "Excellence Initiative"Germany's "Excellence Initiative"
Germany's "Excellence Initiative"Andreas Umland
 
Virtuelna Stvarnost - Talas koji dolazi
Virtuelna Stvarnost - Talas koji dolaziVirtuelna Stvarnost - Talas koji dolazi
Virtuelna Stvarnost - Talas koji dolaziMobile Monday Srbija
 
HTML, CSS i Javascript Web tehnologije - 3. predavanje - Startit.rs
HTML, CSS i Javascript Web tehnologije - 3. predavanje - Startit.rsHTML, CSS i Javascript Web tehnologije - 3. predavanje - Startit.rs
HTML, CSS i Javascript Web tehnologije - 3. predavanje - Startit.rsMilovan Jovičić
 

Andere mochten auch (12)

Mud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKOMud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKO
 
101 socialmediadosanddonts
101 socialmediadosanddonts101 socialmediadosanddonts
101 socialmediadosanddonts
 
Combo Guide Training_FEA FDS_20140312
Combo Guide Training_FEA  FDS_20140312Combo Guide Training_FEA  FDS_20140312
Combo Guide Training_FEA FDS_20140312
 
Новые идеологические слияния в российском антидемократизме
Новые идеологические слияния в российском антидемократизмеНовые идеологические слияния в российском антидемократизме
Новые идеологические слияния в российском антидемократизме
 
Driver's Licence
Driver's LicenceDriver's Licence
Driver's Licence
 
UGent MIS research seminar June 2015
UGent MIS research seminar June 2015UGent MIS research seminar June 2015
UGent MIS research seminar June 2015
 
PhD pre-defense September 2015
PhD pre-defense September 2015PhD pre-defense September 2015
PhD pre-defense September 2015
 
The German Science Landscape
The German Science LandscapeThe German Science Landscape
The German Science Landscape
 
APMalliAnalyysi
APMalliAnalyysiAPMalliAnalyysi
APMalliAnalyysi
 
Germany's "Excellence Initiative"
Germany's "Excellence Initiative"Germany's "Excellence Initiative"
Germany's "Excellence Initiative"
 
Virtuelna Stvarnost - Talas koji dolazi
Virtuelna Stvarnost - Talas koji dolaziVirtuelna Stvarnost - Talas koji dolazi
Virtuelna Stvarnost - Talas koji dolazi
 
HTML, CSS i Javascript Web tehnologije - 3. predavanje - Startit.rs
HTML, CSS i Javascript Web tehnologije - 3. predavanje - Startit.rsHTML, CSS i Javascript Web tehnologije - 3. predavanje - Startit.rs
HTML, CSS i Javascript Web tehnologije - 3. predavanje - Startit.rs
 

Ähnlich wie Big Bowl centrifuge install Ensco 107

CEEM Advanced Hydraulic Workover Unit
CEEM Advanced Hydraulic Workover UnitCEEM Advanced Hydraulic Workover Unit
CEEM Advanced Hydraulic Workover UnitRichard Tabaranza
 
Overhead crane modernizations
Overhead crane modernizationsOverhead crane modernizations
Overhead crane modernizationsKonecranes
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Ashutosh Sachan
 
Seawind Copenhagen Paper 20150310
Seawind Copenhagen Paper 20150310Seawind Copenhagen Paper 20150310
Seawind Copenhagen Paper 20150310Ray Dackerman
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsVijay Raj
 
Report steffones
Report steffonesReport steffones
Report steffonesSteffones K
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsAmer Abdul Aziz
 
Cooling Tower:-By Using More Efficient Equipment Increase Efficiency
Cooling Tower:-By Using More Efficient Equipment Increase EfficiencyCooling Tower:-By Using More Efficient Equipment Increase Efficiency
Cooling Tower:-By Using More Efficient Equipment Increase EfficiencyMayursinh Solanki
 
237978847 pipin-study-7
237978847 pipin-study-7237978847 pipin-study-7
237978847 pipin-study-7homeworkping3
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerTheodoros Dragonas
 
JDWW001v6evapcocondenser
JDWW001v6evapcocondenserJDWW001v6evapcocondenser
JDWW001v6evapcocondenserKelly Erwin
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanDavid H Moloney
 
Master Specifications Vehicle Lifts
Master Specifications Vehicle LiftsMaster Specifications Vehicle Lifts
Master Specifications Vehicle LiftsSlideCommunity
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfAZLANAiyub
 
