SlideShare ist ein Scribd-Unternehmen logo
1 von 7
Roberto S. Guevara
#19 Caraballo St. Marikina Heights
Concepcion 2 Marikina City
email address: bobby_guevara88@yahoo.com
Mobile # +639083770578 (Philippines)
Skype ID: Roberto.Guevara28
KSA Mobile: +966570195684
Objective: To be able to apply/contribute the knowledge I acquired through my experiences in the field of
Operation & Maintenance of llijan Gas Receiving Facility, Power Transmission line and
various horizontal and vertical construction as well in electro mechanical instrumentation
works and Planning scheduling.
Qualification Summary
Licensed Civil Engineer, with twenty one year’s extensive experience in various constructions works
such as Structural Conveyors, Water Pipeline, Combined Cycle Power Plants, Pipelines, Power
Transmission Lines, Sub Stations and high rise buildings. Also included to this experience is the
Operation & Maintenance of Ilijan Natural Gas Receiving Facility. Multi-discipline and knowledge in
AUTOCAD, PRIMAVERA (P3 & P6.1) & MS Project software.
Personal Data:
Nickname: Bobby
Age: 47
Birth Date August 08, 1969
Birth Place: Marikina City
Height: 5’ 6”
Weight: 175 lbs.
Status: Married
Citizenship: Filipino
Religion: Catholic
Father’s Name : Ernesto G. Guevara
Mother’s Name: Helen S. Guevara
Spouse Name: Lerma S. Guevara
No. of Children: 3
Language/Dialect: Filipino, English, Thailand
Education: 1991 – 1985 Mapua Institute of Technology
B. S. Civil Engineering
1985 – 1981 Rizal High School
High School
1975 – 1981 Calumpang Elementary School
Grade School
Roberto S. Guevara Planning Engineer
Experience:
June 28, 2016 – Present Al Sharif Group (Transmission Line & Substation Project)
Planning Engineer
 Performing Engineering Design and Construction Schedule.
 Preparing Planning Package.
 Preparation of cost and Progress Reports for Monthly reports.
 Monitoring project progress, status of the schedule and reporting on progress
 Identifying trends or potential slippages and report on these to Project Manager
 Daily & Weekly coordination to various clients and sub-contractors
 Preparing look ahead schedule and mitigation schedule
 Preparing Invoice and Progress Billings (Weekly & Monthly)
 Weekly coordination to various clients.
Dec 28, 2013 – Jan 31, 2016 Chiyoda-Almana, Design & Consulting Firm (Oil & Gas)
Planning Engineer
 Performing Proposal Pre-FEED/FEED/DDE and Construction Schedule.
 Preparing Planning Package.
 Preparation of cost and Progress Reports for Monthly reports.
 Performing Cash Flows and Resource Analysis.
 Monitoring project progress, status of the schedule and reporting on progress
 Identifying trends or potential slippages and report on these to Project Manager.
 Preparing look ahead schedule and mitigation schedule
 Preparing Invoice and Progress Billings (Weekly & Monthly)
 Weekly coordination to various clients.
Dec 26, 2011 – Dec 14, 2013 WorleyParsons UAE, Design & Consulting Firm (Oil & Gas)
Project Control Engineer
 Performing Proposal and Budget Baseline Schedule.
 Performing Manpower Histogram and Manhour Estimate.
 Preparation of cost and Progress Reports for Monthly reports.
 Performing Cash Flows and Resource Analysis.
 Preparing Invoice and Progress Billings (Weekly & Monthly)
March 27, 2011 – Dec.25, 2011 Chicago Bridge & Iron Co. EPFC – Oil/Gas/Petrochem, Al Khobar
Saudi Arabia
Scheduling Specialist II
 Performing Pre-Bid & Project Baseline Schedule.
 Performing Manpower Histogram and Manhour Estimate.
 Preparation of cost and Progress Reports for Monthly reports.
 Performing Cash Flows and Resource Analysis.
 Coordination to all clients meeting regards to Pre Qualification Bid Projects.
 Performing site visit to ensure that all programming is carried out within the
framework established in the planning procedures.
Roberto S. Guevara Planning Engineer
August 08, 2009 – Feb. 27, 2011 Hyundai Heavy Industries, 1200MW Combined Cycle Power
Plant & Desalination Plant Al-Dur Bahrain
Planning Engineer
 Prepare comprehensive Planning & Cost Control Procedures for the project,
meeting the requirements of the Contract and internal requirements.
 Liaise closely with the Construction teams and gain a detailed appreciation of
the key construction operations, taking into consideration alternative methods
and the optimum construction methodology.
 Preparation of cost and progress reports for monthly reports.
 Conducting analysis and forecasting project costs.
 Ensure that the project runs to program by driving program dates and
communicating program constraints. Reprogram as necessary to recover any
delays and to achieve required milestone dates.
 Oversee that all programming is carried out within the framework established
in the planning procedures
October 22, 2008 – May 22, 2009 Monadelphous Engineering Asc., Boddington Gold Mine &
Pluto Oil & Gas Project, East Perth Western Australia
Planning Engineer
 Performs Planning and Scheduling for the progress of construction and
