Smart Grid, Smart City
Distributed generation and storage trials
Robert Simpson, Ausgrid
26 November 2013
Smart Utilities Australia & New Zealand 2013
• $100 million Australian Government Initiative – Dept. of
Resources, Energy & Tourism
• Consortium led by Ausgrid with partners including IBM, GE
Australia, CSIRO, Transgrid, Gridnet, City of Newcastle, City of
Lake Macquarie, Hunter Water, Sydney Water, University of
Newcastle, University of Sydney
• Late 2010 to September 2013
• Project Streams
• Customer Applications
• Electric Vehicles
• Grid Applications
• Distributed Generation
and Storage
The Smart Grid Smart City project
2
• What is Distributed Generation and Distributed Storage?
• Trial objectives and overview
• Trial areas and technology overview
• Results from solar PV and wind trials
• Results from gas fuel cell trials
• Results from battery storage trials
• Lessons learnt
Overview
3
Distributed Generation
 Can generate electricity at small scale
 Connected to the electricity grid at the customer end
 Examples - PV arrays (solar panels), small wind turbines, fuel cells
 May be installed at customer premises or connected directly to the network
Distributed Storage
 Can store energy (rechargeable batteries)
 Connected to the electricity grid at the customer end
 Have controllable charge and discharge ability
 May be installed at customer premises or within the network
Related benefits, impacts and challenges = Energy Resource Management (ERM)
What is distributed generation & distributed storage?
4
Solar photovoltaic system penetration
-
2,000
4,000
6,000
8,000
10,000
12,000
-
20.0
40.0
60.0
80.0
100.0
120.0
140.0
160.0
180.0
Feb-09
Apr-09
Jun-09
Aug-09
Oct-09
Dec-09
Feb-10
Apr-10
Jun-10
Aug-10
Oct-10
Dec-10
Feb-11
Apr-11
Jun-11
Aug-11
Oct-11
Dec-11
Feb-12
Apr-12
Jun-12
Aug-12
Oct-12
Dec-12
Feb-13
Apr-13
Jun-13
Aug-13
Monthlyinstalledcapacity(kWp)
Totalsolarpanelcapacity(MW)
Ausgrid solar PV trends (2009 to Sep 2013)
Monthly installed capacity (kW)
Total Panel Capacity (MW)
End of NSW SBS
scheme (FiT)
End of Federal
solar credits
Australian Statistics (4 November 2013)
>1,132,000 solar PV systems
>2,976,000 kWp
~6.6 million houses
(Sources, Clean Energy Regulator and ABS Census 2011)
5
One-way electricity flow
Network considerations for high DG penetration
Two way electricity flow, low
penetration
Two way electricity flow, high
penetration
6
Trial overview
8
Three trial environments
1. “Suburban Saturation” - Newington
• PV repair campaign completed
• Data capture via Smart Meters as deployed
• Grid battery simulations
2. Urban “Smart Future” – Newcastle
• 40 RedFlow battery devices deployed
• 25 BlueGEN devices deployed
• Installation of 2 wind turbines in
commercial/industrial areas
• Actively managing operations, collecting data and
modelling high penetration scenarios
3. Rural “Thin Grid” - Scone (Upper Gundy)
• 20 RedFlow battery devices deployed
• 8 wind turbines commissioned
• Collecting data
Distributed Generation and Distributed Storage trial areas
9
1
2
3
Overview of DGDS technologies trialled
Trial Area Solar PV Small wind Fuel cells Batteries
kW No kW No kW No kW No
Sydney (Newington) 1022 1104 1.5 1 5 1
Newcastle (Elermore Vale) 315 138 4.8 2 37.5 25 200 40
Scone (Upper Gundy) 15 2 19.2 8 100 20
10
Sydney trial area (Newington)
Suburbs Newington
Zone Substation Homebush Bay
Feeder Panel 13
Feeder peak load 3.59MW
Customers (NMIs) ~1,800
Network type Underground
Total LV
transformers
9 kiosks
Network monitoring
(LV transformers)
9 kiosks
Smart meters ~240
Advanced meters 37
•Almost every house with solar PV (1kW or 0.5kW)
•High density, ~60% townhouses, 40% apartments
•Suburb built for 2000 Olympics Athlete Village
•PV repair campaign indicated around 20 to 25%
of systems not working
11
Newcastle trial area (Elermore Vale/ Wallsend South)
Trial Area Newcastle
Trial area (main
suburbs)
Elermore Vale,
Wallsend South
Zone Substation Jesmond
Feeder 80784
