SlideShare ist ein Scribd-Unternehmen logo
1 von 9
UNO BUS
RECCE FORM To be completed ahead of recce
Enter details below
STORY
The bus scene includes all band members and additional ‘bus passengers’ on the bus. It
is a normal scene, however there are going to be shots of the band mates playing their
instruments whilst the singers are singing the chorus down walkie talkies- as reference to
another music video by The Police.
BRIEF DESCRIPTION OF FILMING OR OTHER
TASKS (THIS MIGHT INCLUDE LIST OF
INTERVIEWS AND SHOTS REQUIRED)
Close up shots of band mates playing their instruments or singing down the walkie talkie
machines. Also wide shots of all the passengers on the bus.
DATE OF RECCE 17/2/18
LOCATION (WITH DIRECTIONS/MAPS IF
NECESSARY) Park Campus Car Park
DATE AND TIME OF FILMING 17.2.18 – 12-2pm
ESTIMATED TIME ON SITE 2 hours
HAS A RISK ASSESSMENT BEEN COMPLETED? Yes
VEHICLE ACCESS AND PARKING ON SITE? Yes
TOILETS? Yes
FILMING INDOORS AND/OR OUTDOORS? Outdoors on a double decker bus
WILL LIGHTS BE NEEDED? No
GREEN SCREEN RECCE
RECCE FORM To be completed ahead of recce
Enter details below
STORY
BRIEF DESCRIPTION OF FILMING OR OTHER
TASKS (THIS MIGHT INCLUDE LIST OF
INTERVIEWS AND SHOTS REQUIRED) Shots of band members playing their instruments, along with strobe and UV lights.
DATE OF RECCE 18/2/18
LOCATION (WITH DIRECTIONS/MAPS IF
NECESSARY) Green Screen at Avenue Campus
DATE AND TIME OF FILMING 18/2/18 4-7PM
ESTIMATED TIME ON SITE 3 hours
HAS A RISK ASSESSMENT BEEN COMPLETED? Yes
ACCESS TO POWER SUPPLY IF REQUIRED? No
IS THERE A SECURE PLACE TO LEAVE KIT? Yes
WILL MEMBERS OF THE PUBLIC BE PRESENT? No
IF YES ABOVE, WILL THERE BE CHILDREN? No
ADDITIONAL NOTES -
VEHICLE ACCESS AND PARKING ON SITE? Yes
TOILETS? Yes
FILMING INDOORS AND/OR OUTDOORS? Indoors
WILL LIGHTS BE NEEDED? No
ACCESS TO POWER SUPPLY IF REQUIRED? Yes
IS THERE A SECURE PLACE TO LEAVE KIT? Yes
WILL MEMBERS OF THE PUBLIC BE PRESENT? No
IF YES ABOVE, WILL THERE BE CHILDREN? No
ADDITIONAL NOTES -
RACECOURSE
RECCE FORM To be completed ahead of recce
Enter details below
STORY
Filming of band mates ‘acting’ as homeless people on the racecourse, also band shots of
band mates playing their instruments.
BRIEF DESCRIPTION OF FILMING OR OTHER
TASKS (THIS MIGHT INCLUDE LIST OF
INTERVIEWS AND SHOTS REQUIRED)
Close up and medium shots of all the band mates acting. Also long/wide shots of
instruments being played.
DATE OF RECCE 18/2/18 – 19/2/18
LOCATION (WITH DIRECTIONS/MAPS IF
NECESSARY) Racecourse on St George’s Avenue
DATE AND TIME OF FILMING 18/2/18 – 19/2/18
ESTIMATED TIME ON SITE 18/2/18- 5-6 PM – 19/2/18- 3-5 PM
HAS A RISK ASSESSMENT BEEN COMPLETED? Yes
VEHICLE ACCESS AND PARKING ON SITE? Yes
TOILETS? Yes – across the road at Avenue Campus
FILMING INDOORS AND/OR OUTDOORS? Outdoors
WILL LIGHTS BE NEEDED? No
ACCESS TO POWER SUPPLY IF REQUIRED? No
IS THERE A SECURE PLACE TO LEAVE KIT? No
WILL MEMBERS OF THE PUBLIC BE PRESENT? Yes
IF YES ABOVE, WILL THERE BE CHILDREN? Yes, however will stop filming when they are present in the shot.
ADDITIONAL NOTES -
AVENUECAMPUS AND NEWTON BUILDING
RECCE FORM To be completed ahead of recce
Enter details below
STORY
Shots of bandmates playing their instruments in front of the Newton Building. Also shots
of all the bandmates sitting outside the front entrance at Avenue Campus ‘acting’ as
homeless people sleeping rough in the evening.
BRIEF DESCRIPTION OF FILMING OR OTHER
TASKS (THIS MIGHT INCLUDE LIST OF
INTERVIEWS AND SHOTS REQUIRED)
Establishing shots, with a mix of mid shots and close ups of two of the bandmates
playing their instruments outside the front of the newton building. Also close up shots of
the band mates acting outside avenue campus.
DATE OF RECCE 18/2/18
LOCATION (WITH DIRECTIONS/MAPS IF
NECESSARY) Avenue Campus
DATE AND TIME OF FILMING 18/2/18 – 5- 7 PM
ESTIMATED TIME ON SITE 2 hours
HAS A RISK ASSESSMENT BEEN COMPLETED? Yes
VEHICLE ACCESS AND PARKING ON SITE? Yes
TOILETS? Yes
FILMING INDOORS AND/OR OUTDOORS? Outdoors