monitoring man hours usage for each phase of the scope of the project.
 Performs weekly and monthly report for the entire scope of the project.
 Preparation of progress and statistical reports, presentation reports using
Primavera & MS Project software.
 Conduct coordination and interface meeting with the client and sub-contractor.
 Conduct field inspection for the actual progress of the project.
 Performs other duties such as cost control for the equipment, man hours and all
materials which is involve in the project.
September 16, 2007 – May 25, 2008 Al-Hejailan Consultants, Al-Khobar Saudi Arabia
Scheduling & Cost Control Engineer
 Responsible for the development and presentation of cost control and manhour
estimates, manhour reporting, project schedule development and control.
 Performs scheduling and monitor progress of design drawings, forecast
completion dates of design phases, and resource loading/off-loading.
 Preparation of progress and statistical reports, presentation reports using
Primavera & MS Project software.
 Performs construction project scheduling and cost analysis such as Structural,
Civil, Mechanical, Instrumentation, Electrical and Architectural in all types of
construction activities.
 Maintains a data bank for all projects in all disciplines.
September 8, 2006 – May 20, 2007 Khursaniyah Upstream and Downstream Pipeline Project
Saudi Techint Ltd. (ARAMCO Project) Saudi Arabia
Planning & Cost Control Engineer
 Performs planning and scheduling using Primavera software of Khursaniyah
Upstream & Downstream Pipeline Project.
Roberto S. Guevara Planning Engineer
 Performs updating weekly and monthly schedule of pipeline constructions as
well in Power plant instrumentation and construction.
 Performs weekly and monthly schedule reports submitted to Saudi Aramco.
 Prepares daily, weekly and monthly progress reports and procurement progress
report.
 Performs cost analysis and cost estimates for all constructions activities
including the manpower histogram, equipments report, shipments and air
freights.
 Performs site inspection and quality control if all the materials are in place and
have arrive and installed in the specific location of the construction phase.
 Performs monthly provisions/budget for all the cost that are used in the project.
October 2001 – August 2006 Operation & Maintenance of Ilijan, Natural Gas Pipeline
Receiving Facility National Power Corporation
Principal Engineer A – Gas Receiving Facility
 Administers and supervises on shift operator in the operation of the master
control system (SCADA System) of the Ilijan Natural Gas Pipeline Receiving
Facility to enable:
- Central monitoring and control of all pipeline facilities/equipment and
auxiliary.
- Performs scheduling for the operation and maintenance of Ilijan Gas
Receiving Facility.
- Pipeline efficiency monitoring and pigging.
- Rapid identification and correction of unsafe operating equipment and
utilities.
- Pipeline integrity monitoring and gas leak detection.
- Maximize the safety of the employees, the general public and facility and
the environment.
- Tracking of the pig (Scrapper) during the maintenance of the pipeline.
- Verification of various instruments/equipment and accessories.
 Analyzes critical reports involving complicated operating problems
encountered in the gas facility. Conducts studies and research for the
preparation of recommendation for appropriate solutions of the problems
encountered thereby minimizing or eliminating its occurrence in the future.
 Directs and checks the analysis of the natural gas parameters in coordination
with SPEX and KEILCO to determine and ensure operating parameters are safe
and contributory to the efficient operation of the gas pipeline receiving facility.
 Properly nominates SPEX the quantity of natural gas needed for the operation
of the power plant each day in accordance with the provisions of the GSPA and
ECA.
 Assist in the administration and maintenance of the pipeline and other related
facilities.
 Directs and implements energy conservation guidelines and safety rules and
regulations.
 Performs other duties as may be assigned.
July 1999 – September 2001 Ilijan Natural Gas Pipeline and Receiving Facility Project National
Power Corporation
Principal Engineer B
 Supervises and monitors all construction works such as pipe string works, tie-
in, non destructive test, excavation and foundation works.
Roberto S. Guevara Planning Engineer
 Performs scheduling in construction and stringing activities of Naga Tayabas –
Kaliraya 500KV & 230KV T/L.
 Prepares weekly and monthly progress report.
 Reviews and evaluates manufacturer’s drawings and specifications for revision
and approval.
 Handles coordination with contractors of the project concerning all civil works
Nov. 1996 – June 1999 NPC-Eng’g Northwestern Luzon Trans., System Project, San Jose
Substation, San, Jose del Monte, Bulacan, National Power
Corporation
Principal Engineer B
 Supervises & monitors all site inspection & activities related to civil works,