Feeder peak load 5.35MW
Customers (NMIs) ~1,800
Network type Overhead /
underground
Total LV transformers 17 pole top
6 kiosks
Network monitoring
(transformers)
4 pole top
3 kiosks
Smart meters ~290
Advanced meters 91
12
Scone trial area (Upper Gundy)
Trial Area Scone
Trial area (suburb) Upper Gundy
Zone Substation Scone
Feeder/ section 89062/ Miranee
Rd
Peak load 2.68MW/120 kW
Customers (NMIs) 31
Network type Overhead HV
Total LV transformers 24 pole top
Network monitoring Miranee Rd
recloser
Advanced meters 48
Recloser
13
Distributed Generation – Uncontrollable renewable sources
Solar Photovoltaics
 Typically systems <10kW on residential roofs
 Mature technology
 Established installation and connection
policies and procedures
Small wind turbines
 Very low penetration
 More suitable for rural areas
 10 x 2.4kW rated, tail-less small wind
turbines
14
High penetration solar PV - Newington (clear solar)
0
200
400
600
800
1000
1200
1400
1600
0:00
0:40
1:20
2:00
2:40
3:20
4:00
4:40
5:20
6:00
6:40
7:20
8:00
8:40
9:20
10:10
10:50
11:30
12:10
12:50
13:30
14:10
14:50
15:30
16:10
16:50
17:30
18:10
18:50
19:30
20:10
20:50
21:30
22:10
22:50
23:30
11kVfeederload(kVA)
TIME (AEST) on 30/09/2012
11kV feeder load (~1MWp and 60% of customers)
Average load (10 mins)
Minimum load (10 mins)
Maximum load (10 mins)
15
High penetration solar PV - Newington (intermittent solar)
0
200
400
600
800
1000
1200
1400
1600
0:00
0:40
1:20
2:00
2:40
3:20
4:00
4:40
5:20
6:00
6:40
7:20
8:00
8:40
9:20
10:10
10:50
11:30
12:10
12:50
13:30
14:10
14:50
15:30
16:10
16:50
17:30
18:10
18:50
19:30
20:10
20:50
21:30
22:10
22:50
23:30
11kVfeederload(kVA)
TIME (AEST) on 29/09/2012
11kV feeder load (~1MWp and 60% of customers)
Average load (10 mins)
Minimum load (10 mins)
Maximum load (10 mins)
16
Wind turbine – highly intermittent power
17
Effect on low voltage network of high penetration DGDS
Elermore Vale, Close St
transformer
•Measurement of low voltage
phase at the transformer and
end of distributor
•Reverse power flow through
pole top transformer
•Within 1st/99th percentile
voltage ranges (230v +10%, -
6%) but close to limits at the
end of the line
18
Using the smart grid for voltage management
•Elermore Vale, Kerry Avenue transformer, high penetration of batteries
•Voltage ranges before and after transformer tap changes
19
Distributed Generation – Controllable gas fuel cells
Solid oxide fuel cell
 Runs on natural gas supply
 Electrical output can be modulated (0.5-1.5kW)
 Size of dishwasher
 Requires natural gas, water, electricity and
communications systems
Cogeneration system
 Waste heat recovery system
 Domestic hot water tank
 Gas instant hot water booster
 Improves overall system efficiency
20
• BlueGen net used to
control operation on a
scheduled basis
Electrical efficiency
• At 1.5kW, ~53%
• Modulating 0.5-1.5kW,
~40%
• At 0.5kW, ~36%
Modulating power output – efficiency effects
21
Fuel cell generation vs household consumption
-2
-1
0
1
2
3
4
0:30
1:30
2:30
3:30
4:30
5:30
6:30
7:30
8:30
9:30
10:30
11:30
12:30
13:30
14:30
15:30
16:30
17:30
18:30
19:30
20:30
21:30
22:30
23:30
AveragePower(kWper30mins)
Effect of fuel cell operation on household consumption
Household profile
Constant 1.5kW power
Modulated to 1.5kW (2pm-10pm)
•Typical average residential customer in Newcastle LGA, ~15kWh/day
•Gas fuel cell trialled capable of generating 36kWh/day (1.5kW power 24/7)
•Graph of participant usage ~28kWh/day summer average (40kWh on day shown)
22
Waste heat capture and hot water usage patterns
Waste heat recovery highly dependent on customer hot water usage patterns.
On average ~8 to 10% extra system efficiency.
24
Distributed Storage – customer versus grid
Customer Battery Storage
 Generates 5kW output up to 2 hours
 Weighs close to 500kg
 Roughly the size of a narrow household fridge
 Connected at the meter board
 Zinc Bromine flow battery
Grid Battery Storage
 Storage size 60kW for 2 hours
 120kWh Lithium Ion batteries