Marine Market Applications & Innovations
Marine Market Applications & InnovationsMarine Market Applications & Innovations
Marine Market Applications & InnovationsAltra Industrial Motion
 

Ähnlich wie Big Bowl centrifuge install Ensco 107 (20)

CEEM Advanced Hydraulic Workover Unit
CEEM Advanced Hydraulic Workover UnitCEEM Advanced Hydraulic Workover Unit
CEEM Advanced Hydraulic Workover Unit
 
Overhead crane modernizations
Overhead crane modernizationsOverhead crane modernizations
Overhead crane modernizations
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
 
Seawind Copenhagen Paper 20150310
Seawind Copenhagen Paper 20150310Seawind Copenhagen Paper 20150310
Seawind Copenhagen Paper 20150310
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
 
Report steffones
Report steffonesReport steffones
Report steffones
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling Projects
 
Cooling Tower:-By Using More Efficient Equipment Increase Efficiency
Cooling Tower:-By Using More Efficient Equipment Increase EfficiencyCooling Tower:-By Using More Efficient Equipment Increase Efficiency
Cooling Tower:-By Using More Efficient Equipment Increase Efficiency
 
Product of the Week Showcase - May
Product of the Week Showcase - MayProduct of the Week Showcase - May
Product of the Week Showcase - May
 
237978847 pipin-study-7
237978847 pipin-study-7237978847 pipin-study-7
237978847 pipin-study-7
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
 
JDWW001v6evapcocondenser
JDWW001v6evapcocondenserJDWW001v6evapcocondenser
JDWW001v6evapcocondenser
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 
Master Specifications Vehicle Lifts
Master Specifications Vehicle LiftsMaster Specifications Vehicle Lifts
Master Specifications Vehicle Lifts
 
Field Services: Problem Resolution
Field Services: Problem ResolutionField Services: Problem Resolution
Field Services: Problem Resolution
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
Pipe Support & EJ Field Examples & Case Studies
Pipe Support & EJ Field Examples & Case StudiesPipe Support & EJ Field Examples & Case Studies
Pipe Support & EJ Field Examples & Case Studies
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
Marine Market Applications & Innovations
Marine Market Applications & InnovationsMarine Market Applications & Innovations
Marine Market Applications & Innovations
 

Big Bowl centrifuge install Ensco 107

  • 1. Parallel Big Bowl CD 600 Slim Line Hydraulic Centrifuges Installed onboard Ensco 107 at KFEL Shipyard Singapore for Premier Oil Vietnam CHALLENGES Limited deck space on shaker module roof. Share of shaker module roof with MWD / Logging Containers Big bowl Centrifuges had to fit the same footprint deck space for duel standard 518 centrifuges Due to combined weight of the centrifuges / MWD & Logging containers the Shaker module had to have additional strengthening carried out Centrifuge support frame required Ensco Engineering and ABS approval, structural analysis to withstand towing conditions
  • 2. Due to wide load road limitations in Singapore the Centrifuge support frame was designed as pre fabricated modular flanged sections which also reduced hot work requirements during install with consideration for a cold work de mobilization on completion of contract
  • 3. A total of 8 sacrificial welded anchor pads were fitted and to compensate for deck deviations the tie brackets were designed to adjust height prior to welding down the sacrificial Anchor pad, The solids hoppers were pre fabricated and were flanged for ease of install and de mob multiple spray bars and Teflon sheets fitted internal to ensure the large volume of solids discharged from the big bowl centrifuges are flushed freely overboard
  • 4. Positioning and securing the Centrifuge Bowl frames to base frame
  • 5. Positioning and securing the 2 pre fabricated support frames for the Centrifuge Hydraulic Power packs which will be located on the upper level of the frame
  • 6. Installation of the pre fabricated walk ways / hand rails and access ladder to the Hydraulic power pack platform,
  • 7. Centrifuge Hydraulic Power Packs positioned and secured on the upper level of support frame, the only hot work required to get to this stage was the 8 sacrificial anchor pads, matching flanges for the 2 solids hoppers and deck flanges for the 2 feed tube lines everything else is flanged and bolted
  • 8. Left Picture showing the hard pipe feed line tie in with certified crimped flanged jumper hoses to the feed tubes. Right picture showing PLC touch screens mounted on substantial support frame with rubber vibration dampers also shown is the ABS approved removable sea fasteners that are installed when rig is on tow to location pictures taken after commissioning
  • 9. Centrifuge feed pumps positioned and secured Hard pipe suction and discharge lines with certified crimped flanged jumper hoses on the discharges