stringing and tower election.
 Prepares weekly & monthly progress report.
 Performs scheduling for construction, equipment and manpower for San
Manuel – San Jose Del Monte 500KV T/L.
 Reviews and evaluates manufacturer’s drawings & specifications for revision
& approval.
 Handles coordination with contractors of the project concerning all civil works.
 Monitors and supervise stringing activities and tower erection of 500 & 230 kV
transmission lines.
September 1994 – June 1996 Leyte Luzon Interconnection Project, National Power Corporation
Engineer A
 Conducts supervision and inspecting the quality in the execution of the
foundation works and tower erection.
 Prepares cost estimates of all items and other necessary equipment
corresponding to various components and segments of the on-going projects.
 Prepares bid documents and other related documents needed for bidding.
March 1993 – March 1994 International Blaster Co. Ltd. Bangkok, Thailand
Project Engineer
 Performs supervision and inspection of all constructions materials equipment
in constructing highways, airports and power plants.
 Prepares cost estimates of all items and other necessary equipment
corresponding to various components and segments of the on-going projects.
 Prepares monthly and weekly report for the project. Prepares billing and bid
documents and other related documents needed for bidding.
November 1991 – March 1993 LA MESA Treatment Plant, (M. Oreta CO. Inc)
Materials Engineer
 Performs laboratory test such as tensile and yield strength, compressive strength
test, field density test, sounding test and soil test.
 Performs in fabrication of filter slab and other pre-cast structure including the
design mix of all foundations and other structures.
Roberto S. Guevara Planning Engineer
Seminars Attended:
Computer-Aided Construction Project Management (Primavera Ver. 3.1) June 18,
2006 – July 16, 2006 CADVISION ENGINEER TECHNOLOGIES
· SIMATIC S7 Handling & programming (S7-7MICRO) July 22-23
2004, Siemens Manila
· Training Program On Design, Construction, Operation &
Maintenance of Natural Gas Pipeline, August 29 – September 13,
2001 KVAERNER Philippine Corporation Inc., Surabaya Indonesia
· Corrosion & Catholic Protection Monitoring Training Course, June
28, 2001, SOLOMON Corrosion Control Services PTY LTD. SM
Travelodge, Batangas Philippines
· Seminar on 500KV Transmission Line and Substation Projects,
January 25, 2001, NEW JEC, Batangas City
· Effective Negotiating Skills & Salesmanship, November 15 – 18,
1999, NPC/HRTD, Alpha Hotel, Batangas City
· Better Driving Course, May 18, 1999, NPC/HRTD, NPC Diliman
· Civil Engineer in the Midst of Crisis, May 13 – 15, 1999,
Philippine Institute of Civil Engineers, Philam Homes Subdivision,
Quezon City
· Seminar/Workshop On Project Cost Estimating, November 10-14,
1997, NPC/HRTD, La Montana Resort, Tagaytay Cavite
· EHV Power Transmission Line (Design, Project Management,
Construction Supervision and Test & Commissioning), April 01-21,
1997, NEWJEC Engineering Consultants, NPC Diliman
· Right-Of-Way (ROW) Seminar Workshop February 26-29, 1996,
NPC/HRTD, Angat GH, Norzagaray, Bulacan
· Course On Project Design, October 07-11, 1996, Development
Academy Of The Philippines, Pasig City
· Public Speaking For Civil Engineers & Construction Monitoring &
Control, August 04, 1995, PICE, West Avenue, Quezon City
· Comprehensive Computer-Aided Design, Drafting & Color
Rendering, January 16–March 01, 1995, MICROCADD
Technologies Quezon city
· Information Sharing Product Updates & Technology Strategies in
Civil Engineering, July 29-30, 1994, Angeles Fried Chicken
Restaurant, Balibago, Angeles City
· Computer-Aided Structural Analysis & Design for Building
Construction, June 28 – August 02, 1994, MICROCADD
Technologies, Quezon City
· The Effective Supervisor: A Basic Supervisory Course, Northstar
Management
Examination Passed:
1991 Civil Engineer Licensure Examination
Foreign Travel:
August 28 – September 13, Operation & Maintenance Of Natural Gas
2001 Pipeline
Social Civic Organizations:
Roberto S. Guevara Planning Engineer
1991 – Present Philippine Institute Of Civil Engineers
National Chapter
1994 – Present Knights of Columbus (4th Degree)
Marikina Chapter
Special Skills:
 Computer Literate (MS Office/AUTOCAD Rel.12/Primavera)
 Knowledge in Primavera Ver 6.1 and 3.0 and MS Project 2007
 Drafting, Civil Planning & Design
 Operation & Maintenance of Gas Facility
 Troubleshooting
 And other related Civil, Mechanical, Electrical & Inst. works
Character References:
· Grace Gepes Principal Cost Engineer
WorleyParsons Abu Dhabi
Mobile # +971508271779
· Renante Tactaquin Lead Planning Engineer –
Chiyoda Almana Engineering
Mobile No. +97455355895
· Florida. D. Cornejo Division Manager – Industrial Relations
Division / HRD
National Power Corporation
Tel No. (02)-9245304
· Rolando. G. Amiscaray Department Manager – IPP Contracts
Management Department
National Power Corporation
Tel No. (02)-9224036