 Size of a 20 ft container
 Directly connected to the local network
25
Battery performance – summer peak day 5 (full power)
-200
-150
-100
-50
0
50
100
12:00
AM
1:00
AM
2:00
AM
3:00
AM
4:00
AM
5:00
AM
6:00
AM
7:00
AM
8:00
AM
9:00
AM
10:00
AM
11:00
AM
12:00
PM
1:00
PM
2:00
PM
3:00
PM
4:00
PM
5:00
PM
6:00
PM
7:00
PM
8:00
PM
9:00
PM
10:00
PM
11:00
PM
AverageActivePower(kW)
ElermoreVale Battery Performance(40 batteries) - 30 November 2012
Actual performance
Ideal performance
26
Battery performance – summer peak day 1 (half power)
-200
-150
-100
-50
0
50
100
12:00
AM
1:00
AM
2:00
AM
3:00
AM
4:00
AM
5:00
AM
6:00
AM
7:00
AM
8:00
AM
9:00
AM
10:00
AM
11:00
AM
12:00
PM
1:00
PM
2:00
PM
3:00
PM
4:00
PM
5:00
PM
6:00
PM
7:00
PM
8:00
PM
9:00
PM
10:00
PM
11:00
PM
AverageActivePower(kW)
ElermoreVale Battery Performance(40 batteries) - 18 January 2013
Actual performance
Ideal performance
27
Summer peak reduction
-
1,000
2,000
3,000
4,000
5,000
6,000
12:00
AM
1:00
AM
2:00
AM
3:00
AM
4:00
AM
5:00
AM
6:00
AM
7:00
AM
8:00
AM
9:00
AM
10:00
AM
11:00
AM
12:00
PM
1:00
PM
2:00
PM
3:00
PM
4:00
PM
5:00
PM
6:00
PM
7:00
PM
8:00
PM
9:00
PM
10:00
PM
11:00
PM
AverageActivePower(kW)
Peakreduction effectof batteries on Jesmond feeder load: 18 January 2013
Estimated feeder Load (no batteries)
Actualfeeder load (with actual battery operation)
Estimated feeder load (ideal battery operation)
Actual (half power): 0.4% (24kW)
Ideal (half power): 1.7% (91kW)
Theoretical (full power) : 3.7%
(200kW)
28
Load reductions in rural environment (non-peak day)
0
10
20
30
40
50
60
70
80
90
100
0
10
20
30
40
50
60
70
80
90
100
12:00 AM 04:00 AM 08:00 AM 12:00 PM 04:00 PM 08:00 PM 12:00 AM
FeederCurrent(A)
Power(kW)
July 11 to 13 average time of day
Feeder current
calculated recloser power without batteries
measured recloser power with batteries
29
Individual household – no DGDS
-3
-2
-1
0
1
2
3
4
0:15
0:45
1:15
1:45
2:15
2:45
3:15
3:45
4:15
4:45
5:15
5:45
6:15
6:45
7:15
7:45
8:15
8:45
9:15
9:45
10:15
10:45
11:15
11:45
12:15
12:45
13:15
13:45
14:15
14:45
15:15
15:45
16:15
16:45
17:15
17:45
18:15
18:45
19:15
19:45
20:15
20:45
21:15
21:45
22:15
22:45
23:15
23:45
AveragekWinahalfhour
House load Newington Feeder (,000 kW)
Evening peak
30
Individual household – with DGDS (load matching)
-3
-2
-1
0
1
2
3
4
0:15
0:45
1:15
1:45
2:15
2:45
3:15
3:45
4:15
4:45
5:15
5:45
6:15
6:45
7:15
7:45
8:15
8:45
9:15
9:45
10:15
10:45
11:15
11:45
12:15
12:45
13:15
13:45
14:15
14:45
15:15
15:45
16:15
16:45
17:15
17:45
18:15
18:45
19:15
19:45
20:15
20:45
21:15
21:45
22:15
22:45
23:15
23:45
AveragekWinahalfhour
House load Import from grid
Export to grid Newington Feeder (,000 kW)
Battery charging Battery in load matching
Battery discharge and
stripping
Exporting during
peak times
31
• High penetration studies (Solar PV and wind)
• Key issues are voltage impacts & potential to change load profiles
• Impacts determined by network characteristics and settings (not just penetration)
• Small wind is restricted mainly to rural locations & has high output variability
• Rural (thin) networks more influenced by high penetrations
• Fuel cells
– Operation is more suited to customers with high consumption and base load
– Additional efficiency from waste heat capture is dependent on heating load
characteristics
• Battery storage
– Distributed batteries can be controlled and utilised to reduce network peaks
– Battery operation, performance and key parameters are important in assessing
suitability (eg. kWh/kW ratio)
– Advanced battery management/operation functions allow greater customer benefits
• Smart grid
– Network monitoring can assist in voltage management (including meters/devices)
– Standard control interfaces on DGDS may assist in dual benefits for customers and
networks (AS4755 & AS4777)
Lessons learnt
32
Questions?
Find out more
www.smartgridsmartcity.com.au
Trial outcomes can also be found at the Information Clearing House
https://ich.smartgridsmartcity.com.au/
33

