1. RONALD CHARLES GLEESON
16/12/2015
ADDRESS: 482 Upper Warrell Creek Road,
Macksville NSW 2447
PHONE: (02) 65693373
EMAIL: RonGleeson@outlook.com
DOB: 28/03/1968
PROFILE- I am currently seeking fulltime, salary based work in the construction industry.
My current career strategy is focused on maximising my opportunities in a permanent
and stable role within a dynamic environment.
I am experienced at liaising with subcontractors to complete projects within a safe
controlled organized manner, coordinating with structural engineers, architects and
clients.
My goal is to always maintain a clean safe site, site inductions and monitoring of safe
work method statements during construction. I pride myself on personal ambition,
both work and family, and the ability to adapt to all situations.
I have experience in many different aspects of construction and demolition, including,
extensive experience working on projects in occupied areas under renovation.
Meeting completion dates on time within budget. Working on many different types of
projects, including high-rise commercial and unit developments, clubs renovation
residential developments and school projects. All of these projects have involved a
high degree of safety for public and workers.
AVAILABILITY
- Immediate start
EDUCATION
Tertiary Education in Carpentry and Joinery, Clerk of Works St George TAFE
Extensive Occupational Health and Safety training
Spanset working at heights
Course in demolition supervision (restricted)
QUALIFICATIONS
Construction OHS Card CGI00659360SEQ1
Asbestos removal supervisor non friable
Holder EWP SL BL
- Participated in the RMS Quality Management training course
2. INTERESTS
- Fishing fresh and saltwater
- Cricket currently playing in local competition
DEMONSTRATED SKILLS AND ABILITIES
Positive workplace reputation for contributing to the development of a productive and
focused work team.
Aware of O.H.S. safety requirements and needs, while still achieving deadlines
Work well under extreme and sometimes difficult conditions.
High level of integrity.
High standards.
Strong work ethic with demonstrated reliability, accountability and flexibility,
achievement driven performance and impeccable history of work attendance.
Great Communication skills.
- Positive Representation of company or organisation.
PREVIOUS EMPLOYMENT
ALL AREAS DEMOLITION
2014/2015
- Demolition/ Bonded Asbestos Supervisor
- Pre-planning carrying out works in a safe efficient manner.
AUSTRALIAN PRECAST SOLUTIONS
2011/2014
- Workshop/Maintenance/Logistics Supervisor
GRINDLEY CONSTRUCTION
2010/11
- Uniting Care Project (86 bed Nursing Home) Nambucca Heads
- Site manager
- $15 to $20 million
NATIONAL BUILDPLAN
2010
- School Projects (B.E.R.)
- South West Rocks
- Kempsey
- Bowraville
- Nambucca Heads
- Site Manager
PAYNTER DIXON DEVELOPMENT PROJECTS
2009
Paynter Dixon Constructions – St Gabriel's School
3. 190 Old Northern Road Castle Hills
$200,000
Internal renovation and fit out
Position Site Manager
2009
Paynter Dixon Constructions – Hills Grammar School
April 2009 completed sporting complex at Hills Grammar School- $5Million
Kenthurst Rd Kenthurst
Position Site Manager
2007-2008
Paynter Dixon Constructions – Port City Bowling Club
Extension to Port City Bowing Club while occupied, including new lift ,
commercial Kitchen and Bistro Area.
$4.5Million
Port Macquarie
Position Site Manager
2007
Paynter Dixon Constructions – Seagulls Club Tweed Heads
Re-roofing, Poker Machine Area, New Internal Lift, and Commercial Kitchen Fit out of
occupied premises.
$6million
Site Manager
2006-2007
Paynter Dixon Constructions – Nambucca Heads RSL Club
Extension and internal fit out, New lift, Entry Area, cool rooms, Keg room Commercial
Kitchen
ETC.
$4.5million
Site Manager
2005-2006
Paynter Dixon Constructions – Kempsey Macleay RSL Club
Extension of existing club, new lift, occupied premises.