Weitere ähnliche Inhalte

Was ist angesagt?

Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resumeAbdul Basit
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP Robert Romero
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015Fairfax County
 
Land Development Update: November 12, 2015
Land Development Update: November 12, 2015Land Development Update: November 12, 2015
Land Development Update: November 12, 2015Fairfax County
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Land Development Update: NAIOP/NVBIA Joint Meeting- March 10, 2015
Land Development Update: NAIOP/NVBIA Joint Meeting- March 10, 2015Land Development Update: NAIOP/NVBIA Joint Meeting- March 10, 2015
Land Development Update: NAIOP/NVBIA Joint Meeting- March 10, 2015Fairfax County
 
Land Development Update-February 11, 2016
Land Development Update-February 11, 2016Land Development Update-February 11, 2016
Land Development Update-February 11, 2016Fairfax County
 
CarlCharlie_FinalResume
CarlCharlie_FinalResumeCarlCharlie_FinalResume
CarlCharlie_FinalResumeCarl Charlie
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016Ron Mailhot
 
Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016Fairfax County
 
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahMohamed Bamadhaf
 

Was ist angesagt? (19)

Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resume
 
CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015
 
Land Development Update: November 12, 2015
Land Development Update: November 12, 2015Land Development Update: November 12, 2015
Land Development Update: November 12, 2015
 
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Land Development Update: NAIOP/NVBIA Joint Meeting- March 10, 2015
Land Development Update: NAIOP/NVBIA Joint Meeting- March 10, 2015Land Development Update: NAIOP/NVBIA Joint Meeting- March 10, 2015
Land Development Update: NAIOP/NVBIA Joint Meeting- March 10, 2015
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
Land Development Update-February 11, 2016
Land Development Update-February 11, 2016Land Development Update-February 11, 2016
Land Development Update-February 11, 2016
 
CarlCharlie_FinalResume
CarlCharlie_FinalResumeCarlCharlie_FinalResume
CarlCharlie_FinalResume
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
cv
cvcv
cv
 
Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016
 
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS Bamadefah
 

Andere mochten auch

Evaluacion de word.
Evaluacion de word.Evaluacion de word.
Evaluacion de word.lamorenitha
 
E learning herramientas
E learning herramientasE learning herramientas
E learning herramientasDANEYI QUESADA
 
Concorrencia Vestibular 2013 UPE
Concorrencia Vestibular 2013 UPEConcorrencia Vestibular 2013 UPE
Concorrencia Vestibular 2013 UPEpepontocom
 