Weitere ähnliche Inhalte

Was ist angesagt?

Specification grid tie_spv_plant
Specification grid tie_spv_plantSpecification grid tie_spv_plant
Specification grid tie_spv_plantJay Ranvir
 
Grid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at siliconGrid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at siliconNavneet Das
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantShahbaz Makandar A.
 
Renewable energy.pptx my presentation
Renewable energy.pptx my presentationRenewable energy.pptx my presentation
Renewable energy.pptx my presentationshaik maheboob sab
 
Stand-alone (off-grid) isolated ac mini-grid system
Stand-alone (off-grid) isolated ac mini-grid systemStand-alone (off-grid) isolated ac mini-grid system
Stand-alone (off-grid) isolated ac mini-grid systemAnelion Smart Power
 
Smart buildings lecture for Aalto Pro
Smart buildings lecture for Aalto ProSmart buildings lecture for Aalto Pro
Smart buildings lecture for Aalto ProKen Dooley
 
Dhaka | Aug-15 | Solar mini-grids in Bangladesh – Opportunities & Challenges
Dhaka | Aug-15 | Solar mini-grids in Bangladesh – Opportunities & ChallengesDhaka | Aug-15 | Solar mini-grids in Bangladesh – Opportunities & Challenges
Dhaka | Aug-15 | Solar mini-grids in Bangladesh – Opportunities & Challenges Smart Villages
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...Smart Villages
 
Mini grid design manual
Mini grid design manualMini grid design manual
Mini grid design manualSolarReference
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installationAmitesh Kumar
 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales solpowerpeople
 
Case Study - NCC Sportsground 2
Case Study - NCC Sportsground 2Case Study - NCC Sportsground 2
Case Study - NCC Sportsground 2Andrew Mears
 
Energy trading in microgrids and managment system
Energy trading in microgrids and managment systemEnergy trading in microgrids and managment system
Energy trading in microgrids and managment systemmuhammad yousaf khan
 
Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia
Steven-Nethery-Technical-Sales-Manager-Goldwind-AustraliaSteven-Nethery-Technical-Sales-Manager-Goldwind-Australia
Steven-Nethery-Technical-Sales-Manager-Goldwind-Australiagoldwindaus
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantL'Obel Solar Power System
 

Was ist angesagt? (20)

Specification grid tie_spv_plant
Specification grid tie_spv_plantSpecification grid tie_spv_plant
Specification grid tie_spv_plant
 
Grid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at siliconGrid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at silicon
 
roof top solar
roof top solarroof top solar
roof top solar
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Renewable energy.pptx my presentation
Renewable energy.pptx my presentationRenewable energy.pptx my presentation
Renewable energy.pptx my presentation
 
Stand-alone (off-grid) isolated ac mini-grid system
Stand-alone (off-grid) isolated ac mini-grid systemStand-alone (off-grid) isolated ac mini-grid system
Stand-alone (off-grid) isolated ac mini-grid system
 
Smart buildings lecture for Aalto Pro
Smart buildings lecture for Aalto ProSmart buildings lecture for Aalto Pro
Smart buildings lecture for Aalto Pro
 
Dhaka | Aug-15 | Solar mini-grids in Bangladesh – Opportunities & Challenges
Dhaka | Aug-15 | Solar mini-grids in Bangladesh – Opportunities & ChallengesDhaka | Aug-15 | Solar mini-grids in Bangladesh – Opportunities & Challenges
Dhaka | Aug-15 | Solar mini-grids in Bangladesh – Opportunities & Challenges
 
Indian pv-potential
Indian pv-potentialIndian pv-potential
Indian pv-potential
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
 
Mini grid design manual
Mini grid design manualMini grid design manual
Mini grid design manual
 
Iceeot
IceeotIceeot
Iceeot
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
 
Case Study - NCC Sportsground 2
Case Study - NCC Sportsground 2Case Study - NCC Sportsground 2
Case Study - NCC Sportsground 2
 
Energy trading in microgrids and managment system
Energy trading in microgrids and managment systemEnergy trading in microgrids and managment system
Energy trading in microgrids and managment system
 
Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia
Steven-Nethery-Technical-Sales-Manager-Goldwind-AustraliaSteven-Nethery-Technical-Sales-Manager-Goldwind-Australia
Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia
 
Solar Development In India
Solar Development In IndiaSolar Development In India
Solar Development In India
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 