WILL LIGHTS BE NEEDED? No
ACCESS TO POWER SUPPLY IF REQUIRED? No
IS THERE A SECURE PLACE TO LEAVE KIT? Yes
WILL MEMBERS OF THE PUBLIC BE PRESENT? No
IF YES ABOVE, WILL THERE BE CHILDREN? No
ADDITIONAL NOTES -
MUSIC RECORDINGSTUDIO
RECCE FORM To be completed ahead of recce
Enter details below
STORY
The music band and main artist are all performing in the recording studio, this is with
the singers gathered round a microphone and the band mates who play instruments
dotted around the room.
BRIEF DESCRIPTION OF FILMING OR OTHER
TASKS (THIS MIGHT INCLUDE LIST OF
INTERVIEWS AND SHOTS REQUIRED)
Close up shots of the band mates playing their instruments, and mid shots of singers.
These shots will be used in specific verse/ or as montage shots throughout the video.
DATE OF RECCE 18/2/18
LOCATION (WITH DIRECTIONS/MAPS IF
NECESSARY) Avenue Campus Music Block
DATE AND TIME OF FILMING 18/2/18 6-9PM
ESTIMATED TIME ON SITE 3 hours
HAS A RISK ASSESSMENT BEEN COMPLETED? Yes
VEHICLE ACCESS AND PARKING ON SITE? Yes
TOILETS? Yes
FILMING INDOORS AND/OR OUTDOORS? Indoors
WILL LIGHTS BE NEEDED? Yes
ACCESS TO POWER SUPPLY IF REQUIRED? Yes
IS THERE A SECURE PLACE TO LEAVE KIT? Yes
WILL MEMBERS OF THE PUBLIC BE PRESENT? No
IF YES ABOVE, WILL THERE BE CHILDREN? No
ADDITIONAL NOTES -
TRAIN STATION
RECCE FORM To be completed ahead of recce
Enter details below
STORY
There are three scenes at this train station to be filmed on separate occasions. The first
scene is Verity ‘acting’ as a homeless person, so will be sitting on the stairs at the front
entrance of the train station. The second scene involves all the band mates playing their
instruments at the front of the train station. The last scene involves Verity playing her
guitar by herself, which is going to be the start shots for the music video.
BRIEF DESCRIPTION OF FILMING OR OTHER
TASKS (THIS MIGHT INCLUDE LIST OF
INTERVIEWS AND SHOTS REQUIRED)
Close up and mid shots of the band mates playing their instruments, also establishing
shots of the train station and the Northampton train station sign.
DATE OF RECCE 11/2/18- 17.2.18/ 19/2/18
LOCATION (WITH DIRECTIONS/MAPS IF
NECESSARY) Northampton Train Station
DATE AND TIME OF FILMING 11/2/18 – 12-1PM / 17/2/18 – 3-4PM / 19/2/18 – 12PM
ESTIMATED TIME ON SITE 2 hours max
HAS A RISK ASSESSMENT BEEN COMPLETED? Yes
VEHICLE ACCESS AND PARKING ON SITE? Yes
TOILETS? Yes
FILMING INDOORS AND/OR OUTDOORS? Outdoors
WILL LIGHTS BE NEEDED? No
ACCESS TO POWER SUPPLY IF REQUIRED? No
IS THERE A SECURE PLACE TO LEAVE KIT? Yes
WILL MEMBERS OF THE PUBLIC BE PRESENT? Yes
IF YES ABOVE, WILL THERE BE CHILDREN? Yes, when children present the filming was stopped until out of shot.
ADDITIONAL NOTES -
OPEN DOOR CENTRE
RECCE FORM To be completed ahead of recce
Enter details below
STORY
Filming was done at Open Door Centre to highlight the activismof the video. There were
two scenes in this music video that was at this location, one being Verity helping out
with the volunteers and homeless people, also filming on the same day as this. The
second scene was all the other band mates helping out with the setting up of the Open
Door Centre.
BRIEF DESCRIPTION OF FILMING OR OTHER
TASKS (THIS MIGHT INCLUDE LIST OF
INTERVIEWS AND SHOTS REQUIRED)
Close ups of the volunteers as ‘homeless people’, to show the emotion of sleeping
rough. Mid shots and long shots of the band mates helping set up the location. Also close
ups of Verity helping out with the making of the food for the homeless people.
DATE OF RECCE 11/2/18
LOCATION (WITH DIRECTIONS/MAPS IF
NECESSARY) Open Door Centre, Kettering Road, Northampton
DATE AND TIME OF FILMING 11/2/18 – 11-4PM
ESTIMATED TIME ON SITE 11AM
HAS A RISK ASSESSMENT BEEN COMPLETED? Yes
VEHICLE ACCESS AND PARKING ON SITE? Yes
TOILETS? Yes
FILMING INDOORS AND/OR OUTDOORS? Indoors
WILL LIGHTS BE NEEDED? Yes
ACCESS TO POWER SUPPLY IF REQUIRED? Yes
IS THERE A SECURE PLACE TO LEAVE KIT? Yes
WILL MEMBERS OF THE PUBLIC BE PRESENT? Yes
IF YES ABOVE, WILL THERE BE CHILDREN? No
ADDITIONAL NOTES -