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 201513vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015JKAWFMEXICO
 
Carlos magno publicidade 2010 12 revista portifólio web
Carlos magno publicidade 2010 12 revista portifólio webCarlos magno publicidade 2010 12 revista portifólio web
Carlos magno publicidade 2010 12 revista portifólio webLucas Ribeiro de Jesus
 
2016-2017 Firm Visit Package
2016-2017 Firm Visit Package2016-2017 Firm Visit Package
2016-2017 Firm Visit PackageAmber Zhu
 
Prova seriado 1º ano caderno i primeiro d
Prova seriado 1º ano caderno i primeiro dProva seriado 1º ano caderno i primeiro d
Prova seriado 1º ano caderno i primeiro dpepontocom
 

Andere mochten auch (10)

Evaluacion de word.
Evaluacion de word.Evaluacion de word.
Evaluacion de word.
 
E learning herramientas
E learning herramientasE learning herramientas
E learning herramientas
 
CARRICULUM VITEA
CARRICULUM VITEACARRICULUM VITEA
CARRICULUM VITEA
 
Concorrencia Vestibular 2013 UPE
Concorrencia Vestibular 2013 UPEConcorrencia Vestibular 2013 UPE
Concorrencia Vestibular 2013 UPE
 
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 201513vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015
 
Proyecto de aula loayza
Proyecto de aula loayza Proyecto de aula loayza
Proyecto de aula loayza
 
Carlos magno publicidade 2010 12 revista portifólio web
Carlos magno publicidade 2010 12 revista portifólio webCarlos magno publicidade 2010 12 revista portifólio web
Carlos magno publicidade 2010 12 revista portifólio web
 
2016-2017 Firm Visit Package
2016-2017 Firm Visit Package2016-2017 Firm Visit Package
2016-2017 Firm Visit Package
 
Prova seriado 1º ano caderno i primeiro d
Prova seriado 1º ano caderno i primeiro dProva seriado 1º ano caderno i primeiro d
Prova seriado 1º ano caderno i primeiro d
 
Proyecto de aula
Proyecto de aulaProyecto de aula
Proyecto de aula
 

Ähnlich wie Roberto Guevara-CV

Ähnlich wie Roberto Guevara-CV (20)

Nestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning EngineerNestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning Engineer
 
Gerry_Garciano_resume
Gerry_Garciano_resumeGerry_Garciano_resume
Gerry_Garciano_resume
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Bill resume
Bill resumeBill resume
Bill resume
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Resume
ResumeResume
Resume
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Igwebuike CV_Project Control Engineer
Igwebuike CV_Project Control EngineerIgwebuike CV_Project Control Engineer
Igwebuike CV_Project Control Engineer
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CV
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
CV_Muhammad Iqbal
CV_Muhammad IqbalCV_Muhammad Iqbal
CV_Muhammad Iqbal
 
CIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisPCIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisP
 
CV of Raffy Feliciano
CV of Raffy FelicianoCV of Raffy Feliciano
CV of Raffy Feliciano
 
CV (2)
CV (2)CV (2)
CV (2)
 