Ähnlich wie Smart Utilities 2013 - SGSC DGDS

Technology Trialing - TransGrid's 2014 Demand Management Innovation Forum
Technology Trialing - TransGrid's 2014 Demand Management Innovation ForumTechnology Trialing - TransGrid's 2014 Demand Management Innovation Forum
Technology Trialing - TransGrid's 2014 Demand Management Innovation ForumTransGrid AU
 
Montecito Community Microgrid: Renewables-driven resilience for critical faci...
Montecito Community Microgrid: Renewables-driven resilience for critical faci...Montecito Community Microgrid: Renewables-driven resilience for critical faci...
Montecito Community Microgrid: Renewables-driven resilience for critical faci...Clean Coalition
 
Operational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaOperational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaSmarter Grid Solutions
 
Integrating Multiple Microgrids into an Active Network Management System
Integrating Multiple Microgrids into an Active Network Management SystemIntegrating Multiple Microgrids into an Active Network Management System
Integrating Multiple Microgrids into an Active Network Management SystemSmarter Grid Solutions
 
5.5 off main-grid technologies for power generation in rural contexts
5.5 off main-grid technologies for power generation in rural contexts5.5 off main-grid technologies for power generation in rural contexts
5.5 off main-grid technologies for power generation in rural contextsLeNS_slide
 
Engineering the power system of the future
Engineering the power system of the futureEngineering the power system of the future
Engineering the power system of the futureemmaroche
 
Energy Storage - 11: Davy Theophile, Alstom
Energy Storage - 11: Davy Theophile, AlstomEnergy Storage - 11: Davy Theophile, Alstom
Energy Storage - 11: Davy Theophile, AlstomBritish Embassy Paris
 
How to Deploy Energy Storage Technology at the Enterprise Level – Case Study
How to Deploy Energy Storage Technology at the Enterprise Level – Case StudyHow to Deploy Energy Storage Technology at the Enterprise Level – Case Study
How to Deploy Energy Storage Technology at the Enterprise Level – Case StudyEMEX
 
Off-grid Renewable Energy Technologies and Products
Off-grid Renewable Energy Technologies and ProductsOff-grid Renewable Energy Technologies and Products
Off-grid Renewable Energy Technologies and ProductsAnirudh Ramesh
 
Singapore Smart Grid From Concept to Reality Slides.pdf
Singapore Smart Grid From Concept to Reality Slides.pdfSingapore Smart Grid From Concept to Reality Slides.pdf
Singapore Smart Grid From Concept to Reality Slides.pdfPohLianLam1
 
Presentation to the Australian Energy Week Conference June 2017
Presentation to the Australian Energy Week Conference June 2017Presentation to the Australian Energy Week Conference June 2017
Presentation to the Australian Energy Week Conference June 2017Frank Tudor
 
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptxPOWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptxmasterunedo
 

Ähnlich wie Smart Utilities 2013 - SGSC DGDS (20)

Technology Trialing - TransGrid's 2014 Demand Management Innovation Forum
Technology Trialing - TransGrid's 2014 Demand Management Innovation ForumTechnology Trialing - TransGrid's 2014 Demand Management Innovation Forum
Technology Trialing - TransGrid's 2014 Demand Management Innovation Forum
 
Montecito Community Microgrid: Renewables-driven resilience for critical faci...
Montecito Community Microgrid: Renewables-driven resilience for critical faci...Montecito Community Microgrid: Renewables-driven resilience for critical faci...
Montecito Community Microgrid: Renewables-driven resilience for critical faci...
 
Operational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaOperational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and America
 
Energy Storage solutions
Energy Storage solutionsEnergy Storage solutions
Energy Storage solutions
 
Integrating Multiple Microgrids into an Active Network Management System
Integrating Multiple Microgrids into an Active Network Management SystemIntegrating Multiple Microgrids into an Active Network Management System
Integrating Multiple Microgrids into an Active Network Management System
 
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
 
Power systems (1)
Power systems (1)Power systems (1)
Power systems (1)
 
5.5 off main-grid technologies for power generation in rural contexts
5.5 off main-grid technologies for power generation in rural contexts5.5 off main-grid technologies for power generation in rural contexts
5.5 off main-grid technologies for power generation in rural contexts
 
Engineering the power system of the future
Engineering the power system of the futureEngineering the power system of the future
Engineering the power system of the future
 
Energy Storage - 11: Davy Theophile, Alstom
Energy Storage - 11: Davy Theophile, AlstomEnergy Storage - 11: Davy Theophile, Alstom
Energy Storage - 11: Davy Theophile, Alstom
 