Weitere Àhnliche Inhalte

Mehr von Rosie Allen

Storyboard changemaker
Storyboard changemakerStoryboard changemaker
Storyboard changemaker
Rosie Allen
 
Personal release changemaker
Personal release changemakerPersonal release changemaker
Personal release changemaker
Rosie Allen
 
Risk assessment changemaker promo
Risk assessment changemaker promoRisk assessment changemaker promo
Risk assessment changemaker promo
Rosie Allen
 
Shooting schedule one more kiss
Shooting schedule one more kissShooting schedule one more kiss
Shooting schedule one more kiss
Rosie Allen
 
Storyboard individual project
Storyboard individual projectStoryboard individual project
Storyboard individual project
Rosie Allen
 
Personal release forms bus
Personal release forms busPersonal release forms bus
Personal release forms bus
Rosie Allen
 
Personal releases one more kiss
Personal releases one more kissPersonal releases one more kiss
Personal releases one more kiss
Rosie Allen
 
Risk assessment one more kiss
Risk assessment one more kissRisk assessment one more kiss
Risk assessment one more kiss
Rosie Allen
 
Schedule one more kiss
Schedule one more kissSchedule one more kiss
Schedule one more kiss
Rosie Allen
 
Personal releases turn of the tide
Personal releases turn of the tidePersonal releases turn of the tide
Personal releases turn of the tide
Rosie Allen
 
Call sheets for turn of the tide
Call sheets for turn of the tideCall sheets for turn of the tide
Call sheets for turn of the tide
Rosie Allen
 
Risk assessment turn of tide
Risk assessment turn of tide Risk assessment turn of tide
Risk assessment turn of tide
Rosie Allen
 

Mehr von Rosie Allen (20)

Promotional video
Promotional videoPromotional video
Promotional video
 
Storyboard changemaker
Storyboard changemakerStoryboard changemaker
Storyboard changemaker
 