Roberto Guevara-CV

  • 1. Roberto S. Guevara #19 Caraballo St. Marikina Heights Concepcion 2 Marikina City email address: bobby_guevara88@yahoo.com Mobile # +639083770578 (Philippines) Skype ID: Roberto.Guevara28 KSA Mobile: +966570195684 Objective: To be able to apply/contribute the knowledge I acquired through my experiences in the field of Operation & Maintenance of llijan Gas Receiving Facility, Power Transmission line and various horizontal and vertical construction as well in electro mechanical instrumentation works and Planning scheduling. Qualification Summary Licensed Civil Engineer, with twenty one year’s extensive experience in various constructions works such as Structural Conveyors, Water Pipeline, Combined Cycle Power Plants, Pipelines, Power Transmission Lines, Sub Stations and high rise buildings. Also included to this experience is the Operation & Maintenance of Ilijan Natural Gas Receiving Facility. Multi-discipline and knowledge in AUTOCAD, PRIMAVERA (P3 & P6.1) & MS Project software. Personal Data: Nickname: Bobby Age: 47 Birth Date August 08, 1969 Birth Place: Marikina City Height: 5’ 6” Weight: 175 lbs. Status: Married Citizenship: Filipino Religion: Catholic Father’s Name : Ernesto G. Guevara Mother’s Name: Helen S. Guevara Spouse Name: Lerma S. Guevara No. of Children: 3 Language/Dialect: Filipino, English, Thailand Education: 1991 – 1985 Mapua Institute of Technology B. S. Civil Engineering 1985 – 1981 Rizal High School High School 1975 – 1981 Calumpang Elementary School Grade School
  • 2. Roberto S. Guevara Planning Engineer Experience: June 28, 2016 – Present Al Sharif Group (Transmission Line & Substation Project) Planning Engineer  Performing Engineering Design and Construction Schedule.  Preparing Planning Package.  Preparation of cost and Progress Reports for Monthly reports.  Monitoring project progress, status of the schedule and reporting on progress  Identifying trends or potential slippages and report on these to Project Manager  Daily & Weekly coordination to various clients and sub-contractors  Preparing look ahead schedule and mitigation schedule  Preparing Invoice and Progress Billings (Weekly & Monthly)  Weekly coordination to various clients. Dec 28, 2013 – Jan 31, 2016 Chiyoda-Almana, Design & Consulting Firm (Oil & Gas) Planning Engineer  Performing Proposal Pre-FEED/FEED/DDE and Construction Schedule.  Preparing Planning Package.  Preparation of cost and Progress Reports for Monthly reports.  Performing Cash Flows and Resource Analysis.  Monitoring project progress, status of the schedule and reporting on progress  Identifying trends or potential slippages and report on these to Project Manager.  Preparing look ahead schedule and mitigation schedule  Preparing Invoice and Progress Billings (Weekly & Monthly)  Weekly coordination to various clients. Dec 26, 2011 – Dec 14, 2013 WorleyParsons UAE, Design & Consulting Firm (Oil & Gas) Project Control Engineer  Performing Proposal and Budget Baseline Schedule.  Performing Manpower Histogram and Manhour Estimate.  Preparation of cost and Progress Reports for Monthly reports.  Performing Cash Flows and Resource Analysis.  Preparing Invoice and Progress Billings (Weekly & Monthly) March 27, 2011 – Dec.25, 2011 Chicago Bridge & Iron Co. EPFC – Oil/Gas/Petrochem, Al Khobar Saudi Arabia Scheduling Specialist II  Performing Pre-Bid & Project Baseline Schedule.  Performing Manpower Histogram and Manhour Estimate.  Preparation of cost and Progress Reports for Monthly reports.  Performing Cash Flows and Resource Analysis.  Coordination to all clients meeting regards to Pre Qualification Bid Projects.  Performing site visit to ensure that all programming is carried out within the framework established in the planning procedures.
  • 3. Roberto S. Guevara Planning Engineer August 08, 2009 – Feb. 27, 2011 Hyundai Heavy Industries, 1200MW Combined Cycle Power Plant & Desalination Plant Al-Dur Bahrain Planning Engineer  Prepare comprehensive Planning & Cost Control Procedures for the project, meeting the requirements of the Contract and internal requirements.  Liaise closely with the Construction teams and gain a detailed appreciation of the key construction operations, taking into consideration alternative methods and the optimum construction methodology.  Preparation of cost and progress reports for monthly reports.  Conducting analysis and forecasting project costs.  Ensure that the project runs to program by driving program dates and communicating program constraints. Reprogram as necessary to recover any delays and to achieve required milestone dates.  Oversee that all programming is carried out within the framework established in the planning procedures October 22, 2008 – May 22, 2009 Monadelphous Engineering Asc., Boddington Gold Mine & Pluto Oil & Gas Project, East Perth Western Australia Planning Engineer  Performs Planning and Scheduling for the progress of construction and monitoring man hours usage for each phase of the scope of the project.  