How to Deploy Energy Storage Technology at the Enterprise Level – Case Study
How to Deploy Energy Storage Technology at the Enterprise Level – Case StudyHow to Deploy Energy Storage Technology at the Enterprise Level – Case Study
How to Deploy Energy Storage Technology at the Enterprise Level – Case Study
 
Power systems (2)
Power systems (2)Power systems (2)
Power systems (2)
 
Smart grid
Smart gridSmart grid
Smart grid
 
Off-grid Renewable Energy Technologies and Products
Off-grid Renewable Energy Technologies and ProductsOff-grid Renewable Energy Technologies and Products
Off-grid Renewable Energy Technologies and Products
 
Singapore Smart Grid From Concept to Reality Slides.pdf
Singapore Smart Grid From Concept to Reality Slides.pdfSingapore Smart Grid From Concept to Reality Slides.pdf
Singapore Smart Grid From Concept to Reality Slides.pdf
 
UDC_Solar-Dc
UDC_Solar-DcUDC_Solar-Dc
UDC_Solar-Dc
 
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
 
Presentation to the Australian Energy Week Conference June 2017
Presentation to the Australian Energy Week Conference June 2017Presentation to the Australian Energy Week Conference June 2017
Presentation to the Australian Energy Week Conference June 2017
 
smart grid
smart gridsmart grid
smart grid
 
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptxPOWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
 