Personal release changemaker
Personal release changemakerPersonal release changemaker
Personal release changemaker
 
Rosie allen crew
Rosie allen crewRosie allen crew
Rosie allen crew
 
Risk assessment changemaker promo
Risk assessment changemaker promoRisk assessment changemaker promo
Risk assessment changemaker promo
 
Equipment promo vid
Equipment promo vidEquipment promo vid
Equipment promo vid
 
Promotional video
Promotional videoPromotional video
Promotional video
 
Les permission
Les permissionLes permission
Les permission
 
Shooting schedule one more kiss
Shooting schedule one more kissShooting schedule one more kiss
Shooting schedule one more kiss
 
Storyboard individual project
Storyboard individual projectStoryboard individual project
Storyboard individual project
 
Personal release forms bus
Personal release forms busPersonal release forms bus
Personal release forms bus
 
Personal releases one more kiss
Personal releases one more kissPersonal releases one more kiss
Personal releases one more kiss
 
Risk assessment one more kiss
Risk assessment one more kissRisk assessment one more kiss
Risk assessment one more kiss
 
Call sheet one more kiss
Call sheet one more kissCall sheet one more kiss
Call sheet one more kiss
 
Schedule one more kiss
Schedule one more kissSchedule one more kiss
Schedule one more kiss
 
Equipment
Equipment Equipment
Equipment
 
Personal releases turn of the tide
Personal releases turn of the tidePersonal releases turn of the tide
Personal releases turn of the tide
 
Call sheets for turn of the tide
Call sheets for turn of the tideCall sheets for turn of the tide
Call sheets for turn of the tide
 
Risk assessment turn of tide
Risk assessment turn of tide Risk assessment turn of tide
Risk assessment turn of tide
 
Recce form
Recce formRecce form
Recce form
 

KĂŒrzlich hochgeladen

KĂŒrzlich hochgeladen (20)

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health Education
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
80 ĐỀ THI THỏ TUYỂN SINH TIáșŸNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỏ TUYỂN SINH TIáșŸNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỏ TUYỂN SINH TIáșŸNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỏ TUYỂN SINH TIáșŸNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 