Performs weekly and monthly report for the entire scope of the project.  Preparation of progress and statistical reports, presentation reports using Primavera & MS Project software.  Conduct coordination and interface meeting with the client and sub-contractor.  Conduct field inspection for the actual progress of the project.  Performs other duties such as cost control for the equipment, man hours and all materials which is involve in the project. September 16, 2007 – May 25, 2008 Al-Hejailan Consultants, Al-Khobar Saudi Arabia Scheduling & Cost Control Engineer  Responsible for the development and presentation of cost control and manhour estimates, manhour reporting, project schedule development and control.  Performs scheduling and monitor progress of design drawings, forecast completion dates of design phases, and resource loading/off-loading.  Preparation of progress and statistical reports, presentation reports using Primavera & MS Project software.  Performs construction project scheduling and cost analysis such as Structural, Civil, Mechanical, Instrumentation, Electrical and Architectural in all types of construction activities.  Maintains a data bank for all projects in all disciplines. September 8, 2006 – May 20, 2007 Khursaniyah Upstream and Downstream Pipeline Project Saudi Techint Ltd. (ARAMCO Project) Saudi Arabia Planning & Cost Control Engineer  Performs planning and scheduling using Primavera software of Khursaniyah Upstream & Downstream Pipeline Project.
  • 4. Roberto S. Guevara Planning Engineer  Performs updating weekly and monthly schedule of pipeline constructions as well in Power plant instrumentation and construction.  Performs weekly and monthly schedule reports submitted to Saudi Aramco.  Prepares daily, weekly and monthly progress reports and procurement progress report.  Performs cost analysis and cost estimates for all constructions activities including the manpower histogram, equipments report, shipments and air freights.  Performs site inspection and quality control if all the materials are in place and have arrive and installed in the specific location of the construction phase.  Performs monthly provisions/budget for all the cost that are used in the project. October 2001 – August 2006 Operation & Maintenance of Ilijan, Natural Gas Pipeline Receiving Facility National Power Corporation Principal Engineer A – Gas Receiving Facility  Administers and supervises on shift operator in the operation of the master control system (SCADA System) of the Ilijan Natural Gas Pipeline Receiving Facility to enable: - Central monitoring and control of all pipeline facilities/equipment and auxiliary. - Performs scheduling for the operation and maintenance of Ilijan Gas Receiving Facility. - Pipeline efficiency monitoring and pigging. - Rapid identification and correction of unsafe operating equipment and utilities. - Pipeline integrity monitoring and gas leak detection. - Maximize the safety of the employees, the general public and facility and the environment. - Tracking of the pig (Scrapper) during the maintenance of the pipeline. - Verification of various instruments/equipment and accessories.  Analyzes critical reports involving complicated operating problems encountered in the gas facility. Conducts studies and research for the preparation of recommendation for appropriate solutions of the problems encountered thereby minimizing or eliminating its occurrence in the future.  Directs and checks the analysis of the natural gas parameters in coordination with SPEX and KEILCO to determine and ensure operating parameters are safe and contributory to the efficient operation of the gas pipeline receiving facility.  Properly nominates SPEX the quantity of natural gas needed for the operation of the power plant each day in accordance with the provisions of the GSPA and ECA.  Assist in the administration and maintenance of the pipeline and other related facilities.  Directs and implements energy conservation guidelines and safety rules and regulations.  Performs other duties as may be assigned. July 1999 – September 2001 Ilijan Natural Gas Pipeline and Receiving Facility Project National Power Corporation Principal Engineer B  Supervises and monitors all construction works such as pipe string works, tie- in, non destructive test, excavation and foundation works.