Smart Utilities 2013 - SGSC DGDS

  • 1. Smart Grid, Smart City Distributed generation and storage trials Robert Simpson, Ausgrid 26 November 2013 Smart Utilities Australia & New Zealand 2013
  • 2. • $100 million Australian Government Initiative – Dept. of Resources, Energy & Tourism • Consortium led by Ausgrid with partners including IBM, GE Australia, CSIRO, Transgrid, Gridnet, City of Newcastle, City of Lake Macquarie, Hunter Water, Sydney Water, University of Newcastle, University of Sydney • Late 2010 to September 2013 • Project Streams • Customer Applications • Electric Vehicles • Grid Applications • Distributed Generation and Storage The Smart Grid Smart City project 2
  • 3. • What is Distributed Generation and Distributed Storage? • Trial objectives and overview • Trial areas and technology overview • Results from solar PV and wind trials • Results from gas fuel cell trials • Results from battery storage trials • Lessons learnt Overview 3
  • 4. Distributed Generation  Can generate electricity at small scale  Connected to the electricity grid at the customer end  Examples - PV arrays (solar panels), small wind turbines, fuel cells  May be installed at customer premises or connected directly to the network Distributed Storage  Can store energy (rechargeable batteries)  Connected to the electricity grid at the customer end  Have controllable charge and discharge ability  May be installed at customer premises or within the network Related benefits, impacts and challenges = Energy Resource Management (ERM) What is distributed generation & distributed storage? 4
  • 5. Solar photovoltaic system penetration - 2,000 4,000 6,000 8,000 10,000 12,000 - 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 Feb-09 Apr-09 Jun-09 Aug-09 Oct-09 Dec-09 Feb-10 Apr-10 Jun-10 Aug-10 Oct-10 Dec-10 Feb-11 Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Feb-12 Apr-12 Jun-12 Aug-12 Oct-12 Dec-12 Feb-13 Apr-13 Jun-13 Aug-13 Monthlyinstalledcapacity(kWp) Totalsolarpanelcapacity(MW) Ausgrid solar PV trends (2009 to Sep 2013) Monthly installed capacity (kW) Total Panel Capacity (MW) End of NSW SBS scheme (FiT) End of Federal solar credits Australian Statistics (4 November 2013) >1,132,000 solar PV systems >2,976,000 kWp ~6.6 million houses (Sources, Clean Energy Regulator and ABS Census 2011) 5
  • 6. One-way electricity flow Network considerations for high DG penetration Two way electricity flow, low penetration Two way electricity flow, high penetration 6
  • 8. Three trial environments 1. “Suburban Saturation” - Newington • PV repair campaign completed • Data capture via Smart Meters as deployed • Grid battery simulations 2. Urban “Smart Future” – Newcastle • 40 RedFlow battery devices deployed • 25 BlueGEN devices deployed • Installation of 2 wind turbines in commercial/industrial areas • Actively managing operations, collecting data and modelling high penetration scenarios 3. Rural “Thin Grid” - Scone (Upper Gundy) • 20 RedFlow battery devices deployed • 8 wind turbines commissioned • Collecting data Distributed Generation and Distributed Storage trial areas 9 1 2 3
  • 9. Overview of DGDS technologies trialled Trial Area Solar PV Small wind Fuel cells Batteries kW No kW No kW No kW No Sydney (Newington) 1022 1104 1.5 1 5 1 Newcastle (Elermore Vale) 315 138 4.8 2 37.5 25 200 40 Scone (Upper Gundy) 15 2 19.2 8 100 20 10
  • 10. Sydney trial area (Newington) Suburbs Newington Zone Substation Homebush Bay Feeder Panel 13 Feeder peak load 3.59MW Customers (NMIs) ~1,800 Network type Underground Total LV transformers 9 kiosks Network monitoring (LV transformers) 9 kiosks Smart meters ~240 Advanced meters 37 •Almost every house with solar PV (1kW or 0.5kW) •High density, ~60% townhouses, 40% apartments •Suburb built for 2000 Olympics Athlete Village •PV repair campaign indicated around 20 to 25% of systems not working 11
  • 11. Newcastle trial area (Elermore Vale/ Wallsend South) Trial Area Newcastle Trial area (main suburbs) Elermore Vale, Wallsend South Zone Substation Jesmond Feeder 80784 Feeder peak load 5.35MW Customers (NMIs) ~1,800 Network type Overhead / underground Total LV transformers 17 pole top 6 kiosks Network monitoring (transformers) 4 pole top 3 kiosks Smart meters ~290 Advanced meters 91 12
  • 12. Scone trial area (Upper Gundy) Trial Area Scone Trial area (suburb) Upper Gundy Zone Substation Scone Feeder/ section 89062/ Miranee Rd Peak load 2.68MW/120 kW Customers (NMIs) 31 Network type Overhead HV Total LV transformers 24 pole top Network monitoring Miranee Rd recloser Advanced meters 48 Recloser 13
  • 13. Distributed Generation – Uncontrollable renewable sources Solar Photovoltaics  Typically systems <10kW on residential roofs  Mature technology  Established installation and connection policies and procedures Small wind turbines  Very low penetration  More suitable for rural areas  10 x 2.4kW rated, tail-less small wind turbines 14
  • 14. High penetration solar PV - Newington (clear solar) 0 200 400 600 800 1000 1200 1400 1600 0:00 0:40 1:20 2:00 2:40 3:20 4:00 4:40 5:20 6:00 6:40 7:20 8:00 8:40 9:20 10:10 10:50 11:30 12:10 12:50 13:30 14:10 14:50 15:30 16:10 16:50 17:30 18:10 18:50 19:30 20:10 20:50 21:30 22:10 22:50 23:30 11kVfeederload(kVA) TIME (AEST) on 30/09/2012 11kV feeder load (~1MWp and 60% of customers) Average load (10 mins) Minimum load (10 mins) Maximum load (10 mins) 15
  • 15. High penetration solar PV - Newington (intermittent solar) 0 200 400 600 800 1000 1200 1400 1600 0:00 0:40 1:20 2:00 2:40 3:20 4:00 4:40 5:20 6:00 6:40 7:20 8:00 8:40 9:20 10:10 10:50 11:30 12:10 12:50 13:30 14:10 14:50 15:30 16:10 16:50 17:30 18:10 18:50 19:30 20:10 20:50 21:30 22:10 22:50 23:30 11kVfeederload(kVA) TIME (AEST) on 29/09/2012 11kV feeder load (~1MWp and 60% of customers) Average load (10 mins) Minimum load (10 mins) Maximum load (10 mins) 16