Recce forms for turn of the tide

  • 1. UNO BUS RECCE FORM To be completed ahead of recce Enter details below STORY The bus scene includes all band members and additional ‘bus passengers’ on the bus. It is a normal scene, however there are going to be shots of the band mates playing their instruments whilst the singers are singing the chorus down walkie talkies- as reference to another music video by The Police. BRIEF DESCRIPTION OF FILMING OR OTHER TASKS (THIS MIGHT INCLUDE LIST OF INTERVIEWS AND SHOTS REQUIRED) Close up shots of band mates playing their instruments or singing down the walkie talkie machines. Also wide shots of all the passengers on the bus. DATE OF RECCE 17/2/18 LOCATION (WITH DIRECTIONS/MAPS IF NECESSARY) Park Campus Car Park DATE AND TIME OF FILMING 17.2.18 – 12-2pm ESTIMATED TIME ON SITE 2 hours HAS A RISK ASSESSMENT BEEN COMPLETED? Yes VEHICLE ACCESS AND PARKING ON SITE? Yes TOILETS? Yes FILMING INDOORS AND/OR OUTDOORS? Outdoors on a double decker bus WILL LIGHTS BE NEEDED? No
  • 2. GREEN SCREEN RECCE RECCE FORM To be completed ahead of recce Enter details below STORY BRIEF DESCRIPTION OF FILMING OR OTHER TASKS (THIS MIGHT INCLUDE LIST OF INTERVIEWS AND SHOTS REQUIRED) Shots of band members playing their instruments, along with strobe and UV lights. DATE OF RECCE 18/2/18 LOCATION (WITH DIRECTIONS/MAPS IF NECESSARY) Green Screen at Avenue Campus DATE AND TIME OF FILMING 18/2/18 4-7PM ESTIMATED TIME ON SITE 3 hours HAS A RISK ASSESSMENT BEEN COMPLETED? Yes ACCESS TO POWER SUPPLY IF REQUIRED? No IS THERE A SECURE PLACE TO LEAVE KIT? Yes WILL MEMBERS OF THE PUBLIC BE PRESENT? No IF YES ABOVE, WILL THERE BE CHILDREN? No ADDITIONAL NOTES -
  • 3. VEHICLE ACCESS AND PARKING ON SITE? Yes TOILETS? Yes FILMING INDOORS AND/OR OUTDOORS? Indoors WILL LIGHTS BE NEEDED? No ACCESS TO POWER SUPPLY IF REQUIRED? Yes IS THERE A SECURE PLACE TO LEAVE KIT? Yes WILL MEMBERS OF THE PUBLIC BE PRESENT? No IF YES ABOVE, WILL THERE BE CHILDREN? No ADDITIONAL NOTES - RACECOURSE RECCE FORM To be completed ahead of recce Enter details below STORY Filming of band mates ‘acting’ as homeless people on the racecourse, also band shots of band mates playing their instruments. BRIEF DESCRIPTION OF FILMING OR OTHER TASKS (THIS MIGHT INCLUDE LIST OF INTERVIEWS AND SHOTS REQUIRED) Close up and medium shots of all the band mates acting. Also long/wide shots of instruments being played. DATE OF RECCE 18/2/18 – 19/2/18
  • 4. LOCATION (WITH DIRECTIONS/MAPS IF NECESSARY) Racecourse on St George’s Avenue DATE AND TIME OF FILMING 18/2/18 – 19/2/18 ESTIMATED TIME ON SITE 18/2/18- 5-6 PM – 19/2/18- 3-5 PM HAS A RISK ASSESSMENT BEEN COMPLETED? Yes VEHICLE ACCESS AND PARKING ON SITE? Yes TOILETS? Yes – across the road at Avenue Campus FILMING INDOORS AND/OR OUTDOORS? Outdoors WILL LIGHTS BE NEEDED? No ACCESS TO POWER SUPPLY IF REQUIRED? No IS THERE A SECURE PLACE TO LEAVE KIT? No WILL MEMBERS OF THE PUBLIC BE PRESENT? Yes IF YES ABOVE, WILL THERE BE CHILDREN? Yes, however will stop filming when they are present in the shot. ADDITIONAL NOTES - AVENUECAMPUS AND NEWTON BUILDING RECCE FORM To be completed ahead of recce Enter details below
  • 5. STORY Shots of bandmates playing their instruments in front of the Newton Building. Also shots of all the bandmates sitting outside the front entrance at Avenue Campus ‘acting’ as homeless people sleeping rough in the evening. BRIEF DESCRIPTION OF FILMING OR OTHER TASKS (THIS MIGHT INCLUDE LIST OF INTERVIEWS AND SHOTS REQUIRED) Establishing shots, with a mix of mid shots and close ups of two of the bandmates playing their instruments outside the front of the newton building. Also close up shots of the band mates acting outside avenue campus. DATE OF RECCE 18/2/18 LOCATION (WITH DIRECTIONS/MAPS IF NECESSARY) Avenue Campus DATE AND TIME OF FILMING 18/2/18 – 5- 7 PM ESTIMATED TIME ON SITE 2 hours HAS A RISK ASSESSMENT BEEN COMPLETED? Yes VEHICLE ACCESS AND PARKING ON SITE? Yes TOILETS? Yes FILMING INDOORS AND/OR OUTDOORS? Outdoors WILL LIGHTS BE NEEDED? No ACCESS TO POWER SUPPLY IF REQUIRED? No IS THERE A SECURE PLACE TO LEAVE KIT? Yes WILL MEMBERS OF THE PUBLIC BE PRESENT? No IF YES ABOVE, WILL THERE BE CHILDREN? No