$6million
Site Manager
2005
Paynter Dixon Constructions – Bethany Salvation Nursing Home Port Macquarie
Fire up grade
Salvation Nursing Home Merryweather
Fire up grade
2003-2004
Paynter Dixon Constructions – P.J.Gallager Hotel Drumoyne
4. Internal Renovation of Irish Theme Pub
$3million
Site Manager
2002-2003
Paynter Dixon Constructions – Manly Leagues Club
Commercial Kitchen, and Pokies Lounge
Site Manager
2001
Paynter Dixon Constructions – L36 ANA Hotel Sydney
$1 - $2million fit out
Site Manager
MIRVAC DEVELOPMENT PROJECTS:
Mirvac Constructions 1987 to 2001
Position held at completion of employment – Construction Foreman
2001
Joint venture Mirvac/Transfield – Walsh Bay
Completion of sub-station structure within a heritage area
Supervise demolition/ Structural steel/ Form work/ Concrete placement
General liaison with sub-contractors and consultants
Extensive O.H.&S. Training
Reported directly to site manager, Brett Sharp
2000
Mirvac Development
12 luxury apartments, Cliff St. Milsons Point / value $25million
Finishing Foreman (see Reference Mirvac/ G.Doust)
B/W set-out / liaising with finishing trades/ mechanical services from
start to completion of project.
Coordinated materials handling with Tower crane crew
Site Manager G.Doust
1999/2000
Mirvac development
48 luxury apartments, William St. Double Bay
Construction type – load-bearing brickwork
Finishing Foreman (see reference Mirvac/Steve Gray)
B/W set-out / liaising with finishing trades / mechanical services
from start to completion of project.
Coordinated materials handling with tower crane crew
Site Manager Steve Gray
5. 1998/1999
Mirvac development
190 luxury apartments Christie St. St. Leonards
Finishing Foreman / high standard of finishes internal and external
Supervision of all finishing trades through to owners' defects
Overseeing of waterproofing to landscaped areas over a basement car park
Liaising with Interior Designers and Architects/ Engineers on design issues
Extensive materials handling with Tower crane crew
1996/1997
Mirvac
110 luxury apartments Brady St. Mosman
High level of finishes/ value $35million
Foreman Position/ Chairman of Safety Committee liaising with union and work cover,
resolving disputes
Responsible for B/W
Coordination of electrical /mechanical/ drainage services
Extensive waterproofing and landscaping to area over covered car park
Materials handling by use of mobile cranes.
1994/1996
Mirvac housing development/ joint venture Mirvac/Westfield
Kensington, Sydney
Site manager Warren Walters
Position Held – Leading Hand
1993/1994
Mirvac development
44 apartments/ 14 terraces Lombard St. Glebe
Site Manager Steve Gray
Position Held – Leading Hand
1993
Mirvac apartment development Ridge St. North Sydney
Site Manager Ed Selby
Position Held – Leading Hand
1993
Mirvac hotel development
Extensions to Conference Area of Chateau Hotel Kings Cross
Position Held – Leading Hand
Reported directly to Construction Manager Geoff Dickens.
6. 1992
Mirvac hotel development
Refurbishment of Hyde Park Plaza Hotel/ entry lobby and foyer
Position Held – Leading Hand
Reported directly to Construction Manager
1991/1992
Mirvac development
Marriott Hotel Sydney
Site Manager Malcolm House
Position held – Leading Hand
1989/1991
Mirvac development – Quay West Sydney / 44 storeys
High rise apartments and commercial areas
Site Manager Gary Cory
Position Held – Leading Hand/Structures
1988/1989
Mirvac/ AGL development / 12 storey office block North Sydney
Site Manager Kevin Smith
Position Held- Leading Hand
1987
Mirvac development / 12 storey office block Milsons Point
Site Manager Jim Priest
Position Held- Apprentice
REFEREES
Professional
- Rob Lindquist – 0407521981- Lend Lease
Graham Doust – 0412 169 551 – Mirvac Constructions
- John Mayne – 97975555 - Paynter Dixon Constructions
Character
- Bernard Davidson 65693232
Eddie Addison 65683775