  • 16. Wind turbine – highly intermittent power 17
  • 17. Effect on low voltage network of high penetration DGDS Elermore Vale, Close St transformer •Measurement of low voltage phase at the transformer and end of distributor •Reverse power flow through pole top transformer •Within 1st/99th percentile voltage ranges (230v +10%, - 6%) but close to limits at the end of the line 18
  • 18. Using the smart grid for voltage management •Elermore Vale, Kerry Avenue transformer, high penetration of batteries •Voltage ranges before and after transformer tap changes 19
  • 19. Distributed Generation – Controllable gas fuel cells Solid oxide fuel cell  Runs on natural gas supply  Electrical output can be modulated (0.5-1.5kW)  Size of dishwasher  Requires natural gas, water, electricity and communications systems Cogeneration system  Waste heat recovery system  Domestic hot water tank  Gas instant hot water booster  Improves overall system efficiency 20
  • 20. • BlueGen net used to control operation on a scheduled basis Electrical efficiency • At 1.5kW, ~53% • Modulating 0.5-1.5kW, ~40% • At 0.5kW, ~36% Modulating power output – efficiency effects 21
  • 21. Fuel cell generation vs household consumption -2 -1 0 1 2 3 4 0:30 1:30 2:30 3:30 4:30 5:30 6:30 7:30 8:30 9:30 10:30 11:30 12:30 13:30 14:30 15:30 16:30 17:30 18:30 19:30 20:30 21:30 22:30 23:30 AveragePower(kWper30mins) Effect of fuel cell operation on household consumption Household profile Constant 1.5kW power Modulated to 1.5kW (2pm-10pm) •Typical average residential customer in Newcastle LGA, ~15kWh/day •Gas fuel cell trialled capable of generating 36kWh/day (1.5kW power 24/7) •Graph of participant usage ~28kWh/day summer average (40kWh on day shown) 22
  • 22. Waste heat capture and hot water usage patterns Waste heat recovery highly dependent on customer hot water usage patterns. On average ~8 to 10% extra system efficiency. 24
  • 23. Distributed Storage – customer versus grid Customer Battery Storage  Generates 5kW output up to 2 hours  Weighs close to 500kg  Roughly the size of a narrow household fridge  Connected at the meter board  Zinc Bromine flow battery Grid Battery Storage  Storage size 60kW for 2 hours  120kWh Lithium Ion batteries  Size of a 20 ft container  Directly connected to the local network 25
  • 24. Battery performance – summer peak day 5 (full power) -200 -150 -100 -50 0 50 100 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM AverageActivePower(kW) ElermoreVale Battery Performance(40 batteries) - 30 November 2012 Actual performance Ideal performance 26
  • 25. Battery performance – summer peak day 1 (half power) -200 -150 -100 -50 0 50 100 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM AverageActivePower(kW) ElermoreVale Battery Performance(40 batteries) - 18 January 2013 Actual performance Ideal performance 27
  • 26. Summer peak reduction - 1,000 2,000 3,000 4,000 5,000 6,000 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM AverageActivePower(kW) Peakreduction effectof batteries on Jesmond feeder load: 18 January 2013 Estimated feeder Load (no batteries) Actualfeeder load (with actual battery operation) Estimated feeder load (ideal battery operation) Actual (half power): 0.4% (24kW) Ideal (half power): 1.7% (91kW) Theoretical (full power) : 3.7% (200kW) 28
  • 27. Load reductions in rural environment (non-peak day) 0 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 100 12:00 AM 04:00 AM 08:00 AM 12:00 PM 04:00 PM 08:00 PM 12:00 AM FeederCurrent(A) Power(kW) July 11 to 13 average time of day Feeder current calculated recloser power without batteries measured recloser power with batteries 29
  • 28. Individual household – no DGDS -3 -2 -1 0 1 2 3 4 0:15 0:45 1:15 1:45 2:15 2:45 3:15 3:45 4:15 4:45 5:15 5:45 6:15 6:45 7:15 7:45 8:15 8:45 9:15 9:45 10:15 10:45 11:15 11:45 12:15 12:45 13:15 13:45 14:15 14:45 15:15 15:45 16:15 16:45 17:15 17:45 18:15 18:45 19:15 19:45 20:15 20:45 21:15 21:45 22:15 22:45 23:15 23:45 AveragekWinahalfhour House load Newington Feeder (,000 kW) Evening peak 30
  • 29. Individual household – with DGDS (load matching) -3 -2 -1 0 1 2 3 4 0:15 0:45 1:15 1:45 2:15 2:45 3:15 3:45 4:15 4:45 5:15 5:45 6:15 6:45 7:15 7:45 8:15 8:45 9:15 9:45 10:15 10:45 11:15 11:45 12:15 12:45 13:15 13:45 14:15 14:45 15:15 15:45 16:15 16:45 17:15 17:45 18:15 18:45 19:15 19:45 20:15 20:45 21:15 21:45 22:15 22:45 23:15 23:45 AveragekWinahalfhour House load Import from grid Export to grid Newington Feeder (,000 kW) Battery charging Battery in load matching Battery discharge and stripping Exporting during peak times 31
  • 30. • High penetration studies (Solar PV and wind) • Key issues are voltage impacts & potential to change load profiles • Impacts determined by network characteristics and settings (not just penetration) • Small wind is restricted mainly to rural locations & has high output variability • Rural (thin) networks more influenced by high penetrations • Fuel cells – Operation is more suited to customers with high consumption and base load – Additional efficiency from waste heat capture is dependent on heating load characteristics • Battery storage – Distributed batteries can be controlled and utilised to reduce network peaks – Battery operation, performance and key parameters are important in assessing suitability (eg. kWh/kW ratio) – Advanced battery management/operation functions allow greater customer benefits • Smart grid – Network monitoring can assist in voltage management (including meters/devices) – Standard control interfaces on DGDS may assist in dual benefits for customers and networks (AS4755 & AS4777) Lessons learnt 32
  • 31. Questions? Find out more www.smartgridsmartcity.com.au Trial outcomes can also be found at the Information Clearing House https://ich.smartgridsmartcity.com.au/ 33