  • 5. Roberto S. Guevara Planning Engineer  Performs scheduling in construction and stringing activities of Naga Tayabas – Kaliraya 500KV & 230KV T/L.  Prepares weekly and monthly progress report.  Reviews and evaluates manufacturer’s drawings and specifications for revision and approval.  Handles coordination with contractors of the project concerning all civil works Nov. 1996 – June 1999 NPC-Eng’g Northwestern Luzon Trans., System Project, San Jose Substation, San, Jose del Monte, Bulacan, National Power Corporation Principal Engineer B  Supervises & monitors all site inspection & activities related to civil works, stringing and tower election.  Prepares weekly & monthly progress report.  Performs scheduling for construction, equipment and manpower for San Manuel – San Jose Del Monte 500KV T/L.  Reviews and evaluates manufacturer’s drawings & specifications for revision & approval.  Handles coordination with contractors of the project concerning all civil works.  Monitors and supervise stringing activities and tower erection of 500 & 230 kV transmission lines. September 1994 – June 1996 Leyte Luzon Interconnection Project, National Power Corporation Engineer A  Conducts supervision and inspecting the quality in the execution of the foundation works and tower erection.  Prepares cost estimates of all items and other necessary equipment corresponding to various components and segments of the on-going projects.  Prepares bid documents and other related documents needed for bidding. March 1993 – March 1994 International Blaster Co. Ltd. Bangkok, Thailand Project Engineer  Performs supervision and inspection of all constructions materials equipment in constructing highways, airports and power plants.  Prepares cost estimates of all items and other necessary equipment corresponding to various components and segments of the on-going projects.  Prepares monthly and weekly report for the project. Prepares billing and bid documents and other related documents needed for bidding. November 1991 – March 1993 LA MESA Treatment Plant, (M. Oreta CO. Inc) Materials Engineer  Performs laboratory test such as tensile and yield strength, compressive strength test, field density test, sounding test and soil test.  Performs in fabrication of filter slab and other pre-cast structure including the design mix of all foundations and other structures.
  • 6. Roberto S. Guevara Planning Engineer Seminars Attended: Computer-Aided Construction Project Management (Primavera Ver. 3.1) June 18, 2006 – July 16, 2006 CADVISION ENGINEER TECHNOLOGIES · SIMATIC S7 Handling & programming (S7-7MICRO) July 22-23 2004, Siemens Manila · Training Program On Design, Construction, Operation & Maintenance of Natural Gas Pipeline, August 29 – September 13, 2001 KVAERNER Philippine Corporation Inc., Surabaya Indonesia · Corrosion & Catholic Protection Monitoring Training Course, June 28, 2001, SOLOMON Corrosion Control Services PTY LTD. SM Travelodge, Batangas Philippines · Seminar on 500KV Transmission Line and Substation Projects, January 25, 2001, NEW JEC, Batangas City · Effective Negotiating Skills & Salesmanship, November 15 – 18, 1999, NPC/HRTD, Alpha Hotel, Batangas City · Better Driving Course, May 18, 1999, NPC/HRTD, NPC Diliman · Civil Engineer in the Midst of Crisis, May 13 – 15, 1999, Philippine Institute of Civil Engineers, Philam Homes Subdivision, Quezon City · Seminar/Workshop On Project Cost Estimating, November 10-14, 1997, NPC/HRTD, La Montana Resort, Tagaytay Cavite · EHV Power Transmission Line (Design, Project Management, Construction Supervision and Test & Commissioning), April 01-21, 1997, NEWJEC Engineering Consultants, NPC Diliman · Right-Of-Way (ROW) Seminar Workshop February 26-29, 1996, NPC/HRTD, Angat GH, Norzagaray, Bulacan · Course On Project Design, October 07-11, 1996, Development Academy Of The Philippines, Pasig City · Public Speaking For Civil Engineers & Construction Monitoring & Control, August 04, 1995, PICE, West Avenue, Quezon City · Comprehensive Computer-Aided Design, Drafting & Color Rendering, January 16–March 01, 1995, MICROCADD Technologies Quezon city · Information Sharing Product Updates & Technology Strategies in Civil Engineering, July 29-30, 1994, Angeles Fried Chicken Restaurant, Balibago, Angeles City · Computer-Aided Structural Analysis & Design for Building Construction, June 28 – August 02, 1994, MICROCADD Technologies, Quezon City · The Effective Supervisor: A Basic Supervisory Course, Northstar Management Examination Passed: 1991 Civil Engineer Licensure Examination Foreign Travel: August 28 – September 13, Operation & Maintenance Of Natural Gas 2001 Pipeline Social Civic Organizations:
  • 7. Roberto S. Guevara Planning Engineer 1991 – Present Philippine Institute Of Civil Engineers National Chapter 1994 – Present Knights of Columbus (4th Degree) Marikina Chapter Special Skills:  Computer Literate (MS Office/AUTOCAD Rel.12/Primavera)  Knowledge in Primavera Ver 6.1 and 3.0 and MS Project 2007  Drafting, Civil Planning & Design  Operation & Maintenance of Gas Facility  Troubleshooting  And other related Civil, Mechanical, Electrical & Inst. works Character References: · Grace Gepes Principal Cost Engineer WorleyParsons Abu Dhabi Mobile # +971508271779 · Renante Tactaquin Lead Planning Engineer – Chiyoda Almana Engineering Mobile No. +97455355895 · Florida. D. Cornejo Division Manager – Industrial Relations Division / HRD National Power Corporation Tel No. (02)-9245304 · Rolando. G. Amiscaray Department Manager – IPP Contracts Management Department National Power Corporation Tel No. (02)-9224036