  • 6. ADDITIONAL NOTES - MUSIC RECORDINGSTUDIO RECCE FORM To be completed ahead of recce Enter details below STORY The music band and main artist are all performing in the recording studio, this is with the singers gathered round a microphone and the band mates who play instruments dotted around the room. BRIEF DESCRIPTION OF FILMING OR OTHER TASKS (THIS MIGHT INCLUDE LIST OF INTERVIEWS AND SHOTS REQUIRED) Close up shots of the band mates playing their instruments, and mid shots of singers. These shots will be used in specific verse/ or as montage shots throughout the video. DATE OF RECCE 18/2/18 LOCATION (WITH DIRECTIONS/MAPS IF NECESSARY) Avenue Campus Music Block DATE AND TIME OF FILMING 18/2/18 6-9PM ESTIMATED TIME ON SITE 3 hours HAS A RISK ASSESSMENT BEEN COMPLETED? Yes VEHICLE ACCESS AND PARKING ON SITE? Yes TOILETS? Yes FILMING INDOORS AND/OR OUTDOORS? Indoors
  • 7. WILL LIGHTS BE NEEDED? Yes ACCESS TO POWER SUPPLY IF REQUIRED? Yes IS THERE A SECURE PLACE TO LEAVE KIT? Yes WILL MEMBERS OF THE PUBLIC BE PRESENT? No IF YES ABOVE, WILL THERE BE CHILDREN? No ADDITIONAL NOTES - TRAIN STATION RECCE FORM To be completed ahead of recce Enter details below STORY There are three scenes at this train station to be filmed on separate occasions. The first scene is Verity ‘acting’ as a homeless person, so will be sitting on the stairs at the front entrance of the train station. The second scene involves all the band mates playing their instruments at the front of the train station. The last scene involves Verity playing her guitar by herself, which is going to be the start shots for the music video. BRIEF DESCRIPTION OF FILMING OR OTHER TASKS (THIS MIGHT INCLUDE LIST OF INTERVIEWS AND SHOTS REQUIRED) Close up and mid shots of the band mates playing their instruments, also establishing shots of the train station and the Northampton train station sign. DATE OF RECCE 11/2/18- 17.2.18/ 19/2/18 LOCATION (WITH DIRECTIONS/MAPS IF NECESSARY) Northampton Train Station
  • 8. DATE AND TIME OF FILMING 11/2/18 – 12-1PM / 17/2/18 – 3-4PM / 19/2/18 – 12PM ESTIMATED TIME ON SITE 2 hours max HAS A RISK ASSESSMENT BEEN COMPLETED? Yes VEHICLE ACCESS AND PARKING ON SITE? Yes TOILETS? Yes FILMING INDOORS AND/OR OUTDOORS? Outdoors WILL LIGHTS BE NEEDED? No ACCESS TO POWER SUPPLY IF REQUIRED? No IS THERE A SECURE PLACE TO LEAVE KIT? Yes WILL MEMBERS OF THE PUBLIC BE PRESENT? Yes IF YES ABOVE, WILL THERE BE CHILDREN? Yes, when children present the filming was stopped until out of shot. ADDITIONAL NOTES - OPEN DOOR CENTRE RECCE FORM To be completed ahead of recce Enter details below STORY Filming was done at Open Door Centre to highlight the activismof the video. There were two scenes in this music video that was at this location, one being Verity helping out with the volunteers and homeless people, also filming on the same day as this. The second scene was all the other band mates helping out with the setting up of the Open
  • 9. Door Centre. BRIEF DESCRIPTION OF FILMING OR OTHER TASKS (THIS MIGHT INCLUDE LIST OF INTERVIEWS AND SHOTS REQUIRED) Close ups of the volunteers as ‘homeless people’, to show the emotion of sleeping rough. Mid shots and long shots of the band mates helping set up the location. Also close ups of Verity helping out with the making of the food for the homeless people. DATE OF RECCE 11/2/18 LOCATION (WITH DIRECTIONS/MAPS IF NECESSARY) Open Door Centre, Kettering Road, Northampton DATE AND TIME OF FILMING 11/2/18 – 11-4PM ESTIMATED TIME ON SITE 11AM HAS A RISK ASSESSMENT BEEN COMPLETED? Yes VEHICLE ACCESS AND PARKING ON SITE? Yes TOILETS? Yes FILMING INDOORS AND/OR OUTDOORS? Indoors WILL LIGHTS BE NEEDED? Yes ACCESS TO POWER SUPPLY IF REQUIRED? Yes IS THERE A SECURE PLACE TO LEAVE KIT? Yes WILL MEMBERS OF THE PUBLIC BE PRESENT? Yes IF YES ABOVE, WILL THERE BE CHILDREN? No ADDITIONAL NOTES -